Vacuum System DetailsINSTALLATION NOTESInstallation By Others:Installation drawings are provided with each project. Most projects require 2 or more installers and a forklift. Buried pipe, footings and concrete equipment pad(s) should be completed before installing Vacutech systems. J-bolt template kits for footings for vacuum arches and stanchions are available for purchase from Vacutech. Refer to drawings for footing requirements. Changes to vacuum piping, vacuum equipment location, and vacuum equipment enclosure will effect the performance of your system. Changes made to a vacuum system without Vacutech's consultation voids all Vacutech responsibility and the system warranty.Vacutech System Install:Vacutech offers installation as an option when bidding a project. Please note that the scope of Vacutech's installation only includes work above ground. Vacutech will install vacuum arches/stanchions to concrete footings, install vacuum piping and set vacuum equipment in place.Vacutech does not dig trenches, auger footings, dig/backfill/bury pipe or conduit, or provide any work below grade.Vacutech does not pour footings, install J-bolts, install concrete trenches with covers, pour concrete pads, or do concrete work of any kind. Vacutech does not do core drilling through building walls. Vacutech does not wire lights, turbines, disconnects, VFDs , starters or any other electrical component. Vacutech does not pull wire through conduits. These items must be done by a Licensed Electrician.ADDITIONAL NOTESVFD Systems:Instructions for wiring VFD to Turbine and Filter Separator are available for your electrician. After wiring is complete, call our customer service to complete programming.Arch Systems: How Awnings are ordered (Cooloroo/Weblon)Step 1:Arches are to be completely installed on site.Step 2:After installation, Vacutech will send an awning measurement form to be filled out with instructions on how and where to measure. The awning form must be filled out entirely, signed, dated, and faxed or emailed to Vacutech for production.Step 3:Awnings are shipped to site w/ instructions.Maintenance:System longevity under continuous operation is extended by regular maintenance. Issues commonly result from failure to remove obstructions in the piping system, replace damaged or worn parts, or not regularly changing filter bags. Refer to Vacutech maintenance instructionsAssign a person to central vacuum maintenance:To ensure continued trouble free central vacuum system operation and to avoid downtime during periods of heavy use, assign an employee to follow a strict maintenance schedule. Refer to Vacutech recommended maintenance schedule.WARRANTY NOTESCHANGES MADE TO VACUUM SYSTEM WITHOUT VACUTECH CONSULTATION VOIDS ALL VACUTECH RESPONSIBILITY AND SYSTEM WARRANTYEquipment warranty information:(if applicable)When vacuum equipment is installed in an enclosure with 4 walls and a roof it must be ventilated. Enclosure door must be louvered and an exhaust fan with thermostat set at 85°f must be installed to turn over air every 15 min. Vacuum turbine must be exhausted outside with metallic pipe no smaller than 6" with exhaust pipe opening protected from elements. Equipment pad must be flat and level.Variable frequency drive (VFD) warranty information:(if applicable)VFDs must be wired from main distribution panel in separate conduit (sized per code; based on turbine H.P. and voltage) to each VFD and from each VFD to turbine motor.A separate conduit, sized per code, must also be installed from VFD to vacuum pressure transducer installed on filter separator. If two (2) or more VFD's are installed in one (1) enclosure, a separate conduit must be installed for each VFD. Install separate conduit from enclosure to each turbine motor, and each filter separator if there is more than one (1).PIPE NOTESPiping systems above groundPiping system shall be schedule 40 (or sch 80) solid core PVC or ABS plastic pipe, with plastic D.W.V. (drain, waste and vent) fittings. Zinc, aluminum, or galvanized tubing, with directional flow zinc fittings of no less than 16 gauge, designed specifically for central vacuum systems are also acceptable. Buried piping systems cast iron no-hubIn-ground piping systems that are subject to ground freeze/thaw conditions or excessive movement shall be cast iron with no-hub fittings and no-hub couplings (w/ stainless steel band).Buried piping systems PVC sch 40 (or sch 80)In-ground piping systems using PVC pipe shall be sch 40 (or sch 80) solid core, with PVC D.W.V.(drain, waste, and vent) fittings. Plastic pipe installed in-ground have a potential of possible cracking and wear. All plastic pipe systems in-ground must be below freeze line.System notes: All interior surfaces shall be free of burrs and obstructions for a non-restrictive air flow.ABS and PVC piping shall be cut straight and removed of burrs. Piping shall be attached together using a primer, and a cement (clear PVC cement for PVC/ black abs cement for abs) for a 100% tight seal.Overhead piping systems shall be supported by means of approved pipe hangers, and shall be installed at a maximum of six feet O.C. when using abs or PVC pipe and ten feet when using zinc or aluminum tubing. All fittings supporting vacuum drop/hose assemblies shall be supported with within one foot on each side of fitting connection.Piping systems shall be tested to hold 10 psi for a minimum of 24 hours.When vacuum system is installed in potentially explosive environment, the following may be required as a minimum: Explosion proof motor Class I -Group D & Class II -Group E, F & G. Aluminum piping with zinc fittings. Primary and filtered separators and hose assemblies require special grounding. Verify all conditions.PVC and ABS plastic pipe are not U.V. rated and will discolor and soften/cause bowing when exposed to direct sunlight. It is recommended that all exposed plastic pipe and fittings be primed and painted to help prevent this. It is recommended to use zinc, or aluminum tubing and zinc fittings be used when exposed to sun.Plastic pipe exposed to elements:PVC pipe will become brittle at 40° f and can crack/split when moving debris collides with it, it is recommended to use cast iron, zinc, or aluminum tubing for colder conditions.GENERAL NOTESPreliminary Drawings:Preliminary drawings may be provided with a quote to indicate the location of vacuum equipment, piping, and hoses. Drawings may be used in direct coordination with Architects' and Engineers' plans for city/AHJ/client approval. Accurate and complete site plans must be provided to ensure the quality of your vacuum area to coordinate issues such as vacuum parking space width/angle, traffic flow, and hose reach.Drawings are preliminary until the final system order is signed by the client.Changes made to a vacuum system without Vacutech's consultation voids all Vacutech responsibility as well as the system warranty.Project NumberDateDrawn ByChecked ByTHIS PRELIMINARY DRAWING IS THE PROPERTY OF VACUTECH AND IS NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WITHOUT WRITTEN CONSENT. WRITTEN CONSENT MAY NOTBE PROVIDED BY ANYPERSON, AGENCY, OR DEALER NOT AUTHORIZED BY VACUTECH.*THIS DRAWING IS PRELIMINARY AND NOT TO BE USED FOR CONSTRUCTION*1350 HI-TECH DRIVESHERIDAN, WY 82801PHONE: (307) 675-1982EMAIL: info@vacutechllc.comWEB: www.vacutechllc.com7/2/2021 12:17:27 PMV001COVER SHEET100776GLOVERVILLESOUTH KINGSBORO ROADGLOVERVILLE , NEW YORK 120787/2/21MLMBSHEET INDEXNO. NAME REV.V001 COVER SHEETV101 OVERALL SITE PLANV111 VACUUM SITE PLANV121 VACUUM SITE ISOMETRICElevation: 820' ASL# Revision By Chk Date AREA B -8 SPACESAREA A -7 SPACESCAR WASH BUILDING126' - 0"120' - 0"Project NumberDateDrawn ByChecked ByTHIS PRELIMINARY DRAWING IS THE PROPERTY OF VACUTECH AND IS NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WITHOUT WRITTEN CONSENT. WRITTEN CONSENT MAY NOTBE PROVIDED BY ANYPERSON, AGENCY, OR DEALER NOT AUTHORIZED BY VACUTECH.*THIS DRAWING IS PRELIMINARY AND NOT TO BE USED FOR CONSTRUCTION*1350 HI-TECH DRIVESHERIDAN, WY 82801PHONE: (307) 675-1982EMAIL: info@vacutechllc.comWEB: www.vacutechllc.com7/2/2021 12:17:33 PMV101OVERALL SITE PLAN100776GLOVERVILLESOUTH KINGSBORO ROADGLOVERVILLE , NEW YORK 120787/2/21MLMB1OVERALL SITE PLAN# Revision By Chk DateCONSTRUCTION NOTESGENERAL NOTES:a. ALL DIMENSIONS TO BE FIELD VERIFIED BY OWNERb. IF VACUUM EQUIPMENT IS ENCLOSED WITH ROOF/CEILING, REFER TO VENTILATION REQUIREMENTS UNDER EQUIPMENT WARRANTY INFORMATIONc. PIER DESIGN AND REINFORCEMENT FOR CONCEPTUAL USE ONLY. CONSULT STRUCTURAL ENGINEER IN YOUR AREA FOR SPECIFIC DESIGN CRITERIA. d. COMPLY WITH ALL STATE/ COUNTY BUILDING CODES IN YOUR AREAEQUIPMENT & MATERIAL:a. WALL PENETRATION: CORE DRILLING MAY BE REQUIRED FIELD VERIFY HEIGHTb. 21'Lx5'Wx4"H MINIMUM FLAT AND LEVEL CONCRETE FLOOR SPACE REQUIRED FOR VACUUM EQUIPMENTVACUUM & PLUMBING:a. ALL FITTINGS TO BE 'DWV' A1A2A3A4A5A6A7B1B2B3B4B5B6B7B812' - 0"12' - 0"12' - 0"18' - 0"90°90°12' - 0"12' - 0"12' - 0"18' - 0"12345621' - 0"5' - 0"Project NumberDateDrawn ByChecked ByTHIS PRELIMINARY DRAWING IS THE PROPERTY OF VACUTECH AND IS NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WITHOUT WRITTEN CONSENT. WRITTEN CONSENT MAY NOTBE PROVIDED BY ANYPERSON, AGENCY, OR DEALER NOT AUTHORIZED BY VACUTECH.*THIS DRAWING IS PRELIMINARY AND NOT TO BE USED FOR CONSTRUCTION*1350 HI-TECH DRIVESHERIDAN, WY 82801PHONE: (307) 675-1982EMAIL: info@vacutechllc.comWEB: www.vacutechllc.com7/2/2021 12:17:38 PMV111VACUUM SITE PLAN100776GLOVERVILLESOUTH KINGSBORO ROADGLOVERVILLE , NEW YORK 120787/2/21MLMB1SITE PLANSITE PLANITEM DESCRIPTION1 SINGLE USER PALM ARCH AT ENDS OF VACUUM SPACES2 DUAL USER PALM ARCH BETWEEN VACUUM SPACES3 6" OVERHEAD ALUMINUM VACUUM TUBE BETWEEN ARCHES4 6" SCH. 40 SOLID CORE PVC BURIED PRIMARY VACUUM PIPE (BY OTHERS)5 6" SCH. 40 SOLID CORE PVC BURIED BACK-UP VACUUM PIPE (BY OTHERS)6 15' HOSE REACH# Revision By Chk DateVACUUM AREA AQTYITEM2 SINGLE USER PALM ARCH6 DUAL USER PALM ARCH7 CLAW VACUUM TOOL & HOLDER7 CREVICE VACUUM TOOL & HOLDER7 CLAW TOOL EXTENSION BRACKET14 1-1/2"x15' VACUUM HOSE8 17" MAT RACK8 30 GALLON WASTE RECEPTACLE8 8' LED LIGHT (BY OTHERS)VACUUM EQUIPMENTQTYITEM2 50HP T4 DIRECT DRIVE TURBINE2 8" T4 OUTDOOR EXHAUST SILENCER1 45x96 FILTER SEPARATOR1 3" PRESSURE RELIEF VALVE1 96"-140" ADJUSTABLE OVERHEAD PIPE SUPPORTVACUUM AREA BQTYITEM2 SINGLE USER PALM ARCH7 DUAL USER PALM ARCH8 CLAW VACUUM TOOL & HOLDER8 CREVICE VACUUM TOOL & HOLDER8 CLAW TOOL EXTENSION BRACKET16 1-1/2"x15' VACUUM HOSE9 17" MAT RACK9 30 GALLON WASTE RECEPTACLE9 8' LED LIGHT (BY OTHERS) 1234567Project NumberDateDrawn ByChecked ByTHIS PRELIMINARY DRAWING IS THE PROPERTY OF VACUTECH AND IS NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WITHOUT WRITTEN CONSENT. WRITTEN CONSENT MAY NOTBE PROVIDED BY ANYPERSON, AGENCY, OR DEALER NOT AUTHORIZED BY VACUTECH.*THIS DRAWING IS PRELIMINARY AND NOT TO BE USED FOR CONSTRUCTION*1350 HI-TECH DRIVESHERIDAN, WY 82801PHONE: (307) 675-1982EMAIL: info@vacutechllc.comWEB: www.vacutechllc.com7/2/2021 12:17:45 PMV121VACUUM SITE ISOMETRIC100776GLOVERVILLESOUTH KINGSBORO ROADGLOVERVILLE , NEW YORK 120787/2/21MLMB1SITE ISOMETRICSITE ISOMETRICITEM DESCRIPTION1 SINGLE USER PALM ARCH AT ENDS OF VACUUM SPACES2 DUAL USER PALM ARCH BETWEEN VACUUM SPACES3 6" OVERHEAD ALUMINUM VACUUM TUBE BETWEEN ARCHES4 6" SCH. 40 SOLID CORE PVC BURIED PRIMARY VACUUM PIPE (BY OTHERS)5 6" SCH. 40 SOLID CORE PVC BURIED BACK-UP VACUUM PIPE (BY OTHERS)6 6" CLEAN-OUT (TYP.)7 OVERHEAD PIPE SUPPORT# Revision By Chk Date