Loading...
RC-0199-2021 Office Use Only ADDITION/ALTERATION PERMIT Permit#: Z.— 0 10(cl- 2-Q2.1 4qI APPLICATION Permit Fee:$ 2.21 Town of,Qeensbury 742 Bay Road,Queensbury,NY 12804 Invoice#: P:518-761-8256 www.aueensbury.net � Flood Zone? Y Reviewed By: Project Location: 527 Luzerne Rd., Queensbury Tax Map ID#: 308.1072-11 Subdivision Name: D E C JE APR 0 7 2021 PROJECT INFORMATION: TOWN Of QUEEN ;FJRY qSUILDfNIG CODES TYPE: © Residential ❑ Commercial, Proposed Use: N Single-Family ❑ Two-Family ❑ Multi-Family (#of units ) ❑ Townhouse ❑ Business Office ❑ Retail ❑ Industrial/Warehouse ❑ Garage (#of cars ) ❑ Other (describe ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 624 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement (habitable space): Basement (habitable space): Total square feet: Total square feet: 624 Scope of work to be done: We would like to convert a family room in our home to an in-law apartment. Addition/Alteration Application Revised January 2021 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$ 20,000 2.` Source of Heat (circle one): ® Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? ❑ YES ® NO Explain: 4. Are there any easements on the property? ❑YES 0 NO SITE INFORMATION: • Is this a corner lot? ❑ YES ® NO • Will the grade be changed as a result of the construction? ❑ YES ® NO • What is the water source? N PUBLIC ❑ PRIVATE WELL • What type of wastewater system is on the parcel? ❑ SEWER © PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of certificate of occupancy. I have read and agree to the above: PRINT NAME: l SIGNATURE: ATE: Addition/Alteration Application Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE_INCLUDE AN EMAIL • Applicant: Name(s): ' Joel& Stephanie Smith Mailing Address, C/S/Z: 527 Luzerne Rd., Queensbury,NY 12804 Cell Phone: 518-708-5129 Land Line: Email: Steph.361@hotmail.com • Primary Owner(s): Name(s): Joel& Stephanie Smith Mailing Address, C/S/Z: 527 Luzerne Rd., Queensbury,NY 12804 Cell Phone: 518-708-5129 Land Line: Email: Steph.361@hotmail.com x Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): Contractor Trade: Mailing Address, C/S/Z: Cell Phone: Land Line: Email: **Workers' Comp documentation must be submitted with this application** • Architects)/Engineer(s): Business Name: Contact Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person for Compliance in regards to this project: Cell Phone: Land Line: Email: Addition/Alteration Application Revised January 2021 i Generated by REScheck-Web Software M N y o 1 co Compliance Certificate N ` Q *. Mots jvMN Project Smith "Residence - Renovatio 5.-,,.,.-..-�-�- � _ M a N is '��:, M tt � Energy Code: 2018 It& Location: Glens Falls, New York r r y Construction Type: Single-family APB 0 7 2021 A Project Type: Alt_eration �- Climate zone: 6 (7635 HDD) TOWN OF QUEENSBURY Permit Date: BUILDihIG& CODES Permit Number: N N � O Construction Site: Owner/Agent: Designer/Contractor: �. N 527 Luzerne Road Joel Smith Ethan P. Hall Queensbury,NY 12804 527 Luzerne Road Rucinski Hall Architecture 'Queensbury, NY 12804 134 Dix Ave 51 . 8-708-9910 Glens Falls,'NY 12801 joel.361@hotmail.com 518-741-0268. ephall@nycap.rr.com Compliance: Passes using prescriptive requirements for alteration projects Envelope Assemblies Gross Area Cavity Cont. Ceiling 1 Raised or Energy Truss --= --= =-- --- --- Exemption: Framing cavity not exposed. Wall 1:Wood Frame, 16"o,c. --- -- --- --- --- Exemption: Framing cavity filled with insulation Door 1:Solid Door(under 50%glazing) 20 0.300 6 Door 2: Glass 18 0.320 6 Window 1:Wood Frame:Double"Pane.with Low-E - 115 0.290 -33 Crawl:Solid Concrete or Masonry . --- --- --- ,-- --- Wall height:,0.0' Depth below grade:0.0' Insulation depth:".0.0' Exemption: Framing cavity not exposed. Compliance Statement: The proposed building design'described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has"been designed to meet the 2018 IECC requirements in REScheck Version :"REScheck-Web and to comply with the mandatory r emen. Mist th EScheck Inspection Checklist. Ethan P. Hall•-Architect _ _o1:7 -So- �, Name-Title - Signatu -`'Q�' -p'-\ Date Project Title: Smith Residence- Renovations .z =d-�,f` Report date: 04/03/21 Data filename: Pagel of 9 • REScheck Software Version : RE.Scheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the ".Comments/Assumptions" column is provided by the user in the REscheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field'Verified' # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, ;Construction drawings and ElComplies 103.2 documentation demonstrate ❑Does Not [PR1]1 ;energy code compliance for the Cal :building envelope.Thermal ❑Not Observable ;envelope represented on. ! I❑Not Applicable ;construction documents. ; 103.1, ;Construction drawings.and i❑Complies ; 103.2, documentation demonstrate f❑Does Not 403.7 energy code compliance for [PR3]1 ;lighting and.mechanical systems. I❑Not Observable ; 10 :Systems serving multiple ❑Not Applicable ; dwelling units must demonstrate ; ;compliance with the IECC I Commercial Provisions. I 302.1, ;Heating'and cooling equipment is;, Heating- Heating: I❑Complies 403.7 sized per ACCA Manual S based Btu/hr. Btu/Fir ❑Does Not [PR2]2 ;on loads calculated perACCA 0 ;Manual j or other methods Cooling: Cooling: ❑Not Observable approved by the code official. ; Btu/hr - Btu/hr :❑Not Applicable ; l , Additional Comments/Assumptions: 1 High Impact,(Tier 1) 2 Medium Impact(Tier 2) Lmact(Tier 3) Project Title: Smith Residence-Renovations Report date: 04/03/21 Data filename: Page 2 of 9 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.2.11 ;Unvented crawl space wall R- . ; R- ;❑Complies ;See the Envelope Assemblies [FO7]1 insulation R-value. :❑Does Not ;table for values. R- ; R-. ❑Not Observable ❑Not Applicable 3032 ;Unvented crawl space wall i ,❑Complies ❑D [FO8]1 insulation installed per Ioes Not manufacturer's instructions. le' ;❑Not Observable , ❑Not Applicable 402.2.11 ;Unvented crawl space'continuous ElComplies. [FO9]1 vapor retarder installed over i❑Does Not ;exposed earth,joints overlapped by 6 in.and sealed,extending at , ,❑Not Observable least 6-in.up and attached to the i PNot Applicable wall. 402:2A1 ;Unvented crawl space wall in'. in. ;❑Complies ;See the Envelope Assemblies FO10 1 insulation depth of burial or ; ;table for values. [ ] p ❑Does Not distance from top of_wall. 10-' ' ;❑Not Observable ; ;❑Not Applicable 303.2.1 ;A protective covering.is installed ,❑Complies [FO11]2 to protect exposed exterior IE]Does Not I insulation and extends a ; minimum of 6 in. below grade. I❑Not Observable j❑Not Applicable 403.9 ;Snow-and ice melting system ;❑Complies [FO12]2 controls installed. I (❑ Does Not g =❑Not Observable ; ;ONot Applicable Additional CommentsjAssumptions. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence - Renovations Report date: 04/03/21 Data filename: Page 3 of 9 Section Plans Verified Field Verified . # Framing/Rough-In Inspection Value Value Complies?. . Comments/Assumptions & Req.ID 402.1.1, ;Door U-factor. U= . ; U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ❑Does Not table-for values. [FRl]1 ;❑Not Observable ❑Not Applicable 402.1:1, ;Glazing U-factor(area-weighted U- U- : Complies ;See the Envelope Assemblies 402.3.1, average). Does Not table for values. 402.3.3, ;❑ 402.5 '❑Not Observable [FR2]1 ;❑Not Applicable , ; 303.1.3 ;U-factors of fenestration products !❑Complies [FR4]1 ;are determined in,accordance i ;❑Does Not J ;with the NFRC test procedure or I I taken from the default table. ❑Not Observable ; ❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier } ElComplies [FR23I1 installed per manufacturer's i❑Does Not e instructions. ❑Not Observable ; {❑Not Applicable 402.4.3 ;Fenestration that is not site built ;❑Complies [FR20]1 :is listed and labeled as meeting ;❑Does Not AAMA/W D MA/CSA 101%I.S.2/A440 g ;or has infiltration rates per NFRC I ;❑Not Observable 1 ;400 that do not exceed code }❑Not Applicable ; } limits. � ; 402.4.5 ;IC-rated recessed lighting fixtures ;❑Complies [FR16]2 Isealed at housing/interior finish ;❑Does Not and labeled to indicate s2.0 cfm j leakage at 75 Pa. ;I❑Not Observable i❑Not Applicable 403.3.1 ;Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is f�Does Not 8 >=3 inches in diameter and >_ R-6 where<3 inches.Supply and }❑Not Observable ;return ducts in other portions of ;❑Not Applicable ;the building insulated >= R-6 for diameter>= 3 inches and R-4.2 ; .for< 3 inches in diameter. 403.3.2 ;,Ducts,air handlers and filter- I ;❑Complies [FR13]1 :boxes are sealed with ❑Does Not :AV, joints/seams compliant with international Mechanical Code or I❑Not Observable International Residential Code,as i j❑Not Applicable applicable. ; 403.3.5 ;Building cavities are not used as } }❑Complies [FR15]3 +ducts or plenums. 1 }❑Does Not ;❑Not Observable j❑Not Applicable 1 High Impact(Tier 1] 2 Medium impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence-Renovations Report date: 04/03/21 Data filename: Page 4 of 9 Section Plans Verified . Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 403.3.7 ;Ducts declared to be within the ElComplies [FR28]3 i conditioned space are either.1) I❑Does Not completely within the continuous 91 air barrier and within the building I❑Not Observable ;thermal envelope,2) buried j❑_Not Applicable )within ceiling insulation in ;_accordance with Section . I R403.3.6 and the air handler is s I located completely within the continuous air barrier and.within the building thermal envelope I and the duct leakage is<= 1.5 4 j cfm/100 square feet of {conditioned floor area served by I the duct system,or 3)the ceiling insulation R-value installed against.and above the insulated_ I I duct>=to the proposed ceiling i insulation:R-value, less the R- �value of the insulation on the. 403.4 I HVAC.piping conveying fluids R- R- ❑Complies. [FR17]2 t above 105 QF or chilled fluids ;❑Does Not below 55 QF are insulated to zR- v ;❑Not Observable 3. ❑Not Applicable. 403.4.1 Protection of insulation on HVAC ;❑Complies [FR24]1 piping. f ❑Dbes Not 1 Al ❑Not Observable '❑Not Applicable 403.5.3 ;Hot water pipes are insulated.to R- R- ;❑Complies [FR18]2 zR-3. ❑Does Not j J ;❑Not Observable I ❑Not Applicable I 403.6 ,Automatic or gravity dampers are j I❑Complies [FR19]2 installed on all outdoor air I ❑Does Not I intakes and exhausts. ; ;❑Not Observable , ❑Not Applicable Additional Comments/Assumptions: 1 High.Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact.(Tier 3) Project Title: Smith Residence-Renovations Report date: 04/03/21 Data filename: Page 5 of 9 -J7 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ;All installed insulation is labeled ! {0Complies [IN13]2 or the installed R-values 1 i❑Does Not provided. eJ UNot Observable ❑Not Applicable 402.1.1, {Wall insulation R-value. If this is a: R- ; .R- ❑Complies ;See the Envelope Assemblies 402.2.5, :mass wall with at least 1/2 of the ❑ Wood. ;❑ Wood ;Oboes Not I table for values. 402.2:6 ;wall insulation on the wall ;❑ Mass El Mass ❑Not Observable [IN3]1 exterior,the exterior insulation El Steel ❑ Steel ;❑Not Applicable g� requirement applies(FR10). PP I ; ; ; 303.2 ;Wall insulation is installed per '❑Complies [IN4]1 manufacturers instructions. j g❑Does Not [_-]Not Observable i❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 6 of 9 Section . Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;Ceiling insulation R-value. ; R= R- ;❑Complies ;See the Envelope Assemblies 402.2.1, ;[-]-Wood ;❑ Wood ;❑Does Not table for values. 402.2.2, ❑ Steel ;❑ Steel tNot Observable 402.2.6 [Fill' I❑Not Applicable I 303.1.1.1,;Ceiling insulation installed per ; ;❑Complies 503.2 1 manufacturer's instructions. i i❑Does Not [FI2]1 ;Blown insulation marked every I '300 ftz.' f ,❑Not Observable ❑Not Applicable 402.2.3 ;,Vented attics with air permeable j❑Complies [FI22]2 j insulation include baffle adjacent I ;❑Does Not 1 ,to soffit and eave vents that extends overt insulation. ;❑Not Observable f❑Not Applicable ; 402.2.4 ;Attic access hatch and door R- R-- . - ;❑Complies [FI3]1 :Insulation aR-value of the ElDoes Not 1 ;adjacent assembly. ❑Not Observable 1 ;❑Not Applicable 402.4.1.2 ;.Blower door test @ 50 Pa. <=5 ACH 50 = 1 ACH 50 ❑Complies [FI17]1. lath in Climate Zones 1-2,and 1 T-lDoes Not <=3 ach in Climate Zones 3=8. ❑Not Observable ❑Not Applicable 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies [FI27]1 j determine air leakage with ft2 j ft2 ❑Does Not ;either: Rough-in test:Total leakage measured with a I ❑Not Observable 1 pressure differential of 0.1 inch 1 ;❑Not Applicable w.g.across the system.including j :the manufacturer's air handler enclosure if installed at time of 1 I 1 1 1 ;test. Postconstruction test:Total ; leakage measured with a ; pressure differential of 0.1 inch I w.g.across the entire system including the manufacturer's air 1 !handler enclosure. I. 403.3:4 ;Duct tightness test result of<=4 ; cfm/100 cfm/l00 ;❑Complies [FI4]1 lcfm/100,ft2 across the system or 1 ft2 j ft2 ;❑Does Not <=3 cfm/100 ft2 without air 1 handler @ 25 Pa.For rough-in 1❑Not Observable I 'tests,verification may need to . 1 ' ;❑.Not,Applicable occur during Framing Inspection. ; 403.3.2.1 ;Air handler leakage.designated 1I f❑Complies [FI2411 :by manufacturer at<=2%of i I❑Does Not design air flow, i i I❑Not Observable ❑Not Applicable 403.1.1 I Programmable thermostats 'f ❑Complies [FI9]2 !installed for control of primary f ;❑Does Not heating and cooling systems and initially set by manufacturer to 1❑Not Observable 1 code specifications. i ;❑Not Applicable 403.1.2 ;Heat pump thermostat installed ,❑Complies [FI10]2 Ion heat pumps. j❑Does Not � 1 i ;❑Not Observable ;❑Not Applicable 403.5.1 ;Circulating service hot water " ;❑Complies [FI11]2 systems have automatic or j❑Does Not ;accessible manual controls. i ❑Not Observable ❑Not Applicable 1 High Impact.(Tier 1) 2 Medium Impact(Tier 2) 3 Low impact-IT ier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 7 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system; I❑Complies [FI25]2 fans not part of tested and listed I ❑Does Not HVAC equipment meet efficacy ;and airflow limits per Table ❑Not Observable R403.6.1. ;❑Not Applicable ; 403.2 'Hot water boilers supplying heat I ;❑Complies [F[26]2 I through,one-or two-pipe heating ; '❑Does Not systems have outdoor setback control to lower boiler water I '❑Not Observable I temperature based on outdoor ;❑Not Applicable temperature. 403.5.1.1 ;Heated water circulation systems j ;❑Complies [F128]2 have a circulation pump.The I :[]Does Not ;system return pipe is a dedicated I return pipe or a cold water supply ,❑Not Observable pipe. Gravity and thermos- J❑Not Applicable syphon circulation systems are not present.Controls for circulating hot water system ; pumps start the pump with signal ;for hot_water demand within the ;occupancy.Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and ; no demand for hot water exists. 403.5.1.2 ;Electric heat trace systems j ;❑Complies ' [F129]2 comply with IEEE'515.1 or UL ❑Does Not 515.Controls automatically j adjust the energy input to the ❑Not Observable heat tracing to maintain the i ❑Not Applicable desired water temperature in the piping. , 403.5.2 ;Demand recirculation water y i❑Complies [F130]2 systems have controls.that 1 ❑Does Not manage operation of the pump and limit the temperature of the , 1❑Not Observable water entering the cold water i ;❑Not Applicable piping to<= 104°F. i 403.5.4 ;Drain water heat recovery units ; ;❑Complies [FI31]2 tested in accordance with CSA ❑Does Not 655.1. Potable water-side i pressure loss of drain water heat i❑Not Observable recovery units<3 psi for. t ;❑Not Applicable individual units connected to one or two showers. Potable water- I side pressure loss of drain water I ; heat recovery units<2 psi for individual units connected to ( ; three or more showers. 404.1 ;90%or more of permanent ;❑Cornpl'ies [FI6]1 fixtures have high efficacy lamps.! i❑Does Not ,❑Not Observable j ;❑Not Applicable 404.1.1 i Fuel gas lighting systems have ; ;❑Complies [FI23]3 no continuous pilot light. I ElDoes Not A ; ❑Not Observable ; ;[]Not Applicable 401.3 ;Compliance certificate posted. ;❑Complies [FI7]2 '❑Does Not i ❑Not Observable j❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 8 of 9 Section- Plans Verified . . Field Verified # Final Inspection Provisions Complies? Comments/Assumptions & Req.ID Value Value 303.3 ;Manufacturer manuals for I❑Coplies [FI18]3 mechanical and water heating {❑Dmoes Not systems have been provided. fff i❑Not Observable_ i❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 9 of 9 2018 IECC' Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 0.00 Below-Grade Wall 0.00 Floor 0:00 Ceiling /Roof 0.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0:29. Door 0.30 . CoolingHeating & Heating System: Cooling System: Water Heater Name: Date: Comments RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall 134 Dix-Avenue �JCr Glens Falls NY 12801 Voice 518 741-0268 Fax 518 741-0274 Email ephall@nycap.rr.com Transmittal To: Mark Smith-Town of Queensbury—Code Enforcement From: Ethan Hall Date: 20 July, 2021 Re: Smith Residence—527 Luzerne Road Addition — revised plans to as-built conditions Mark, Attached please find three (3) full sets of revised plans for the above referenced project location. These revisions are done to indicate the as-built revisions made by the homeowner. If there are any additional questions please let me know. Regards, C4 4. /4 Ethan P. Hall AS BUILT Architect D E C 2 nn JUL 2 2 2021 TOWN OF QUEENSBURY BUILDING& CODES YASmith-527 Luzeme RoadUransmittal-20 July 202 Ldoc Generated by REScheck:Web Software Compliance Certificate CnD n to 0 l ID CDoQ Project Smith Residence -`Renovations j c� Energy Code: 2018 IECC LE �, rt Location: Glens Falls,.New York D Construction Type: Single-family _ 20-21 .Project Type: Alteration NIN Climate Zone: 6 (7635 HDD) C6\I��uIJRYPermit Date: . . CO D.ES � O Permit Number: ).a Construction Site.: Owner/Agent: Des.!gner/Contractor: I N 527 Luzerne Road joeI Smith Ethan P. Hall Queensbury,NY 12804 527 Luzerne Road Rucinski Hall Architecture 1 to N Queensbury, NY 12804 134 Dix Ave 518408=9910 Glens Falls, NY 12801 joel.361@hotmail:com 518-741-0268 ephall@nycap.rr.com usingCompliance: P asses prescriptive requirements for alteration projects REVIEWED FOR ENERGY CODE COMPLIANCE FILE Copy Enve ope Assemblies Gross Area Cavity Cont. Perimeter Ceiling 1: Raised or Energy Truss --= -=- ==- --- --- Exemption: Framing cavity not exposed. Wall 1:Wood Frame, 16"o.c. -=- =-- --- --- --- Exemption:Framing cavity filled with insulation Door 1: Solid Door(under 50%glazing) 20 0.300 6 Door 2: Glass 18 0.320 6 Window 1:Wood Frame:Double Pane with Low-E - 115 0.290 33 Crawl:Solid Concrete or Masonry --- --- --- --- --- Wall height 0.0' Depth below grade:0.0' Insulation depth: 0.0' Exemption: Framing cavity not exposed. Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck=Web and to comply with the mandatory r ireme ist t REScheck Inspection Checklist. Ethan P. Hall-Architect 1�y ���� ✓ �i'G• � Name--Title Signature. ti-',q�1 o L y? `� Date r 1 : ',� � Y t sq R 9 Project Title: Smith Residence-Renovationse, �, Report date: 04/03/21 Data filename: Pagel of 9 = REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For.each requirement,the user certifies that anode requirement will be met and how that is documented, or that an exception is being claimed: Where compliance is itemized in a separate table,.a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and j i❑Complies 103.2 ;documentation demonstrate I I❑Does Not [PRJ]1 ;energy code,compliance for the i 19) :building envelope.Thermal I❑Not Observable envelope represented on. + 1❑Not Applicable j construction documents. 103.1, ;Construction drawirgs and j f❑Complies 103.2, :documentation demonstrate JE]Does Not 403.7 ;energy code compliance for [PR3]1 ;lighting and mechanical systems. IoNot Observable gj :Systems serving multiple []Not Applicable ; ;dwelling units must demonstrate compliance with the IECC ` Commercial Provisions. 302.1, ;Heating and cooling equipment is: Heating: ; Heating:. ❑Cortiplies 403.7 sized per ACCA Manual S based Btu/hr Btu/Kr :❑Does Not [PR2]2 ;on loads calculated per ACCA ; Cooling: Cooling: ,g) f Manual J or other methods ; Btu/hr . Btu/hr ;❑Not Observable approved by the code official. ; ;❑Not Applicable ; Additional Comments/Assum'ptions: 1 High Impact,(Tier 1) 12 IMedium Impact(Tier 2) 1 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 2 of 9 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.2.11 ;Unvented crawl space wall ; R= . R- ;❑Complies ;See the Envelope Assemblies [F07]1 l insulation R-value. ❑Does Not ;table for values. R- R- �' ;❑Not Observable ❑Not Applicable 303.2 ;Unvented crawl space wall ( ;❑Complies ; (F08]1 :insulation installed per } ElDoes Not manufacturer's instructions. 1 U ;❑Not Observable 1 j❑Not Applicable 402.2.11 ;Unvented crawl space continuous; ;❑Complies [F09]1 vapor retarder installed over . f �E]Does Not ,J ;exposed earth,joints overlapped I Observable ; by 6 in.and sealed,extending at ❑Not least 6 in. up and attached to the 1 1❑_Not Applicable :wall. j 402.2.11 ;Unvented crawl space wall in. ; in. ;❑Complies ;See the Envelope Assemblies FO10 1 �insulation depth of burial or ; ;table for values. [ l P ,❑Does Not e ;distance from top of wall. 1 ❑Not Observable - �❑Not Applicable 303.2.1 ;A protective covering is installed 10Complies [F011]z Ito protect exposed exterior I❑Does Not insulation and extends a i minimum of 6 in. below grade. ; )❑Not Observable 1 1❑Not Applicable 403.9 ;Snow-and ice-melting system ;❑Complies [FO12]2 controls installed. {� ;❑Does Not J ( I[]Not Observable j IONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1] 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence-Renovations Report date: 04/03/21 Data filename: Page 3 of 9 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;Door U-factor. U- U- ;❑,Complies ;See the Envelope Assemblies 402.3.4 :❑Does Not ;table for values. [FRlll U ; _ ;❑Not Observable 9 ;❑Not Applicable 402.1:1, ;GlazingU-factor(area-weighted U= U- ; Complies ;See the Envelope Assemblies 402.3.1, average). :❑Does Not ;table for values. 402.3.3, ;. 402.5 ; ;❑Not Observable [FR2]1 ; ; ;❑Not Applicable i 303.1.3 ;U-factors of fenestration products ;❑Complies ; [FR4]1 I are determined in accordance I❑Does Not ;with the-NFRC test procedure or ;taken from the default table. i i❑Not Observable ; ❑Not Applicable ; 402.4.1.1 ;Air barrier and thermal barrier } ;❑Complies [FR23]1 installed per manufacturer's f !❑Does Not instructions. f j J❑Not Observable l ❑Not Applicable . 402.4.3. ;Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as-meeting j❑Does Not AAMA/WDMA/CSA 101/i.S72./A4401 ;❑Not Observable ,or has infiltration rates per NFRC 400 that do not exceed-code t❑Not Applicable ; :limits.,. # .. 402.4.5 ;IC-rated recessed lighting fixtures ;❑Complies j [FR16]2 (sealed at housing/interioe finish ❑Does Not and labeled.to indicate<,2.0 cfm leakage at 75 Pa. I❑Not Observable ; i❑Not Applicable 403.3.1 ;Supply and return ducts in attics '❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not lQ >= 3.inches in diameter and >_. ` R-6 where<3 inches;Supply and i❑Not Observable ; ;return ducts in other portions of {❑Not Applicable 1 ;the building insulated >= R-6 for { diameter>=3 inches and R74.2 ; for<3 inches in diameter. E 403:3.2 ;Ducts,air handlers and filter ![]Complies [FR13]1 :boxes are sealed with. ❑Does Not joints/seams compliant with I ; J ❑Not Observable International Mechanical Code or ;International Residential Code,as ❑Not Applicable applicable. I ' 403.3.5 ;Building cavities are not used as 10Complies [FR15]3 ducts or plenums. ❑Does Not J { ❑Not Observable + f 11]Not Applicable 1 High Impact_(Tier 1) 2 Medium,Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 4 of 9 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 403.3.7 ;Ducts declared to be within the ;❑Complies [FR28]3 S conditioned space are either 1). ( j❑Does Not e I completely within the continuous ; air barrier and within the building 1❑Not Observable ;thermal envelope,2) buried j :❑Not Applicable ;within ceiling insulation in I i accordance with Section ; R403.3.6 and the air handler is ; +located completely within the $continuous air barrier and within .! {the building thermal envelope I i ;and the duct leakage is<= 1..5 cfm/100 square feet of ; conditioned floor area served by. i I ;the duct system, or 3)the ceiling ; insulation R-value installed ; against and above the insulated S duct>=to the proposed ceiling insulation R-value,less the R- ;value of the insulation on the I f 403.4 ;HVAC piping conveying fluids R- R- I❑Complies [FR17]2 above 105 4F or chilled fluids i I :❑Does Not below 55 9F are insulated to zR- g� ;3. ; :❑Not Observable ; ❑Not Applicable. 403.4.1 ;Protection of insulation on HVAC # ❑Complies [FR2411 piping. I ❑Does Not U ❑Not Observable (❑Not Applicable 403.5.3 ;Hot water pipes are insulated to. R- R ;❑Complies [FR18]2 j zR=3. ❑Does Not eJ I ; ; ;❑Not Observable ; ❑Not Applicable 403.6 ;Automatic or gravity dampers are I ;❑Complies ; [FR19]2 installed on all outdoor air j❑Does Not i intakes and exhausts: i - ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 5 of 9 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ,All installed insulation is labeled ( ;❑Complies [IN13]2 !or the installed R-values I j❑Does Not }provided. g , ;❑Not Observable j ;❑Not Applicable 402.1.1, ;,Wall insulation R-value. If this is a; R= ;.R- ;❑Complies ;See the Envelope Assemblies 402.2.5, :mass wall with at least 1/2 of the ❑ Wood ;❑ Wood ;❑Does Not table for values. 402.2.E wall 'insulation on thb wall El ❑ Mass ,❑Not Observable [IN3]1 ;exterior,the exterior insulation g, requirement applies(FR10). ;❑ Steel ❑ Steel ;❑Not Applicable v 1 1 1 1 1 303.2 I Wall insulation is installed per ; ;❑Complies [IN4]1 manufacturer's instructions. !❑Does Not 1 ❑Not Observable ; ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) T2 Medium.lmpact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 6 of 9 Section Plans Verified Field Verified # . Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;Ceiling insulation R-value. R- . R- ;❑Complies ;See the Envelope Assemblies 402.2.1, ❑ Wood ;❑ Wood ;❑Does Not table for values. 402.2. ❑ Steel ;❑ Steel ;❑Not Observable 402.2.6 [Fill' ;❑Not Applicable ' ; 303.1.1.1, ;Ceiling insulation installed per I ;❑Complies 303.2 ,manufacturer's instructions. I EDoes Not [FI2]1 :Blown insulation marked every 300 ftz, j I❑Not Observable j ;❑Not Applicable 402.2.3 ;Vented attics with air permeable ; ;❑Complies [FI22]2 :insulation include baffle adjacent 1 ;❑Does Not to soffit and eave vents that 6:ktends over insulation. i❑Not Observable ❑Not Applicable j 402.2.4 ;Attic access hatch and door R- R- ;E]Complies [FI3]1 insulation aR-value of the '❑Does Not ;adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ;❑Complies [FI17]1 :ach in Climate Zones 1-2,and El Does ach in Climate Zones 3=8. Does Not ; ❑Not Observable ❑Not Applicable 403.3.3 ;Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies [FI27]1 - :determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total ❑Not Observable ;leakage measured With a pressure differential of 0.1 inch ;❑Not Applicable w.g.across the system including ;the manufacturer's air handier ; enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g.across the entire system including the manufacturer's air ; handler enclosure. I 403.3.4 I Duct tightness test result of<=4 ; cfm/100 cfm/100 ClComplies [Fl4]1 cfm/100_ft2 across the system or ; ft2 ft2 i❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ;❑Not Ofservable (tests,verification may need to ; ; Not Applicable ;occur during Framing Inspection. 403.3.2.1 ;Air handler leakage designated ;❑Complies [FI24]1 :by manufacturer at<=2%of ;❑Does Not design air flow. I❑Not Observable j ;❑Not Applicable 403.1.1 Programmable thermostats ; ;❑Complies [FI9]2 installed for control of primary 1 ❑Does Not heating and cooling systems and + initially set by manufacturer to I I❑Not Observable code specifications. ; ;❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 I on heat pumps. iIDoes Not 1 i❑Not Observable ' ❑Not Applicable 403.5.1 Circulating service hot water 1 ;OCompiies [FI11]2 systems have automatic or :❑Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 7 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system( ❑Complies [FI25]2 fans not part of tested and listed i❑Does Not HVAC equipment meet efficacy ;and air flow limits per Table t❑Not Observable R403.6.1. �❑Not Applicable 403.2 ;Hot water boilers supplying heat j❑Complies [FI26]2 through one-or two-pipe heating ;❑Does Not systems have outdoor setback control to lower boiler water ❑Not Observable f ;temperature based on outdoor UNot.Applicable temperature. 403.5.1.1 ;Heated water circulation systems ❑Complies [F]28]2 have a circulation pump.The ;❑Does Not ; system return pipe is a dedicated } return pipe or a cold,water supply ❑Not Observable I pipe.Gravity and thermos- ;❑Not Applicable ;syphon circulation systems are j not present.Controls for circulating hot water system ' pumps start the pump with signal Ifor hot_water demand within the occupancy.Controls i I automatically turn,off.the pump ;when water is in circulation loop is at set-point temperature and ; E no demand for hot water exists. + 403.5.1.2 ;Electric heat trace systems I ;❑Complies [FI29]2 comply with IEEE 515.1 or UL ;❑Does Not 515.Controls automatically adjust the energy input to the } ❑Not Observable heat tracing to maintain the } �❑Not Applicable desired water temperature in the piping. 403.5.2 ;Demand recirculation water ;❑Complies [F130]2 systems have controls.that I !❑Does Not manage operation of the pump } and limit the temperature of the i '❑Not Observable water entering the cold water } ;❑Not Applicable piping to<= 1042F. I I 403.5.4 ;Drain water heat recovery units ; ;❑Complies [F131]2 tested in accordance with CSA + ❑Does Not j1355.1. Potable water-side } I pressure loss of drain water heat ' 4❑Not Observable 'recovery units< 3 psi for ;❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water . heat recovery units<2 psi for individual units connected to three or more showers. I 404.1 ;90%or.more of permanent {❑Complies [FI6]1 fixtures have high efficacy lamps. ;❑Does Not I '❑Not Observable I j j❑Not Applicable 404.1.1 Fuel gas lighting systems have ;❑Complies [FI23]3 no continuous pilot light. ;0Does Not ®1 ;❑Not Observable ; ? ;❑Not Applicable 401.3 'Compliance certificate posted. ;❑Complies [F17]2 I ;❑Does Not } ;❑Not Observable j !❑Not Applicable 1 High Impact,(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 8 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 303.3 Manufacturer manuals for j i0complies [FI18]3 mechanical and water heating ( ❑Does Not systems:have been provided. i {❑Not Observable ' ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Smith Residence- Renovations Report date: 04/03/21 Data filename: Page 9 of 9 8/ 2018 IECC Energy Efficiency Certificate' . Insulation Rating R-Value Above-Grade Wall 0:00 Below-Grade Wall 0.00 Floor 0.00- Ceiling/Roof- 0.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.29 Door 6.30 CoolingHeating & Heating.System: Cooling.System: Water Heater: Name:. Date:. . Comments