Loading...
RC-0557-2021 Office Use Only r4 I PRINCIPLE STRUCTURE 2021 PER APPLICATION Permit#: 4C- 056 4- Permit Fee:$ 2� b• b5 742 Bay Road,Queensbury, NY 12804 *Rec Fee:$ loUO P: 518-761-8256 www.queensbury.net Invoice#:. Afj1aJ: Flood Zone? Y N Reviewed-By:� Project Location: 33 Warren Ln. Queensbury, NY 12804 Tax Map #: 308.6-1-67 Subdivision Name: *RECREATION FEE$1000.00 for new dwelling units: single family, duplexes/t - multiplefamily, apartments,condominiums, townhouses;a-NYS Building Standards &Cod s jPV(j rAWT 1 VC4 1 le. This is in addition to the permit fee(s). W. PROJECT INFORMATION: JUL 2 2 2021 O Residential ❑ TOWN F QUEENSBURYCommercial, Proposed Use: BUILDING&CODES Single-Family: ❑Two-Family ❑ Multi-Family(#of units: ) 1. ❑Custom Raised-Randh Home 2. ❑Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) ❑Townhouse ❑ Garage W of cars ) ❑ Business Office ❑ Retail_ ❑ Hotel/Motel ❑ Industrial ❑ Heated Warehouse/Storage Building ❑ Unheated Warehouse/Storage Building ❑Amusement Ride ❑ Other(describe: ) MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1`r floor: 26'x32'- 819sgft 15T floor: 2nd floor: _-2"d floor: 3rd floor: Total.square feet: Basement(habitable space): Unfinished Total square feet: 819sgft Principle Structure Packet Revised March 2021 / 3. ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ $160,000 2. Proposed use of the building: Single-family residential home, primary residence 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat: ❑ Gas ❑ Oil © Propane ❑ Solar ❑ Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application, one per'apaliance) 5. Are there any structures not shown on the plot plan? [].YES NO Explain, if yes: 6. ' Are there any easements on the property? ❑YES ® NO 7. SITE INFORMATION: a.What is the dimensions'or acreage of the parcel? .43 Acre b. Is this a corner lot? ❑YES ® NO c.Will the grade be changed as a result of the construction? Z YES ❑.NO d.What is the water source? © PUBLIC ❑ PRIVATE ❑ WELL e. What type of wastewater system is on the parcel? [] SEWER ® PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,.additional reviews and re-approval. 2. If,for any reason;the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the. NYS Building Codes,local building laws and ordinances, and in conformance with localzoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will'obtain a certificate of occupancy. 5. 1 also understand.that I/we are required to provide an as-built survey by a WSlicensed land surveyor ofall newly constructed facilities rip ortoissuanceofacertificateofoccupancy. I have read and agree to the above: PRINT NAME:'Larry Clute - President/Owner- Clute Enterprises, Inc. SIGNAURE: DATE: _ f�1VIA Principle Structure Packet Revised March 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): Larry Clute - President/Owner-Clute Enterprises, Inc. Mailing Address, C/S/Z:,6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: .518-793-7277 Email: cluteenterprises@gmail.com • Primary Owner(s): Name(s): •Larry Clute - President/Owner- DKC Holdings, Inc. Mailing Address, C/S/Z: 6 Holden Aye. Queensbury, NY.12804 Cell Phone: Land Line: 518-793-7277 Email: cluteenterprises@gmail'.corn ® Check if all work will be performed by property owner only i Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): Larry Clute= President/Owner-Clute Enterprises, Inc. Contractor Trade:General Contractor Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land,Line: 518-793-7277 Email: cluteenterprises@gmail.com . **Workers' Comp documentation must be submitted with this application** • Arc hitect(s)/Eng1neer(s): Business Name: Contact Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person for Compliance in regards to this project: Cell.Phone: Land Line:518-793-7277 Email:.. cluteenterprises@gmail.com Principle Structure Packet Revised March 2021 CHECKLIST--SINGLE FAMILY Project Location: �jcx REQUIRED-2SETS 1. Building Permit application, completed YES NO N/A 2. Energy Code inspector's report from ResCheck, completed &siened ® ❑ ❑ 3.. Septic alteration application, if applicable © ❑ 1 ❑ 4._ Solid fuel burning or gas insert appliance form(s), if applicable ❑ ❑ 5. Driveway_.permit, if applicable ❑ ❑ 6. Structural drawings;including: a. Floor plans ® ❑ ❑ b. Foundation plans V ❑ ❑ c. Cross sections © ❑ ❑ d. Elevations ❑ ❑ e. Window&door'schedule ® ❑ 0 f. Natural light,ventilation &emergency egress © ❑ ❑ 7. Plot plan: showing proposed structure(s)with setback dimensions from all ❑ ❑ surveyed property lines' . 8. Electrical inspection agency selected ❑ ❑ ❑ CHECKLIST--MULTI-DWELLING/COMMERCIAL Project Location: REQUIRED-2SETS 1. Building Permit application, completed YES NO N/A 2. Energy Code inspector's report from ComCheck, completed&siened ❑ ❑ ❑ 13. Septic alteration application, if applicable ❑ ❑ ❑ 4. Solid fuel burning or gas insert appliance form(s), if applicable ❑ ❑ ❑ 5. Driveway permit, if applicable ❑ ❑ ❑ 6. Structural drawings, including: a. Floor plans ❑ ❑ ❑ b. Foundation plans ❑ ❑ ❑ c. Cross sections ❑ ❑ ❑ d. Elevations ❑ ❑ ❑ e. Design loads including floor,snow &wind load ❑ ❑ ❑ f. Seismic design ❑ ❑ ❑ g. Plans signed and sealed by registered architect or engineer ❑ ❑ ❑ h. Window &door schedule 7. Plot plan: showing proposed structure(s)with setback dimensions from all ❑ ❑ ❑ surveyed property lines, 8. Electrical inspection agency selected ❑ ❑ ❑ 9. FINAL AS-BUILT PLANS SUBMITTED ELECTRONICALLY Principle Structure Packet Revised March 2021 1. Office Use Only Permit#: PAC - �`J •Z@y Permit Fee:$ 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.aueensbury.net Invoice#: /N) SEPTIC DISPOSAL PERMIT APPLICATION Flood Zone? Y Reviewed By: Project Location: 33 Warren Ln.Queensbury, NY 12804 Tax Map#: 308.6-1-57 RESIDENCE INFORMATION: New Construct 26'x 32'Raised-Ranch Year Built Gallons #of bedrooms: X gallons per =total daily flow per day bedroom Garbage Grinder Yes No 1980'or older 150 Installed? (choose one) ❑ 1981-1991 130 Spa or Hot Tub Yes No Installed? (choose one) 1992-Present 110 V to PARCEL INFORMATION: Topography ® Flat Rolling ❑ Steep,Slope %Slope Soil Nature ©Sand ❑ Loam ❑ Clay ❑ Other, explain: Groundwater At what depth? Bedrock/Impervious At what depth? material Domestic Water Supply ® Municipal ❑Well ❑ Lake (if well or lake,water supply from any septic system absorption is ft.) Percolation Test Rate: per minute per inch (test to be completed by a licensed engineer/architect) PROPOSED SYSTEM INFORMATION: Tank size 1000 gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/.hot tub System Absorption field w/#2 stone Total length 16o ft.; Each Trench 7xso ft. --r^o— . -- -i — ------ F­WL,al requ'red-m—fty? nit size TT'�rizvi'rn� NOTES: 1. Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file—no exceptions. 3. As- built drawings-must be submitted prior to the inspection, if there has been a change to the submitted plans. Principle Structure Packet Revised March 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL ❑ Check if all work will be performed by property owner only • Contractor: Contact Name(s): Larry Clute - President/Owner - Clute Enterprises, Inc. Contractor Trade: General Contractor Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 518-703-7277 Email: cluteenterprises@gmail.com "Workers'-Comp documentation must be submitted with this application" • Eneineer(s):, Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email Contact Person for Compliance in regards to.this project: Cell Phone: Land Line: Email: Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known,by or on behalf of an applicant, shall,be void. I have read the regulations and agree.to abide by these and.all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: Larry Clute = Clute Enterprises, Inc. SIGNATURE: DATE: Principle Structure Packet Revised March 2021 airTown of Queensbury David bueli ., Highway Superintendent Highway -'' 518-761-8212 f Department .. Mark Benware 742 Bay,Road- Queensbury, NY Deputy Highway Superintendent 12801 518-761=8210 Phone: (518)761-8211 Fax: (518)745-4466 DRIVEWAY PERMIT DATE: APPLICANT NAME: TELEPHONE NO.: ADDRESS TO BE INSPECTED: RETURN ADDRESS: Applicant must show exact location and`width of driveway(s)to be connected to the highway by placing stakes at the specified.location. The Superintendent of Highways of the Town of Queensbury has.reviewed this application. The following action has been taken: STEP 1: ( ) Preliminary Approval NEED: ( ) Slight swale ( ) Deep swale ( ) Level with the road ( ) Level with the top of-the paved wing Size culvert pipe to be used (if necessary)- O 12" O 15" O 18" O 24„ O 3611 Preliminary inspection completed by: Date: Approval-by Highway Supt: (or) .Deputy Supt: Upon completion, please resubmit this,approved permit for a final approval. STEP 2: O Final Approval O Rejected Date: David Duell, Highway Superintendent Mark Benware, Deputy Highway Superintendent \i Ciple Structure Packet Revised March 2021 Residential Plan Review: 1- and 2- Family Dwellings r , Y/N/NA (1 of 2) Two (2)full sets of plans Over 1,500 sq. ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties Window schedule with glass size & main doors/Air leakage< .5 cfm for doors, < .3 cfm for windows/Tempered glass in bathrooms Door schedule/Main entrance 36" door Emergency Escape or Bedrooms & Habitable Space Above-grade: 5.7 sq. ft. Grade: 5.0 sq. ft. +16 24" (h)x 20" (w) minimum w-cZ 44" maximum height above door ' Window control devices 24" or less 2"d story or 72" above grade Egress window from basement 5.0 sq. ft. Floor system sizing per table 502.3.1 Residential the k ERI or Prescriptive method �QO Driveway length: 300' or more-12' width required/500' or more,turnaround required �J -A Foundation drainage on plans, if required Q/ 6" drop in 10' exterior grade Framing cross section for each roof line, vertical fire stopping every 10'where required/joist spans pg.-127 Ice &snow shield—24" from exterior wall Platforms at exterior doors Stairway headroom 6'8"; all stairs 36" width Stair run and rise Winder run and rise (� Spiral stairs meet requirements Smoke detectors—battery backup & proper location, interconnected Bathroom fixtures—proper clearance Hall width-36" width Handrails more than four risers on open sides Railing&guards> 30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas Garage fire separation:%" gable end/5/8" under living space &%" on walls/20 min. door t1i 'A and closer Garage floor sloped Attic access: gasket seal & R-value equal to roof insulation Roof over 30"—22"x 30"/Crawl spaces 18" x 24" access Residential Plan Review Revised March 2018 r Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (2 of 2) Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected within 15' of sleeping area Soil test results, if required Septic to well or water line separation All paperwork signed Note on plans energy saving light bulbs 75% Blower door test agency paperwork Floodplain Permit required —check map: 2 feet above flood elevation q�rj' Hurricane clips required Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel Manuals S &J required for heating system. Cold air return hard piped Separate room for draft HVAC or hot water heater with fresh air .�j ,,,-�_ HRV shown and calculations Baffles at eaves for insulations and knee walls Makeup air for range hood >400 cfm Cont{nuous header for garage doors to end wall Chimney rain cap shown for fireplaces Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised March 2018 TOWN ORQUEENSBURY 742 Bay Road, Queensbury, NY. 12804-5902 Septic System Checklist -t✓"Plan to scale Received Deep hole perc test results from engineer/Architect if applicable(Town Approved Engineers and Architects;June 30 to April 15 Town Engineer for unapproved Engi eers and Architects) S a P l l s �'J All wells on property and adjacent properties shown -91.IiVater line shown Municipal or well 10'separation to any part of system 4g6etback to property lines show 10'or more for any part of system Septic tank and pump stations 10'from foundation 50'from any well/lake/wetland 10'from any wage Septic tank to foundation crawl space/slab on grade,grade in crawl space must be above top of septic tank / for 0',Separation required (field verification required) eptic tank sized for number of bedrooms and add 250 gals for Jacuzzi tubs/garbage grinder each Leech Field 20'from foundation 100'from any well 10'from water line �LSeepage pit 150'from well 50'from septic tank J Seepage Pits 3-times diameter apart Septic tank and pump stations over 30 gallons 50'from watercourse or wetland W—clistance' from bottom of trench or system 24"to bedrock or mottling 36"within 1000'of Lake George j � Leech field 100'from watercourse or wetland �✓f��Toe of mound or bottom of retaining wall 10'from property line 100'from well 20'from �� Foundation Provide Engineer/Architect stamp for bed or design systems i Department of Health Approval for all mobile home park new systems Flood Plain requirements AJO 2'above established flood elevation to bottom of system L)O All tanks anchored or 2'above flood elevation WINDOW-SCHEDULE CALCULATION SHEET (please complete if details are not provided on plans) - 9.WsIID Project Lo. lion: 33 Warren Ln.Queembury,NY 12804 Primary weer (s): Chiba Errterprises;,Inc.. Habitable Rooms �..�� lZ. �fJ Window Metter Oirti Plan Manufacturer Name - 5,C\,e- ModellTypele -- U'nit/Block,# n o Cell Size �j �✓ 7 Rough Opening ? Width Z7 ?J'-? �a -'J '�'� Sq. Ft. Vent '�3 r-T3 `I3 .�� 47 Sq. Ft. Egress/ �-. 9`1' Clear OpenI ng rJ, �3 �J a Z 3 `� Pi 3 Z� a . CiearOpening- Z� _7 . -7 -15 'Z� ?5 Width in'inches 4 �� 7 - -� 33. Clear Opening 15 Height in inches '72 27 2-7 � '� . . Special,Hardware or-instructlons U-value �2 e 9 4 Revised tJfarch2fl21 Principle Structure Packet. WINDOW SCHEDULE CALCULATION SHEET (please complete if'details are not provided on plans) DetailsbWkUd buildilIg_RIA Project. Lo tiom .33,Warreri Ln.-Queensbury,,NY�i!904 .Primary . wner (s): 'Clubs Enterprises;,.Inc: FILE COPY Habitable _ ' Rooms Window#/letter_ On Plan Manufacturer- Name5� = Model/Type �e- Unit/Block.# Cell-Size4. Rough.Opening Width J 7v L4 1, Sq.:Ft.,Vents Z `13 ` L17 5$ • (c, , „ Sq. Ft. Egress/ S, �3 '"Z 3 _47 Clear Opening j 5, . Clear Opening- 7.5 Width in inches- Clear Opening- Height in,inches. 2:5 27 2-jID L4155-5, Special-Hardware ' or instructions U-Value P.rincipie Structure Packet; Wssed'M+ rch 2021 •FURNACES•BOILERS•AIR CONDITIONING ' Wk , P 1 I. 518.79�2� 2220- •PROPANE•#2 FUEL OIL•KERO•DIESELFX. 792-6999 - - •INSTALLATION•SERVICE � ' ' � '1 WWW,gfheating0ll.COn1. DATE: JOB NAME/LOCATION: PH: BILL T0: wk-e in-1-P r lS v-2 FX: w /--\V I CELL: 0U evis v("( Vqy 2-V EMAIL: Quotation_ and Contract (::a- '5Lk t`lk-y gmcw) Ac- •oCD C: 00 C Need Supplemental Neat? Ar" tsit us at............................... N fN C N �►- _ o v 518-798-2220 �di �` •Fireplaces•Stoves•Inserts If you have any questions,please call, •cos•wood•Pellet•coat Sincerely,Brian S.Nelson17< -___J www.firstfiamefireptaces.com ----------------------J , TOTAL COST OF PROPOSAL AS DEFINED-ABOVE:$ WARRANTY=1 YEAR PARTS&LABOR+MFR.WARR�.TEvR_M_S_5500%.Deposit required upon signing before equipment is ordered.Balance due upon completion of job.ANY-CHANGE FROM THE ABOVE DEFINED PROPOSAL MAY INCUR EXTRA COSTICHARGESIMATERIALS& OR LABOR AND WILL BE DUE AND PAYABLE UPON COMPLETION.QUOTE VALID FOR 30 DAYS.WARRANTY VALID ONLY WHEN PAID IN FULL.In the event of nonpayment our team may stop work until pa ment is made.All legal fees,and finance charges incurred will be the responsibility of the customer.Customers shall hold contractor completely harmless,and shall indemnity,contractor fee,all costs,damage,losses and expenses,including judgments and attorney fees,resulting from Disc OVER any claim against this job. RECEIVED:$ CACK+ VISAMC+ EXP PIN ACCEPTANCE:I HEREBY ACCEPT THE ABOVE DEFINED PROPOSAL ITEMS,PRICES,AND SPECIFICATION. VISA PRINT NAME SIGNATURE DATE MITSUBISHI]� ®UELd[tAL�ISKUTTLE .® TAHREESS WATER HEATERS NipvaO+Pia°ic4 Cooling and Heating Solutions SPECIFICATIONS,&DIMENSIONS Energy Recovery Ventilator ® E E �' C&US 9 O P SL%arIclar cl H V'" -LISTED CERTIFIED' Runeo"[aT 29ss AEa0Vr1 RAiO" e955 INDOOR UNIT SPECIFICATIONS Ventilation Type: Max.Shipping Dimensions&Weight ein carton): _ Static plate,heat and humidity transfer 33"L x 22"W x 29"H TypicalAfrilow'Ran 9.e: 40.110 CFM 65 Ihs. fit Mator(s): UnWis HVWTisted/Certilfed per CSA C439 Oty,2,Standard motorized impeller blowers *.•.... Protocol:-Using one L-100.65 Core -Accessories: Standard Features: Backdraft damper 6",8" t , X. Whitepainted cabinet Automatic balancing dafnper4",5'';6" Line-cord.power supply Louvered wall vent 6"-while,brown 'L _i Low-voltage circuit for controls :Digital time clock-wall mount(TC7D-W); Unit may be.motinted in any orientation in exterior enclosure(TC7D-E)' Cross-core differential pressure ports. Carbon dioxide sensor/control-wall mount(CO2-W), Controls: duct mount(CO2-D) Onboard 24 VAC transformer/relay package [AO sensor-wall mount(IAO-W),duct mount(IAO-D) n —f with switched dry contacts Motion occupancy sensor/control- -� Filters: ceiling mount(MC-C),wall mount(MC-W) Total qty.2,MERV 8,spun-polyester media: Percentage timer control(PTL) 21 3/4"x 101/2"x 1" Push-button point-of-use controls(PBL),PTL req'd. Download specification at: Percentage timer control with furnace interlock(RA) renewaire.com/specifications Uhit Dimensions&.Weight: Dehumidistat control(DH24) 221/2"L x 24"W x 23 3/4"H MERV 13 filter-OA airstream(stripped toose) 51 lbs. Electric duct heater-RH series(1-3 kW); designed for indoor ductwork installation only Note:Indirect Gas-Fired Duct Furnace Is not available'on the EV90P. ELECTRICAL DATA UNIT PERFORMANCE CORE PERFORMANCE HP •Volts` Hz' Phase 'In ut Watts I FLA • rAirllow.CFM ESP fn!H O .Alrflow CFM Temp EFF% Total EFF%a' P : Winter/Summer't 0.03 1 120 60 Single 44 @ 90 CFM 0.'35 42 0.60 42 86 83/71 55 0.50 55 85 82/70 74 0.40 74 84 80/68 87 0.30 87 83 79167 100 0.20 100 82 78/66 r (�®Y 108 0.10 108 I 82 78/65 011 Note:These arecore only ratings and are not IM cenifed. Hyl ratings apply to complete units only.- See HVI certHiraficn ratings on pg.30 of Single/MuIO-Family Catalog. UNIT•DIMENSIONS AMEviAnoNS AIRFLOW ORIENTATION 221/2 EA:6FDuil As to OV0lda ® Available as shown in dimension drawing. Overall o oA•ou:en A:nlaka Rcom Ai to aee.nwtlea I rA:rmur Ai:o mtido 21/.Typ,— I-18-Cosc� INSTAUATIONORIENTATION VNI—y tc{ni!c ca rn any - «:enlalgn. UNIT MOUNTING&APPLICATION Noie Can be mounted in an orientation.-RA/EA airstream Q-rn I.U1ETA NS UE sE ROUNDED ® Y �.>C 14FARESI EIGHTH ARE f At'INCH, INE can be switched with OA/FAairstream. A j �.o NFAREs1EiONIr/OrANI`:CN.. 24V AC A p4 1 0=It2.SPECInCATIONS MAY BESUBRCT Control 0 _L O TO CHANGE K'IUIOUT NOTICE. Terminal - TOP VIEW 23 5/8" 221/4'EAinimum Case 34"Line Cord ° 'Service Area io 08'Nominc{ ` (Door can be Typ• _ Removed from 06"Nomincl Hinges.) _ T OA RA D12 s << 1 1;f r Door 0 0 O i.ii io a f ; •�� Swing!f v a O EA `��•,-✓% PA N N ----------/ -E_F Formed Q I i Inlet Ring Pressure Ports m 0)Typ. LEFT VIEW FRONT VIEW RIGHT VIEW Specifications may be subject to change without notice. P-r��%l RenewAire' IIIF.naryy/trtmeyYudliluflmr FOR THE tAOSTCGt>aPLUE941DCURRUiIMIFORMIA110M.s11S{TRENEWAIRE.COPA ( 15 � EcE0ME 4c, Av JUL 12 2021 NSBUFRINN CODE8 Y Sizing and Selecting a Lifebreath HRV or ERV Step 1:Fallow these general guidelines to determine the best HRV or ERV for your application Option 1:Size your Residential unit by Air Exchange(ac/hr)Method Step 1 Step 2 �FILE 2400sgft(L x W)with9' (H) ceiling, ac/hr=(Total Cubic Volume x.35)/,6 Cubic volume=(L x W x H) or(2400 x 9)x.35/60min =126cfm 'In all cases local and all other codes requirements must be followed Option 2:Size your Residential unit using ASHRAE 62.2(Minimum requirement) Residential Ventilation Air Requirements(CFM/Bedrooms) Sizing MIABLE 4.1a aZ, 3 4 5 Floor Area Sq.ft. <Soo 30 f 38, 45 - 53 60 501-1000 45 C53 60 68 75 V1'001= 500`—"`--60 —6$ I 75 83 90 _ 1501-2000 75� 83 90 98 105 2001-2500 90 98 105 113 120 2501-3000 105 113 120 128 135 3001-3500 120 128 135 143 150 3501-4000 135 143 150 158 165 4001-5000 150 159 165 173 1 180 5000-5001 165 1 173 180 188 1 195 *In all cases local and all other codes requirements must be followed Size your Commercial unit—Note it's recommended o mechanical engineer always be consulted. Application Occupant CFM/Person CFM/SQFT Comments Density/1000sgft Retail Stores 15 10 Classroom 25.35 15 Varies with age Offices 5 10 Conference Rooms 50 15 Hair/Nail Salons 25 20 Do not Undersize Pet Shops 1 Physical Therapy 20 15 Bars/Lounges 100 10 Non-Smoking Health Clubs 40 20 Only 10/1000 in weight room *Swimming Pools 1-10 Varies greatly with temperature Places of Religion 120 5 Generated by REScheck-Web Software Compliance Certificate Project 26x32 (832), RAISED RANCH FI C®PY Energy Code: 2018 IECC Location: Warren County, New York Construction Type: Single-family Project Type: New Construction REVIEWED FOR Conditioned Floor Area: 1,940 ft2 Glazing Area 7% ENERGY CODE COMPLIANCE Climate Zone: 6 (8499 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 33 Warren Lane Clute Enterprises Inc. CLUTE ENTERPRISES, INC Queensbury, NY 12804 6 Holden Ave 6 HOLDEN AVE Queensbury, NY 12804 QUEENSBURY, NY 12804 518-793-7277 CLUTEENTERPRISES@GMAIL.COM I • • . UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 128 Your UA: 128 The%Better or worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules, It DOES NOT provide an estimate of energy,use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Corit. Prop. Req. Prop. Req. Perimeter Ceiling 1: Raised or Energy Truss 832 38.0 0.0 ' 0.025 0.026 21 22 Wall 1:Wood Frame, 16"o.c. 928 21.0 0.0 0.057 ,0.045 47 37 Door 1: Solid 18 0.16014,,i 0.300 3 5 Door 3: Solid Door(under 50%glazing) 18 0.160 0.300 3 5 Window 1:Vinyl Frame 69 0.330, 0.300 23 21 Basement Wall 1: Solid Concrete or Masonry - Wall height: 4.0' 768 0.0 19.0 0.041 0.050 31 38 Depth below grade: 4.0' Insulation depth: 4.0' Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 1 of 9 REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 201$ IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Complies? Comments/Assumptions &Re AID Value Value 103.1, Construction drawings and ( i❑Complies ;Requirement will be met. 103.2 documentation demonstrate 1 113Does Not [PR1]1 !energy code compliance for the 9 building envelope.Thermal ; j 1❑Not Observable 1 envelope represented on 1 1❑Not Applicable 1 construction documents, ! 1 i 103.1, Construction drawings and :❑Complies l Requirement will be met. 103,2, documentation demonstrate 1 403,7 I energy code compliance for ! 1❑Does Not [PR3]1 I lighting and mechanical systems, 1 UNot Observable 1 Q !Systems serving multiple I❑Not Applicable dwelling units must demonstrate lcompliance with the IECC !Commercial Provisions. 302.1, ;Heating and cooling equipment is; Heating: Heating: ;❑Complies ;Requirement will be met. 403.7 {sized per ACCA Manual 5 based ! Btu/hr ! Btu/hr 1❑Does Not [PR2]2 on loads calculated per ACCA : Cooling: 1 1 Manual J.or other methods 1 Btu/hrg 1 Btu/hr ;❑Not Observable approved by the code official. 1 1 :❑Not Applicable 1 r 1 1 1 1 I l 1 1 1 1 1 Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 1,3 1 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 2 of 9 Section:. pian's\Verified. '. Field.�Lecified':,_•;.,- , # Foundation,Inspection Compii, 7 , Comments/Assumptions &Re :ID °Value' Value 402.1.1 {Conditioned basement wall i R- R. ;❑Complies ;See the Envelope Assemblies [FO4]1 insulation R-value:Where interior 1 R- a R_ ;❑Does Not I table for values. 11 insulation is used, verification may need to occur during ; ; I❑Not Observable `Insulation Inspection. Not ;[]Not Applicable ; required in warm-humid locations; t in Climate Zone 3. 303.2 !Conditioned basement wall ; ;❑Complies ;Requirement will be met. [F05]1 'insulation installed per i ;❑Does Not C) manufacturer's instructions. ❑Not Observable j f i❑Not Applicable 402.2.9 Conditioned basement wall ft p ft ;❑Complies ISee the Envelope Assemblies [F06]1 insulation'depth of burial or I ' ;[:]Does Not ;table for values. 0 distance from'top of wall., i ! ;❑Not Observable { ; ;❑Not Applicable 303.2.1 JA protective covering is installed f ;❑Complies ;Requirement will be met. [F011]z to protect exposed exterior I❑Does Not- .. U insulation and extends a minimum of 6 in. below grade: { '[]Not Observable .;❑Not Applicable ; 403.9 Snow-and Ice-melting system ' ;❑Complies :Requirement will be met. [F012]2 controls Installed. j UDoes Not [ 1❑Not Observable ; ❑Not Applicable ; Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 3 of 9 Section plans Verified Field Verified, '. # Framing /Rough-In InspectionComplies? Comments/Assumptions & Re .ID Value Value 402.1.1, 1 Door U-factor. ; U- U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ;❑Does Not table for values. [FRl]1 ❑Not Observable G ; ;❑Not Applicable 402.1.1, 1Glazing U-factor(area-weighted ; U- ; U- ;,[]Complies See the Envelope Assemblies 402,3.1, �average)', I I ❑Does Not ;table for values. 402.3.3, 402.5 ;❑Not Observable [FR2]1 ' ;❑Not Applicable J 303.1.3 U-factors of fenestration products, I❑Complies ;Requirement will be met. [FR4]1 are determined in accordance ;❑Does Not iwith U the NFRC test procedure or ; itaken from the default table. 1❑Not Observable , I ;❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ,. 1❑Complies I Requirement will be met. [FR23]1 installed per manufacturer's 1 "1❑Does Not i instructions, k I 1❑Not Observable ; j❑Not Applicable 402.4.3 ;Fenestration that is not site built ; !❑Complies ;Requirement will be met. [FR20]1 is listed and labeled as meeting f ! 1❑Does Not JAAMA/WDMA/CSA 101/I.S.2/A4401 for has infiltration rates per NFRC f ,❑Not Observable ; ;❑Not Applicable 1400 that do not exceed code i !limits. I I 402.4.5 1IC-rated recessed lighting fixtures' ;❑Complies i Requirement will be met. [FR16]2 sealed at housing/interior finish i �❑Does Not and labeled to indicate s2.0 cfm 1 1❑Not Observable leakage at 75 Pa. - I , 1 , a ;❑Not Applicable ; 403.3.1 Supply and return ducts in attics { "'❑Complies I Requirement will be met. (FR12]1 I insulated >= R-8 where duct is # r E]Does Not >= 3 inches in diameter and >= R-6 where<3 inches.Supply and ❑Not Observable ; return ducts in other portions of 1 111Not Applicable ; ithe building insulated >= R-6 for 1 diameter>= 3 inches and R-4.2 !for<3 inches in diameter. 403.3.2 Ducts,air handlers and filter ;❑Complies ;Requirement will be met. [FR13]1 I boxes are sealed with l❑Does Not 0 joints/seams compliant with ! "_ ; International Mechanical Code or i !❑Not Observable ! International Residential Code, as j❑Not Applicable I applicable. 403.3.5 Building cavities are not used as ;❑Complies (Requirement will be met. [FR15]3 ducts or plenums. I 3,E]Does Not ( ! ;❑Not Observable 111Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3. Low Impact(Tier 3) Project Title: 26x32.(832) RAISED RANCH Report date: 07/30/21 Data filename: Page 4 of 9 Section ' Plans-Verified Field Ver'ifie`d'`. # Framing /Rough-ln,lnspection Complies? Comments/Assumptions & Re .ID •Value Value 403.3.7 Ducts declared to be within the ;❑Complies !Requirement will be met. [FR28]3 ,conditioned space are either 1) I UDoes Not ;e completely within the continuous ;❑Not Observable air barrier and within the building.'( , thermal envelope, 2) buried I - ❑Not Applicable ; within ceiling insulation in accordance with Section R403.3.6 and the air handler is located completely within the i continuous air barrier and within # ' the building thermal envelope I and the duct leakage is <= 1.5 cfm/100 square feet of conditioned floor area served by i the duct system,or 3)the ceiling insulation R-value installed ,, against and above the insulated I I duct>=to the proposed ceiling d Insulation R-value, less the R- ; value of the insulation'on the I t l 403.4 1 HVAC piping conveying fluids 1 R- ; R- ;❑Complies ;Requirement will be met. [FR17]2 labove 105 4F or chilled fluids ;❑Does Not below 55°F are insulated to aR- JQ ; ; 3 I❑Not Observable I ;❑Not Applicable ; 403.4.1 !'!Protection of insulation on HVAC j❑Complies ;Requirement will be met. [FR24]1 i piping, ;❑Does Not J f J❑Not Observable 1 ; ;01\lot Applicable 403.5.3 Hot water pipes are insulated to ; R- R. ;❑Complies ;Requirement_will be met, [FR18]2 zR-3. ❑Does Not. . ;❑Not Observable ; ❑Not Applicable 403.6 !Automatic or gravity dampers are ;❑Complies ;Requirement_ will be met. [FR19]2 I installed on all outdoor air ! ❑Does Not- E �intakes'and exhausts. I• i ;❑Not Observable ; 4 ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: . 07/30/21 Data filename: Page 5 of 9 Section Plans Verified Field Verified # Insulation Inspection Complies?, Comments/Assumptions & Re .ID Value Value. ; 303.1 'All installed insulation is labeled f ZIComplies ;Requirement will be met. [IN13J2 lorthe installed R-values `❑Does Not i provided.' J i ; UNot Observable []Not Applicable 402.1.1,. Wall Insulation R-value, If this is a.; R- R- ;❑Complies ;See the Envelope Assemblies 402.2.5, I mass wall with at least 1/2 of the ❑ Wood ;❑ Wood ;❑Does Not I table for values. 402.2.6 iwall insulation on the wall I❑ Mass I❑ Mass ',[]Not Observable [IN3]1. exterior,the exterior insulation Steel I❑ Steel 1❑Not Applicable r 'requirement applies(FR10). I I I PP I l l l l l l l l l 1 1 303.2 Wall insulation is installed per E❑Complies ;Requirement will be met. [IN411 manufacturer's instructions. j l❑Does Not I ❑Not Observable f f j❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 6 of 9 Section = oians" Ved ted' :::'Fleld Ve'r.ified'.":, # Final.Inspection Provisions, , '* _.Value, Value'.::,`;'°' ' Complies? '.'Comm®nts/Assumptions & Re .ID = 402.1.1, ;Ceiling insulation R-value, R- R- ;❑Complies ;See the Envelope Assemblies 402.2.1, ; Wood ;❑ Wood UDoes Not 1 table for values. 402.2.2, ! Steel '❑ Steel ' 402.2.E ;❑Not Observable [Fill' ;❑Not Applicable 1 I 1 1 1 1 1 1 1 I 1 f 303.1.1.1,ICelling insulation installed a.;,: per € ,.., �-" �##I❑Complies ;Requirement will be met, 303.2 manufacturer's instructions. f. "a' i❑Does Not [FI211 i Blown insulation marked every t I ❑ 300 ft2. I ? ' jNot Observable , I ` ;(]Not Applicable 402.2.3 ;Vented'attics with air permeable = "„: ;;; '❑Complies !Requirement will be met. [FI22]2 {insulation include baffle adjacent .{❑Does Not I to soffit and eave vents that extends over insulation. '[]Not Observable', ..;❑Not Applicable ; 402.2.4 (Attic access hatch and door R- R- ;❑Complies ;Requirement will be met. (FI311 insulation ZR-value of the ,Does Not adjacent assembly. 1 I i❑Not Observable-; ❑Not Applicable 402.4.1.2 ;Blower door test @ 50 Pa, <=5 ACH 50 = ACH 50 = ;❑Complies !Requirement will be met. [FI171' �ach'in Climate Zones 1-2, and- ;❑Does Not <=3 ach in Climate Zones.3-8. 1 I I { ; I❑Not Observable ; ❑Not Applicable 403.3.3 i Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies ;Requirement will be met.- [FI271' Idetermine air leakage with ft2 ft2 �MDoes Not 'either: Rough-in test:Total leakage measured with a tNot'Observable i pressure differential of 0.1 inch ❑Not Applicable ; 1 1 i 1 lw.g. across the system including i,the manufacturer's air handier ; 'enclosure if installed at time of I I test. Postconstruction test:Total o leakage measured with a pressure differential of 0.1 inch o w.g, across the entire system including the manufacturer's air ; i handler enclosure. 403.3.4 'Duct tightness test result of<=4 ; cfm/100 cfm/100 ;❑Complies ;Requirement will be met. [FI411 cfm/100 ft2 across the system or 1 ftz ftz ;❑Does Not <=3.cfm/100 ft2 without air ; I °❑Not Observable handler @ 25 Pa. For rough-in , tests,,verification may need,to a ;❑Not Applicable ; occur during Framing Inspection. ' 1 R 1 1 403.312.1 'Air handler leakage designated {; •, ;❑Complies ;Requirement will be met. [FI241 by manufacturer at<=2%of f ;❑Does Not design air flow, s l , ]❑Not Observable ; '0Not Applicable 403.1.1 !Programmable thermostats ; f i❑Complies ;Requirement will be met. [17I91z installed for control of primary ` r 1❑Does Not heating and cooling systems and initially set by manufacturer to i ❑Not Observable }code specifications. :;❑Not Applicable ; 403.V2 SHeat pump thermostat installed ❑Complies ;Requirement will be met. [FI10? Ion heat pumps, i ❑Does Not UNot Observable ( -;❑Not Applicable 403.5.1Circulating service hot water A {❑Complies ;Requirement will be met. [Fill]2 systems have automatic or PDoes Not accessible manual controls, ( , 1 I❑Not Observable ❑Not Applicable ; 1 Hlgh Impact(Tier 1) 2 1 Medium Impact(Tier 2) 1. 3, Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 7 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Re .ID 403.6.1 'All mechanical ventilation system ;❑Complies ;Requirement will be met. [F125]2 !fans not part of tested and listed 1 ;❑Does Not HVAC equipment meet efficacy ; 1 ;and air flow limits per Table ; {❑Not Observable i R403.6.1. I 1❑Not Applicable 403.2 Hot water boilers supplying heat ;❑Complies i Requirement will be met. [FI26]2 through one-or two-pipe heating ;❑Does Not ;systems have outdoor setback 1 control to lower boiler water ; I❑Not Observable temperature based on outdoor ;❑Not Applicable temperature. I 403.5.1.1 'Heated water circulation systems! ;❑Complies i Requirement will be met. [F[28]2 'have a circulation pump.The 1 ❑Does Not !system return pipe is a dedicated, t❑Not Observable return pipe or a cold water supplyi pipe. Gravity and thermos- L ;❑Not Applicable syphon circulation systems are ; not present.Controls for j circulating hot water system I i pumps start the pump with signal for hot water demand within the occupancy.Controls I I I l automatically turn off the pump when water is in circulation loop 1 ; Is at set-point temperature and I no demand for hot water exists. 403.5.1.2 ,`Electric heat trace systems i ❑Complies ;Requirement will be met. [F]29]2 comply with IEEE 515.1 or UL ;❑Does Not 1515. Controls automatically `adjust the energy input to the ; 1❑Not Observable , ,heat tracing to maintain the ;❑Not Applicable ; !desired water temperature in the { 1piping• 1 403.5.2 ;Demand recirculation water ;❑Complies ;Requirement will be met. [FI30]2 systems have controls that ;❑Does Not 1 manage operation of the pump 1 ,and limit the temperature of the ❑Not Observable , water entering the cold water (❑Not Applicable I piping to <= 1049F. 403.5.4 'Drain water heat recovery units ; ;❑Complies ;Requirement will be met. [FI31]2 tested in accordance with CSA 1 ;❑Does Not B55.1. Potable water-side i ;❑Not Observable pressure loss of drain water heat I recovery units < 3 psi for I 1❑Not Applicable individual units connected to one or two showers. Potable water- }side pressure loss of drain water 1 heat recovery units < 2 psi for 1 1 individual units connected to !three or more showers. 404.1 ;90%or mo ❑re of permanent ' Complies i Requirement will be met. [FI6]1 fixtures have high efficacy lamps.l ❑Does Not I 1 ❑Not Observable ❑Not Applicable 404.1.1 Fuel gas lighting systems have i i❑Complies :Requirement will be met. [FI23]3 no continuous pilot light. } ❑Does Not 1 i❑Not Observable } ;❑Not Applicable [01.3 Compliance certificate posted. i j❑Complies :Requirement will be met. ❑Does Not ' '❑Not Observable , I❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 8 of 9 Section Plans Verified Field Verified. # Final Inspection Provisions Complies? Comments/Assumptions & Re .ID „Value. ;Value 303.3 (Manufacturer manuals for ; IOComplies ;Requirement will be met. [FI18]3 +mechanical and water heating 10Does Not systems have been provided, ; ;❑Not Observable j ;ONot Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1). 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 9 of 9 2018 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.06' Below-Grade Wall 29.00 Floor 0.00 Ceiling[Roof 38.00 Ductwork(unconditioned spaces): Glass & Door Rating • Window 0.33 0.70 Door- 0.16 CoolingHeating & Heating System: Cooling System: Water Heater:_ Name: Date: Comments 3 � r ��nn � Y E- J....---......-...__.-._._..�-. LJ `� u v IL�rf E JUL2 EMS- HVAC Load Calculator � 2021 www.hvacloadcalculator com TOWN OF QUEENSBURY j BUILDING&CODES Date: Wed Jul-7 Loaded Document: gf info Welcome - GFOIL 2021 13:10pm ji copy f1 ` Company Info Client Information ! Company GF HEATING OIL LLC. 1 Name CLUTE ENTERPRISES/33 WAI 1 ! j Preparer - BRIAN NELSON Address1 CLUTE ENTERPRISES 6 HOLE i I ! I � Phone Address2 (518) 792-2220 —� i E i Email - l Address3 brian@gfheatingoil.com J i I Phone ! . Email 308.E-1-57 RC-0557-2021 I i Clute Enterprises Date 07-Jul-2021 M f 33 Warren Ln Single Family Dwelling 819 s.f.. ; ! I I This.HVAC load calculation has been performed using sound engineering principles as prescribed by Manual J.eighth edition and ASHRAE Handbook of Fundamentals. Duct sizing has been ; performed as prescribed by Manual D. 1. Design Conditions(Temp. F) ! O Check If Using Celcius INDOOR OUTDOOR TEMP Front of f South DIFF Building is -- Facing j WINTER 70 -20 90 ` Total 900 Sq.Ft SUMMER 65 95 30 Conditioned I I Area I j � I 12.'Summer Humidity { i Moderately H v 40 Grains i Difference i 3. How Tight is Structure i Average-under 1500 Sq. Ft. Winter Summer Air/Changes/Hr. I � 0 {4. Fireplace Evaluation I Number , . Evaluation CFM none Tight ! i j 5. Number of Occupants generally equals number of bedrooms + 1 i i Overhang Characteristics j i Enter all n-ieasurements decimally 2"=.2 $"_.i 1 ! p_�a w fR az 3"= 3 i 4"= 3 10„= S I 5"=A 11"=A � f� 6"= 5 I s,4+tldrrJ ._. Tdai linear fusmAs tap c£wlw;k"=11 it. Example-2ft S.in.=2.7ft. f i I � i I ; EAST WEST S/SE/SW N/NE/NW 1 Distance of OH from top of 9.6 1.6 1.6 -� 1.6 window (A) � Length of overhang (B) 1 6 � �� 1.6 FI.6 Total linear ft. across top of 0 0 10 11 1 windows located below overhang jSolar GainThrough Glass ! � � l O Check this box if using manufacturer specifications and enter the latitude, U-value and SHGC Latitude 45 U- SHGC i i Value i_ ( Facing Area(sq ft) Type Glass HTM Unshaded Shaded BTUH I , North or 68 Double 24.00 0 94 2,246 Shaded ' i I NE/NW 0 0.00 0 0 0 South 60 Double .. 40.00 34 26 1,376 i SE/SW 0 0.00 0 0 0 i East 0 Double 75.00 0 0 0 ! j i West 0 Double V 75.00 0 0 0 j Does glass have reflective No V 1 3,622 k - � coating? I j Skylight 0 Clear 150 0 I Total 3,622 ! Solar Gain •, S a i ------------_______..____.__—__._.__...-------_..._.__.._._____._---_.__.__._____.----•-- __.______—_ J DUCTS OR PIPES Location(Heating) Duct 0.00 I Conditioned are I Loss ' Location(Cooling) Conditioned are .. Duct 0.00 Gain j Duct/Pipe Insulation I Duct Leakage Area of Attic or 0 I Floor Where Duct is fLocated Attic Temperature(If ( i ducts located in �— attic) , Load Calculation Elements of Load Area or Lin. Insulation/R- U- Heat Heat Gain Latent ( ii I(I Ft value Value Loss Btuh Btuh f Btuh Solar Gain from 3,622 Glass Walt W Gross a � 928 � i Glass 1 128 Double .• 0.56 6,451 i ' Skylight 0 I� 0.00 0 I I Doors 2 Insulate 0.40 72 24 I Net Wall 798 R-21 —JV 0.07 4,668 1,556 I Ceiling ' 816 R-38 0.03 1,909 955 � I , 1 I Floor i 1 . Over Crawl or — 0.05 0 0 R_ 9 ' 0 I Unheated l -_ 1 , i jBasement Open-Beach 0.00 0 0 0 •• i House Above Carport . j Slab On Grade - 0.80 0 0 ! 0 No Insul. � , �. enter-linear ft I j Infiltration=Enter 6528 10,771 1,795 I cubic-ft of f building j People 690 600 r i Appliances E:) 3 i Enter F i Value � I ( Sub Total 23,872 8,645 I € Duct 0 0 331 i Loss/Gain : Total Sensible 23,812 8;645 Load j Latent Load 1,480 Total Latent 2,411 Load { ; I ; f ; I SUMMARY Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons � f I ! 23,872 8,645 2,411 11;056 0.96 OUTDOOR AIR FLOW RATE 31.5 i I * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a-Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. i f Summary Including Basement � 1 j Heating Load Sensible Cooling Latent Cooling Total Cooling Load Nominal Tons 31 Ii t Whole House. (Block Load) Completed Scroll to top For Additional Options 4 i i ------------- Solar Gain Through Glass (E O Check if Using Manufacturer specs I i Latitude 40 U- SHGC I Value I � I I Facing Area(sq ft) Type Glass HTM BTUH f North i ` Shaded 16 —� Double 24.00 384 NE/NW FO 0.00 0 South 0 Single 50.00 0 f I , SE/SW l 0 1 0.00 0 i L J i I j East 0 Double 75.00 0 !, West f { 16 Double �l 75.00 1,200 i I Does glass have reflective coating? EN o 1,584 I ' i Total Solar 1,584 i I � Gain- I i I Basement Load Calculation ; �) jElements of Area or Lin. Insulation/R- U- Heat Heat Gain Latent 1 ! Load Ft value Value Loss Btuh Btuh ! f Btuh I! Solar Gain From 1,584.00 I Glass i Gross Wall Above 232 Grade ! Glass 1 32 0.56 1,613 i Double ! i Doors 0 . 0.00 0 0 ! Net Wall-Above 200 0.04 756 252 i { R-25 i Grade I I Wall Below Grade 696 R-19 v 0.03 1,879 626 Ceiling 0 R-21 .. 0.04 0 0 Floor 816 0.02 1,763 1,763 1 I� i ! Infiltration-Enter 2,693 898 6528 i cubic-ft of i building People 0 0 0 i I Appliances FO I i s � i i Total Sensible 8,703 3,360 Load I I M Latent Load 740 I i I Total Latent 1,040 Load i I Basement Summary Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons 8,703 3,360 1,040 4,100 0.37 !I * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT i ratio at the chosen outdoor design temperature. I M.Room by Room Load Calculation ! Total House Total House System CFM i I Cooling Heating Heat Loss Sensible Heat I p 0 ' ` Gain 32,576 _...._. ...._. _...... j 12,005 i { i � 1 +Add-Room Room HeatLoss HeatGain CFM_Heat CFM_Cool E Name :EeCheck=Calculations-When-Completed f auto- 8,703 3,360 0 0 basement j Totals: 8,703 3,360 0 0 i I Percent Of Original: 26% 27% { li a ! Return Trunk or branch cfm duct air I dia vel First section off AH 0 1st reduction or branch 0 � 1 IE 2nd reduction or branch 3rd reduction or branch 0 4th reduction or branch 0 i i 5th reduction or branch 0 Basement supply and return 0 i trunk Room Runs cfm no of outlet duct air outlets cfm dia vel i auto-basement FO 0. i i --_..-------__----- __......_ _.__.__.._.._...... i i Duct Sizing Completed I jScroll to top For Additional Options -� i Equipment selection as per Manual S Instructions: enter load, weather and manufacture's data in white cells Auto Complete I BTU H Total Heat Loss 32576- Design Outdoor Indoor i Conditions f i Total Heat Gain 15156 -20 70 I � i I � I E Sensible Heat 1r12p05 95 65 Gain ( I Latent Heat 3,150 ID Design RH 50%, 63F WB 1 Gain Sensible/Total 0.79 Altitude 344 j ! Ratio 1 target clg Temp. 21 Predominantly. Heating climate ! i . Drop i I � i ! ' j -I j Manufactures Equipment Specifications ' iEquipment Manufacturer Model BTUH Total Sensible Latent j ! No output(heating) cooling BTUH BTUH BTUH @ OD design i temp ! Furnace RUUD R9 60000 3 �. � ��i.�J 1�C��C i i Boiler 0 r Heat Pump RUUD R�A,1�j �A .j'�!� 24000 0 24000 i or Air �� I I f Conditioner ! j b Evaporator RUUD Coil I I i ! I I ( Air Handler Total 59174.4 23876.16 0 23876.16 ' i ' Capacity I I with i i ! Altitude { ! Correction j Selected OVERSIZED OVERSIZED UNDERSIZED OK ? i Equipment Size ! f ! I Heating CFM Cooling CFM External Static Pressure of i (recommended) Blower 1200 —� 0 i . I Available static presure for Supplemental heat needed for heat ` duct system pump Blower ext. 0 HP capacity C� l 0 I static press 47F I Coil press 0 HP capacity @ Fo I f drop* 17F I j Filter press 0 HP capacity @ 0 I I ; drop* ODDT f Register 0 BTUH 32,576 i press drop supplemental heat ` I Grille 0 Pressure KW 10 i Drop supplemental i heat Other 0 I i i { Other I o i Other 0 Available SP 0 I for duct � I j . Equipment Size Limits 1 ± Air conditioner- Furnace Boiler 1 jI heat Pump �I Cool Climate Heat Climate output output f I E 45,606 45,606 Maximum Size 17,429 18,945 4 ' I I f a FURNACES BOILERS-AIRCONDITIONING ■ ■ ' ■ Ph. 518.792.2220 •PROPANE-#2 FUEL OIL o KERO-DIESEL [till FX. .792-8999 INSTALLATION SERVICE �' 'I www.gfheatingoil.com DATE: `Z"� "1 � 1 JOB NAME/LOCATION: PH: BILL_TO: U,"h-e . Zr1 i�p c wc btr-?_Yl Ltn—LP FX: l Y, Ia�O . N, CELL: EMAIL: Quotation and Contract ovLA MIA- �kTv n Alt=- 2 � � � � Need Supplemental Heat? pE Visit as at............................... JUL 2 2 2021 518-798-2220 •Fireplaces•Stoves-Inserts TOWN OF QUEEN$BURY Si •Gas-wood.pellet-coal you have any questions,please call, Sincerely,Brian S.Nelson BUI LDING& C.ODES www.first/lameflreplaces.com TOTAL COST OF PROPOSAL AS DEFINED ABOVE:$ WARRANTY=1 YEAR PARTS✓£LABOR+MFR.WARR.TERMS.50%Deposit required upon signing . before equipment is ordered.Balance due upon completion of job.ANY CHANGE FROM THE ABOVE DEFINED PROPOSAL MAY INCUR EXTRA COSTICHARGESIMATERIALS& OR LABOR AND WILL BE DUE AND PAYABLE UPON COMPLETION.QUOTE VALID FOR10 DAYS.WARRANTY VALID ONLY WHEN PAID IN FULL.In the event of nonpayment our team may stop work until payment is made.All legal fees,,and finance charges incurred will be the responsibility of the customer.Customers shall hold contractor completely harmless,and shall'indemnity,contractor fee,all costs,damage,losses and expenses,including judgments and attorney fees,resulting from �,5:,•:E� any claim against this job. Yr RECEIVED:$ CACK+ VISAMC+ EXP PIN ACCEPTANCE,I HEREBY ACCEPT THE ABOVE DEFINED PROPOSAL ITEMS,PRICES,AND SPECIFICATION, •PRINT NAME SIGNATURE DATE VISA 6 mi9ire . SKUT f ll~ MITSUBISHI TANKEESS WATER RfATERS ��Imeoo..u.awiarw�n. �''`�ELECTRIC RUUD E§11W11111 Cooling and Heating Solutions NY Q-Z(dc� JUL TOXIN OF G 8,CODES gU1LpIN Sizing and Selecting a Lifebreath HRV or ER Step 1:follow these general guidelines to determine the best HRV or ERV for your application Option 1:Size your Residential unit by Air Exchange(ac/hr) Method Step 1 Step 2 2400sgft (L x W)with 9' (H) ceiling . ac/hr=(Total Cubic Volume x.35)/60 Cubic volume=(L x W x H) or(2400 x 9)x.35/60min = 126cfm 'In all cases local and all other codes requirements must be followed Option 2:Size your Residential unit using ASHRAE 62.2(Minimum requirement) Residential Ventilation Air Requirements(CFM/Bedrooms) Sizing AWOEMIABLE 4.1a 3 4 5 Floor Area Sq.ft. ;? <500 30 =38? 45 - 53 60 501-1000 45 ;53. 60 68 75 = _,'a68i aJ 75 83 90 1501-2000 75 ___ T83 90 98 105 2001-2500 90 98 105 113 120 2501-3000 105 113 120 128 135 3001-3500 120 128 . 135 143 150 3501-4000 135 143 150 158 165 4001-5000 150 159 165 173 180 5000-5001 165 173 180 188 195 *In all cases local and all other codes requirements must be followed Size your Commercial unit—Note it's recommended a mechanical engineer always be consulted. Application Occupant CFM/Person CFM/SQFT Comments Density/1000sgft Retail Stores 15 10 • Classroom 25-35 15 Varies with age - Offices S 10 . Conference Rooms 50 15 Hair/Nail Salons 25 20 Do not Undersize Pet Shops 1 Physical Therapy 20 15 Bars/Lounges 100 10 Non-Smoking Health Clubs , 40 20 Only 10/1000 in weight room *Swimming Pools 1-10 Varies greatly with temperature Places of Religion 120 5