Loading...
RC-0797-2020 Office Use.Only. PRINCIPLESTRUCTURE PERMIT �C Permit#: APPLICATION - rml . Z Town'of Queensbury' Pe t Fee:$ *Rec _ Fee:.$- 742 Bay.Road;Queensbury,.-NV 12804- Invoice.#:.: P: 518-761-8256 www .queensburynet Project:.Location ,3.7 Richmond Hill Drive . - .. Tax Map:#: 308.7-1-48.3 Subdivision Name::Bauuae is TOWN BD RESOLUTION 86=2013:.$850 recreation fee for:new'dwelling units:single family, duplexes/two family; multiplefamily, apartments;condominiums.; townhousesiand/or manufactured &modular homes,but not,mobile . homes: T.his.is in.;add1tlgnto the permit fee(s). :: CONTACT: INFORMATION: 4 Applicant:: Names):.David Howard. -. Mailing Address, C/S/Z: 500 Luzerne Road, Queensbury,'NY 1.2804- . '� _ Cell:Ph.: (_518�361-071.4 .. Land Line:.( ) f ... . . :Email: howard35_2000@yahoo.com Prima. Owners : TOWN OF . _ . .. JEENS UR BUILDING ` CODES Name(s): David.Howard' c Mailing Address, C/S/Z: 50016'erne Road,Queensbury, NY 12804 Cell.Phw:.(51-8)361:=0714 :. -Land Line: (: Email: howard35_2000@yahoo.com : • Contractor(s): . Name(s): DDI) Enterprises Mailing Address, 'C/S/Z:470 West;Mountain Road, Queensbury; NY 12804 Cell Ph.: (518)361-0714: ':Land.Line: Em'ail:,h6ward35_200,0@y6hoo.com Arch itect(s)/Engineer(s):: :. . - Name(s): RucinskF Hall-Arch itecture . Mailing.Address, C/S%Z:. 1.34 Dix Ave,._Glens Falls, NY 12801 - .Cell-Ph..- ( , . Land.Line: (518)741-0268 Email: ephall@nycap.rr.com Contact.Person for Building & Code:Compliance: Ethan-Hall Land Line: (518)741-0268 Ernail:ephall@nycap.rr:com-. - Principle Structure Application Revised January 2019 PROJECT INFORMATION: TYPE: ❑ Commercial N Residential WORK CLASS: N Single-family El Two-family ❑ Multi-family (#of units: ❑ Townhouse ❑ Business Office ❑ Retail ❑ Hotel/Motel ❑ Industrial/Warehouse ❑ Garage (#of cars ❑ Other(describe STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1sT floor:1607 1ST floor:525 2"d floor: 2"d floor: 3rd floor: Total square feet:_525 Basement(habitable space): Total square feet: 1,607 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$_150,000 2. Proposed use of the building:_Single Family Residence 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat: ®Gas ❑Oil ❑Propane ❑Solar ❑Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application,one per appliance) 5. Are there any structures not shown on the plot plan? DYES ENO Explain:_ 6. Are there any easements on the property? ❑YES ENO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? _43,847 SF b. Is this a corner lot? ❑YES ONO c. Will the grade be changed as a result of the construction? DYES ENO d. What is the water source? ®PUBLIC ❑PRIVATE ❑WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? _Private Principle Structure Application Revised January 2019 DECLARATION: I. 1 acknowledge that no construction shall commence priorto issuance ofavalid building permit and work will be completed within a 12 month period. 2. If the work is not completed by the 1year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed 1, or my agents, will obtain a certificate of occupancy. 5. 1 understand that Me are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: _Ethan P: Hall —Architect\Agent for the Applicant SIGNATURE: DATE: 22 Dec 2020 Principle Structure Application Revised January 2019 CHECKLIST-SINGLE FAMILY Project Location : Lot 37 Richmond Hill Drive REQUIRED 2 SETS YES NO N/A 1. Building Permit application, completed ® ❑ ❑ 2. Energy Code inspector's report from REScheck, completed & signed 2 ❑ ❑ 3. Septic alteration application, if applicable ® ❑ ❑ 4. Solid Fuel Burning or Gas Appliance form completed, if applicable ® ❑ ❑ 5. Driveway Permit, if applicable ® ❑ El 6. Structural Drawings: ® ❑ ❑ a. Floor plans b. Foundation plans c. Cross Sections d. Elevations e. Window & Door Schedule f. Natural Light,Ventilation & Emergency Egress 7. Plot Plan: Show proposed structure(s) with setback dimensions ® ❑ ❑ from all surveyed property lines 8. Electrical inspection agency selected 1z JEI JEI CHECKLIST- MULTI-DWELLING/COMMERCIAL Project Location: REQUIRED -2 SETS YES NO N/A I. Building Permit application, completed ❑ ❑ ❑ 2. Energy Code inspector's report from COMcheck, completed & ❑ ❑ ❑ signed 3. Septic alteration application, if applicable ❑ ❑ ❑ 4. Solid Fuel Burning or Gas Applianceform completed, if applicable'' ❑ ❑ ❑ 5. Driveway Permit, if applicable ❑ ❑ ❑ 6. Structural Drawings: 11 ❑ ❑ a. Floor plans b. Foundation plans c. Cross Sections d. Elevations e. Design loads including floor, s now&wind load f. Seismicdesign g. Plans signed & sealed by registered architect or engineer h. Window & Door schedule 7. Plot Plan: Show proposed structure(s)with setback dimensions ❑ ❑ ❑ from all surveyed property lines 8. Electrical inspection agency selected ❑ ❑ ❑ 9. FINALAS-BUILT PLANS SUBMITTED ELECTRICONICALLY ❑ ❑ ❑ Principle Structure Application Revised January 2019 - Office:Use Only j FUEL BURN ING.APPLIANCE.& Permit#: '+ "2Q7� CHIMNEY. APPLICATION Permit Fee:$ . Invoice M. Tani of Queensbury 742 Bay Road,:Queensbury. ;N- Y 12 : - P 518 .761-8256 www,queensbury:net P:roject.Location: _37 Richmond -Hill Driv'e..Tax:M.ap ID: 308.74-48.3 Room :of Install: Family Planned Install Date; _Mar 2020 **ONE AP.PLICATI ON PERAPPLIANCE**` CONTACT INFORMATION''..'. P 0 Applicant Name(s): David.Howard. Mailing:Address, C/S/Z:.500 Luzerne Road;Queensbury;NY-12804 . - Cell Ph.: 518 361.-0714: Land'Lino.:: Email: howard35_2000@yahoo.com �. . . Primary O.wner(s): Name(S):. David Howard. Mailing Address, C/S/Z: :500 Luzern&:Road, Queensbury, NY .12804 Cell.Ph.:-(518)361-0714 an Line:.(:: ) Email: howard35_2000@yahoo.com Installer/Builder: Name(S): DDDJ Enterprises Mailing Address; C/S/Z: 470 West Mountain Road'.Queensbury; NY 12804 Cell.Ph..: (518)361-0.714 Land Line..(.. . Email: howard35_2000@yahoo.com Contact.Person for Building &:Code,Compliance: Ethan Hall Cell Ph.: (.. ) . Land Line: (518)741-0268 Email:ephall@nycap.rr.com - Principle Structure Application Revised January 2019 FUEL BURNING APPLIANCE INFORMATION:= TYPE"OF DEVICE: ❑Stove ❑Fireplace I"nsert ®.Fireplace L7FuelFired,Equipment((jarageOnly,:18'clearanceperlMC304.3). ©Fireplace, factorybuilt ** *" Manufacturer's Name: -Quadeafire QV-32 Model k OV-32 SOURCE OF HEAT: El Wood ❑Coal. OPellet ®.Gas CHIMNEY INFORMATION:" ❑ Masonry(requires'plans to be submitted):,= " " ❑ block ❑brick . ❑stone " ❑.Flue: (] the steel size,-in inches ❑ Material*: ® double-wall ❑ triple-wall -❑ insulated -(*Manufacturer's name: Quadrafire Model#: ) ADDITIONAL INFORMATION: 1. Two .(2) inspections are "required: -A rough-in inspection,-prior to .installation and a final:inspection, after installation:. 2.. ..Manufacturer's -installation manual Must be..available. at the time of inspection. 3. Mason-ry fireplaces &_chimneys.require plans.to"be submitted: 4. - Twenty-four (24) hour notification is required for"nspections: -" Declaration:-.'Construction/"installation must conform to NYS Fire Prevention&Building.Code and/or manufacturer . req uirements.The applicant or.owner agrees to comply_with all applicable laws,- ordinances,-regulations and all conditions that are,part of-these requirements and also will allow the inspector to enter the premises to perform the required inspections. have read and agree to the above: PRINT. NAME,: _Ethan PH all rchitect\Agent for the"Applicant SIGNATURE: DATE: 22 Dec 2020. - Principle Structure Application Revised January 2019 SEPTIC DISPOSAL PERMIT APPLICATION Office.Use Only Permit.#: Town otQucensbury_ Permit Fee:$: ; Ir1VOICe,#: 742 Bay Road,Queensbury,NY 12804 Septic Variance? Yes No P:518-761-8256 wrww.gueensbury.net • Primary Owner(s): Project Location: 37 Richmond Hill Road Name(s): David Howard Tax Map D#:_308.74 48.3 Mailing Address, C/S/Z: 500 Luzerne Road,.Quieensbury,NY 12804 Cell Ph.: (518)361-0714 ;Land Line: Email: howard35-2000@yahool.com • Installer/Builder: Name(s): DDDJ Enterprises Mailing Address, C/S/Z: 470 West Mountain Road,Queensbury, NY 12804 Cell-Ph.: (518)361-0714- Land Line:,( ) E. . . mail:_howard35_2000@yahoo.com • Engineer(s): Name(s)--_Rucinski Hall Architecture . Mailing Address, C/S/Z:_134 Dix Ave;Glens Falls, NY 12801 . Cell Ph.: ( Land Line: (518)741:-0268 Email: ephall@nycap.r..com Contact Person.for Building&:Code.Compliance: Ethan Hall. Cell Ph.:_-(518)260-2888 RESIDENCE INFORMATION: Year Built- Gallons- #of bedrooms X gallons per- total daily flow per day. bedroom 1980 or older 150 _ _ Garbage grinder installed? ❑yes- ® no 1981-1991 130 Spa or hot.tub installed? ❑yes M no 1992-Present 110 3 110 : 330 PARCEL]N FORMATION: Topography ®Flat Rolling ❑Steep Slope %Slope . .. Soil Nature ®Sand ; ❑Loam: [I Clay ❑Other Click or.tap hereto enter text. Groundwater At what depth?+64.inches' Bedrock/Impervious-material. At what depth? NA Domestic Water Supply ®Municipal El Well(if well,water supply from any,septic sy..stem absorption is_ft.).- Percolation.Test Rate: 1'=30" per.minute per ihch.(te'st to 6e completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION:. Tank size. _1;000_gallons(min.size 1,000 gallons,add 250 gallons for each.garbage cylinder or spa/hot tub System Absorption field with#2 stone. Total length._150_ft.;..Each Trench._2_ft. Seepage Pit with-#3 stone How many:. ;Size: Alternative'System Bed or other_type: Holding Tank System . Total required capacity?. ;tank size.. . ;#of tanks NOTES:1.Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be-covered until such time as an as-built plan is received and approved.The installed system must match the septic layout on file—no exceptions. Declaration:Any permit or approval"granted which is based upon or is granted-in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall.be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: Ethan .Hall— chitect\A entfor the Applicant SIGNATURE: DATE: Principle Structure Application Revised January 2019 ibwn Of QueenS61.Lry -David Due11 Highway Superintendent H1g11Way.: 518-761=8212 Department Mark Benware 742 Bay Road-Queensbury,'NY Deputy Highway Superintendent 12801 ----�. 518-761-8210 Phone: (518) 761-8211 Fax: (518) 74574466 DRIVEWAY PERMIT: DATE:_22 Dec 2020 APPLICANT NAME: David Howard TELEPHONE.NO: 518-36.1-0714 ADDRESS TO BE INSPECTED: 37 Richmond,Hill Drive RETURN ADDRESS: 500 Luzetne Road _Queensbury,NY.12804 Applicant.must show exact location and:width of driveways)to be connected to the highway by ., placing stakes at the specified location: The Superintendent of Highways of.the Town of Queensbury has reviewed this application.The following action has been taken: STEP 1: ❑ Preliminary Approval NEED: ❑ Slight swale ❑ Deep swal.e ❑ Level with the road El Level with the top_of the:paved wing Size culvert pipe-to be used (if necessary) ❑ 12" ❑ 15" ❑ 18" ❑ 36" Preliminary_inspection completed by: Date: Approval by Highway Supt: . (or) Deputy Supt: Upon completion, please resubmit1his approved permit for a final approval.- STEP 2: ( ) Final Approval ().Rejected Date: David Duell, Highway Superintendent Mark Benware; Deputy Highway Superintendent , Principle Structure Application Revised January 2019 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (1 of 2) ►` Two (2) full sets of plans Over 1,500 sq. ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties Light and vent room schedule Window schedule with glass size & main doors/Air leakage < .5 cfm for doors, < .3 cfm for windows/Tempered glass in bathrooms Door schedule/Main entrance 36" door Emergency Escape or Bedrooms & Habitable Space Above-grade: 5.7 sq. ft. Grade: 5.0 sq. ft. 24" (h) x 20" (w) minimum 44" maximum height above door Window control devices 24" or less 2nd story or 72" above grade Egress window from basement 5.0 sq. ft. Floor system sizing per table 502.3.1 Residential check ERI or Prescriptive method All foam plastic on foundation & crawl space covered by 15 minute thermal barrier"AA . A Driveway length: 300' or more-12' width required/500' or more,turnaround required Foundation drainage on plans, if required 6" drop in 10' exterior grade Framing cross section for each roof line, vertical fire stopping every 10' where required/joist spans pg. 127 Ice &snow shield-24" from exterior wall 1~ Platforms at exterior doors ^� Stairway headroom 6'8"; all stairs 36" width Stair run and rise J Winder run and rise pJJk Spiral stairs meet requirements Smoke detectors—battery backup & proper location, interconnected- Bathroom fixtures—proper clearance j` Hall width-36" width Handrails more than four risers on open sides Y,, Railing&guards > 30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas yIQ Garage fire separation:%" gable end/5/8" under living space &%" on walls/20 min. door and closer Garage floor sloped Residential Plan Review Revised August 2020 Residential Plan Review: 1- and 2- Family Dwellings � S Attic access: gasket seal & R-value equal to roof insulation �f Roof over 30" —22" x 30 /Crawl spaces 18" x 24" access Y/N/NA (2 of 2) Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected 1 within 15' of sleeping area Soil test results, if required 62& L* t Septic to well or water line separation All paperwork signed Note on plans energy saving light bulbs Blower door test agency paperwork Floodplain Permit required—check map: 2 feet above flood elevation A/p -� Hurricane clips required 4 Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel VES Manuals S &J required for heating system. Cold air return hard piped A Separate room for draft HVAC or hot water heater with fresh air rAff HRV shown and calculations Baffles at eaves for insulations and knee walls Makeup air for range hood >400 cfm --L t,3L-;r Continuous header for garage doors to end wall/3" nailing pattern/strapping Chimney rain cap shown for fireplaces �l�r, ►Z.�Tsvi.'� Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised August 2020 TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY. 12804-5902 Septic System' Checklist N-Plan to scale IC Received peep hole pert test results from engineer/Architect if applicable(Town Apaperroaveol Engineers and Arrchitects)(Ju ne 30 to April 15 Town Engineer for unapproved Engineers and Architects) _All wells on property and adjacent properties shown W C� il„rj *Water line shown Municipal or well 10'separation to any part of system Setback,to property lines show 10'or more for any part of system Y�tseptic tank and pump stations 10'from foundation 50'from any well/lake/wetland 10'from any waterline ALA Septic tank to foundation crawl space/slab on grade,grade in crawl space must be above top of septic tank for 0',Separation required (field verification required) Septic tank sized for number of bedrooms and add 250 gals for Jacuzzi tubs/garbage grindereach J I4- Leech Field 20'from foundation 100'from any well 10'from water line Iq kseepage pit 150'from well 50`from septic tank seepage Pits 3-times diameter apart Septic tank and pump stations over 30 gallons 50'from watercourse or wetland l distance from bottom of trench or system 24"to bedrock r mottling 3 "within 1000'of lake george Leech field 100'from watercourse or wetland Toe of mound or bottom of retaining wall 10'from property line.100'from well 20'from r Foundation N Provide Engineer/Architect stamp for bed or design systems Department of Health Approval for all mobile horse park new systems Flood Plain requirements -NO 2'above established flood elevation to bottom of system 0AU tanks anchored or 2'above.flood elevation " Home of Natural Be"auty ... A Good Place to Live " Genera ted by.FtESchec -Web Software Compliance. Gertifica e Project .37 Richmond,Hill Drive. Model Energy Code: 2018.IECC Location: Glens Falls,-New York 308.7-1-48.3 RC-0797-2020 i construction Type: single-family Howard, David Project Type: New Construction �. .Orientation: Bldg. faces.135.deg. from:North 37 Richmond Hill Dr a .conditioned Floor Area:. 1,607,ft2 SFD w/g S fp 1607 S.f., Garage 525 s.f. Glazing Area.- 12% Climate Zone:- 6 (7635 HDD) . Permit Date: Permit Number: .. . . Construction Site:. Owner/Agent: Designer/Contractor: 37 Richmond Hill Drive . . David Howard Ethan Peter Hall q. Queensbury,NY 12804 500 Luzeme Road.- Rucinski Hall Architecture Queensbury,NY 12804 134 Dix Ave 518-361=0714 Glens Falls, NY 12801 ephall@nycap.rr.com Compliance: trade-off Compliance: 1.3%Better Than Code -Maximum UA-' 301 Your UA-' 297 The%Better or-Worse Than Code Index reflects how.close to.compliance the house is based on code trade-off rules.. It DOES NOT provide an estimate of energy use or cost relative to a minimurrl-code home. ' . . Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor UA Ceiling 1: Raised or Energy Truss. 1,607 38.0 0.0 0.025 40 Wall_1:Wood Frame, 16"o.c.. 626 21.0: 3.6 0:046 25 Orientation: Front _ Door 1: Solid 0.300 6 Orientation: Front al " 21 O window 1:Wood.Frame:Double Pane with Low-E 66 0.290 19 Orientation: Front p Wall 2:Wood Frame, 16"o.c. C) 1 i 363 21.0 3.6 0.046 16 Orientation:Right side {�r) N Window 2:Wood Fralnebouble Pane With Low-E, l C 8 0.290 2 Orientation:.Right side " I Wall 3:Wood Frame, 16"o.c. 0 7 � 626 21.0 16 _ 0.046 22 Orientation: Back. 0 U, ' Door 2: Glass ?� � 40 6.320 '13 Orientation: Back Window 3:Wood Frame:Double Pane with Low-E 102 0.290 . 30 Orientation: Back .Wall 4:Wood Frame,16"o.c. 363 21.0, 3.6 0.046 16 Orientation: Left side Door 3:Solid 18 0.300 5 Orientation: Left Side Project Title: 37 Richmond Hill Drive Model Report date_: 12/22/20 Data filename: . Page 1 of10 Gross Area Cavity Cont. Perimeter Window 4:Wood Frame:Double Pane with Low=E- - 8 0.290 .2 Orientation: Left side- Wall 5:Wood Frame,.16"o;c. 48 21.0. . 3.6 0.046 1 Orientation:Right'side Door.4:Glass 18 .. 0.320 6 Orientation: Right side Wall,6:Woo d•Frame, 16"o.c.. 93 21.0 3,6 0.046 4 Orientation:-Left side Basement Wall 1:Solid Concrete or Masonry. 557 0.0 15.0 0:049 27 nentation: Front. Wall height..8.9'. : : . . Depth below_grade:-7.0' . Insulation depth':8.5' Basement-Wall 2:Solid Concrete or.'Masonry 323 -0:0 15;0 O'649 15 'Orientation:-Right side Wall.height:8.9'. Depth below.grade:.7.0'. Insulation.depth: 8.5'. Window 5-'Wood Frame':Double' Pane with Low-E 12 0.290 3 Orientation: Right side Basement Wall 3:'Solid Concrete or.Masonry . 557. :, 0.0 -15.0 0.049 27 Orientation:Back` . . Wall height:8:91.. . Depth'below grade:7.0' . Insulation,depth:81.5' Basement Wall 4:.Solid Concrete or.Masonry 323- 0.0 15.0 0.049 16 Orientation: Left side . • Wall height:.8.9' .: Depth below grade: 7.0' Insulation depth:_8.5' Window 6:Vinyl/Fiberglass Frame:Double Pane with Low-E 6 .0.290 . 2.. Orientation: Left side . Compliance Statement: The proposed building.design described here is consistent,with the,building plans,specifications,and other calculations.submitted with the permit application.The proposed:biiilding.has beeu design6d-io.meet the 2018 IECG requirements in REScheck Version:.REScheck-Web and to comply with the mandafo " ' ' ` p . ,quire, ent'' i- e• the REScheck Inspection Checklist:. iIIAN. Y- pw.-. :t�R ..> 'Name:Title-. . Sig ure` Date Project Title: 37 Richmond Hill Drive Model Report_ date: 12/22/20 Data filename: . . Page 2 of10 REScheck Software Version REScheck-Web " tns, pectiow-Che' , &I-Ist Energy Code: 2018. IECC Requirements: 100.0%were addressed directly in the REScheck software Text in the ".Commments/Assumptions" column is p_rovided:tiy.the_user"in th' REScheck Requirements screen. For each requirement,the user certifies that a code.requirerrient will be met and how that is documented, or:thatan exception is_beirig claimed. Where compliance is ite'rh`—d.in ' separate_table, a.�reference to that table is provided; section Plans-Verified Field Verified . # Pre=Inspection/Plan"Review Complies? Comments/Assumptions & Req.ID Value Value; 1,03.1, ;Construction drawings,and - ❑Complies ;Requirement_will be met. 103.2. :documentation demonstrate' ❑Does Not [Il ljz ;energy.code compliance for the" Location on.plans/spec:A- J ;building envelope.Thermal ❑Not Observable .'envelope represented on; I]NotApplicable ;constructioh documents: 103.1; ;Construction drawings and' ❑Complies" ,Requirement will be met. 103.2;. 1 documentation demonstrate ❑Does Not 403.1 . ;energy code.compliance for Location on plans/spec:A- - ❑Not Observable Ill- :lighting and,mechanical systems. 1 :Sy§tems'serving multiple,. ❑Not Applicable { ;dwelling units must demonstrate ;compliance with-the IECC A Commercial,Provisions. 302.1, i Heating.and cooling equipment is;.Heating: Heating: ;❑Complies ;Requirement will be met: 4037 (Sized per ACCA Manual S.based Btu/hr':. . Btu/hY. . ❑Does Not [PR2]2 on loads calculated;per ACCA ; Coolie Coolie ;location on plans/spec:A= 9 9 ❑Not Observable Q Manual J•or other methods, Btu/hr .' Btu%hr.' 1 approved by the code official. ; _ ; ;❑Not Applicable- Additional•Comments/Assumptions: -1 High Impact.(Tier 1). 12 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 37 Richmond.Hill Drive Model Report date: 12122/20 Data filename: Page 3 of10 Section Plans Verified Field Verified . # Foundation'Inspection Complies? Comments/Assumptions & Req.ID value Value. ' 402.1.1 ;Conditioned basement wall. R R- ;❑Complies Seethe Envelope Assemblies [F04]1 ;insulation R-value.Where interior.. ; ;table for values. insulation.is u_sed,verification R-. R-. ❑Does Not' . lU ; ;❑Not.Observable ;may need to occur during , Insulation.lns''ktiori:Not ;❑Not Applicable ; ;required in warm-humid locations; ;in Climate Zone 3. 303:2 ;Conditioned,basement wall 10co. plies ;Requirement-will be met: [F05I11 insulation installed per []Does' Not manufacturer's' instructions: Location on plans/spec:A- J ❑Not Observable ;1 []Not Applicable 402:2.9 ;Conditioned basement wall ; ft ft ❑Complies ;See the.Envelope Assemblies [F0:6]1 insulation deptli.of burial or i 1 'E❑Does Not. ;table for values. :distance from top-of wall. CID) ;❑Not Observable EIN , of I Applicable- 303.2.1 'A protective.covering is installed ❑Complies 1 Exception: Requirement is [FO11]2 to protect exposed exterio []Does Does Not ;not applicable. v insulation and extends a minimum.of 6 in.below grade: ❑Not Observable i iE3Not Applicable - 403.9 f Snow-and ice=melting system ❑Complies Exception: Requirement is [FO12]2 pp�controls installed. ❑Does Not' !hot applicable. J ❑Not Observable ; ❑Not Applicable - Additional Comments/Assumptions:. .1 High Impact.(Tier IY 2 Medium Impact(Tier 2) 3 Low Impact_(Tier 3) Project Title: 37 Richmond Hill Drive Model Report date: 12/22/20 Data filename: . Page 4 of10 Section Plans Verified Field Verified" #- Framing/Rough=ln inspection "Complies? Comments/Assumptions . & Req.ID Value Value 402:1.11 ;Door U-factor. U ; U- :OComplies•. . Seethe Envelope Assemblies" 402:3.4 i ❑Does Not table for values. [FRlh ; Or ;❑Not-Observable ; ❑Not Applicable 402:1:1;.: 'Glazing U-factor(area-:weighted . U= ; U- _ElCorriplies ;See the Envelope assemblies 402.3.1, table for values. average). I❑Does.Not 402.3:3, 402.5 {❑Not Observable ❑Not Applicable- 303.1.3 0-factors of fenestration products JEIComplies {Requirement"will be met, [FR4]i. are determined in accordance' ❑Does Not with the NFRC test procedure or Location on plans/spec:A- ,, :taken the default table.. ❑Not Observable";1 j❑Not Applicable. ; 402.4.1.1 ;Air barrier and thermal barrier ❑Complies" Requirement Will,be met. [FR23]1 .":installed per.manufacturer's oboes Not [Instructions. ;Location on plans/spec:A- ❑Not Observable 1. " ❑Not Applicable ; 402.4.3 Fenestration that is not site"built_ ❑Complies . Requirement will be met. [FR20]1 is listed and labeled ais meeting ❑Does Not p AAMA/WDMA/CSA101%LS.2/A440 �. ;or has infiltration rates per NFRC" ❑Not Observable :400 that do not exceed code " . ❑Not Applicable mits.. ; 402,45 IC-rated recessed lighting fixtures ❑Complies" ;Exception: Requirement is" [FR16j2 sealed at housing/interior"fnisH . ❑Does Not riot applicable." and"labeied.to indicate"<_2.0 cfm leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.3.1 !Supply and return ducts in attics locomplies ;Exception: Ducts located [FR12]1 !insulated >=R-8 where duct is;. ❑Does Not - 1 completely inside the . >_3"inches in"diameter and >= building envelope. ft-6 wh"ere<"3 inch ❑Not Observablees..Supply and S , i return ducts"in other portions of. ❑Not Applicable 1 Location on plans/spec:A- 4the building insulated>=R-6for. diameter>= 3 inches'and R=4-.2. :for<3 inches in diameter: 403:3.2 :Ducts,.air handlers and filter ❑Complies " Requirement will be meta [FR1311 i boxes are sealed with ❑Does Not " joints/seams compliant.with 1 Location on plans/spec:A u' I ❑Not Observable International".Mechanicai Code:or 1 :International Residential Code,as tAppliceb a❑No I ,applicable. 403.3.5 1 luilding cavities are not used as ❑Complies Requirement wi11 be met. [FR1513 )"ducts-or plenums. ❑Does Not e ;Location on plans/spec:A- pNot Observable ,1 " i❑Not Applicable 1 High Impact_(Tier 1) 2 Medium"impact(Tier 2) 3 Low Impact.(Tier 3) Project Title: 37 Richmond Hill Drive Model Report date: 12/22/20 Data filename: Page 5 of10 Section Plans Verified Field Verified i # Framing/Rough-In Inspection • Complies? Comments/Assumptions &.Req.lD Value Value. 403.3.7 s Ducts declared to be.within.the_ Complies , Requirement will be met.' [FR28]3 conditioned space are either l). ❑Does Not. ,e, completely within the continuous ;Location-on plans/spec:A air barrier arid within the building ❑Not.Observable I1. thermal envelope,.2).buried' ONot Applicable ; within ceiling insulation in' accordance With Section •- ; i R403.3.6 and the air handler is ; located completely within the'.. 1 continuous air barrier and.within the building thermal envelope. } ; arid.the duct leakage is<= 1.5 .` f cfm/:100 square feet of conditioned floor area served by the duct system,or 3)the-ceiling insulation R=value installed against,and above the insulated_ I duct>=to the:proposed ceiling insulation'R-value;less the R- value-of the.insulation on the_ 403.4 kvk piping conveying.fluids R- ; R- ❑Complies '. ;Exception: Requirement is [FR17]z above.105°F or chilled fluids ;❑Does Not not applicable. v i below 55°F are-insulated ❑Not Observable ❑Not Applicable. 403.4.1 ;Protection of.insulation on HVAC 11komplies ;Exception: Requirement is [FR24]Y .,:piping.. ❑Does Not• �not applicable.. '. Ca ❑Not Observable ; ❑Not Applicable 403.5.3 ;Hot water pipes are insulated.to R-. R- ;OComplies ;Exception: Requirement is [FR18]2 >R_3:.. . ❑Does Not not applicable. J ;❑Not.0bservable ;E]NotApplicable 403.6 Automatic or gravity dampers are ❑Complies: ;Requirement will be met. [FR19]z installed on all outdoor air - ❑Does Not intakes and exhausts. Location on plans/spec:A= ❑Not Observable ❑Not Applicable. Additional Comments/Assumptions: 1 High Impact,(Tier 1). 2 Medium Impact(Tier 2) 3 Low Impact,(Tier 3) Project Title: 37 Richmond.Hill Drive Model Report date: 12/22/20 Data filename:. . Page 6 of10 section. :Plans Verified : . Field Verified Insulation Inspection Complies# ?:., Comments/Assumptions - Req.ID _.Value Value. 303.1 ;All installed insulation is labeled ,l ❑Complies ;Requirement will be met. pN13]2 {or the.installed R=values ❑Does Not e; s provided.. " ❑Not.Observable ; IPNot Applicable . 402.1:1;. ;Wall"insulation.R-value.If this is"a:; R- ; .R- - []Copes'. ;See the'EnveippeAssemti/ies 402.2.5, mass wall With at.least'1%z'of the D:Wood 0 Wood ;Does Not table for values. 402.2.6 ;wall insulation on the:wall -"Mass Mass .. ❑Not Observable. pN311 ;exterior,the.exterior insulation" ; Ire uirement.a lies(FR10). ; Steel Steel U PP Not Applicable. . . q 303.2. ;Wall insulation'is installed per ❑Complies:. ;Requirement will be met. DN411 manufacturer's instructions. ❑Does Not," j Location on plans/spec:A- I❑Not Observable ;1- - ' I❑Not Applicable Additional Comments/Assumptions:. 1.11 High Impact.(Tier 1]. 2 Medium.Impact(Tier 2) 3 Low Im pact(Tier 3) Project Title: 37 Richmond Hill Drive Model Report date: 12/22/20 Data filename:. Page 7 of.10 Section Plans Verified . Field Verified . j • # Final Inspection ProvisionsComplies? Comments/Assumptions &.Req.ID Value Value..'402.1.1, ;Ceiling insulation R-value: ; R= . R- ;'Complies ;See the Envelope Assemblies 402:2.1; ❑ Wood ;❑ Wood Does Not table for values. 402.2.2, 0 Steel ❑ Steel E❑Not Obable 402.2:6 - serv❑Not Applicable [Fill- PP 303.1.1.1,;Ceiling insulation installed per ioco'mpli6s ;Requirement will be met. 303'2 :manufacturer's instructions. ,. ❑Does Not. [FI2]1 Blown insulation marked every Location.on plans/spec:A= 300 ft2. ❑Not Observable 1. . ❑Not-Applicable ; 402.2.3 ;.Vented attics,with air permeable jElComplids ,Requirement will be met. [FI22]2 iinsulation include baffle adjacent. ❑Does Not to-soffit.and eave.vents that . ;Location on plans/spec:A- extends over insulation. ❑Not Observable1 i . ❑Not Applicable. 402.2.4 ;Attic access hatch and door R- R- ;OComplies' ;Requirement Will be met. [FI3]1 ;insulation>_R-value.ofthe : ❑Does Not adjacent assembly. Location on plans/spec':A- ❑Not Observable ;1 ❑Not Applicable ;. 402.4.1.2 :Blower door test @ 50 Pa.<=5 ;.ACH56 = ACH 50'=. ;OComplies ;Requirement will be met. [Fill]', ach in.Climate Zones 1-2, and ❑Does Not. <=3 ach in Climate Zones 3=8: �Location on plans/spec:A- 1 1 - . ❑Not Observable-�1 . ;❑Not Applicable. 403.3.3 ;Ducts are pressure tested to cfm/100 ; Cfm/100 ;❑Complies ;Exception:All ducts and.air [FI2l]' .determine air leakage with ft2 ft2 ;❑Does Not handlers are located within ;either: Rough-in test:Total- conditioned space. leakage measured with a I❑Not�Observable ;pressure differential of 0.1 inch. ; ;E]Not Applicable ; w.g:across the system including: ;the manufacturer's air handler I enclosure if.installed aftime of 1 ;test.Postconstruction test:Total leakage measured with a pressure.differential of 0.1 inch ;w.g,across.the entire system including the manufacturer's air handler enclosure: 403.3:4 I Duct tightness test result.of<-4 ; cfm/100 ; cfm/100 . ;❑Complies . ;Exception:All ducts and air. [FI4]? cfm/100_ft2 across the system or ft2 ft2 ;❑Does Not- handlers are locatd within <=3 cfm/100 ft2 without air i conditioned space.- handle r.@ 25 Pa. For rough=iri ; 1❑Not Observable f .tests,verification may need to. ;❑Not Applicable ; occurduring Framing inspection. 403.3.2.1 ,Air handler leakage designated_ ❑Complies ;Requirement will be met. [FI24]1 :by manufacturer at.<=2%of IODoes Not design air flow. Location'on plans/spec:A- ❑Not-Observable ❑Not-Applicable 403.1.1 Prograrrimable thermostats ❑Complies ;R m equireent-will,be met. [FI9]2 installed for control of primary. ODoes Not heating and cooling systems.arid. I Location on plans/spec:X. ❑Not_Observable ; initially set.by manufacturer to 1 code specifications. ❑Not Applicable 403.1.2 ;Heat pump thermostat installedi ❑Complies ;Exception: Requirement is- [FI70]2 on-heat pumps. ODoes Not not applicable. i ❑Not Observable ❑Not Applicable . 403.5.1 ;Circulating'g service hot water j❑Complies ;Exception:'Requirern6nt is. [FI11]2 i systems have automatic or `ODoes Not not applicable. accessible manual controls. ❑Not Observable ; IE]NotAo'plicia ble 1 High Impact(Tier 1). 2 Medium impact(Tier 2) 3 Low Impact_(Tier 3) Project Title: 37 Richmond.Hill Drive Model Report date: 3.2/22/20 Data.filename: Page 8 of10 Section Plans Verified . . Field Verified ' # Final Inspection Provisions Complies? Comments/Assumptions & Req.ID Value Value. 403.6.1 'All mechanical ventilation system {[]Complies Requirement will be met. [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy {{ ;Location on plans/spec:A- and air flow limits perTable ❑Not Observable 1 R403.6.1. 'QNot Applicable 403.2 Hot water boilers:supplying heat. l❑Complies ;Exception: Requirement is [FI26]z through one-or two=pipe heating 1❑Does-Not not applicable. systems have outdoor setback f control to lower:boiler water 4 ;❑Not Observable itemperature based on outdoor J❑Not Applicable temperature: . . . 403.5.1.1 ;Heated water circulation,systems ❑Complies ;Exception: Requirement is [F128]2 l have a circulation pump.The Oboes Not not applicable. Isystem return pipe is a dedicated return pipe or a cold,water'supply ❑Not Observable, pipe.Gravity and thermos- I❑Not Applicable syphon circulation systems are not present.Controls for 1 circulating hot water system, PUMPS start the pump with signal ;for hot water demand within the ;occupancy.Controls automatically turn-off.the pump when water is in circulation loop, is at set-point temperature and i no demand for hot water exists: f 1 403.5.1.2 Electric heat trace systems ❑Complies;. . 'Exception:.Requirement is [F129]2 comply with IEEE 515.1 or UL ❑Doe's Not j not applicable. 515..Controls automatically adjust the energy input.to the ❑Not Observable I heat tracing to maintain.the ❑Not Applicable desired water temperature in the j piping.. 403.5.2 Demand recirculation water ❑Complies 1 Exception: Requirement is [F130]2 systems have controis.that [:]Does- Not not applicable. manage operation of the pump and limit.the temperature of the ❑Not Observable I i water entering the cold water ❑Not Applicable piping to<= 1049F. 403.5.4 ;,Drain water heat recovery.units '❑Complies ;Requirement will be met. [F131]2 ;tested in accordance with CSA I❑Does Not B55.1.Potable water-side 1 ;Location on plans/spec:A- pressure loss of drain.water heat S❑Not Observable 1 recovery.units<3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat.recovery units<2 psi for iridivid;ual units connected to l !three or.more showers. I 404.1 190%.or more of permanent ❑Complies Requirement will be meta [FI6]1 ;fixtures have high efficacy lamps. �E]Does Not, ` Location on plans/spec:A- f❑Not Observable ;1 UNot Applicable . 404.1.1 Fuel gas lighting,systems have i0Complies ;Requirement will be met. [F[23]3 'no continuous pilot light. l❑Does Not A i❑Not Observable ;Location on plans/spec:A- IONot Applicable 401.3 ;Compliance certificate posted. t❑Complies Requirement will be met. [F17]2 ; ;❑Does Not f 1❑Not Observable ❑Not Applicable j .1 High Impact.(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 37 Richmond Hill Drive Model Report date: 12/22/20 Data filename: Page 9 of10 v Section Plans Verified Field Verified . 3` # Final.lnspection Provisions = Complies? Comments/Assumptions & Req.ID Value Value. 303.3 I Manufacturer manuals for. ❑Complies ;Requirement will be met. [FI18]3 mechanical and water heating ❑Does Not systems.have been provided. ❑Not.Observable . ❑Not Applicable . Additional Comments/Ass,uniptions: 1 High.Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 37 Richmond.•Hill.Drive Model Report date: .12%22/20 .Data filename:. Page 10 of 1� 2018 IECC: Energy Efficiency Certificate Insulation . Above-Grade Wall 24.60 - Below-Grade.Wall 15.00 Floor OAO Ceiling /Roof 38A0 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window: 0:29:. . . 0.33 Door 0.32 . . : 0.33 CoolingHeating& Heating System: - Cooling System: Water.Heater: Name: : Date.•. . . Comments �E r k. l :rJf ^A F l °nh yy -".t, .SY:r. '.3'R, 4n• � � "�:� jam'.. `-w• `.b �Y.°u'r f" Env .�y�'Y.+t 1�' C .i'�a - _:`v`-'✓�_+It' ,�ri.�,T:ht� a}T f '�'M.,$`�":LZ.- i%�":4. `?,'•, _ yN L.u,. f�J5 vk2• _ •5> ,..;,r4^::+�•�;'„ :@i: ., ',v`e.ret•,:.`: .(t�� i' �.� ,�;t.•�i' - .,5+'.a ,`s�� ..,,.tit :;}- dry=id L,�t, � - _,,:5' y'. •a.2 -�.�- '_ '.r,::t 'ryry++'}y:,�: -. - q :�?*.n rr.,, i��fF. yi.•�Rr.i '€,IL i F'L l.�t., :''S. `Sq i�t?.��" .�,;14.sr;�:.. .�..vrf n'': ���.it•.fyy 4�ry�+' ,p-�•,�• "-,;,4:*=•" ! .:fir.— ! `.y. - ,.jg^o::•i _ ma -;'asl-y} �,: _ .y -G`,.`.i-f� .��'i?��-°M���s"� �Y";.F-.T���^,..�:-.:":•,.':,.:.p:•.�s-.sry 'fd _ ':iN�W: "-Y,_�.• .�1't-a�'•�,3'. - i M � y4?',�,"�4 A1wit%:, �^':' =`r,S r'L,. ..�L '' •^'V F.'�..` _ _ .?;�i: ��-->`�•'`S:`"'."���n �Jai ii 3y.. }, q.ash^•-•. -- :frij•-'.'.:.• Y �:'b: �3•^ ::.3�4^' ,2.,;-;.::fir+' :-�a, { - .5�,."4,c ^iv/~ •�• k� >.y'�,r.-f,�.'•,. ._. a, a-W,'.;:s.^-'�,.'+ n:.. 'xtr V .t:" £: _ f��t� } ��� q .�}-` W'�?^•:>��::',....-:".v 5{�'V�1•of `, ,_�:. ,'c�� _ - sf,�y_ .�x,.gtr, ,zi'>`��'' h'i.�:-,?;�z-;..,t.,r!•. '`r '�,.':'.- .•:.' Ci: , 'k.i .�9', .":.3;�. _ •EC•'."-.;M.Q,Y.+..:. .S,4T: •;'G►- A: �3 r'�"Fw--� �Y '%� r y� is�', G°'•i:';�:_;.��;.;_.- ,�„-�•µ „7�,. S'7vr^ - .'.5(...�+�' _�' ;::;y:*`•.'''-:.. ,:_:• •,.f;>.mar^'r.���k,.^+�•-, s�" '''' •`4s'`,� 4 J '.�'1��.' :iy'�^fw+"421:rirS`; - y:7-�'--v:"•'="�''-„'�: :.pi�4.h�� i'.YF�' `•'hSyti rj: w'�- '`t��.,. _•, �?' �, •;''3: `•��ii�YSx:C'••.,:^j_,.., iyE4�,,-. `�',,' - i`C,• :s4,�R' :".• '::�';. fa..^w y^.tip';:> ')'^,•���,' ;' [@ fit' .:. .. ':�a'F - - -14•l - •p_*.; i.�. 2..: t4`..,.,�•` •`,7 ' ' 1? 'fir: �„�,r.:.� '•:vu.?''��-'•''X.n` :>....-.::. _ ...;'��=o,tn,,e.• r t z�•.p.. �-?aa _^.{�;• :mil- .. t]F - j qt•-::.4 :v`5+:.[r'.:<:;J:�' ^ t .I d�r�f�+Sr,�, 1' MM µ R CT % � .- Fy q �,12?:nr'^v,��° },iG.Y`� - 4!,4...,�_ .. .. •'e:+n,. - � ,_,_ �e•<,�. �,.,,� rL-ia.�t-:-tea. y Cb eq .'• "c '.4 An easy, efficient way to freshen the air in your home. 'F A"breath of fresh air"doesn't have to be just a nice expression.It's something you can experience everyday with the Healthy Climate"Ventilation Control System.This innovative solution provides r proper ventilation—one of the most effective ways to improve the air quality inside your home. Compatible.with any forced-air system,the Ventilation Control System connects to an outside wall to allow the right amount of fresh air to enter your home.The result is improved comfort,air quality and !F efficiency—in a word,refreshing. J'--"a .:1.'E✓i���=G.JG vi1 t•�?.i51 ......iOZV?4. :. �... _ J C. t•'v��✓ �.°i..i_J..t:..;l.l. The system's electronic controller monitors Easy-to-use controls allow you to manage the . outdoor temperatures and indoor humidity amount of fresh air inside your home based on our individual references,giving you increased levels,automatically adjusting fresh air as y p 9 g Y :. needed to ensure the proper balance inside comfort and control.And since the Ventilation r your home.A tinter manages the quantity of air Control System comes with a 2-year limited entering your home for improved efficiency and warranty,you're ensured fresh,cleaner**indoor lower energy cqs% air for years to come. �4 IFeatures J How it works 'How it helps `~ 1 " ((Motorized Damper !Works like a valve,automatically Y Helps keep the air inside ni i(connects to outside wall) l allowing or shutting off fresh air your home fresh,cleaner and `'�"�`' • ' i as needed. comfortable.* 24-Hour rimer r Manages the cjantity of air Helps control energy costs. i entering your home,providing ;•. „' ventilation only when you need it. l Electronic Controller I Helps manage indoor air quality Balances temperature and I I by responding to outdoor humidity for improved indoor k jtemperatures and indoor comfort and air quality. humidity levels. User Controls Allows you to manage air ^~ Offers greater fiexibility and j i exchange and circulation based comfort. Ion your individual needs. I i `Applies'to residential applications dnly,see actual.warranty certificate for.details. `*Deperidingon the out'sideairquality. ti " ;L'a ^ all ` � �'� ' ;��' � + (, � � . —� ` �` � ' ' � � � '' ' ^ 0 qXV . Bulletin No.210406 PRO8DKyCY SPEC0F0CAT0ONS Supmedes Maymm M COO Whole-housevanU(oUon{orhnprovedindourakquoU� � and comfort. 'n^� Automatic monitoring of outdoor temperature and indoor relative humidity, Compatible with any forced oirHVAO system. Digital Ventilation Controller ia installed in the return NODE- These modes below utilize the Outdoor duct ofa forced air HVACsystem. Temperature Sensor(funnisheu) 0n increase comfort and Meets ASHRAEO2.2'2UiU Standard for Ventilation. reduce energy costs by preventing extreme hot, cold or hu/n�da�hnmbe/n�usodbxwon��/ebhohouuo VVodkingin conjunction with the suppUeddompe[ the . Digital Ventilation Controller determines when and The Digital Ventilation Cm,bnVnrp/even1yyontilabnn how long 0o ventilate.This ia done through continuous opnmdon when indoor relative humidity i&above 55% monitoring of indoor relative humidity, outdoor and the oubide,temperature is above 50^F8oprevent temperature,and user-adjusted timer settings. excess indoor//un/kditylevels. Indoor relative humidity io monitored to help prevent D8odmB: Timer Controlled Ventilation(with high humidity conditions inside the house,The Digital temperature and humidity limits) Ventilation Controller will not open the damper Uuthe Uses outdoor temperature, indoor humidity, and user- outside air if there is o chance of raising the humidity adjustable timer settings to determine when ventilation inside the house tohigh levels. is required. 0k��k��b�0..�dgQ�pgd�e0�g�yQi���..~.^~.-�'_�~.^.&|kuwa000na|uQnd|admn.mperoUnn^duwm-tu^2Q:F^~�=~~��^''� recommended. Ll/CG can be used with an exhaust fan outdoor temperature without heafing and down hoO"F tu provide balanced ventilation. Per AGHRAEO2.2, with heating.Also prevents ventilation operation<f 2D1O`very cold climates are those that have more, than outdoor air temperature ia above 1O0^For below O^F. 0OO annual heating degree-days based on66"Fday, [Node C: Tinier Controlled Ventilation for Cold WARRANTY Climates (with temperature and humidity limits) AH Covered Components'Five year limited warranty Uses outdoor temperature, indoor humidity, and user- in reaidenUa|app/ioatiuno' adjustable 8mer settings tn determine when ventilation Refer to Lennox Equipment Limited Warranty cart is required. ' included with unit for specific details. Allows normal ventilation operation down toO"P outdoorh»mpenob/ro./UoopreVentnven0adnn MODE SELECTOON operation if outdoor air temperature ia above 1UU^For The Digital Ventilation Controller operates in one uffour bu\mwO°F available modes. Mode D: Timer Controlled Ventilation for Warm Modes are selected by the installer inside the Digital Climates (with temperature and humidity limits) Ventilation Conti-oiler by means ofa4-way rotary DIP Uses outdoor temperature, Indoor humidity-, and user- switch. adjustable timor settings hu determine when ventilation Mode A: Timer Controlled Ventilation (no is required. temperature u,humidity limits) Allows normal ventilation operation down tn40^F Used for time-based ventilating regardless of outdoor temperature without heating and down boU"F temperature orhumidity. with heating.Also prevents ventilation operation\f This mode may bo required by local codes. outdoor air temperature io above SO^Fcv below 0"F. ^ , ' L /�` COMPONENTS Controller Settings Kit includes Digital Ventilation Controller, motorized \AmmUlatkon Time~Set by the kqubon front exterior uf ° damper, outdoor temperature sensor, and 24VAC controller. Unlimited settings from Off hoGOminutes. transformer, Test-~TE8T"setting |m all the way clockwise nnthe Controller Ventilation Time knob.This setting ix used to check the Coo�d|ormtinnta|haUon. |n Test mode the Ventilation|nput22to30VAC. 2.0VAnumina� Controller activates the HVAJG blower and opens the Damper Output: 18to3O VAC, 1 OVA nominal damper for one.minute or until the knob io taken off the Temperature accuracy: j:5"F ' "Taot'setting,whichever occurs first.After the minute. Relative Humidity Accuracy:±696RH has passed,the Ventilation Conti-oiler will not work unb|the knob im placed in the"off'position for several Ventilation Time: O'8U minutes (aaladobia) oouondo�honaa�ingittu�hodaoirudvend|etionbme. K4untbein�a||odat least G inches up'otnoom�om0eoh air intake duct, humidifier or humidifier bypass duct Outdoor Temperature Sensor work. Senses outdoor temperature and reports bothe Indoor Humidity io measured in the return duct With a controller, sensor built into the Controller. Sensor should be installed in the fresh air intake hood N0TE' This system may not bo installed with upower- (field provided) orin the intake duct, no more than th»ed robbing thermostatfeet from the outside wm|} ' If the outdoor temperature in above 1OU"F of-below O°F, the dampor will not open. Damper 0 in. diameter, 10'3/4(n. length NonnoUy`donad. power-open 24 VAC/O.31 amp/Two-wire Transformer . i2UV primary, 24 VAC secondary 1 OVA output '! Y �, VENTILATION TIME SETTING'MINUTES PER HOUR ,Size of House- Number of Bedrooms The time settings determine when and how long 100 '-- hovonU|mto.Thafn|lowingohnrtuonbeuoadbo '^"'=""" determine the time settings. For a more precise way 2001'e500 of determining ventilation thne, see the Ventilation VVorkohooton the following page. NOTES-Table based on ASHRAE 62.2-2010 Based on20 ft.flexible-fresh air duct mAthn1s in.°�static A longer v"mur lower return static pressure xm/increase the ventilation time xqmreu / Local codes may affect the time nemnus�, Quality of air is regulated by preventing ventilation when CFM required is based on A.SHRAE Ventilation the outside air is too hot,too cold,or could raise the Standard,the area and occupancy of the house. relative humidity in the horne above 55%. CFM delivered is based.on length of fresh air intake Quantity of air is regulated by setting the Ventilation duct, static pressure of the return, and the type of duct. Time. The following three steps will help assure proper adjustment of the controller. Step 9 -Determine Ventilation Air Required(per ASHRA1E Standard 62.2-2010) 120 -.-^ ____._...._. , Find square footage of house on __ s. •. l__ .__._:_ _.:}_3_ _i.__'__._ horizontal axis. i Example:A 7.300 sq;ll.3 bedroom - Drawavertical line up from the fdgl Itomnwould requite 53 CFh4 — bottom to the point that intersects the �_t__ ••;-- t -(-;• • . i;•.,..>:.1;,._., ;_,Shed!��_, °-. line for the number of bedrooms in b dl" the house. 50:•._7_ -. - -' -- ---'—' o 't" _ ._.."e.d�nnnl`•c---•` From the point where the house size ti �''� ��^ �j'ri��r��:�-`f.;--•, _; 4��-.,��- ��"�--'adI`e�t:..�; i ? .f 5"�i'~• r�'`w' ) i i �� t^ ~lr•.-•.�r.�.,_._ r;,r..1-�('-�•lam i and bedroom lines intersect, draw a horizontal line to the left(vertical) axis to determine how much ventilation air(CFM) is required. NOTE-ASHRAE 62.2-2010 calls for j r ~� r �_, : ._. , ' i t , • ='_' 1 CFM of ventilation per 100 square feet of house plus 7,5 CFM perfit bedroom plus an additional 7.5 CFM. JJ------�-_-�� .� _ .--:`--- : . - � • IOOD 1500` 2na0 250D 3000 3500 4000 •I500 5000 House Size(sq.ft.) Step 2-Determine How Much Ventilation Air the System will Deliver Ventilation Air the System Will Deliver'•CFM Using the table, '-Static Pressure of Return Duct-in,w.c. determine how much Length of 6 in. _ CFM can be brought diameter 0.05 0.10 0.16 0,20 0.25 0.30 into the house based fresh air intake duct Flex Rigid Flex Rigid Flex Rigid Flex Rigid Flex Rigid Flex Rigid on the length and type loft 60 65 85 90 105 110 120 125 135 140 150 160 of fresh air duct used 20 ft. 55 _60 80 85 100 105 115 120 130 135 1140 150 as well as the static 30 ft. 50 55 75 80 95 100 110 115 125 130 130 140 pressure in the return air duct. I For the static pressure shown,the Ilex duct is laid loose with two wide 90'bends and[tie damper fully open.For rigid pipe the __ -•values are:based.on-two=90*,elbovls:atid,the:dainper-fullycopeti ForbotlrtypLs of•dudthe-Eiif-intake'is'femtinale�'witli'afielal've0f hood with a birdscreen.Adjust airflow up or down'for variations,including elbows or bends,or if the length of duct isn't listed. 300 Step 3-Ventilation Controller Setting r Example•If 53 CfM is required and 110 S ' 1 contro0er knob to 30 minutes pen c�. ....,. Using the value obtained in Step 1, _�.__ i• .:_;" -- iw�__---::'::_ x locate the CFM required on the left (vertical) axis and draw a horizontal i_.: :. :_ ._ . _;._!___ _1__1 h•. :�°-:'` I_ ::: line to the end of the chart. 200 1_ - .-, Using the value obtained in Step (_.-. ;__ f )- 1 ,__ .; , t .r_•...__....ram.__..i.: .___;(. :; 2 locate the CFM Delivered on the ' -t { `�' rM ✓ horizontal axis and draw a vertical ,5D line up from the bottom to a point beyond the vertical CFM required i line. ).. _ .l ).; �{ { t...,... The point where the two lines }rr�f 'i' _t fr. intersect Indicates where the r•� �j�-;••-•.. Yr ,��--~�;••'f ;� It ' i- • _l___ , Ventilation Time should be set. It 50.1:-- --~ v .1.._ —r^��.-7:!_7) may be necessary to estimate the precise setting if the intersection �..= "' "'-- -= " �' ;-' ' jW" - ~. _'`�i•'. " f point falls between two lines. 0 50 100 150 200 250 300 CEM Delivered LVCS Ventilation control System!Page 3 4 Sections Description of Change l: Features Damper actuator updated. Visit us at www.lennox.com For the latest technical information,www.lennoxdavenet.com Contact us at 1-800-4-LENNOX NOTE-Due to Lennox'ongoing commitment to quality,Specifications,Ratings and Dimensions subiect to change without notice and without incurring liability. Improper installation,adjustment,alteration,service or maintenance can cause property damage or personal injury. Installation and service must be,performed by a qualified installer and servicing agency. Cc 2016 Lennox industries,Inc. 37 Richmond Hill Drive HVAC Load Calculations for Dave Howard&Pete Davis Prepared By; Greg Watson Appolo Heating &Cooling 868 Burdeck St Schenectady,N.Y Thursday, December 24,2020 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. Rhvac-Residential&Light Commercial HVAC Loads: Elite Software Development,Inc. Appolo Heating Inc. 37 Richmond Hill Drive Schenectady,NY 12306 Page 2 Pro ect Report General Project Information Project Title: 37 Richmond Hill Drive Designed By: Dave Howard&Pete Davis Project Date: Thursday, December 24, 2020 Client Name: Dave Howard&Pete Davis Company Name: Appolo Heating&Cooling Company Representative: Greg Watson Company Address: 868 Burdeck St Company City: Schenectady,N.Y Design Data Reference City: Schenectady, New York Building Orientation: Front door faces North Daily Temperature Range: Medium Latitude: 42 Degrees Elevation: 378 ft. Altitude Factor: 0.986 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: 1 0.31 n/a n/a 70 n/a Summer: 87 72 49% 50% 75 30 Check Figures Total Building Supply CFM: 778 CFM Per Square ft.: 0.244 Square ft. of Room Area: 3,190 Square ft. Per Ton: 1,930 Volume (ft3): 30,630 Building Loads Total Heating Required Including Ventilation Air: 47,721 Btuh 47.721 MBH Total Sensible Gain: 16,894 Btuh 85 % Total Latent Gain: 2,938 Btuh 15 % Total Cooling Required Including Ventilation Air: 19,832 Btuh 1.65 Tons(Based On Sensible+ Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\37 Richmond hill drive.rh9 Thursday, December 24, 2020, 9:43 AM Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc. Appolo Heating Inc. 37 Richmond Hill Drive Schenectad NY 12306 '�°. Pa e 3 Miscellaneous Report System 1 Lennox Outdoor Outdoor Outdoor Indoor Indoor Grains Input Data r)ry Bulb Wet Bulb'. Rel.Hum -Rel-Hum Dry Bulb Difference Winter: 1 0.31 80% n/a 70 n/a Summer: 87 72 49% 50% 75 29.96 Duct Sizin In uts Main Trunk Runouts Calculate: Yes Yes Use Schedule: Yes Yes Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg./l00 ft. 0.1000 in.wg./l00 ft. Minimum Velocity: 0 ft./min 0 ft./min Maximum Velocity: 900 ft./min 750 ft./min Minimum Height: 0 in. 0 in, Maximum Height: 0 in. 0 in. Outside Air Data Winter Summer Infiltration Specified: 0.280 AC/hr 0.150 AC/hr 143 CFM 77 CFM Infiltration Actual: 0.280 AC/hr 0.150 AC/hr Above Grade Volume: X 30,630 Cu.ft. X 30,630 Cu.ft. 8,576 Cu.ft./hr 4,595 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration: 143 CFM 77 CFM Total Building Ventilation: 0 CFM 0 CFM ---System 1--- Infiltration&Ventilation Sensible Gain Multiplier: 13.02 = (1.10 X 0.986 X 12.00 Summer Temp. Difference) Infiltration&Ventilation Latent Gain Multiplier: 20.09 = (0.68 X 0.986 X 29.96 Grains Difference) Infiltration &Ventilation Sensible Loss Multiplier: 74.87 = (1.10 X 0.986 X 69.00 Winter Temp. Difference) Winter Infiltration Specified: 0.280 AC/hr(143 CFM), Construction:Average Summer Infiltration Specified: 0.150 AC/hr(77 CFM), Construction: Average C:\...\37 Richmond hill drive.rh9 Thursday, December 24,2020, 9:43 AM Rhvac-Residential 8�.LightCommercial HVAC'Loads::: "` ;:,;, :; °`Elite Software Development,Inc: Appolo Heating Ind: :r•;.` u°i' „37 Richmond Hill Drive Schenectad NY�12306 =': 'S`..a Pa e 4: Load Preview Report Net itz San Lat Net Sen Htg Cig Act Duct Scope I Ton rron Area" Gain Gain Gain Loss CFM CFM CFM Size Building ! 1.651 1.9301 3,190, 16,894" 2,938� ^19,832i -`47,7211 628: 7784 _._778`__...__ System 1.651 1,930s-.3 2, 38 19,632,1901 16,894 " _938 1 47.7211 628;;' 778 778' 10x15 _i.. 938� 132 ... s � 3,190? 16,894' 9,8 ''__.__..___:_ --.-- _ 2, ,-,- .?-^ 47,721;`-...628 _�;,778• 778 10x15 17Basement 1,600 2,933' 672[ 3,6051 14,874- 196 135 135 2-6 2 Bedroom 2 169 1,806, 459! 2,2651, 3,7761 50`.',-83 83, 1-6 3-Bathroommall " 91 900+• 29j 9291 1,526� 20'''• "41. 41s 1-5 4-Bedroom 1 169= 1,825 459' 2,284 3,6231 48 84 84 1-6 5-Dining Area 108: 9= 381 968, 2,251: 30 ' , 43 43 1-5 6•M, tchen i 96; 719• 34: 753 1,587; 21 33 33 1-4 7-Master Bedroom i 210. 2,277, 759i 3,036; . 3,328; 44 105 1051 1-7 8-1Nic/hall 105:, 681` 29 710' 1,656; 22, 31' 31, 1-4 9-Master Bath .1201 761 97 858 3,274 43 35 35' 1-4 10 Stairs 72� 602; 921 694, 2,211' 29 28 28: 1-4 11-Mud Room = 66 609 21[ 630 1,109 15 ; 28 28: 1-4 12-Laundry Room : 64 732 671 799, 1,931, 251, 34 34' 1-4 13-Living Room i 1 32 2,120i 1821 2,302! 6,575' 87 •,`. 98 98 1-7 C:\...W Richmond hill drive.rh9 Thursday, December 24,2020, 9:43 AM Rhvac-Residential✓3<Light Commercial HVAC Loads Elite Software Development,Inc. Appolo Heating Inc. 37 Richmond Hill Drive Schenectady,NY 12306 Page 5 Duct Size Preview Room or Minimum Maximum Rough Design SP Duct Duct Hq Clg Act Duct DuctName Source Vdocty Vdoc�ly Factor U1001 Loss Vdocty Length Flow Flow Flow Size System 1 i Supply Runouts Zone 1 .._..-. - _. . __ .. ..... ... - - 1-Basement Built-In 0! 750; 0.01 0.1 344.2; 196L 1351 135 2-6 2-Bedroom 2 Built-In 01 750) 0.01' 0.1 423.8 50 1---8-31. 83 1-6 3-Bathroom/hall ;Built-in 0; 7501 0.01; 0.1' 304 201 411 41 1­5 4-Bedroom 1 Built-in 0; 750i 0.01 0.11 428.3, 48 J84' 84 1-6 5-DiningAxea Built-in 0' 750i 0.01 0.1 314.2 30��4 43 1-5 6-Ktchen Built-in 0! 750+ 0.01 0.1 379.9; 21) 33! 33 1-4 7-Master Bedroom Built-In 0! 750' 0.01, 0.1 392.6•, 44 105_ 1-7 8-Wiclhall Built-In 0 750 0.01 0.1 359.6! 22��31 31' 1-4 9-Master Bath Built-in 0 7501 0.01 0.1 401.7• 43[T35� 35 1-4 _. n_ ... ._ .; 10-Stairs Built-In 0 7501 0.01 0.1 317.6' 29 28, 1-4 11-Mud Room Built-In 0: 750, 0.01` 0.1 321.5 15 t 28! 28 1-4 12-Laundry Room Built-In 0: 7501 0.01 0.1 386.7! 25 -_.�, 34 1-4 ��.... . 13-Living Room Built-In 0. 7501 0.01 0.1 365.5� 87=98; 98 1-7 Other Ducts in System 1 SupplyMainTnnk Built-In 0; 9001 0.003: 0.1. 747.3; 628j 778i778; 778 10x15 Summary System 1 Heating Flow. 628 Cooling Flow. 778 C:\...\37 Richmond hill drive.rh9 Thursday, December 24, 2020, 9:43 AM Rhvac-Residential&Light Commercial HVAC Loads. Elite Software Development,Inc. Appolo Heating Inc. �' 37 Richmond Hill Drive Schenectady,NY 12306 Page 6 Total Building Summary Loads Component Area Sen Lat Sen Total Description Quan Loss Gain Gain Gain Anderson: Glazing-Anderson, U-value 0.28, SHGC 0.3 161.3 3,115 0 2,024 2,024 Slider: Door-Slider Generic, U-value 0.28 40.8 788 0 263 263 Therma Tru 90 Min: Door-Therma Tru 90 Min, U-value 19 184 0 61 61 0.14 Front Door: Door-Front Door Generic, U-value 0.19 20.4 267 0 89 89 12D-Obw: Wall-Frame, R-15 insulation in 2 x 4 stud 1440 8,544 0 1,116 1,116 cavity, no board insulation, brick finish,wood studs, U-value 0.086 12F-Obw: Wall-Frame, R-21 insulation in 2 x 6 stud 1615.5 7,246 0 799 799 cavity, no board insulation, brick finish,wood studs, U-value 0.065 16B-38: Roof/Ceiling-Under Attic with Insulation on Attic 1590 2,851 0 1,944 1,944 Floor(also use for Knee Walls and Partition Ceilings),Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-38 insulation, U-value 0.026 21 B-28-c: Floor-Basement, Concrete slab, any thickness, 1600 1,656 0 0 0 2 or more feet below grade, R-3 or higher insulation installed below floor, carpet covering, 28'wide, U- value 0.015 19A-Ocp: Floor-Over enclosed crawl space, No insulation 1249 9,551 0 1,663 1,663 on exposed walls, sealed or vented space, passive, no floor insulation, carpet or hardwood, U-value 0.295 19A-Otp: Floor-Over enclosed crawl space, No insulation 341 2,817 0 490 490 on exposed walls, sealed or vented space, passive, no floor insulation,tile or vinyl, U-value Subtotals for structure: 37,019 0 8,449 8,449 People: 4 1,400 1,800 3,200 Equipment: 0 0 0 Lighting: 1625 5,541 5,541 Ductwork: 0 0 0 0 Infiltration:Winter CFM: 143, Summer CFM: 77 10,702 1,538 998 2,536 Ventilation:Winter CFM: 0, Summer CFM: 0 0 0 0 0 AED Excursion: 0 0 106 106 Total Building Load Totals: _ 47,721 2,938 __ 16,894 19,832 Check Figures Total Building Supply CFM: 778 CFM Per Square ft.: 0.244 Square ft. of Room Area: 3,190 Square ft. Per Ton: 1,930 Volume(ft'): 30,630 Building Loads Total Heating Required Including Ventilation Air: 47,721 -Btuh 47.721 MBH Total Sensible Gain: 16,894 Btuh 85 % Total Latent Gain: 2,938 Btuh 15 % Total Cooling Required Including Ventilation Air: 19,832 Btuh 1.65 Tons (Based On Sensible+ Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\37 Richmond hill drive.rh9 Thursday, December 24,2020, 9:43 AM Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc- Appolo Heating Inc. 37 Richmond Hill Drive Schenectady,NY 12306 Pa a 21 System 1 Room Load Summaty Htg Min Run Run Clg Clg Min Act Room Area Sens Htg. Duct Duct Sens Lat Clg Sys No Name SF Btuh CFM Size Vel Btuh Btuh CFM CFM --Zone 1-- 1 Basement 1,600 14,874 196 2-6 344 2,933 672 135 135 2 Bedroom 2 169 3,776 50 1-6 424 1,806 459 83 83 3 Bathroom/hall 91 1,526 20 1-5 304 900 29 41 41 4 Bedroom 1 169 3,623 48 1-6 428 1,825 459 84 84 5 Dining Area 108 2,251 30 1-5 314 930 38 43 43 6 Kitchen 96 1,587 21 1-4 380 719 34 33 33 7 Master Bedroom 210 3,328 44 1-7 393 2,277 759 105 105 8 Wic/hall 105 1,656 22 1-4 360 681 29 31 31 9 Master Bath 120 3,274 43 1-4 402 761 97 35 35 10 Stairs 72 2,211 29 1-4 318 602 92 28 28 11 Mud Room 66 1,109 15 1-4 321 609 21 28 28 12 Laundry Room 64 1,931 25 1-4 387 732 67 34 34 13 Living Room 320 6,575� 87 1-7 366 2,120 182 98 _98 System 1 total 3,190 47,721 628 _ 16,894 2,938 778 7_78 System 1 Main Trunk Size: 10x15 in. Velocity: 747 ft./min Loss per 100 ft.: 0.098 in.wg Cooling System Summary Cooling Sensible/Latent Sensible Latent Total Tons Split Btuh Btuh Btuh Net Required: 1.65 85%/15% 16,894 2,938 19,832 Actual: 1.83 75%/25% 16,500 5,500 22,000 Equipment Data . Heating System Cooling System Type: Natural Gas Furnace Standard Air Conditioner Model: ML196UH070XE36B-* 13ACXN024-230A** Indoor Model: C35-36B*+TDR Brand: MERIT 90 MERIT 13ACX SERIES-RFC Description: Natural Gas or Propane Furnace Efficiency: 96 AFUE 13 SEER Sound: 0 0 Capacity: 64,000 Btuh 22,000 Btuh Sensible Capacity: n/a 16,500 Btuh Latent Capacity: n/a 5,500 Btuh AHRI Reference No.: n/a 10256965 C:\...\37 Richmond hill drive.rh9 Thursday, December 24, 2020, 9:43 AM RUCINSKI BALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall 134 Dix Avenue �JC: Glens Falls NY 12801 Voice 518 741 0268 Fax 518 741 0274 Email ephail@nycap.rr.com 37 Richmond Hill 19 July 2021 Charles Dyer—Town of Queensbury Building Department 742 Bay Road Queensbury NY 12804 Re: Installation of New Sewage Disposal System At the above referenced project location this office observed the installation of the new septic tank, distribution box and distribution laterals prior to backfill. The attached drawing reflects the.leach field placement as constructed. This installation is acceptable to this office. If there are any questions please contact.,our.,office to discuss:' Regards, Ethan-Peter Hall ;L D E LEE ArchitectJUL 19; ,' a 'N�.=..,sue, TOWN OF QUEENS►3URY BUILDING&CODES �� QUILT 1