CC-0081-2021 1 1
Office Use Only
ADDITION/ALTERATION PERMIT Permit#:-CC- 00b,k ^ 2021
Town ofQuccns6ury APPLICATION Permit Fee:$
742 Bay Road,Queensbury,NY 12804 Invoice#: ZZ'
P:518-761-8256 www.aueensbury.net
Flood Zone? Y N Reviewed By:
Project Location:J' \rjc0 r%r}V1 .
Tax Map ID#: 523400 308 .16-2-4.1 Subdivision Name:
PROJECT INFORMATION:
TYPE: Residential X Commercial, Proposed Use:
Single-Family —Two-Family _Multi-Family(#of units ) _Townhouse
_Business Office _Retail _Industrial/Warehouse _Garage (#of cars_)
X Other(describe Manufacturing )
7 ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE:
1st floor: 1st floor:
2nd floor: 2nd floor:
jr,3 floor: 3rd floor: -
Basement(habitable space): Basement(habitable space):
Total sq ft: Total sq ft: �
8� yvid
Scope of work to be done: Insulate exterior walls for now
QV I LIE
FEB 2 4 2021
TOWN OF QUEENSBURY
BUILDING& CODES
Addition/Alteration Application Revised January 2021
4
ADDITIONALPROJECT INFORMATION:
1. Estimated Cost of Construction: $ 85, 000 .00
2. Source of Heat(circle one): XGas —Oil —Propane _Solar—Other
Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application
3. Are there any structures not shown on the plot plan? —YES XNO Explain:
4. Are there any easements on the property? YES X NO
I —
I
SITE INFORMATION:
• Is this a corner lot? -t�, YES I NO
• Will the gradebe changed as a result of the construction? —YES VIVO
• What is the water source? x PUBLIC PRIVATE WELL
• What type of wastewater system is on the parcel? x SEWER PRIVATE SEPTIC
I
DECLARATION:
i
1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be
completed within a 12 month period.Any changes to the approved plans prior to/during construction will require
the submittal of amended plans,additional reviews and re-approval.
2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of
7 Queensbury.After 1 year from the initial application date, 100%of the fee is retained.
I
3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees
and department approval.
4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description
of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws
and ordinances, and in conformance with local zoning regulations.
5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of
occupancy.
6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of certificate of occupancy.
have read and agree to the above:
PRINTNAME: E. Georcre B ock
SIGNATURE: DATE: 15 12 - ��
Addition/Alteration Application Revised January 2021
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL
• Applicant:
Name(s): Hacker Boat Company Inc
Mailing Address, C/S/Z: 8 Delaware Ave Silver Bay NY 12874
Cell Phone: 973 ) 590-9058 Land Line: ( 57 S ) 543-6666
Email: eqb@hackerboat.com
• Primary Owner(s):
Name(s): Robert Perkins Jr
Mailing Address, C/S/Z:_15 Michael Rd Fort Edward NY 12828
Cell Phone: ( Land Line: 518 ) 798-4041
Email: =erki nsrpcgrl i ng11 5(agma i 1 rnm
❑ Check if all work will be performed by property owner only
• Contractor(s): (List all additional contractors on tfhe back of this form)
Contact Name(s): Snyder's Drywall Inc
Contractor Trade:
Mailing Address, C/S/Z: 1555 Saratoga Rd Fort Edward NY 12828
Cell Phone: 518 ) 361-0105 Land Line: 518 ) 761-0979
Email: dan@snydersdrywall.com I
**Workers' Comp documentation must be submitted with this application"
• Architect(WEnei nee r(s):
Business Name: Saratoga Design Build
Contact Name(s): Dana Scot
Mailing Address, C/S/Z: 70 Beacon Street Bolton Spa NY 12020
Cell Phone:_�) Land Line: 518 ) 269-2984
Email: danascot@gmail.com
Contact Person for Compliance in regards to this project: Dave Sollenberger.
Cell Phone:() Land Line: 518 ) 543-6666
Email: dave.sollenberger@hackerboat.com
Addition/Alteration Application Revised January 2021
• Contractor(s):Workers' Comp documentation must be-submitted with this application
Contractor Name(s): Snyder's Drywall Inc
Contractor Trade:
Mailing Address, C/S/Z: 1555 Saratoga Rd Fort Edward, NY 12828
Cell Phone: 518-361-0105 Land Line: 518-761=0979
Email: dan@snydersdrywall.com
• Contractor(s): Workers' Comp documentation must be submitted with this application
Contractor Name(s):
Contractor Trade:
Mailing Address, C/S/Z:
Cell Phone: Land Line:
Email:
• Contractor(s):Workers'Comp documentation must be submitted with this application
Contractor Name(s):
Contractor Trade:
Mailing Address, C/S/Z:
Cell Phone: Land Line:
Email:
P Contractor(s): Workers' Comp documentation must be submitted with this application
Contractor Name(s):
Contractor Trade:
Mailing Address; C/5/Z:
Cell Phone: Land Line:
• Contractor(s):Workers' Comp documentation must be submitted with this application
Contractor Name(s):
Contractor Trade:
Mailing Address, C/S/Z:
Cell Phone: Land Line:
Email:
Addition/Alteration Application Revisedlanuary 2021
...................... ......
—Y—M ..........
�4------- —-------------------- ---------- ------------V�=_.
.. cp. -------
.............
ti
wwsoo;.
. .........
FILE COPY
• jn.mr."„� .�e.r
e
yrry + ♦ �' I .r en o h.• r�.,�,,'.�"'...•'. ]cr ro m em rem �naa mm�a i'0'�we[]ivra airnt eanr�
t Al wm J:- �•,��,,�;;�,�;�` ,� - ��y 4 { . •�6,dp° i• nm nx a+e ucw zraa]e✓resv:.w—
Tamil mx ;. -••••••,<,ome�m.'mrae J Ps- ure 1mnArwN
NO w:r�a�•_�•a11°' - —a ar« rmrn u�rem�ane
CONGRE(E PAVEtSE3ff I ravoem uu.Yuo<ax
w S.R F f=a m-+ h --- .w..mr.°�:<^°np b<m r<ua •�'�b e°&� _n,ra,« �„w rxswso
N
..`.Y ac , J ecb C-^- c.��d.—�� WYG ]tAl✓•]I]4C ]eLA J.t],Ls� � i-rrx•� evr rm raca.mm° aus°arn• 1o°°u J.ieoeR am,J.vi<x
em wn
� Q °'• .oa< 9ILMT*N TF�LH
IN&T PAVVW
LOCATION MAP ravm]c
�wrre amoi. +•u anuRemum
�� It
�m rm<o w« raenauw]mr nwacnirc��nus 1 _ \� o �,q�,mQ vcarurc unru•�ivacxs eca®
xas eaawea
'•Z 'c AS
1 NOR.41 MY90t0 PYIT
pir ro Ou1R <.s bL11 UDIf 011E +, m5T NP V.—
lw
M WCAPPED AC6BSABLE PARKNS PAC BS t ��
MAP F�1GE P �; rts+a sw �� I �.
°°<nm,ree RmT .'a"aea ea eci`•°'°ie r'tm` ., - � uR uiowmen..
mR axm+rrn ao r.]m.mr a Rma rce.ox°aR.n<c urn\ oar ran.s-�f n•a� - - ir.,r w�� J. @�', �.a,�%�j a�
INtTLTHATION TEST ..•.^..:^'.•:..r"r:rrF,-3••:.^._ - z
sr•_-mmmr n - arcro,•;,,r•.v�• ' .. ,. .. ,
C`
r. bit
-gros]r Ym m.e I RrfsrzRJ 1,• j/ b L .'' �
EXI$TMB f•2T/J.91DPD .®. - � p l
EB40 SF p?x a - j � L T
_ I rci _^ ? rRr sr:an wv a BUILDING NO. L
e, .� �� �p �-�Q'-��- '••- r/llRdli°I Rif I!.Reb.]eTO' N'Y Qi[Y dRlmre N:.NWCXI NLY LaG1L1[rm a5�wui O O � --
r.'to;ci' id1 <Y
G �•y''r�Jt' �- wa v m I Runrf,Mfu�R `.•�-�".�.'.�r .1...-. °d.T � C1< ..
wA I G
•�'}.�-•'},'r„`.'; :�:. - x v swam —IRt'' ",lruwm rcva rum aRm]w uwnce iaa
_~�-w wru � faw¢6-ai srtRr aI CMfrALmr
- 'oa rzm m rq ravT nur ga>a<u ° rm fie° vnerte r>enn: / O
ORN'9 _ - aGRprawaaT tr..rY
5EDR4'NI Comm Iva RRA o�:,r'",. ?' '•Stan _ -
e]o97w rary.OVev i ® NACE
`_ " `•1 .-ur r rrnitwc?� IENGtNEERINGI
_'y`~••-_ �rre• 1 BUILDING NG. 2X.tiF-
T.... fae ^ I Er:-'r'r BTORA&E
SOIL STOGa'lE PLAfl I rRun MRu]°' _ •tl : �wilts.
n.�smgrinrurw ma es qr� I �-�19TORA6E rvy.:. '
r �Q:••s• ova.eou.,am
_ __ wr�'i °um wiur�rara•'' aouiaoa , � -
_ r c.nar
�y�.�.:�«;>�.�•^.. 7 - - - - - •-�"�- -_F-�=`- r�m�r.= - - - F - - ] nor` i �..��rv+'<�cmmn
^=• CAREY ROAD a
IrM ROAD
.�,.,....•.�.�.�.�_ _._^� - .._ _ p_ _ - - - _ _ _�_ -I_ __4— - - - - _.� - _ __�. - - -_per 1� I DETAILS
�)) SITE LAYOUT PLAN •`�� SP-1
308.16-2-4.1 CC-00812021 J
Hacker Boat Co
315 Corinth Rd
Exterior Alts (insulation) 830 linear ft
Carey Road
to
94
I r
Q
0. V
Hil
Mi
C3
- ---------------------
EF
to
>
4J
S-1
COMcheck Software version 4.1.5.1
Envelope Compliance Certif E 0 W E
MAR 0 2 221
Project Information
Energy Code: 2018 IECC TOWN OF QUEENSBURY
Project Title: Hacker Boat Facility
BUILDING&CODES
Location: Glens Falls, New York
Climate Zone: Al FILE COPY
Project Type: Alteration I� COPY
i
Construction Site: Owner/Agent: Designer/Contractor:
315 Corinth Road David L.Sollenberger Pasquale Marchese,AIA LEED AP BD+C
Queensbury, NY 12804 Morgan Marine General Manager Bottega of Architecture
315 Corinth Road 1431 Rocco Drive,Schenectady NY 12303
Building Area Queensbury, NY 12804 Floor Area bottega.of.architecture@gmail.com
(518)469-2131
1-Manufacturing Facility: Nonresidential 40375
Envelope Assemblies
R-Value Proposed Max.Allowed
Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
Floor Slab:Slab-On-Grade:Unheated,[Bldg.Use 1 - -- --- 1.000 — 0.540 --
Manufacturing Facility]
Roof:Metal Building,Screw Down,[Bldg.Use 1 -Manufacturing -- -- --- -- -- --
Facility],Exemption:Framing cavity not exposed.
NORTH
North Wall:Metal Building Wall,[Bldg.Use 1 -Manufacturing -- --- -- -- --- --
Facility],Exemption:Framing cavity filled with insulation.
Overhead Door:Other Door,Garage door 14 7.25292e- — -- 0.310 -- 0.310 —
2661azing,[Bldg.Use 1 -Manufacturing Facility]
Overhead Door:Other Door,Garage door 14 7.25292e- -- -- 0.31 b -- 0.310 ---
2661azing,[Bldg.Use 1 -Manufacturing Facility]
Egress Door:Uninsulated Double-Layer Metal,Swinging,[Bldg. -- --- 0.370 — 0.370 Use 1 -Manufacturing Facility]
EAST
East Wall:Metal Building Wall,[Bldg.Use 1 -Manufacturing — -- -- — — --
Facility],Exemption:Framing cavity filled with insulation.
Egress Door:Uninsulated Double-Layer Metal,Swinging,[Bldg. --- --- 0.370 -- 0.370 ---
Use 1 -Manufacturing Facility]
SOUTH
South Wall:Metal Building Wall,[Bldg.Use 1 -Manufacturing -- -- -- -- — --
Facility],Exemption:Framing cavity filled with insulation.
Overhead Door:Other Door,Garage door 14 7.25292e- -- -- 0.310 -- 0.310 --
2661azing,[Bldg.Use 1 -Manufacturing Facility]
Overhead Door:Other Door,Garage door 14 7.25292e- -- -- 0.310 -- 0.310 --
2661azing,[Bldg.Use 1 -Manufacturing Facility]
Overhead Door:Other Door,Garage door 14 7.25292e- -- -- 0.310 -- 0.310 --
2661azing,[Bldg.Use 1 -Manufacturing Facility]
Egress Door:Uninsulated Double-Layer Metal,Swinging,[Bldg. -- -- 0.370 -- 0.370 ---
Use 1 -Manufacturing Facility]
WEST
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 1 of 10
R-Value Proposed Max.Allowed
Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
West Wall:Metal Building Wall,[Bldg.Use 1 -Manufacturing -- --- -- -- -- --
Facility],Exemption:Framing cavity filled with insulation.
(a)'Other components require supporting documentation for proposed U-factors.
(b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope
Envelope Compliance Statement
Compliance Statement. The proposed envelope alteration project represented in this document is consistent with the building
plans, specifications,and other calculations submitted with this permit application.The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Pasquale Marchese,Architect A/. dj / 03-01-2021
Name-Title Signature Date
ti5 pLE Mqq �/J.
car.�C
o,
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 2 of 10
COMcheck Software Version 4.1.5.1
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Re .ID
C103.2 ;Plans and/or specifications provide all ;❑Complies ;Requirement will be met.
[PR1]1 iinformation with which compliance I❑Does Not
;can be determined for the building
;envelope and document where :❑Not Observable
exceptions to the standard are 1❑Not Applicable
;claimed. ;
C402.4.1 ;The vertical fenestration area <= 30 ;❑Complies ;Requirement will be met.
[PR10]1 ;percent of the gross above-grade wall CDoes Not
;area. t❑Not Observable
❑Not Applicable
C402.4.1 ;The skylight area <= 3 percent of the ;❑Complies ;Requirement will be met.
[PR11]1 gross roof area. PDoes Not
❑Not Observable;
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 3 of 10
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Re .ID
C303.2 ;Slab edge insulation installed per ;❑Complies ;Requirement will be met.
[FO4]2 manufacturer's instructions. E❑Does Not
❑Not Observable
❑Not Applicable
C303.2.1 ;Exterior insulation protected against ;❑Complies ;Requirement will be met.
[FO6]1 damage,sunlight, moisture, wind, ;❑Does Not
;landscaping and equipment i
;maintenance activities. 1❑Not Observable
:❑Not Applicable ;
C105 ;Installed slab-on-grade insulation type ;❑Complies ;See the Envelope Assemblies table for values.
[FO3]2 .and R-value consistent with insulation ;❑Does Not i
jspecifications reported in plans and
COMcheck reports. ;❑Not Observable
❑Not Applicable ;
C402.2.4 ;Slab edge insulation depth/length. ;❑Complies ;Exception: Requirement does not apply.
[FO7]2 (Slab insulation extending away from ;❑Does Not
;building is covered by pavement or :See the Envelope Assemblies table for values.
{>= 10 inches of soil. :❑Not Observable
❑Not Applicable
C402.2.6 iRadiant heating systems panels ;❑Complies ;Exception: Requirement does not apply.
[FO12]3 ;insulated to >=R-3.5 on face opposite :❑Does Not .
;space being heated. :See the Envelope Assemblies table for values.
;❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 JH1gh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 4 of 10
Section
# Framing/Rough-In Inspection Complies? Comments/Assumptions
&Re .ID
C303.1.3 ;Fenestration products rated in ;❑Complies ;Exception: Default values are used.
[FR12]2 accordance with NFRC. []Does Not
;❑Not Observable;
❑Not Applicable
C303.1.3 ;Fenestration products are certified as ;❑Complies ;Requirement will be met.
[FR13]1 Ito performance labels or certificates :❑Does Not
provided. ;❑Not Observable;
;❑Not Applicable
C402.4.3 ;Vertical fenestration SHGC value. ;❑Complies ;See the Envelope Assemblies table for values.
[FR10]1 UDoes Not
;❑Not Observable;
❑Not Applicable
C402.4.3, ;Vertical fenestration U-Factor. ;❑Complies ;See the Envelope Assemblies table for values.
C402.4.3. ;❑Does Not
[FR8]1 1❑Not Observable
;❑Not Applicable ;
i
C402.4.4 ;U-factor of opaque doors associated ;❑Complies ;See the Envelope Assemblies table for values.
[FR14]1 with the building thermal envelope PDoes Not
meets requirements. ;❑Not Observable;
;❑Not Applicable
C402.5.1 ;The building envelope contains a ;❑Complies ;Requirement will be met.
[FR16]1 continuous air barrier that is sealed in I❑Does Not
an approved manner and either
,constructed or tested in an approved ;❑Not Observable 1
manner.Air barrier penetrations are I❑Not Applicable
;sealed in an approved manner.
C402.5.2, ;Factory-built fenestration and doors ;❑Complies ;Requirement will be met.
C402.5.4 fare labeled as meeting air leakage :[]Does Not
[FR18]3 arequirements.
;❑Not Observable;
;❑Not Applicable
C402.5.7 (Vestibules are installed on all building ;❑Complies ;Exception: Requirement does not apply.
[FR17]3 entrances. Doors have self-closing PDoes Not
devices.
I ;❑Not Observable;
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 5 of 10
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C402.5.5, iStair and elevator shaft vents have :❑Complies . :Exception Requirement does not apply.
C403.2.4. motorized dampers that automatically i❑Does Not
3 close. Refernece section C403.7.7 for ' i
[ME3)3 operational details. UNot Observable:
❑Not Applicable
I 1
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 6 of. 10
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
&Re .ID
C405.6 ;Low-voltage dry-type distribution ;❑Complies ;Exception: Requirement does not apply.
[EL26]2 electric transformers meet the 1❑Does Not
,minimum efficiency requirements of ;
;Table C405.6. :❑Not observable:
❑Not Applicable
C405.7 ;Electric motors meet the minimum ;❑Complies ;Exception: Requirement does not apply.
[EL27]2 ;efficiency requirements of Tables :❑Does Not
�C405.7(1)through C405.7(4).
{Efficiency verified through certification;❑Not Observable
under an approved certification :❑Not Applicable
;program or the equipment efficiency
;ratings shall be provided by motor i
;manufacturer(where certification
;programs do not exist).
C405.8.2, ;Escalators and moving walks comply ;❑Complies ;Exception: Requirement does not apply.
C405.8.2. ;with ASME A17.1/CSA B44 and have :❑Does Not
1 ;automatic controls configured to ,
[EL28]2 ;reduce speed to the minimum ❑Not Observable
;permitted speed in accordance with t]Not Applicable
;ASME A17.1/CSA B44 or applicable i ;
;local code when not conveying
{passengers. ;
C405.9 ;Total voltage drop across the ;❑Complies ;Exception: Requirement does not apply.
[EL29]2 ;combination of feeders and branch ;❑Does Not
circuits <=5%. 1
! ;❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 IHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 13 JLow Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 7 of 10
Section
# Insulation Inspection Complies? Comments/Assumptions
& Re .ID
C303.1 ;Roof insulation installed per ;❑Complies ;Requirement will be met.
[IN3]1 manufacturer's instructions. Blown or I❑Does Not
poured loose-fill insulation is installed
;only where the roof slope is<=3 in UNot Observable
12 ;❑Not Applicable ;
C402.2.1 ;Insulation installed on a suspended :[]Complies ;Exception: Requirement does not apply.
[IN20]1 !ceiling having ceiling tiles is not being ;❑Does Not
;specified for roor/ceiling assemblies. ;
;Continuous insulation board installed ;❑Not Observable
in 2 or more layers with edge joints i❑Not Applicable
;offset between layers.
C303.1 ;Building envelope insulation is labeled ',❑Complies ;Requirement will be met.
[IN10]2 ;with R-value or insulation certificate I❑Does Not .
providing R-value and other relevant
;data. :❑Not Observable
❑Not Applicable ;
C303.2 ;Above-grade wall insulation installed ;❑Complies ;Requirement will be met.
[IN7]1 Iper manufacturer's instructions. :[:]Does Not
❑Not Observable
❑Not Applicable
C303.2.1 ;Exterior insulation is protected from ;❑Complies ;Requirement will be met.
[IN14]2 :damage with a protective material. ElDoes Not
verification for exposed foundation ; ;
'insulation may need to occur during ;❑Not Observable
;Foundation Inspection. ;❑Not Applicable ;
C105 ;Installed above-grade wall insulation ;❑Complies ;See the Envelope Assemblies table for values.
[IN6]1 type and R-value consistent with !❑Does Not
!insulation specifications reported in
;plans and COMcheck reports. ❑Not Observable
;❑Not Applicable ;
C402.2.3 ;Installed floor insulation type and R- ;❑Complies ;See the Envelope Assemblies table for values.
[IN8]2 ;value consistent with insulation !❑Does Not
;specifications reported in plans and ; ;
COMcheck reports. ,❑Not Observable
;❑Not Applicable ;
C402.2.6 SRadiant panels and associated ;❑Complies ;Exception: Requirement does not apply.
[IN38]3 ;components, designed for heat I❑Does Not
;transfer from the panel surfaces to the;
;occupants or indoor space are :❑Not Observable
'insulated with a minimum of R-3.5. I❑Not Applicable ;
C105 ;Installed roof insulation type and R- ;❑Complies ;See the Envelope Assemblies table for values.
[IN2]1 !value consistent with insulation :❑Does Not
;specifications reported in plans and
COMcheck reports. For some ceiling ;❑Not Observable
(systems,verification may need to ;❑Not Applicable ;
;occur during Framing Inspection.
C402.5.1. !All sources of air leakage in the ;❑Complies ;Requirement will be met.
1 :building thermal envelope are sealed, :❑Does Not
[IN1]1 ;caulked, gasketed,weather stripped ;
,or wrapped with moisture vapor- ;❑Not Observable
:permeable wrapping material to :❑Not Applicable
;minimize air leakage. ;
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 8 of 10
Section
# Final Inspection Complies? Comments/Assumptions
& Re .ID
C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Requirement will be met.
[F[37]1 :dock cargo door openings and provide QDoes Not
direct contact along the top and sides :
;of vehicles parked in the doorway. ❑Not Observable
;❑Not Applicable ;
C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Requirement will be met.
[FI37]1 :dock cargo door openings and provide :❑Does Not
direct contact along the top and sides ;
;of vehicles parked in the doorway. ;❑Not Observable
❑Not Applicable ;
C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Requirement will be met.
(F137]1 dock cargo door openings and provide ;❑Does Not
direct contact along the top and sides ; -
;of vehicles parked in the doorway. ❑Not Observable
;❑Not Applicable ;
C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Requirement will be met.
[FI37]1 dock cargo door openings and provide :❑Does Not
:direct contact along the top and sides ;
of vehicles parked in the doorway. ❑Not Observable
;❑Not Applicable ;
C402.5.8 Recessed luminaires in thermal ;❑Complies ;Exception: Requirement does not apply.
[FI26]3 !.envelope to limit infiltration and be IC :❑Does Not
`rated and labeled.Seal between
I interior finish and luminaire housing. ;❑Not Observable
;❑Not Applicable ;
C408.1.1 ;Building operations and maintenance ;❑Complies ;Requirement will be met.
[FI57]1 :documents will be provided to the PDoes Not
owner. Documents will cover
;manufacturers' information, {❑Not Observable;
specifications, programming :❑Not Applicable
;procedures and means of illustrating ;
to owner how building,equipment and
;systems are intended to be installed,
;maintained, and operated.
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 12 IMedium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 9 of 10
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 10 of 10
G
COMcheck Software Version 4.1.5.1
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Re .ID
C103.2 ;Plans and/or specifications provide all ;❑Complies ;Requirement will be met.
[PR1]1 information with which compliance 1❑Does Not 1
;can be determined for the building
envelope and document where ❑Not Observable 1
,exceptions to the standard are :❑Not Applicable
claimed. 1
C402.4.1 ;The vertical fenestration area <=30 10Complies ;Requirement will be met.
[PR10]1 ;percent of the gross above-grade wall 1❑Does Not
area. ;❑Not Observable
❑Not Applicable
C402.4.1 ;The skylight area <= 3 percent of the ;❑Complies ;Requirement will be met.
[PR11]1 :gross roof area. ;❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 JHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Hacker Boat Facility Report date: 02/23/21
Data filename: C:\Users\charris\Documents\COMcheck\Hacker Boat Facility.cck Page 3 of 10
www.lamteb.com
LAMTEC
CORPORATION
WMP-1 0
POLYPROPYLENE/SCRIM / KRAFT
Meets ASTM C1136,Type II, IV
FACING COMPOSITION, DESCRIPTION VALUES(ENGLISH) VALUES(METRIC)
White Film Metallized Polypropylene 12.5 Ibs/3000 ft2 20 g/m2
Adhesive Flame Resistant
Reinforcing Tri-directional 5/inch (MD) 20/100 mm (MD)
Fiberglass/Polyester 5/inch (XD) 20/100 mm (XD)
Kraft White 14 Ibs/3000 ft2 23 g/m2
PHYSICAL PROPERTIES TEST METHOD VALUES (ENGLISH) VALUES(METRIC)
Basis Weight Scale 19 Ibs/1000 ft2 93 g/m2
Permeance (WVTR) ASTM E96 0.02 perm 1.15 ng/N•s
Procedure A (grains/hr-ft2•in Hg)
Bursting Strength ASTM D774 65 psi 4.6 kg/cm2
Puncture Resistance ASTM C1136 125 beach units 3.7 Joules
Tensile Strength ASTM C1136 40 Ibs/inch width (MD) 7.0 kN/m (MD)
35 Ibs/inch width (XD) 6.1 kN/m (XD)
Caliper/Thickness Micrometer 0.009 inch 229 micron
Accelerated Aging 30 Days @ No Corrosion No Corrosion
95% RH, 120°F(49°C) No Delamination No Delamination
Low Temperature Resistance ASTM D1790 Remains Flexible Remains Flexible
-40°F(-40°.C) No Delamination No Delamination
High Temperature Resistance 4 hours @ Remains Flexible Remains Flexible
240°F(116°C) No Delamination No Delamination
Water Immersion 24 hours @ 73°F(23°C) No Delamination No Delamination
Mold Resistance ASTM C665/C1'338 No Growth No Growth
Dimensional Stability ASTM D1204 0.25% 0.25%
Light Reflectance ASTM.C523 85% 85%
FIRE TESTING fM
ASTM E84/UL 723 CAN ULC-S102M BS 476
Film Side Kraft Side Film Side Kraft Side Class APPROVED
Flame Spread 10 15 15 15 0
Smoke Developed 10 5- 30 45 Surface L
Physical Properties based upon statistical averages, Weight/Thickness+/-10%
"LAMTEC"AND"WMP"ARE REGISTERED TRADEMARKS OF LAMTEC CORPORATION
5010 River Road Mount Bethel, Pennsylvania 18343-5610 U.S.A.
Phone: (570) 897-8200 Fax: (570) 897-6081 Web: www.lamtec.com
2/17
FILE.- COPY
mLAMTEC . - -°
www.la tec,.com
CORPORATION
WMP-10 PERFORATED
POLYPROPYLENE'/SCRIM / KRAFT "-
FACING COMPOSITION DESCRIPTION VALUES (ENGLISH) VALUES (METRIC)
White Film Metallized,Polypropylene 12.5 Ibs/3000 ft2 20 g/.m2
Adhesive Flame Resistant"
Reinforcing Tri-directional 5/inch (MD) 20/100 mm (MD)
Fiberglass/Polyester . 5/inch (XD) 20/100 mm (XD)
Kraft White 14 Ibs 13000 ft2 23 g/m2
PHYSICAL PROPERTIES TEST METHOD VALUES (ENGLISH) - VALUES (METRIC)
Basis Weight Scale 19 Ibs/1000 ft2 93 g/m2
Permeance(WVTR) ' ASTM E96" > 10 perm >574 ng/N•s
Procedure A (grains/hrft2•in Hg)
Bursting Strength ASTM D774 -_60 psi 4.2 kg/cm2
Puncture Resistance ASTM C1136 115 beach units 3.4 Joules
Tensile Strength ASTM'C1136 35 Ibs/inch width (MD) 6.1 kN/m.(MD)
25 Ibs/inch width (XD)- 4.4 kN/m (XD)'
Caliper/Thickness Micrometer 0.009 inch. 229 micron
Accelerated Aging 30 Days @ No Corrosion No Corrosion
95% RH, 120°F (49°C): No Delamination No Delamination
Low Temperature Resistance- ASTM D1790. Remains Flexible Remains Flexible
-40°F (-40'C) No Delamination No Delamination
High Temperature Resistance 4 hours @ Remains Flexible Remains Flexible
240°F (116°C) No,Delamination No Delamination
Water Immersion 24 hours @ 73°F (23°C), No Delamination No Delamination
Mold Resistance- ASTM C665/C1338 No Growth: No Growth
Dimensional Stability ASTM D1204 0:25% 0.25%
Light Reflectance ASTM C523, 85% 85%
FIRE TESTING
UL-723/ASTM E84 _
Flame - Smoke ``assiF;�a
Spread Developed 00
Film Exposed 10 10
Kraft Exposed 15 5
Physical Properties based upon statistical averages of non-perforated product, Weight/Thickness+/-10%-
"LAMTEC"AND"WMP"ARE-REGISTERED TRADEMARKS OF LAMTEC CORPORATION
5010 River Road Mount Bethel, Pennsylvania 18343-5610 U:S,.A.-
Phone: (570) 897-8200 Fax: (570) 897-6081 Web: www.lamtec.com
04/20