Loading...
application.2 8/20/02 Site Plan Review General Information Application No. (Office Use Only) Project Location: ��c4ke� �ooJ - �N 11Ar- �• l���Sln Tax Map ID: Z_ci 4 Z O - I - z Zone Classification: 1.-i (f- VevL� ci- Compliance with Zoning Ordinance Section: Detailed Description of Project: include current& proposed use): 4 4, ns Ila_c t1a , c• I r7 6� Sal u,'l d,�1 ' CG, In)oAl 3 . ip k LU6e '� � \ The�e� c1, is (.c ��c.v sties IDS Ca„ � s� J je�e � Modification to existing Site Plan, Yes: No: (If so,indicate Site Plan No.& approval date) Square Footage of proposed structure: f (P , (� 3 Z- Applicant: w c e��a�N e w'� C0 Address: ) 7s7 Leh 1 � . �lhnv, G °1 IZZbS Home Phone: ffG4 -3z te, Work Phone/Fax: Applicant's Agent: Address: I Zed 4- Home Phone: 7 S 4 4" Work Phone/Fax: 7 mot' z- - eZ S )l C— Property Owner: Address: Home Phone: Work Phone/Fax: Directions to Site: / r*i� � qs- C.51 i/o/�F,c. i c_oC�-- (04 ' S )ct1�✓�ci��� 8/20/02 Site Plan Review Site Development Data Area/Type Existing sq. ft. Proposed Addition Total sq. ft. s . ft. A. Building Footprint �' l(o e3z-- tla ,oaz B. Detached Garage C. Accessory Structures) D. Paved, gravel or other hard surfaced areas (p p ZL� Z �,� 2- 4 Z E. Porches/Decks F. Other Total Non-Permeable Sum A through F) Z1 -7(a Z 14 Parcel Area Z13 , ib1 ZIP c7 i Z13 lol Percent Non-Permeable Total Non-Penneable/Parcel,Area G � 1J Setback Requirements Required Existing Proposed Front(1) `^ a — L Front(2) Shoreline 77-5 s _5 Side Yard (1) .L�; — �(7.0 Side Yard (2) y5 49. Rear Yard (1) Z-5 � Za .S Rear Yard(2) Buffer/Travel Corridor -7 5 Z + N K PC Height L_ 4o Z8 Permeability 3� Z Sign Setback No. of Parking Spaces Z`( 3Q 8 Adbk we 8/20/02 Site Plan Review Checklist—please prepare a map depicting existing and proposed conditions. Failure to complete the following checklist or include all required information may result in a determination of incompleteness and a delay in the processing of our application PR NA WR Address Each Item GENERAL A. Title,name, address of applicant&person responsible for preparation of drawing B.North arrow,Tax Map ID, date prepared and scale(minimum 1 in.=40 ft.) C. Boundaries of the property plotted to scale, zoning boundary D. Location of principal structures,accessory structures with exterior dimensions E. Location of site improvements incl. outdoor storage areas, driveways (existing & proposed) parking areas, etc. F. Setbacks for all structures and improvements G. Elevations of proposed structures WATER& SEWER / A. Location of on-site sewage disposal facilities, design details, construction details, flow rates, and number of bedrooms proposed B. Location of water supply(i.e., well) and septic on adjoining lots with separation distances to existing / or proposed on-site water supply and septic C. Separation distances for proposed sewage disposal system to well and waterbodies D. Location and description of existing public or private water supply (well, lake, etc.). Method of securing public or private water, location, design and construction of water supply including daily water usage E. Percolation test location and results • PARKING/ PERMEABLE AREAS A.Number of spaces required for project including calculations and justification B. Number of existing parking spaces, number to be removed,number to maintain and type of surfacing material (e.g., gravel,paved) C. Provision for pedestrian and handicap access and parking D. Location and design details of ingress, egress,loading areas and cutting E. Location and character of green areas (existing and proposed), modification to green area,buffer zone to remain undisturbed F. Lighting,location and design of all existing or proposed outdoor lighting ADDITIONAL SITE DEVELOPMENT AND MISCELLANEOUS A. Location of on-site&adjacent watercourses, streams,rivers, lake and wetlands B. Location of proposed&existing: utility/energy distribution systems(gas, electric,solar,telephone) C. Location, design and construction of all existing and proposed site improvements including: drains, culverts,retaining walls,fences, fire&emergency zones and hydrants D. Location and amount/portion of building area proposed for office,manufacturing,retail sales or other commercial activities E. Signage: Location, size,type,design and setback foie_ F. Waiver Request: provide letter with application requesting any waivers G. Commercial / Industrial Development requires submission of a Landscaping Plan, Stormwater Management Plan, Grading Plan and a Lighting Plan H.The Bd. may request other elements as considered necessary. I. Identify any Federal, State or County permits required for the project. J. Please submit record of application for approval status of all necessary permits required from Federal, State and County officials. Legend: PR—Provided; NA—Not Applicable; WR—Waiver Requested TOWN OF Q UEENSB URY 742 Bay Road, Queensbury, NY. 12804-5902 Town of Queensbury Planning Board Waiver Request I hereby request that the Planning Board grant me a waiver from the requirement for the submission of the following plans. ❑ Stormwater Management Plan ❑ Grading Plan ❑ Lighting Plan o Landscaping Plan ❑ Sketch Plan approval ( Subdivision I acknowledge that these plans are required and I seek such waiver(s) knowingly and for the following reasons: V l e1 Applicant Date L:\Crdg\Templates\woiverReq86O2.doc w AML 8/20/02 Site Plan Review Signature Page This Page includes the Authorization to Act as Agent Form, Engineering Fee Disclosure, Other Permit Responsibilities and Agreement to provide documentation required. Complete the following if the OWNER of the property is not the same as the applicant Owner's Agent Form n Owner: Designates: As agent regarding Variance Site Plan _Subdivision For Tax Map No.: _Section —Block Lot Deed Reference: _Book _Page _Date SIGNATURE: (Owner) (Date) Complete the following if the APPLICANT is unable to attend the meeting or wishes to be represented by another party: Applicant's Agent Form \ II Owner: bvc � ��wr�Y CkJ.LP, Designates: Rao= 'e-nq �MkS l ale Ids As agent regarding: <Variance .X Site Plan _Subdivision For Tax Map No.: Zg4.zn Section / Block L Lot SIGNATURE: �� L ( r� (Date) Engineering Fee Disclosure: Applications may be referred to the Town consulting engineer for review of septic design, stone drainage, etc. as determined by the Zoning or Planning Department. Fees for engineering review services will be charged directly to the applicant. Fees for engineering review will not exceed $1,000 without notification to the applicant. Please Note: Other permits may be required for construction or alteration activity subsequent to approval by the Zoning Board or Planning Board. It is the applicant's responsibility to obtain any additional permits. Official Meetin¢ Minutes Disclosure: It is the practice of the Community Development Dept. to have a designated stenographer tape record the proceedings of meetings resulting from application, and that minutes transcribed from those tapes constitute the official record of all proceedings. If there is a discrepancy between such record and the handwritten minutes taken by the designated stenographer, the handwritten minutes shall be deemed the official record. I, the undersigned, have thoroughly read and understand the instructions for submission, agree to the submission requirements and completed the checklist. SIGNATURE OF APPLICANT: *C CaQ wt -Date L_I o z l Q SIGNATURE OF AGENT: c� L -Date d 3 N URS Page 1 of 1 January 17, 2003 William J. Simpson, Senior Vice President Hoffman Development Corporation 1757 Central Avenue Albany, NY 12205 Re: Hoffman's Car Wash/Jiffy Lube Quaker Road,Town of Queensbury Dear Mr. Simpson: The following summarizes our professional opinion regarding potential traffic-related impacts associated with the subject project. The new facility will be located on the north side of Quaker Road in the town of Queensbury,New York directly adjacent to and east of the existing Lowe's/Applebee's shopping center. It will consist of an automatic car wash, a three bay self-service car wash,a three bay quick lube facility and a three bay laser-type car wash. Quaker Road is a four-lane suburban arterial. Development in the area is typical of suburban commercial development. Relative to traffic-related impacts of the facility on adjacent roadways, it is important to note that neither a car wash nor a quick lube shop are significant trip generators. This is most clearly indicated by the very limited amount of data on these types of facilities included in even the latest edition of the Institute of Traffic Engineers' Trip Generation Manual(6t'Edition). Car washes and quick lube shops are seldom a destination in and of themselves. Trips to these types of facilities are usually combined with other trips to primary destinations nearby. Many trips in and out are based on spur of the moment decisions made as one is driving by such a facility. The majority of vehicles pulling in would have already been in the traffic stream of the adjacent roadway. No adverse impacts are expected for Quaker Road or the Quaker Road/Bay Road intersection as a result of this project. The specific location proposed for this project is well suited for such a commercial land use. The internal site layout proposed is very similar to that used with great success at other Hoffman locations throughout the Capital District. It provides for a good internal flow of traffic, as well as substantial vehicle storage to prevent any interruptions to Quaker Road. Should you need any further assistance in this regard,please do not hesitate to contact the undersigned. Sincerely, URS Corporation Michael K. Chevalier,PE Project Manager URS Corporation One Northway Lane Latham, NY 12110-4810 Tel: 518.786.0676 Fax: 518.786.0680 M:\Miscellaneous Project Management\Quaker Road Hoffman's\011703ws.doc