Loading...
Staff Notes for 8/17/2021 Town of Queensbury Planning Board Community Development Department Staff Notes August 17, 2021 Site Plan 35-2021 CHRIS RACICOT 20 Newcomb Street / MS – Main Street / Ward 4 SEQR Unlisted Material Review: revised site plan application, site plans, stormwater, and architectural Parcel History:SP 45-2008, 2009-039 Comm. Alt., SP 35-2009, 94663-4008 res. addition, 2005-494 partial garage demo, Disc 1-2021 __________________________________________________________________________________________ Requested Action Planning Board review and approval for construction of 14 units consisting of three buildings where two buildings will have six units and one building will have two units. Resolutions 1. SEQR – provide decision to the Town Board Project Description SEQRA: Planning Board may proceed with SEQRA review. Applicant proposes construction of 14 units consisting of three buildings where two buildings will have six units and one building will have two units. The buildings are to be two-story with garage and exterior patios. Project includes sewer connection agreement and construction. Project site work includes lighting, landscaping and stormwater controls. Pursuant to Chapter179-3-040, 179-5-090, 179-5-100, 179-7-070 & 179-8-050 of the Zoning Ordinance new construction shall be subject to Planning Board and other department reviews. Staff Comments  Location-The project site is located 20 Newcomb Street on a lot of 1.04 acres.  Arrangement- The project has been revised since the original submission to include three buildings. Two of the buildings to be 6 unit. The third building would replace an existing building and be a two unit building. The site would then contain 14 units total.  Site Design- The arrangement on the lot is for two building to be placed along the south border meeting setbacks. The drive area would be on the north property line side allowing access for tenants and for emergency vehicles. The townhouse entrance will be from Newcomb Street. The southern portion of the property will have patio areas for each unit.  Building – The building is to be two story. The south facing side would be the rear of the building and the north facing side would be the entrance to the units. There is an existing 1 1.2 story building on the site that is to remain. The building type will need to be confirmed as it is listed as a home and an office.  Traffic- The parking information indicates 21 spaces are required and 28 are provided. This include 1.5 spaces per unit for a multi-family project.  Grading and drainage plan, Sediment and erosion control-The plans include a stormwater plan where there is to be basins along the front property line and south property line. The applicant has received engineering comments in regards to phasing for the third building, requirements of DEC and NHP, location and depth of devices to be installed.  Landscape plan- The Board should review 179-8-050 Multi-family landscaping requirements. The applicant has provide a landscape plan with plantings along the front property line and to the southeastern red b property line. On the north property line are some eastern red bud plantings (small tree/shrub).   Site lighting plan-Site Lighting was not provided – plans should be updated to provide site lighting information.  Utility details-The project includes connecting to the existing municipal water and sewer lines. The applicant is requesting an “out-of- district user” agreement with the Town Board. The project is subject to a coordinated review with the Town Board  Signage-The applicant has indicted there is to be a 25 sq ft free standing sign. The project is located in the Main Street zone where type of material and illumination information will need to be part of the project.  Elevations-The elevation plans indicate the building is 34 ft 10 inches in height. The rear elevations show dividers between each patio. The dividers details should be updated with dimensions. The front elevation shows the garages, entry porch areas. The plans do not indicate if there is to be porch lighting.  Floor plans-The floor plans are shown – [[1040,804,1563,861][12][,I,][Times New Roman]]labeling appears to be off [[1554,804,1567,861][12][,I,][Times New Roman]] [[1567,804,2080,861][12][,I,][Times New Roman]]on the more detailed plan [[2080,804,2093,861][12][,,][Times New Roman]] [[2093,804,2118,861][12][,,][Times New Roman]]– [[2117,804,2393,861][12][,,][Times New Roman]]the first floor would most likely consist of the garage, living room, kitchen and bathroom. The second floor most likely is showing 3 bedrooms, bathroom and laundry area.  Waivers-Planning staff would suggest addition discussion on lighting and signage.  The applicant has provided information on the following items: j. stormwater, k. topography, l. landscaping n traffic o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal, snow removal floor plans  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The Planning Board may begin environmental review. Planning Board may request additional information for lighting, signage, the divider with the patio area, and phasing of project activities. [[1805,1562,2218,1619][12][,I,][Times New Roman]]Also to be noted the [[150,1620,377,1677][12][,I,][Times New Roman]]applicant h [[377,1620,973,1677][12][,I,][Times New Roman]]as identified the project as a t [[972,1620,2323,1677][12][,I,][Times New Roman]]ownhouse project however it is a multi family building project as a [[150,1677,1615,1734][12][,I,][Times New Roman]]Townhouse project would require each unit to be on its own separate lot. [[1615,1677,1641,1734][12][,I,][Times New Roman]] Tentative SEQRA process  Planning Board receives application –SEQRA Type determined – unlisted- as it is greater than 4,000 sq ft April 2021- completed  Planning Board seeks Lead agency May 2021 - completed  Lead agency request is forwarded to the Town Board and NYSDEC May 2021 - completed  Planning Board waits 30 days or until Involved agencies consent to Planning Board Lead agency request June 2021/ - completed  Planning Board may start a seqra review August 2021  Planning Board may make a decisions on seqr – and forwards the decision to the Town Board, Chris Harrington Superintendent of Water and Wastewater, and NYSDEC August 2021  Town Board completes out of district agreement for sewer connection August 2021/ September 2021  Planning Board may conduct Site Plan review etc. September 2021/ October 2021 Meeting History: PB: 5/18/21, 6/15/21, tabled 7/2021, 8/17/2021 - 2 -