Staff Notes Department of Community Development Queensbury Planning Board Staff Notes January 17, 2012 APPLICATION: Site Plan 8-2012 / Area Variance 5-2012 APPLICANT: Gregg Laber, GMS Realty LLC REQUESTED ACTION: Recommendation to the Zoning Board of Appeals concerning the relief requested in the variance application as well as the potential impacts of this project on the neighborhood and surrounding community LOCATION: 319 Corinth Road EXISTING ZONING: CLI-Commercial Light Industrial SEQRA STATUS: Type II-no further action required WARREN CO. REFERRAL: 1/11/2012 PARCEL HISTORY: AV 5-2012: Pending SP 57-2011: Multi-tenant use to existing on-site office space. Change and expansion of use in the CLI zone requires Planning Board review and approval Approved 8/23/2011 SP 7-2011: Modification to existing approved site plan. Approved 2/15/2011 AV 49-2010: 4 lot subdivision - Relief requested from front, side, and travel corridor setback requirements Approved 9/22/2010 SP 56-2010: Wholesale & retail electrical sales Approved 9/30/2010 SUB 10-2010: 4 lot subdivision Approved 9/30/2010 PROJECT DESCRIPTION: Site Plan: Applicant proposes a handicap ramp for proposed office located at northwest corner of parcel. Change of use and expansion of a non-conforming structure in a CLI zone requires PB review and approval. Variance: Relief requested from front setback, travel corridor overlay and side setback requirements of the CLI zone. Further, relief requested for expansion of a non- conforming structure. Planning Board shall provide a written recommendation to the Zoning Board of Appeals. STAFF COMMENTS: The project before the board is associated with properties owned by GMS Realty and leased to Green Mountain Electric. Currently the 915 square foot building to be utilized as an office is vacant. The applicant is also seeking approval for the placement of racking equipment associated with the wholesale/retail electrical use for the storing of conduit to the rear of the parcel. Further to the racking equipment, the applicant proposes an approximate 2,200 square foot conduit storage area locate to the south of the proposed racks. Nature of Area Variance: Parcel will require area variances as follows: 1.Front setback – Relief request for 17.7 feet from the 75 foot Front Setback requirement for the proposed handicap access ramp. 2.Travel corridor – Relief request for 17.7 feet from the 75 foot Travel Corridor Setback requirement for the proposed handicap access ramp. 3.Side setback – Relief request for 4.5 feet from the 30 foot side setback requirement for the proposed handicap access ramp. 4.Expansion of a non-conforming structure – This variance will need to be approved by the Zoning Board of Appeals. Site Plan Review: Page 11-538 1.Parking requirements are based on square footage as per §179-4-090; 915 square foot office will require four (4) spaces or 1 per 300 square feet of office space. The proposal is short one (1) space and will either require Zoning Board approval or the placement of an additional space to the proposal. Reconfiguration aligning spaces perpendicular to the structure is encouraged. 2.Handicap spaces require a loading zone as per Building Code New York. Logical location would be nearest to the proposed handicap ramp. 3.The plan calls for the removal of the existing wood porch on the wood frame house. Will there be continued access or will the door be removed? Please clarify. 4.Plan calls for three (3) conduit racks yet enlargement submitted denotes four (4) conduit racks, please clarify. 5.Seven racks exist on site as evidenced during site visit. Please clarify number and location of all proposed racks. 6.Twenty (20) foot drive aisle required for emergency access at the location of the interconnect with the property to the east. Additional Comments: 1. Fire Marshal’s comments attached. 2. The Planning Board may wish to ascertain if additional modifications to the approved site plan are anticipated anytime soon. 3. Waivers from stormwater, lighting, grading, and landscaping requirements requested. Application Protocol 1/17/12 PB recommendation to ZBA 1/18/12 ZBA review 2/21//12 PB review L:\Keith Oborne\2012 Staff Notes\Planning\January 17\SP 08-12 Laber_PBR_AV 5-12.doc - 2 -