Loading...
Draft Resolution Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804-5902 Town of Queensbury Planning Board RESOLUTION TO APPROVE / DISAPPROVE SITE PLAN 2-2012 WILLIAM THREW A site plan application has been made to the Queensbury Planning Board for the following: Proposal calls for a boundary line adjustment between the northern and southern lot to promote site compliance and separate ownership; resulting lot size for south lot to be 1.91 acres. Further, applicant proposes to relocate existing 4,500 sq. ft. Quonset hut to northern parcel and construct a 6,000 sq. ft. vehicle repair facility; The PB provided a recommendation to the ZBA on 1/18/2012; the ZBA approved the variance request on 1/19/2012; A public hearing was advertised and held on 1/24/2012 tabled to 3/20/2012; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SITE PLAN NO. 2-2012 WILLIAM THREW, Introduced by _________ who moved for its adoption, seconded by __________: 1)Pursuant to relevant sections of the Town of Queensbury Zoning Code [Chapter 179-9-080], the Planning Board has determined that this proposal satisfies with the requirements as stated in the Zoning Code; and 2)The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative / Positive Declaration; 3)Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; and 4)As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy; and 5)The Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; and 6)Waiver requests granted / denied: stormwater mgmt., grading, landscaping & lighting plans; and 7)Engineering sign-off required prior to signature of Zoning Administrator; and 8)The applicant must submit a copy of the following to the Town: a)The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit or for coverage under an individual SPDES prior to the start of any site work. b)The project NOT (Notice of Termination) upon completion of the project; and 9) The applicant must maintain on their project site, for review by staff: a)The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; and b)The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. Duly adopted this 20th day of March 2012, by the following vote: AYES: NOES: Cc: Hutchins Engineering; Michael J. O’Connor “Home of Natural Beauty-A Good Place to Live”