Loading...
Staff Notes for 2/22/2022 Town of Queensbury Planning Board Community Development Department Staff Notes February 22, 2022 Site Plan 6-2022 Native Development Association, LLC. 24 Native Drive Lot 1/ Commercial Light Industrial/ Ward 4 SEQR Type II Material Review: site plan application, site plan, floor plans, elevations, updated information –floor plan etc Parcel History:SP 69-2017, SP 14-2019, SUB 5-2020, SUB 6-2020, SUB 5-2021, SUB 6-2021 __________________________________________________________________________________________ Requested Action Planning Board review and approval for a one story addition to the west side of an existing building. Resolutions 1. PB decision Project Description Applicant proposes to construct a 19,320 sq ft one story addition on the west side of the existing 117,000 sq ft building and removal of a 6,000 sq ft area lot. Site work includes development of 34 parking spaces and alterations to a portion of the access drive. Improvements to the building will update the existing office area as well. Pursuant to Chapter 179-3-040, site plan for an addition to existing industrial building and associated wok shall be subject to Planning Board review and approval. Staff Comments  Location-The project is located at Lot 1 of the recent subdivision for Native Development with an existing building Lot 1 is 11.15 acres the subdivision is not in the system where the entire lot of 24 Native is 33.37 ac.  Arrangement- The site has an existing multi-tenant building of 117,000 sq ft. The site has existing parking and loading areas for the tenants.  Building – The addition is 19,320 sq ft and is to be for the storage/warehouse space for the existing three tenants. The addition includes incorporating the building overhang 6,720 sq ft within the addition space.  Traffic- The project will include 32 parking spaces will be added. The applicant has indicate 130 spaces are required for the three existing tenants and 141 are proposed (109 existed). The plans also include the truck turning radius to demonstrate the site can accommodate the turn. The plans do note the new paved surface also includes a portion onto the adjoining lot – Lot 2 of the subdivision – leading to a future driveway for other lots within the subdivision.  Grading and drainage plan, Sediment and erosion control-The project has provided a stormwater summary explaining the stormwater management has been addressed during the subdivision review. Staff has requested supporting information from the subdivision stormwater management specific to the addition and area of work.  Landscape plan-The plans do not show any new landscaping. 179-7-080 All industrial zones guidance for landscaping  Site lighting plan-The plans indicate there are to be 8 building mounted lights on the addition area. The plans show the building mounted lights that previous existing on the building.  Site details-  Utility details-The plans indicate sanitary sewer to be replaced per master plan (municipal connection). Site has access to municipal water with no changes.  Signage-No signage on the site is to change at this time.  Elevations-The plans show the proposed addition and the existing overhang to be incorporated in the addition. The addition is to include an overhead door on the west elevation.  Floor plans-The plans indicate the area is for all three tenants for warehouse storage – the plans don’t show the accessibility by each tenant.  Waivers-Planning staff has reviewed the applicants request for waivers that include items, h. signage, l. landscaping, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s. snow removal.  The waivers requested–Staff finds it reasonable to request a waiver of these items as the project is for one addition to the existing building and related site work associated with the addition. The applicant has included information on g. site lighting, j. stormwater, k. topography, p floor plans  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The applicant has completed a site plan application for the construction of a 19,320 sq ft building with associate site work for loading area, parking area, and utility work. The board may request clarification for snow removal – as the lots are developed there may be less area to be used for snow removal storage – should be identified on a lot to lot basis; clarification of the interior tenants access to the storage area and exterior building access. st Meeting History: 1 Meeting - 2 -