Staff Notes for 3/22/2022 PLANNING BOARD STAFF NOTES MARCH 22 , 2022 Queensbury Planning Board Agenda Second Regular Meeting: Tuesday,March 22,2022/Time 7—11 pm Queensbury Activities Center @ 742 Bay Road DEVISED Administrative Item: Site Plan 15-2021 Paul Derby request for a one year extension Tabled Items Ap lip cant(sL_j_BRETT&PAMELA WEST Main House _Application Type Site Plan 51-2021 Owner(s) Same as applicants SEQR Type_ Type II Agent(s) EDP Lot size 0.91 acre Location 106 Bay Parkway Ward: 1 Zoning Classification: WR Tax ID No. ( 226.15-1-17 Ordinance Reference 179-3-040, 179-6-065, 147 Cross Reference 53-2017 septic var.;AV 47-2007&SP 39-2007- Warren Co.Referral August 2021, boathouse;SP PZ 89-2016&SP PZ 210-2016& February 2022(stormwater device) AV 95-2016—addition;SP 37-2009; AV 57-2021, SP 52-2021 Public Hearing September 28,2021,November 16,2021,December Site Information APA,CEA,LGPC 16,2021,February 22,2022,March 22,2022 Project Description: (Revised 111812022)Applicant proposes to demo existing home plus shed and construct a new 2 story home with a 5,436 sq.ft. footprint with a garage.Also,included is installation of permeable pavers for patio and driveway areas,a covered walkway between the two properties. The new floor area will be 8,670 sq.ft.where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house,septic,stormwater management.Project includes a lot line adjustment but no change to lot size.Pursuant to chapter 179-3-040, 179-6- 065, 147,site plan for new floor area in a CEA and hard surfacing within 50 ft.of the shoreline are subject to Planning Board review and approval. Applicant(s) (—NORTHWAY SELF STORAGE,LLC. _�j _Application Type Site Plan 16-2022 Owner(s) Same as applicant SEQR Type Unlisted Agent(s) ED_P(B._Ragone) _ Lot size 2.77 acres Location J 162 Carey Road — Ward: 4 Zoning Classification: CLI Tax ID No. 309.13-2-31.112 ( Ordinance Reference 179-3-040, 179-9-020 Cross Reference SP 46-2020 � Warren Co.Referral March 2022 Public Hearing__( March 15,2022,March 22,2022 _Site Information Carey Industrial Park Project Description: Applicant proposes construction of two new self-storage structures,one 4,000 sq.ft.and one 6,000 sq.ft. Site work includes additional pavement for new buildings.There are 4 existing self-storage buildings on the site with a total of 24,000 sq ft.Pursuant to chapter 179-3-040, 179-9-020,site plan for new storage buildings shall be subject to Planning Board review and approval. New Business: Applicant(s) MARC GARVEY Application Type _Site Plan 10-2022 Owner(s) Garvey Sisters,LLC. _ �— _� SEQR Type ( Unlisted ^Agent(s) EDP(B.Ferguson) Lot size 6.97 acres Location 257 Dix Avenue Ward: 2 Zoning Classification: Cl Tax ID No. 303.15-1-3 Ordinance Reference 179-3-040, 179-9-020 Cross Reference SP 55-2018 _� Warren Co.Referral ( March 2022 Public Hearing March 22,2022 Site Information Project Description: Applicant proposes an 8,000 sq ft addition to an existing building,23 additional parking,display car area,site work,and stormwater management.A portion of the existing 15,395 sq ft building will be removed when the addition is constructed.There are also proposed alterations to the facade.Pursuant to chapter 179-3-040, 179-9-020,site plan for a new floor plan and facade are subject to Planning Board review and approval. Applicant(s) _CKT ENTERPRISES Application Type Site Plan 13-2022 Owner(s) Same as applicant SEQR Type Type II Agent(s) Rucinski Hall Architecture(Ethan Hall) Lot size 1.72 acres Location 11 Lafayette Street Ward:2 Zoning Classification:Cl Tax ID No. 302.7-1-18 Ordinance Reference 179-3-040, 179-9-020 Cross Reference SP 36-99,SP 37-2020 _ Warren Co.Referral March 2022 H Public earing March 22,2022 _ ( Site Information Project Description: Applicant proposes additions to the existing Baker Funeral Home-west 1,008 sq ft with an upstairs attic access,east 756 sq ft.The project includes enclosing existing pole barn with new overhead doors at the front and a 436 sq ft addition for enclosure.Minimal site work for stormwater and site preparation for construction.The main building on site is 4,630 sq ft and the pole barn is 2,627 sq ft.Pursuant to chapter 179-3-040, 179-9-020,site plan for construction of additions and enclosures of the pole barn shall be subject to Planning Board review and approval. Applicant(s) FOOTHILLS BUILDERS(TERRE MAJESTIC Application Type Site Plan 17-2022 HOLDINGS.LLC.) Owner(s) Russell Thomas SEQR Type Type II Agent(s) Hutchins Engineering(T.Center) ( Lot size 1.17 acres(lot 10), 1.39 acres(lot 9) Location Highpoint Drive _� Ward: 1 Zoning Classification: MDR Tax ID No. 296.5-1-17 Ordinance Reference j 179-3-040, 179-9-020, 179-6-060 Cross Reference SUB 4-1993,SUB 4-1993 Mod.(2006) Warren Co.Referral March 2022 Public Hearing March 22,2022 Site Information Project Description: The applicant owner of lot 9 of Highpoint Drive proposes to install a 3,200 sq ft driveway within the deeded easement area on the parcel of 23 Highpoint Drive,lot 10.The driveway to be 10%plus grade.There will be two driveways located at 23 Highpoint Drive,lot 10,the proposed driveway to be adjacent to the existing driveway.Lot 9 is currently under construction for a single family home.The project includes stormwater management along the new driveway area.Pursuant to chapter 179-3-040, 179-9-020, 179-6-060,development of the driveway at a 10% grade shall be subject to Planning Board review and approval. Old Business Applicant(s) RONALD SEGULJIC Application Type Site Plan 9-2022 Owner(s) Same as applicant SEQR Type Type II Agent(s) _EDP(MacElroy,Keil) _ Lot size � .26 acres v� Location 32 Forest Road Ward: 1 �� Zoning Classification: WR Tax ID No. _226.19-1-41 Ordinance Reference 179-3-040, 179-6-065 Cross Reference _AV 8-2022 Warren Co.Referral (_March 2022 Public Hearing March 22,2022 Site Information APA,LGPC,CEA Project Description Applicant proposes to alter the existing home to construct a 276 sq.ft.addition,a 156 sq.ft.patio area at the rear,an 84.5 sq.ft. covered front porch,and a lower level for a garage and living area of1,237.83 sq ft.The project includes a new septic system,well,driveway area,and swale areas.The existing home footprint of 965 sq.ft.with a 190 sq.ft.porch/deck.The existing floor area is 965 sq.ft.and the proposed is 2,592.71 sq.ft.Pursuant to chapter 179-3-040, 179-6-065,site plan for a new floor plan shall be subject to Planning Board review and approval. Applicant(s)___J_KATHARINE SEELYE Application Type _� Site Plan I 1-2022 Owner(s) �) Same as applicant _� SEQR Type Type II Agent(s) �� Rucinski Hall Architecture(Ethan Hall) � Lot size .62 acres Location 14 Crooked Tree Drive Ward: 1 Zoning Classification: WR Tax ID No. 239.15-1-10 Ordinance Reference 179-3-040, 179-13-010, 179-6-050 Cross Reference SP 22-2003,SP 592007,AV 29-2001,AV 17-2003, Warren Co.Referral March 2022 SP 55-2017,AV 53-2017,AV 70-2017,AV 9-2022� Public Hearing March 22,2022 ( Site Information _APA,LGPC,CEA Project Description: Applicant proposes a second story dormer of 136 sq ft and interior alterations.The dormer addition is to be open below and the existing loft will be enclosed for a bunk room.The project includes fagade changes with new window installation on the main and upper floors.No site work is proposed.There are to be no changes to the existing home's footprint of 1,209 sq ft,700 sq ft deck/porch and floor area of 2,778 sq ft.Pursuant to chapter 179-3-040, 179-13-010, 179-6-050,site plan for expansion of a non-conforming structure in a CEA shall be subject to Planning Board review and a2proval. -Any further business which may be properly brought before the Board- Administrative Item : Site Plan 15-2021 @ 31 Canterbury Drive Paul Derby Draft resolution- grant/deny request for extension February 14, 2022 RE: extension of site plan 15-2021, PAUL DERBY To the Planning Board of the Town of Queensbury: This is a request for a one year extension for Site Plan 15-2021 (approved March 25, 2021),Tax Map ID: 289.17-1-22, owner Paul Derby, 31 Canterbury Dr., Lake George (Queensbury), NY 12845. Due to the Covid pandemic and associated delays in the supply lines and resulting very high costs of building materials, it has not been possible to secure a contractor in a timely manner. It has been a difficult time. Thank you for your time and patience. If you require additional information or have questions, please contact me at 519-761-7015 or paul.derby@castleton.edu. Respectfully, Z) Paul Derby 31 Canterbury Dr. Lake George (Queensbur , NY. 12845 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 TOWN OF QUEENSBURY PLANNING BOARD RESOLUTION—GRANT/DENY EXTENSION REQUEST SITE PLAN 15-2021 PAUL DERBY Tax Map ID: 289.17-1-22/Property Address: 31 Canterbury Drive/Zoning: WR The applicant submitted an application for: Applicant proposes a 639 sq. ft. upper level addition to an existing single story home with a 2,044.5 sq. ft. footprint and new floor area of 2683.9 sq. ft. The project also includes the removal of concrete to be replaced with permeable pavers. Pursuant to Chapter 179-3-040, 179-6-065, 179-13-010 & Chapter 91 of the Zoning Ordinance, new floor area in a CEA, expansion of a non- conforming structure in a CEA, hard surfacing within 50 ft. of shoreline and a variance for a septic system in a flood plain shall be subject to Planning Board review and approval The Planning Board approved this site plan on March 25, 2021. MOTION TO APPROVE A ONE YEAR EXTENSION FOR SITE PLAN 15-2021 PAUL DERBY. Introduced by who moved for its adoption, seconded by Duly adopted this 22"a day of March 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road,Queensbury,NY 12804 1 www.queensbury.net Site Plan 51-2021 @ 106 Bay Parkway Brett & Pamela West (Main House) Public Hearing Scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site:Plan'51-2021 BRETT &PAMELA WEST (MAIN HOUSE) 106 Bay Parkway/Waterfront Residential/Ward 1 SEQR Type II Material Review: application, site plans, floor plans, elevations, deed, stormwater management, revised plans November, December, January Parcel History: 53-2017 septic var.; AV 47-2007 & SP 39-2007 - boathouse; SP PZ 89-2016 & SP PZ 210-2016 &AV 95-2016—addition; SP 37-2009; AV 57-2021, SP 52-2021 Requested Action Planning Board review and approval for demolition of existing home and construction of a new 2 story home and garage. Resolutions 1 PA decision Proiect Description Applicant proposes to demo existing home plus shed and construct a new 2 story home with a 5,436 sq. ft. footprint with a garage. Also, included is installation of permeable pavers for patio and driveway areas, a covered walkway between the two properties. The new floor area will be 8,670 sq. ft. where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, stormwater management. Project includes a lot line adjustment but no change to lot size. Pursuant to chapter 179-3-040, 179-6-065, 147, site plan for new floor area in a CEA and hard surfacing within 50 ft. of the shoreline are subject to Planning Board review and approval. Staff Comments • Location-The project is located at 106 Bay Parkway on a parcel of 0.91 acres. • Arrangement- The project involves a tear down and construction of a new home. The project includes in of a new septic system, stormwater management, and drive-way area. The existing home is a log style home building approximately in 1941. • Building—The home to be constructed is 5,436 sq ft footprint includes a porte-cochere and an attached garage. The patio are to be installed is 1,800 sq ft. The project includes a covered walkway of 692 sq ft that is to extend from the proposed house to a new home on the adjoining property. The new floor area is 8,670 sq ft. • Site conditions-The property is an odd configuration where most of the site will be disturbed for construction but minimal disturbance of the shoreline. • Grading and drainage plan, Sediment and erosion control-The project includes 0.54 acres of disturbance and plans show the silt fence location on the property. The grading of the property is also shown between 323 to 325 for the finished floor. The project is subject to a major stormwater permit as the project consists of greater than 15000 sq ft of disturbance. The plans show the rain garden locations. The project has been referred to the Town Engineer for review and comment. • Landscape plan-The project site is located on Lake George and is subject to the shoreline buffer review. The applicant has indicated a new set of plantings to occur around the house. No plantings along the shoreline are to be removed.There are some new plantings on the east shoreline proposed. Below are the guidelines from the shoreline buffer.code section o Shoreline Buffer- Section 179-8-040 -Minimum width 35 ft(Lake George) -For every 700 sgft of shoreline buffer area—one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover-7—24 in native shrubs; 14 herbaceous plants Project site " -465 ft of shoreline per survey -Shoreline buffer 465 ft X 35 ft width is 16,275 sq ft -Shoreline buffer area-16,275/700=23.25 round up to 24—twenty-four large trees at 3 inch diameter -Ground cover-16,275/350=46.5 round up to 47 (X7)=329 native shrubs and 47 (X14)herbaceous plants=658 o Shoreline Cutting restrictions- Section 179-6-050 Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 465 ft Shoreline X 30%= 139.5 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan-Lighting information was not provided and Staff suggests confinning residential light fixtures are downward cast cutoff. • Utility details-The plan shows anew holding tank system to be installed. Approved by the local BOH.The water supply is drawn from the lake. • Elevations-The elevations show the view of the home, an attached porte cochere(second garage), an attached garage and the covered open walkway. • Floor plans-The first floor plan shows, living room area,kitchen, dining room,the porte-cochere, media room, small office, game room, and a three car garage. Note the area labeled wet bar will have no kitchen elements. The second floor plan shows bathrooms, closets, bedrooms, and the garage area will be open with no second floor. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/construction details, r. construction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information on j. stormwater, k. topography, 1. landscaping p floor plans, q. soil logs. 9_: Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance Still under review by the ZBA. Revised February 2022. The new home is to be located 46 ft.to the east shoreline, 35 ft.to the west shoreline where 50 ft. is required. The covered walkway is to be 0 ft.from the west side setback where a 20 ft. setback is required. The project proposes two garages where only one is allowed—the porte-cochere is considered a garage, due to width of open sides allowing vehicles. Relief is also requested for setbacks for stormwater device Note: Permeability 77.9%is proposed where 75%is required-no permeability relief is requested. The floor area proposed is 8,670 sq ft where 8,687 sq ft is the maximum size allowed—no floor area relief is requested. Summary Pending ZBA review. Meeting History: PB: 9/28/2021, 11/16/2021, 12/16/2021, 2/15/22, 2/22/22; ZBA: 9/29/2021, 10/27/21, 12/15/2021, 2/16/22, 3/16/22 M h La'eRa Power U by partnership. February 17, 2022 Mr.Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only:CraigB@gueensbury.net Re: West Residence—Main House Town of Queensbury, Warren County, New York Chazen Project#92100.38 Queensbury Ref#SP51-2021 Dear Mr. Brown: LaBella Associates has received the latest submission responding to comments offered by LaBella August 18, 2021. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management& Erosion and Sediment Control: 1. Since the last submission, both the West Main House (SP51-2021) and West Guest House (52-2021) HydroCAD models have been combined. Some of the subcatchments cross the properties lines for the two applications. This has made a review of the Minor project requirements (West Guest) and Major project requirements(West Main)difficult.We respectfully request these two HydroCAD models/analysis are kept separate.For instance,the West Guest parcel(Minor project standards)would require all post-development impervious surfaces to be tributary to an infiltration practice, because the existing condition includes no impervious surfaces. However subcatchment S13 (West Guest parcel) is not tributary to an infiltration practice and therefore would not conform to the Minor project requirements. 2. Please note that some of the comments below may change the post-development runoff rate and volume, so a review of the rate and volume requirements will occur once the changes are incorporated. 3. In response to comment 3 of LaBella's August 18,2021 comment letter,the Applicant updated the mapping. However, the thickness of the subcatchment boundary lines compared to the thickness of other linetypes makes the subcatchment map undiscernible. We respectfully request the Applicant revise the subcatchment map so it is discernable. 4.' In response to comment 7 of LaBella's August 18, 2021 comment letter,the Applicant performed five test pits and three infiltration tests. While this is helpful to characterize the existing soils, most proposed infiltration practices do not include a deep soil test pit and infiltration test within the proposed bounds of the practice. Further,the existing conditions plan does not include at what depth the infiltration tests were performed at.The Applicant shall perform deep soil test pits and infiltration tests within the bounds of the infiltration practices. The test pits and infiltration tests shall meet the standards prescribed in the NYS Stormwater Management Design Manual (See Appendix D). HUDSON VALLEY* CAPITAL DISTRICT® NORTH COUNTRY-WESTCHESTER 0 TENNESSEE Chazen Engineering, Land Surveying&Landscape Architecture Co., D.P.C. (New York) Chazen Engineering Consultants, LLC(Tennessee) Town of Queensbury West—Main House February 17,2022 Page 2 of 3 5. In response to comment 8 of LaBella's August 18, 2021 comment letter, the Applicant states: "Several infiltration devices are proposed within 100 feet of Lake George, we will be requesting a variance for these devices. The location of the neighboring drinking water supplies are being located and will be shown on the plans once located." The Applicant to provide the revised plan showing the neighboring drinking water supplies once completed. 6- In response to comment 9 of LaBella's August 18, 2021 comment letter, the Applicant states that approximate locations of the neighboring wastewater treatment systems are being located and will be shown on the plans once they are located.The Applicant to provide the revised plan once they are located. 7. In response to comment 11 of LaBella's August 18, 2021 comment letter, the Applicant stated that gravel filter strips are proposed along the edge of the drive where that is directly contributing to the grass depression. It does not appear that the gravel filter strip treats the entire tributary area. It does not appear that pre-treatment practices are provided forthe grass depression(GD#2 models exfiltration),rain gardens, and drip edges.Town code section 147-11.1(3)(d)[3] requires pre-treatment devices for infiltration practices. The Applicant to revise accordingly. 8.. In response to comment 12 of LaBella's August 18,2021 comment letter,the Applicant states that the model has been updated to use 0.5 inches/hour to represent the slower more restrictive infiltration rate through the soil media. However, it does not appear that the HydroCAD model is setup this way. For instance, the HydroCAD model takes exfiltration at the bottom of the practice which is the stone layer, not the soil media layer. The exfiltration through the soil media would occur at the basal surface area of the practice and the HydroCAD model shall be revised accordingly 9.. In response to comment 13, of LaBella's August 18, 2021 comment letter, the Applicant indicated the locations of the roof leaders. Once the subcatchment map is discernable the roof leader locations can be corresponded to the subcatchment map. 10. It does not appear that the grading plan for Rain Garden#1 matches the HydroCAD model. First,the surface area in HydroCAD states a surface area of 308 square feet, however the plans appear to indicate approximately 275 square feet. Second,there is not sufficient spot grades on the grading plan to allow for a full review of the elevations in the HydroCAD model. The HydroCAD model would indicate the basal surface area would be 324.25 and the top of the garden would be 325.00, however the grading plan does not show either of those elevations. Third, based on the rain garden detail (sheet 8), it is unclear how the HydroCAD model takes exfiltration credit for the whole surface area, however based on the footing drain/impermeable line, exfiltration would not occur over the entire surface area. This comment appears to also apply to Rain Garden 2, Rain Garden 3, Rain Garden 4, Rain Garden 5, and Rain Garden 6. The Applicant to revise accordingly. 11. It does not appear that the drip edge infiltration practices include the winter infiltration provisions and shall be revised accordingly. 12. The grading plan does not appear to be detailed enough to verify the elevations modeled in HydroCAD for the drip edges.The Applicant to revise accordingly. 13. The grading and utility plan for grass depression #3 does not appear to match the HydroCAD model. First, the Applicant to add more spot grades to allow for a review of the surface area at elevation 325.5. Second, Z:\Projects\92100-92199\92100.00-Town of Queensbury\92100.38-T.Queensbury-SP51-2021-West-MainHouse\ENG\REV\92100.38-West_Main-SP51-2021_2022-02-17_L2.docx :- Town of Queensbury West—Main House February 17,2022 Page 3 of 3 there appears to be underdrain proposed that is not modeled in HydroCAD. The Applicant to revise accordingly. 14. The grading and utility plan for grass depression #2 does not provide sufficient information to allow for a review of the HydroCAD model.The HydroCAD model indicates 175 square feet at elevation 324.5,however the grading plan only provides one spot grade at 324.5 and therefore it is impossible to verify the surface area at that elevation.The Applicant to revise accordingly. 15. The grading and utility plan for grass depression #1 does not provide sufficient information to allow for a review of the HydroCAD model. The HydroCAD model indicates 1536 square feet at elevation 322.9, however the grading plan only provides a few spot grades at that elevation and therefore it is impossible to verify the surface area at that elevation. Further the utility plan appears to depict underdrain below the depression, however the underdrain is not modeled.The Applicant to revise accordingly. 16. In regard to the grass depressions that are not modeled as infiltration practices, town code section 147- 11.1(3)(d)[2] requires vegetated depressions to dewater in 1 day.The Applicant shall model and indicate the method of dewatering. 17. There does not appear to be a porous pavement detail. The Applicant to provide a detail in the next submission. • Conclusion&Recommendations It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1926. Sincerely, Sean M. Doty, P.E., LEED AP, CPMSM Senior Civil Engineer Regional Leader cc: Shauna Baker,Town Planning Office Administrator(via email) Laura Moore,Town Land Use Planner(via e-mail) File Z:\Projects\92100-92199\92100.00-Town of Queensbury\92300.38-T.Queensbury-SP51-2021-West-MainHouse\ENG\REV\92100.38-West_Main-SP51-2021_2022-02-17_L2.docx Town of Queensbury Community Development Office 742 Bay Road, Queensbury,NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 51-2021 BRETT&PAMELA WEST(MAIN HOUSE) Tax Map ID: 226.15-1-17/Property Address: 106 Bay Parkway/Zoning: WR The applicant has submitted an application to the Planning Board: (Revised 1/18/2022) Applicant proposes to demo existing home plus shed and construct a new 2 story home with a 5,436 sq. ft. footprint with a garage. Also, included is installation of permeable pavers for patio and driveway areas, a covered walkway between the two properties. The new floor area will be 8,670 sq. ft. where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, stormwater management. Project includes a lot line adjustment but no change to lot size. Pursuant to chapter 179-3-040, 179-6-065, 147, site plan for new floor area in a CEA and hard surfacing within 50 ft. of the shoreline are subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 2/15/2022; the ZBA approved the variance requests on 3/16/2022; The Planning Board opened a public hearing on the Site plan application on 2/22/2022 and continued the public hearing to 3/22/2022,when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE /DISAPPROVE SITE PLAN 51-2021 BRETT & PAMELA WEST (MAIN HOUSE); Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Page 1 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f j If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT(Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 22nd day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: S18.763..8220 I Fax: 518.745.44371742 Bay Road, Queensbury, NY 1.28041 www.queensbury.net Site Plan 16-2022@ 162 Carey Road Northway Self Storage, LLC. Public hearing scheduled Unlisted SEAR Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site Plan 16-2022 NORTHWAY SELF STORAGE, LLC. 162 Carey Road/Commercial Intensive/Ward 4 SEQR Unlisted Material Review: site plan application, narrative, site plans, elevations, floor plans, lighting, stormwater Parcel History: SP 19-2015, SP 46-2020, SUB 6-1987 Requested Action Planning Board review and approval for construction of 2 new self-storage buildings. Resolutions L SEQR 2.' PB decision Proieet Description Applicant proposes construction of two new self-storage structures, one 4,000 sq. ft. and one 6,000 sq. ft. Site work Jncludes additional pavement for new buildings. There are 4 existing self-storage buildings on the site with'a total of 24,000 sq ft. Pursuant to chapter 179-3-040, 179-9-020, site plan for new storage buildings shall be subject to Planning Board review and approval. Staff'Comments • Location-The project site is at 162 Carey Road on a 2.77 acre parcel. • Arrangement- The site has four existing self- storage buildings with a total of 160 storage units. The site also includes drive aisle areas, landscaping and stormwater areas. • Site Design- The two new storage buildings will placed towards the front of the property with associated stormwater controls for the new building and surfaces. • Building—There are two new buildings proposed with one at 6,000 sq ft, one at 4,000 sq ft and the existing are four buildings at 6,000 sq ft each. • Traffic- The applicant has indicated there are to be 55 parking spaces where 48 spaces are required. • Grading and drainage plan, Sediment and erosion control-The plans show shallow grass depressions and pervious pavement. The information will be forwarded to Labella for review and comment. • ' Landscape plan-The plans show a photo of existing landscaping. Staff would recommend revisiting landscaping as the previous modification for landscaping some of the plantings have died. • Site lighting plan-The applicant has provided a lighting plan and provided a photo of the typical light to be installed on the outside of the buildings. The number of wall lights is to be 14 and mounted at 9 ft. • Utility details- Standard electric utility connect to the new units. • Signage-No change to signage is proposed • Elevations-The elevations indicated the height of the buildings to be a 10 ft. The buildings are to be a neutral color with a green overhead doors. •1 Floor'plans-The floor plans indicate the 6,000 sq ft building will have 49 units and the 4,000 sq ft building will have 27 units. • Waivers-Planning staff has reviewed the applicants request for waivers that include items, h. signage, 1. landscaping, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s 'snow removal. • The waivers requested—Staff would suggest the board discuss landscaping and detennine the waivers after the discussion. The applicant has provided these items-g. site lighting , n traffic, p floor plans j. stormwater, k. topography • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary Note The,Planning Board tabled the application (to March 22, 2022) to allow the applicant to develop additional landscaping for the roadside of the project and building fagade facing the road. The applicant has completed a site plan application for the construction of two buildings on the site one at 6,000 sq ft and a second at 4,000 sq ft to a site that already has four 6,000 sq ft buildings all for self-storage. The project includes associated site work for stormwater management, landscaping. Meeting History: I"Meeting 3/15/2022, 2"d Meeting 3/22/2022 Reviewed by Department on Tuesday,March 1, 2022 Warren County Planning Department Mar2022-17 Project Review and Referral Form Project Name: Northway Self Storage, LLC Owner,: Northway Self Storage, LLC ID''Ntimber: QBY-22-SPR-16 County Project#: Mar2022-17 Currmt Zoning: CLI Community: Queensbury Prolect'Description: App;l,cant proposes construction of two (2) new self-storage structures. Site Location: 162 Carey Road Tax Map Numbers: 300.13-2-31.112 County Planning Recommendation: Concurw%Local Board Informal Staff Comments: i Local actions to date(if any): Local Action/Final Disposition: 3/1/2022 Warren`County Planning Department Date Signed Local Official Date Signed PLEASE RETURN THIS FORM TO THE WARREN COUNTY PLANNING DEPARTMENT WITHIN 10 DAYS OF FINAL ACTION LaBeLLa PC?werod by partnership. March 10, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury ..742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: Northway Self-Storage Town of Queensbury, Warren County, New York LaBella Project#2220706.11 Queensbury Ref#SP16-2022 Dear Mr. Brown: LaBella Associates (LaBella) has received a submission package from your office for the above referenced project. The Applicant is proposing construction of two new self storage buildings (10,000 SF), additional parking and travel surfaces, landscaping, and on-site stormwater management. Information submitted to !: our office for review includes the following: • Elevations, Existing Landscape, and Floor plan, prepared by EDP LLP, dated February 15,2022; • Footcandle analysis, prepared by EDP LLP, dated February 15, 2022; • Project Narrative, prepared by EDP LLP, dated February 15, 2022; • Properties within 500 ft, prepared by EDP LLP, dated February 15, 2022; • Site Plan Application, prepared by EDP LLP, dated February 15, 2022; • Site Plans, prepared by EDP LLP, dated February 15, 2022; • Stormwater Design Report, prepared by EDP LLP, dated February 15, 2022, and; • EAF Mapper Summary Report, prepared by EDP, LLC, dated December 17, 2021. Your office has requested that we limit our review to the design of stormwater system as it relates to compliance with local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the site plan review application,the proposed site improvements will disturb less than one (1)acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2 Section 179-6-080 of the Town Code states that stormwater drainage plans shall analyze the impacts of commercial or Industrial projects using at least a 50-year return storm. The stormwater plan shall work in effect so that post-development runoff rate and volume conditions do not exceed pre- development conditions.The Applicant has provided a 50-year storm analysis for review. 3. The HydroCAD model for PP6 is not modeled correctly as the discarded volume is greater than the entire tributary volume.The Applicant to revise accordingly. Further, within the HydroCAD model, the stage storage for Depression P2 should be revised to accommodate the elevation of the overflow weir.While this is noted and should be modified, it is unlikely that there will be a change in the results. 4. Section 6.3.3 of the NYS SMDM specifies pretreatment requirements for infiltration practices. From the site plans, it appears that no pretreatment techniques are proposed for the infiltration depression 2P. The Applicant to revise the depression design to include the pretreatment requirements accordingly. 5. In the post-development HydroCAD model, Pond 2P is modeled with a basal surface elevation of 382.5, however the site plans do not show the 382.5 contour line and therefore the surface area at that elevation cannot be reviewed.The Applicant to revise accordingly. 6. There does not appear to be soil test pits or infiltration test results provided for the proposed infiltration devices. The Applicant to perform soil test pits and infiltration testing within the bounds of each infiltration practice and provide the results in subsequent submissions.The Applicant shall ensure that soil testing for the proposed infiltration practices meets the requirements specified in Appendix D of the 2015 NYS Stormwater Management Design Manual (SMDM). The Applicant shall notify the Town prior to conducting the soil test pits so the Town can witness if they so choose. 7 The subcatchment boundary lines appear to match the parcel lines, however it does appear that offsite areas are tributary to the site.The subcatchment boundaries shall not be limited to the parcel boundary and shall be the tributary area. The Applicant to revise accordingly and USGS information can be used for offsite areas. 8. The total area analyzed in the post-development condition is roughly 1,700 square feet less than the pre-development condition, however the subcatchment boundary does not support this. The Applicant to clarify or revise accordingly. 9. The standard and specifications for winter stabilization of the NYS SSESC requires "A temporary site specific, enhanced erosion and sediment control plan to manage runoff and sediment at the site during construction activities in the winter months to protect off-site water resources. This standard applies to all construction activities involved with ongoing land disturbance and exposure between November 15th to the following April 1st." The Applicant shall provide a separate, temporary site specific, enhanced erosion and sediment control plan, if construction activities with ongoing land disturbance and exposure is planned after November 15th. This erosion and sediment control plan shall conform to all requirements of the winter stabilization specification referenced above Conclusion&Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. u .la In.the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at(518) 824-1926. Sincerely, -Sean M. Doty, P.E., LEED AP, CPMSM !: Senior Civil Engineer/ Regional Leader cc: Shauna Baker,Town Planning Office Administrator(via email) Laura Moore,Town Land Use Planner(via e-mail) Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board SEQR RESOLUTION—Grant Positive or Negative Declaration SITE PLAN 16-2022 NORTHWAY SELF STORAGE, LLC. Tax Map ID: 309.13-2-31.112 /Property Address: 162 Carey Road/Zoning: CLI -storage structures, one 4,000 sq. ft. and one 6,000 sq. ft. The applicant proposes construction of two new self Siteywork includes additional pavement for new buildings. There are 4 existing self-storage buildings on the site with a total of 24,000 sq ft. Pursuant to chapter 179-3-040, 179-9-020, site plan for new storage buildings shall' :,be subject to Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; The;,proposed action considered by this Board is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury; No Federal or other agencies are involved; Part 1 of the Short EAF has been completed by the applicant; Upon:review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning Board-as-lead agency that this project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. MOTION`TO GRANT A POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR SITE PLAN 16-2022 NORTHWAY SELF STORAGE, LL Introduced by who moved for its adoption. As per the resolution prepared by staff. 1. Part II of the Short EAF has been reviewed and completed by the Planning Board. 1 Part III of the Short EAF has been reviewed and completed by the Planning Board. Or Part III of the Short EAF is not necessary because the Planning Board did not identify potentially moderate to large impacts. Motion seconded by Duly adopted this 22°d day of March 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 Fax: 518.745.4437 1 742 Bay Road,Queensbury,NY 12804 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 16-2022 NORTHWAY SELF STORAGE, LLC. Tax Map ID: 309.13-2-31.112/Property Address: 162 Carey Road/Zoning: CLI The applicant has submitted an application to the Planning Board: Applicant proposes construction of two new self-storage structures, one 4,000 sq. ft. and one 6,000 sq. ft. Site work includes additional pavement for new buildings. There are 4 existing self-storage buildings on the site with a total of 24,000 sq ft. Pursuant to chapter 179-3-040, 179-9-020, site plan for new storage buildings shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board has reviewed the potential environmental impacts of the project, pursuant to the State Environmental Quality Review Act (SEQRA) and adopted a SEQRA Negative Declaration—Determination of Non-Significance; The Planning Board opened a public hearing on the Site plan application on 3/15/2022 and continued the public hearing to 3/15/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/15/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 16-2022 NORTHWAY SELF STORAGE, LLC; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Pagel of 2 Phone: 518.761.8220 I Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan,must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Motion seconded by Duly adopted this 22nd day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761..82201 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 10-2022 @ 257 Dix Avenue Marc Garvey Public Hearing Scheduled Unlisted SEAR Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site Plan 10-2022 MARC GARVEY 257 Dix Avenue/ Commercial Intensive/Ward 2 SEQR Unlisted Material Review: site plan application, site plans, elevations, floor plans, stormwater management Parcel History: SP 55-2018 `Requested Action Planning Board review and approval for an 8,000 sq ft addition to an existing building. Resolutions 1. SEQR 2 PB decision Project Description Applicant proposes an 8,000 sq ft addition to an existing building, 23 additional parking, display car area, site worI and stormwater management. A portion of the existing 15,395 sq ft building will be removed when the addition is constructed. There are also proposed alterations to the facade. Pursuant to chapter 179-3-040, 179-9- 020, site plan for a new floor plan and facade are subject to Planning Board review and approval. Staff Comments •. Location-The project site is located at 257 Dix Avenue on a 6.96 ac parcel. • Arrangement- The site has an existing auto sales and repair business with associated parking, lighting, i .stormwater and landscaping. • Site Design- The site parking is to be rearranged as some parking is being elimintated closer to the building on the west side. New parking is proposed to the north and east side of the lot. • ' Building—The building additions include a 6,500 sq ft addition on the east side noting a portion of the east side building is to be removed. The west side of the building will have a new addition of 518 sq ft for parts delivery. The west side will also have a covered vehicle area of 568 sq ft. There is also a 483 sq ft covered area for site maintenance area. • Traffic- The plans indicated 75 spaces required. The plan includes 128 spaces for customer service and employee. The display spaces on the site include used and new vehicles is to be 198 spaces. The applicant has noted a display space at the access area to the facility. The display area meets the required setback for display areas at 25 ft setback from the property line. • Grading and drainage plan, Sediment and erosion control- The applicant has indicated there are minor modifications to the existing stormwater basins to assist with the existing and new drainage. The project has been referred to the Town Designated Engineer for review and comment. • Landscape plan-No new landscaping is proposed—the board may request clarification of the landscaping. • Site lighting plan-The applicant has indicated there will be new wall packs on the addition areas. A reminder cutsheets should be on the final plan sets and they should be cutoff fixtures. • Utility details-The connections remain the same. • Signage-The plans indicate there is a new directional sign to be installed. The plans do not indicate the building signs square footage in relation to what has been previously approved. Elevations-The elevations plans show each side of the building. • Floor plans-The floor plans show the alterations to the interior of the building with the additions. Also, included is the floor plan of the second floor. • Waivers-There are no requests for waivers the applicant has provided items for g. site lighting, h. signage,j.. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans,; q. soil logs, r. construction/demolition disposal s. snow removal. w There are no waivers requested at the time of application. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The'applicant has completed a site plan application for the proposed additions to an existing building, alterations to the existing parking/display area, upgrade to stormwater management. The board may request clarification of landscaping, lighting and signage. 'Meeting History: 1s`Meeting Reviewed by Department on Tuesday, March 1, 2022 Warren County Planning Department Mar2022-12 Project Review and Referral Form Project Name: Garvey, Marc Owner: Garvey Sisters, LLC ID Number: QBY-22-SPR-10 County`Project#: Mar2022-12 Current;Zoning: CI Community: Queensbury Project Description: Appl;i,cant proposes addition to existing building and 23 additional parking/display car area. Site Location: 87;Dix Ave Tax Map Numbers: 303.15-1-3 County Planning Recommendation: Informal Staff Comments: Local actions to date (if any): Local Action/Final Disposition: 3/1/2022 Warren County Planning Department Date Signed Local Official Date Signed PLEASE RETURN THIS FORM TO THE WARREN COUNTY PLANNING DEPARTMENT WITHIN 10 DAYS OF FINAL ACTION LaBeLLa Powered by partnership. March 10, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: Garvey Hyundai Town of Queensbury, Warren County, New York Chazen Project#2220706.08 Queensbury Ref#SP10-2022 Dear Mr. Brown: LaBella Associates (LaBella) has received a submission package from your office for the above referenced project. The Applicant is proposing 4 additions (6,500 SF, 483 SF, 515 SF, 568 SF), 23 additional parking, display car area, and site work/stormwater management. Information submitted to our office for review includes the following: • Building Plans, prepared by Rucinski Hall Architecture, dated February 24, 2022; • Impact Statement, received February 24, 2022; • Project Narrative, prepared by EDP, LLP, dated January 2022; • Site Plan Review Application, prepared by EDP, LLP, dated February 3, 2022; • Overall Site Plans, prepared by EDP, LLP, received February 24, 2022, and; • EAF Mapper Summary Report, prepared by EDP, LLC, dated February 2, 2022. Your office has requested that we limit our review to the design of stormwater system as it relates to compliance with local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the site plan review application, the proposed site improvements will disturb less than one (1)acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2. Section 179-6-080 of the Town Code states that stormwater drainage plans shall analyze the impacts of commercial or Industrial projects using at least a 50-year return storm. The stormwater plan shall work in effect so that post-development runoff rate and volume conditions do not exceed pre- development conditions.The Applicant has provided a 50-year storm analysis for review. 3. The plans do not appear to depict contour elevations within depression 1P(existing basin).The contours for the elevations referenced in the HydroCAD are needed for further review of the HydroCAD model.The applicant shall provide contour elevations for the existing basin to support a review of the HydroCAD stage/storage data. 4. Further, the elevation of the device #1 (round culvert) in the pre-development HydroCAD model is modeled at an elevation of 319.93'. However, the elevation on the existing conditions map shows the culvert at 319.95'.The applicant is to clarify the elevation of the culvert. 5. Further, In the HydroCAD model,the runoff depth shows a ">" indicating that a time span of 5-20 hours is not sufficient to realize the full effects of the storm.The Applicant to revise the time span such that it is at least the length of the storm analyzed (24 hours) or more ideally to sufficiently long to depict the full effects of the storm. 6. The Applicant should indicate if any infiltration testing was done to support the infiltration rate used within the HydroCAD model. If not, infiltration testing on site, near the existing infiltration basin should be done to substantiate the design assumptions. 7. The standard and specifications for winter stabilization of the NYS SSESC requires "A temporary site specific,enhanced erosion and sediment control plan to manage runoff and sediment at the site during construction activities in the winter months to protect off-site water resources. This standard applies to all construction activities involved with ongoing land disturbance and exposure between November 15th to the following April 1st." The Applicant shall provide a separate, temporary site specific, enhanced erosion and sediment control plan, if construction activities with ongoing land disturbance and exposure is planned after November 15th. This erosion and sediment control plan shall conform to all requirements of the winter stabilization specification referenced above. Conclusion &Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at(518) 824-1926. Sincerely, r V1 7n��S- Sean M. Doty, P.E., LEED AP, CPMSM Senior Civil Engineer/ Regional Leader cc: Shauna Baker, Town Planning Office Administrator(via email) Laura Moore, Town Land Use Planner(via e-mail) ZA2022Projects\Queensbury,Town of\2220706.08-Marc Garvey SP Review\OS Design\Civil\Muni\REV\2220706.08-GarveyHyundai-2022-03-30—LI.docx w FIRE MARSHAL'S OFFICE Tozvrt of Queensbury 742 Bay Road, QiteensburiI, NY 12804 z. " Horne of Natural Beauty ... A Good Place to Give " PLAN REVIEW (site) Garvey Hyundai 257 Dix SP— 10 - 2022 2/24/2022 The following comments are based on a review of submittals: • Fire Marshal has no site issues at this time Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal@queensbury.net Fire Marshal 's Office , Phoue: 518-761-8206 . Fax: 518-745-4437 (zretrtarslutL@c�teettsf�ttttt.net � zuzvzv.�tteettsbtutt.ttel Town of Queensbury Community Development Office �- 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board SEQR RESOLUTION—Grant Positive or Negative Declaration SITE PLAN 10-2022 MARC GARVEY Tax Map ID: 303.15-1-3 /Property Address: 257 Dix Avenue/Zoning: CI The applicant proposes an 8,000 sq ft addition to an existing building, 23 additional parking, display car area, site work, and stormwater management. A portion of the existing 15,395 sq ft building will be removed when the addition is constructed. There are also proposed alterations to the facade. Pursuant to chapter 179-3-040, 179-97020,site plan for a new floor plan and facade are subject to Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; The'proposed action considered by this Board is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury; ,r No Federal or other agencies are involved; Part 1: of the Short EAF has been completed by the applicant; Upon`;review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency that this project will result in no significant adverse impacts on the environment, and, "therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is. issued. MOTION TO GRANT A POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR SITE PLAN 10-2022 MARC GARVEY Introduced by who moved for its adoption. As per the resolution prepared by staff. 1. Part Ir of the Short EAF has been reviewed and completed by the Planning Board. 2. Part III of the Short EAF has been reviewed and completed by the Planning Board. Or Part III of the Short EAF is not necessary because the Planning Board did not identify potentially moderate to large impacts. Motion seconded by Duly adopted this 2211 day of March 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 j Fax: 518.745.4437 1 742 Bay Road,Queensbury,NY 12804 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 10-2022 MARC GARVEY Tax Map ID: 303.15-1-3/Property Address: 257 Dix Avenue/Zoning: CI The applicant has submitted an application to the Planning Board: Applicant proposes an 8,000 sq ft addition to an existing building, 23 additional parking, display car area, site work, and stormwater management. A portion of the existing 15,395 sq ft building will be removed when the addition is constructed. There are also proposed alterations to the facade. Pursuant to chapter 179-3-040, 179-9-020, site plan for a new floor plan and facade are subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board has reviewed the potential environmental impacts of the project, pursuant to the State Environmental Quality Review Act (SEQRA) and adopted a SEQRA Negative Declaration—Determination of Non-Significance; The Planning Board opened a public hearing on the Site plan application on 3/22/2022 and continued the public hearing to 3/22/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 10-2022 MARC GARVEY; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Pagel of 2 Phone: 53.8.761.8220 1 Fax: 5i8.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT(Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan,must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 22°d day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: S18.76i.8220 ( Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 13-2022@ 11 Lafayette Street CKT Enterprises Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site Planl3-2022 CKT Enterprises 11 Lafayette Street/ Commercial Intensive/ Ward 2 SEQR Type II Material Review: site plan application for pole barn and funeral home, elevation and floor plans for both Parcel History: SP 36-99, SP 37-2020 Requested Action "Planning Board review and approval for additions to the existing Baker Funeral home. Resolutions 1. PB decision Pro iect Description Applicant proposes additions to the existing Baker Funeral Home- west 1,008 sq ft with an upstairs attic access, east 756 sq ft. The project includes enclosing existing pole barn with new overhead doors at the front and a 436 sq ft addition for enclosure. Minimal site work for stormwater and site preparation for construction. The main building on site is 4,630 sq ft and the pole barn is 2,627 sq ft. Pursuant to chapter 179-3-040, 179-9-020, site plan for construction of additions and enclosures of the pole barn shall be subject to Planning Board review and approval. Staff Comments •' Location-The project is located at 11 Lafayette on a parcel of 1.78 ac. • . Arrangement- The site has an existing funeral home and pole barn building. The plans show the existing parking lot and gazebo. • Building—The existing funeral home is 4,630 sq ft with two proposed additions on either side of the building both with a second story portion. The work on the pole barn was proposed in 2020 with enclosing the pole barn for storage; the site plan had expired. • Traffic-The site has 105 parking spaces where there is to be 1 space per 2 seats at maximum occupancy (note application should be updated with correct parking requirements. The board may request clarification of parking as the plans do not show specific parking layout and since the smaller viewing room appears to be larger. ,Grading and drainage plan, Sediment and erosion control-The site has minimal grading proposed on the site and has included stormwater management as part of the project. The project has been referred to the Town Designated Engineer for review and comment • Landscape plan-The applicant has included a note on the plans that indicate a new planter bed with mulch to be installed on the west side of the building addition. The existing use of a funeral home is adjacent to an existing residential use where the addition and work on the site triggers the review of the buffer ,requirements between uses. The previous plan for the pole barn that has since expired had included a split rail fence along the property line. The board may request additional information about the 50 ft buffer such as,landscaping and or fencing between the business and the residential use. • Site lighting plan-The plans do not indicate if there is to be new wall lighting for the additions or the pole barn. The Board may request clarification on lighting. • Utility details-There are no changes to the utility connections for the buildings. • • Signage-The plans do not indicate any changes to the sign- no changes are anticipated. • Elevations- The elevations only show the addition sections on the funeral home. The board may request a full elevation of the building on all four sides. The pole barn elevations are shown. • Floor plans-The floor plans show the only the addition sections on the funeral home. The board may request a full floor plan of the funeral home with existing and proposed together. The pole barn floor plans show the open space area for storage. • Waivers-The applicant has not requested any waivers. The applicant has provided information for items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. Staff has, suggested additional information for buffer between the business and residential use, landscaping, lighting, elevations and floor plans of the funeral home with full views of the existing and additions together be provided. • There are no waivers at the time of application. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary. The applicant has completed a site plan application for the improvements to the buildings for the funeral home. The project includes two additions to the main funeral home building as 2 story additions; then the project includes enclosing the pole barn for interior storage. The board may request additional information on the buffer.between the business and residential use, landscaping, lighting, elevations and floor plans of the funeral home with full views of the existing and additions together. Meeting History: I"Meeting Reviewed by Department on Tuesday,March 1, 2022 Warren County Planning Department Mar2022-14 Project Review and Referral Form Project.Name: CKT Enterprises Owner: CKT Enterprises ID Nnmber: QBY-22-SPR-13 County Project#: Mar2022-14 Current,Zoning: CI Community: Queensbury Project,Description: Applicant.proposes additions to funeral home with attic access to include enclosing existing pole barn. Site'!'Location: 11 Lafayette Street Tax Map Numbers: 302.7A 18 County Planning Recommendation: NCI. Informal Staff Comments: Local actions to date(if any): Local Action/Final Disposition: 3/1/2022 !Warren'County Planning Department Date Signed Local Official Date Signed i �PLEASE RETURN THIS FORM TO THE WARREN COUNTY PLANNING DEPARTMENT WITHIN 10 DAYS Or FINAL ACTION LaBeLLa Powcared by partnership. March 8, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: CKT Enterprises LLC(Baker Funeral Home) Town of Queensbury, Warren County, New York LaBella Project#2220706.09 Queensbury Ref#SP 13-2022 Dear Mr. Brown: LaBella Associates (LaBella) has received a submission package from your office for the above referenced project.The Applicant is proposing to construct a new 1,665 SF addition to the existing facility. Information submitted to our office for review includes the following: • General Information, prepared by Rucinski Hall Architecture, dated February 8, 2022; • Overall Site Plans, prepared by Rucinski Hall Architecture, dated February 8, 2022, and; • Floor Plans and Elevations drawn by Rucinski Hall Architecture, dated February 9, 2022. Your office has requested that we limit our review to the design of stormwater system as it relates to compliance with local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the site plan review application,the proposed site improvements will disturb less than one (1)acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2. Section 179-6-080 of the Town Code states that stormwater drainage plans shall analyze the impacts of commercial or Industrial projects using at least a 50-year return storm. The stormwater plan shall work in effect so that post-development runoff rate and volume conditions do not exceed pre- development conditions. The Applicant has not provided a 50-year storm analysis for review. The applicant shall submit a 50-year storm analysis to demonstrate compliance with town code section § 179-6-080. It does not appear that the plan set includes proposed stormwater management features. 0 k x�,..1_9 3. It does not appear that erosion and sediment controls are depicted on the plans, and they shall be incorporated in subsequent submission in accordance with the NYS SSESC. 4. The standard and specifications for winter stabilization of the NYS SSESC requires "A temporary site specific, enhanced erosion and sediment control plan to manage runoff and sediment at the site during construction activities in the winter months to protect off-site water resources. This standard applies to all construction activities involved with ongoing land disturbance and exposure between November 15th to the following April 1st." The Applicant shall provide a separate, temporary site specific, enhanced erosion and sediment control plan, if construction activities with ongoing land disturbance and exposure is planned after November 15th. This erosion and sediment control plan shall conform to all requirements of the winter stabilization specification referenced above. 5. The plans appear to depict neither the existing contours nor the proposed contours. The Applicant to provide the existing and proposed contours, existing and proposed spot grades, or flow path arrows on subsequent submissions to better understand the existing and proposed flow paths. Conclusion &Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at(518) 824-1926. Sincerely, III 7n��Ss- Sean M. Doty, P.E., LEED AP, CPMSM Senior Civil Engineer/ Regional Leader cc: Shauna Baker,Town Planning Office Administrator(via email) Laura Moore, Town Land Use Planner(via e-mail) Z:\2022Projects\Queensbury,Town of\2220706.09-CKT Enterprises\05_Design\Civil\Muni\REV\2220706.09-CKT-SP13-2022-Ll.doa Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 13-2022 CKT ENTERPRISES Tax Map ID: 302.7-1-18/Property Address: 11 Lafayette Street/Zoning: Cl The applicant has submitted an application to the Planning Board: Applicant proposes additions to the existing Baker Funeral Home- west 1,008 sq ft with an upstairs attic access, east 756 sq ft. The project includes enclosing existing pole barn with new overhead doors at the front and a 436 sq ft addition for enclosure. Minimal site work for stormwater and site preparation for construction. The main building on site is 4,630 sq ft and the pole barn is 2,627 sq ft. Pursuant to chapter 179-3-040, 179-9-020, site plan for construction of additions and enclosures of the pole barn shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on 3/22/2022 and continued the public hearing to 3/22/2022,when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 13-2022 CKT ENTERPRISES; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Page 1 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 22°d day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.8220 I Fax: 53.8.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 17-2022@ Highpoint Drive Foothills Builders (Terre Majestic Holdings) Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site Plan 17-2022 FOOTHILLS BUILDERS (TERRE MAJESTIC HOLDINGS, LLC.) Highpoint Drive/Moderate Density Residential/ Ward 1 SEQR Type II Material Review: site plan application, site plan, septic, narrative Parcel History: SUB 4-1993, SUB 4-1993 Mod. (2006) Requested Action Planning Board review and approval for installation of driveway within deeded easement of adjoining parcel. Resolutions 1.PB decision Project Description The'applicant owner of lot 9 of Highpoint Drive proposes to install a 3,200 sq ft driveway within the deeded easeiiaent area on the parcel of 23 Highpoint Drive, lot 10. The driveway to be 10% plus grade. There will be two 'driveways located at 23 Highpoint Drive, lot 10, the proposed driveway to be adjacent to the existing driveway. Lot 9 is currently under construction for a single family home. The project includes stormwater management along the new driveway area. Pursuant to chapter 179-3-040, 179-9-020, 179-6-060, development of the'driveway at a 10% grade shall be subject to Planning Board review and approval. Staff Comments •` 'Location-The project activity is located on Lot 10 at 23 Highpoint Drive to install a 3,200 sq ft driveway within an easement area identify for access to Lot 9 • Arrangement-There is an existing home and driveway at 23 Highpoint Drive Lot 10. • Site Design- The new driveway will be located in a designated easement area/designated right-of-way on Lot 10 specifically for Lot 9 access • Building—There is an existing home on Lot 10 that is to remain and then on Lot 9 there is a home under construction. • Grading and drainage plan, Sediment and erosion control-The applicant has proposed stormwater management for the new driveway area with trench areas. The information has been forwarded to the Town Designated Engineer for review and comment. • Site details-The project area was subject to a subdivision in 1993 for 23 Lots on 18.9 acres where 15 of the lots would be developed on a culdesac. The filed plat shows Lot 9 and Lot 10 with a common driveway; notes on the plat " 1) common access drives for Lot 9 and 10 have a minimum of a12 ft width travel area, 24 ftwide cleared area, room to pass two vehicles along access at approximate point and room fora turn- around area near the houses." The owner of Lot 10 had a subdivision modification in 2006 where the driveway that had been constructed was partially on Lot 11, so the Planning Board granted a lot line adjustment. The plat for the lot line adjustment has noted"easement for the benefit of Lot 9." • • Utility details-There are no changes to the utilities on either site. • :Elevations, Floor plans-Not applicable. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. co nstruction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver as the project is for the construction of a driveway. The applicant has provided information j. stormwater, k. topography. Also noting the application materials for the house the driveway • ':' Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the ,written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. summary The,applicant has completed a site plan application for the construction of driveway of 10% grade. The plans showthe location and the details of the construction. Meeting History: 1st Meeting Reviewed by Department on Tuesday,March 1, 2022 Warren County Planning Department NIar2022-18 Project Review and Referral Form Project Name: Foothills Builders(Terre Majestic Holdings, LLC) Owner: Russell Thomas ID;.N,umber: QBY-22-SPR-17 County Project#: Mar2022-18 Current Zoning: MDR Community: Queensbury Project Description: Applicantproposes to install 3,200 sq ft driveway. .Site Location: Highpoint Drive Tak-Map Numbers: 296:5-1-17 County Planning Recommendation: Concur w/Local Board Informal Staff Comments: Local actions to date(if any): Local Action/Final Disposition: 3/1/2022 Warren County Planning Department Date Signed Local Official Date Signed i PLEASE RETURN THIS FORM TO THE WARREN COUNTY PLANNING DEPARTMENT WITHIN 10 DAYS OF FINAL ACTION aa: LaBeRa Powered by partnership. March 8, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net RE: Foothills Builders - Round Pond Road Subdivision Town of Queensbury,Warren County, New York LaBella Project#2220706.12 Queensbury Ref#SP17-2022 Dear Mr. Brown: LaBella has received a submission package from your office for the above referenced project. The applicant is proposing to construct a new access road to a new residence being built on the parcel. This is planning to address a property line issue that occurred on the adjacent lots. • Summary Narrative, prepared by Hutchins Engineering PLLC, dated February 15, 2022 • Site Plan Review Application, Signed and dated February 14, 2022 • Wastewater Plan, prepared by Hutching Engineering PLLC, last revised February 15, 2022 • Deed, Provided by Warren County, Dated August 17, 1998 Your office has requested that we limit our review to the design of stormwater system as it relates to compliance of local, state or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. Accordingto the site plan review application,the proposed site improvements will disturb less than 1 acre and therefore this project does not require the preparation of a SWPPP in accordance with the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0- 20-001) that includes erosion and sediment controls as well as post construction stormwater management practices. Comments related to the proposed stormwater management and erosion and sediment control features proposed for the site are offered below. 2. Section 179-6-080 of the Town Code, states that stormwater drainage plans shall analyze the impacts of a project using at least a 25-year return storm with regards to both runoff rate and volume for residential projects.The Applicant has not provided a 25-year storm analysis and shall include one in subsequent submissions. The Applicant did provide stormwater calculations using the "Minor" project methodology, which is only allowed for projects within the Lake George Basin. 3. Section 6.3.3 of the NYS SMDM and good engineering practice suggests that pretreatment should be provided for infiltration practices. Chazen understands that for small sites involving projects disturbing less than an acre, it is not necessarily always feasible to provide standard pretreatment facilities. The Applicant to clarify what is the intended pre-treatment practices for the proposed infiltration devices. 20 Elm Street I Suite 110 ! Glens Falls. NY 128o1 I p(518)812-0513 www.LabeLL,-ipc.com 4. The provided plans do not indicate that deep soil test pits or infiltration testing has been performed at the locations of the infiltration trench. Such testing shall be performed to confirm infiltration rates and separation distances.The Applicant to provide the results once determined. 5. It does not appear that erosion and sediment controls are depicted on the site plan.The Applicant to depict erosion and sediment controls on the site plan (and include details) in subsequent submissions. 6. The Applicantto depict any neighboring water wells or septic systems within reason (approximately 200 feet). Conclusion &Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. Sean M. Doty, P.E., LEED AP, CPMSM Senior Civil Engineer/Regional Leader LaBella Associates cc: Shauna Baker,Town Planning Office Specialist(via email) Laura Moore,Town Land Use Planner(via email) File 2 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 17-2022 FOOTHILLS BUILDERS (TERRE MAJESTIC HOLDINGS, LLC.) Tax Map ID: 296.5-1-17/Property Address: Highpoint Drive/Zoning: MDR The applicant has submitted an application to the Planning Board: The applicant owner of lot 9 of Highpoint Drive proposes to install a 3,200 sq ft driveway within the deeded easement area on the parcel of 23 Highpoint Drive, lot 10. The driveway to be 10% plus grade. There will be two driveways located at 23 Highpoint Drive, lot 10, the proposed driveway to be adjacent to the existing driveway. Lot 9 is currently under construction for a single family home. The project includes stormwater management along the new driveway area. Pursuant to chapter 179-3-040, 179-9-020, 179-6-060, development of the driveway at a 10% grade shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on 3/22/2022 and continued the public hearing to 3/22/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 17-2022 FOOTHILLS BUILDERS (TERRE MAJESTIC HOLDINGS, LLC.); Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Pagel of 2 Phone: 518.761.8220 I Fax: 518.74S.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT(Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff. i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan,must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 22°d day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: S18.76i.8220 I Fax: 518.74S.4437 1742 Bay Road, Queensbury, NY 1.28041 www.queensbury.net Site Plan 9-2022@ 32 Forest Road Ronald Seguljic Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site Plan 9-2022 RONALD SEGULJIC 32 Forest Road/Waterfront Residential/Ward 1 >�:.SEQRI Type II Material Review: site plan application, elevations and floor plans, site plans Parcel History: AV 8-2022 Requested Action Planning Board review and approval for alterations and additions to existing home. Resolutions 1. PB decision Project Description Applicant proposes to alter the existing home to construct a 276 sq. ft. addition, a 156 sq. ft. patio area at the rear, an 84.5 sq. ft. covered front porch, and a lower level for a garage and living area ofl,237.83 sq ft. The project includes a new septic system, well, driveway area, and swale areas. The existing home footprint of 965 sq. ft"with a 190 sq. ft. porch/deck. The existing floor area is 965 sq. ft. and the proposed is 2,592.71 sq. ft. Pursuant to chapter 179-3-040, 179-6-065, site plan for a new floor plan shall be subject to Planning Board review and approval. Staff Comments • Location-The project is located at 32 Forest Road and is an interior lot of 11,250 sq ft. • Arrangement- There is an existing residence on the site with an attached deck and shed. • Site Design- The project includes an addition to the home, a new patio area and a new front porch area. •. Building—The existing home is 965 sq ft foot print with a 190 sq ft porch. The new footprint is 1,241 sq ft With a 70 sq ft porch area. •, Grading and drainage plan, Sediment and erosion control-The plans show the grading for the site to for the septic area, driveway area, walkway area. The plans also show two shallow grass areas for stormwater management on the site. The project has been referred to the Town Designated Engineer for review and comment. • Landscape plan-The plans show the existing trees on the site and is unclear if the trees are to remain. Staff would encourage additional information about landscaping or information of site vegetation existing and to remain. o Site lighting plan-The plans do not identify lighting, Staff recommends reminding the applicant light '';,fixtures are to be down cast cutoff fixtures including residential lighting. • Site details- The applicant has indicated there is a patio to be added to the rear of the home but it is separate from the home to be 16 ft from the property line. Noting this not subject to a variance but should be included in the hard surfacing on the site. •' Utility details-The site has a new septic system that had received septic variance in 2021. A new well is proposed for the site. • Elevations-The plans show the existing home as one story and the proposed home with a new garage and living space under the existing home. ;i; • • Floor plans-The floor plans show the first floor with a three season room, sun porch and 2 bedrooms; the foundation floor plan indicates a third bedroom and living space. Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, 1. landscaping, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver as these items are typically, :associated with commercial projects. The applicant has provided information on j. stormwater, k. topography, p floor plans. • . Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature.of Variance Granted 3/16/2022The applicant proposes additions to an existing home where the covered porch to the front of , the home is to be located 26 ft where a 30 ft setback is required; the rear addition is to be 26 ft from the rear property line where a 30 ft setback is required. The floor area is to be 2,592.71 (23%) where 2475(22%) is the maximum allowed. Summary The applicant has completed a site plan application for additions and alterations to an existing home including front,andrear additions, and ground level garage and living space improvements. The board may request supporting information for the landscaping and lighting. Meeting.History: PB: 3/15/22; ZBA: 3/16/2022 Reviewed by Department on Tuesday, March 1, 2022 Warren County Planning Department Mat2022-6 Project Review and Referral Form Project Name: Seguljic, Ronald Owner: Ronald Seguljic ID'Number: QBY-22-SPR-9 County Project#: Mar2022-6 Current Zoning: WR Community: Queensbury Project Description: - Applicant proposes alteration addition to existing home of patio area, covered front porch and lower level garage and living space. Project includes ne septic,well, driveway area and swale areas. `t Site Location: 32 Forest Rd Tax Map Numbers: 226-10-1741. County Planning Recommendation: Informal Staff Comments- Local actions to date(if any): Local Action/Final Disposition: 3/1/2022 Warren'County Planning Department Date Signed Local Official Date Signed PLEASE RETURN THIS FORM TO THE WARREN COUNTY PLANNING DEPARTMENT WITHIN 10 DAYS OF FINAL ACTION . i Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 9-2022 RONALD SEGULJIC Tax Map ID: 226.19-1-41/Property Address: 32 Forest Road/Zoning: WR The applicant has submitted an application to the Planning Board: Applicant proposes to alter the existing home to construct a 276 sq. ft. addition, a 156 sq. ft. patio area at the rear, an 84.5 sq. ft. covered front porch, and a lower level for a garage and living area ofl,237.83 sq ft. The project includes a new septic system, well, driveway area, and swale areas. The existing home footprint of 965 sq. ft. with a 190 sq. ft. porch/deck. The existing floor area is 965 sq. ft. and the proposed is 2,592.71 sq. ft. Pursuant to chapter 179-3-040, 179- 6-065, site plan for a new floor plan shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 3/15/2022; the ZBA approved the variance requests on 3/16/2022; The Planning Board opened a public hearing on the Site plan application on 3/22/2022 and continued the public hearing to 3/22/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 9-2022 RONALD SEGULJIC; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Pagel of 2 Phone: S18.76i.8220 I Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan,must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 22nd day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.82201 Fax: S18.745.44371742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 11-2022@ 14 Crooked Tree Drive Katharine Seelye Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 22, 2022 Site Plan 11-2022 KATHARINE SEELYE 14 Crooked Tree Drive/Waterfront Residential/Ward 1 SEAR. Type II Material Review: site plan application, site plans, elevations, floor plan Parcel History: SP 22-2003, SP 592007, AV 29-2001, AV 17-2003, SP 55-2017, AV 53-2017, AV 70-2017, AV 9-2022 Requested Action Planning Board review and approval for second story dormer addition and interior alterations. Resolutions 1. PB decision Project Description Applicant proposes a second story dormer of 136 sq ft and interior alterations. The dormer addition is to be open:below and the existing loft will be enclosed for a bunk room. The project includes fagade changes with new window installation on the main and upper floors. No site work is proposed. There are to be no changes to '.the existing home's footprint of 1,209 sq ft, 700 sq ft deck/porch and floor area of 2,778 sq ft. Pursuant to chapter 179-3-040, 179-13-010, 179-6-050, site plan for expansion of a non-conforming structure in a CEA shall be subject to Planning Board review and approval. Staff Comments •' Location-The project site is located at 14 Crooked Tree Drive on a 0.37 acre parcel. • Arrangement- The site has an existing home that had an addition and interior alterations in 2017. • Site Design- There are no changes proposed to the existing site. •' Building—The existing home footprint of 1,209 sq ft and 700 sq ft deck/porch is to remain. The addition is to'the second floor for a dormer that is open to the porch below—no new floor area. • Grading and drainage plan, Sediment and erosion control-There are no changes to the site proposed. • Landscape plan-There are no changes to the proposed site. The existing landscaping is to remain. Below are the guidelines from the shoreline buffer code section ;o Shoreline Buffer- Section 179-8-040 -Minimum width 35 ft (Lake George) -For every 700 sgft of shoreline buffer area—one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover-7—24 in native shrubs; 14 herbaceous plants Project site -144 ft of shoreline per survey -Shoreline buffer 144 ft X 35 ft width is 5040 sq ft =Shoreline buffer area-5040/700 =7.2 round up to 8—eight large trees at 3 inch diameter -Ground cover-5040/350 = 14.4 round up to 15 (X7) =105 native shrubs and 15 (X14) herbaceous plants=210 o' Shoreline Cutting restrictions- Section 179-6-050 Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 144 ft Shoreline X 30%=43.2 feet of the shoreline buffer cut to allow a view, access and to reduce runoff(such as angled across the lot). - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. 0 ,'• Site lighting plan- The board may wish to confirm there is no new exterior lighting and a reminder if there is' new lighting the fixtures are to be cut off and down cast-even for residential lighting. • Utility details-There are no changes to the well or septic system. • Elevations-The plans show the existing and proposed fagade areas with window changes. • Floor plans-The plans show the main floor plan existing where most of the work on the main floor is the three season porch and office area exterior fagade and windows. The second floor area shows the existing condition of three bedrooms on the lake side and then the proposed were the middle bedroom is converted to open loft area and the area above the three season porch to a dormer with area open to the porch area below allowing additional window light for the porch area. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details;p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be. granted. Nature of Variance Granted 3/16/2022. The proposed dormer will be located 33 ft from the shoreline and 29 ft 9 inches to the west property line. Relief is requested for the shoreline setback where 75 ft is required Summary The applicant has completed a site plan application for the alterations to an existing home with a dormer on the second floor, fagade/window work and interior alterations. Meeting History: PB: 3/15/22; ZBA: 3/16/22 i Reviewed by Department on Tuesday,March 1, 2022 Warren County Planning Department Mar2022-8 Project Review and Referral Form Project Name: Seelye, Katharine Owner Katharine Seeley ID Number: QBY-22-SPR-11 County Project#: Mar2022-8 Current Zoning: WR Community: Queensbury Project Description: Applicant proposes a second story dormer where the dormer is to be open below and existing loft enclosed,interior alterations,fagade changes and new window instillations on both floors. Site Location: 14 Crooked Tree Drive Tax Map Numbers: 239.15-1-10 County Planning Recommendation: NCI.;'' Informal Staff Comments: i Local actions to date(if any): Local Action/Final Disposition: 3/1/2022 Warren'County Planning Department Date Signed . Local Official Date Signed PLEASE RETURN THIS FORM TO THE WARREN COUNTY PLANNING DEPARTMENT WITHIN 10 DAYS OF FINAL ACTION u ° Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 11-2022 KATHARINE SEELYE Tax Map ID: 239.15-1-10/Property Address: 14 Crooked Tree Drive/Zoning: WR The applicant has submitted an application to the Planning Board: Applicant proposes a second story dormer of 136 sq ft and interior alterations. The dormer addition is to be open below and the existing loft will be enclosed for a bunk room. The project includes fagade changes with new window installation on the main and upper floors. No site work is proposed. There are to be no changes to the existing home's footprint of 1,209 sq ft, 700 sq ft deck/porch and floor area of 2,778 sq ft. Pursuant to chapter 179-3-040, 179-13-010, 179-6-050, site plan for expansion of a non-conforming structure in a CEA shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 3/15/2022; the ZBA approved the variance requests on 3/16/2022; The Planning Board opened a public hearing on the Site plan application on 3/22/2022 and continued the public hearing to 3/22/2022 when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 11-2022 KATHARINE SEELYE• Introduced by who moved for its adoption; Per the draft provided by staff conditioned upon the following conditions: 1) Waivers request granted/denied: 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) If application was referred to engineering,then engineering sign-off required prior to signature of Zoning Administrator of the approved plans; Page 1 of 2 Phone: 518.76i.8220 I Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net b) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements, c) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; d) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; e) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; f) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy; g) Resolution to be placed on final plans in its entirety and legible. Duly adopted this 22nd day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.82201 Fax: 53.8.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net