Loading...
Staff notes for 3/29/2022 PLANNING BOARD STAFF NOTES MARCH 29, 2022 Queensbury Planning Board Agenda Second Regular Meeting: Tuesday,March 29,2022/Time 7- 11 pm Queensbury Activities Center @ 742 Bay Road REVISED Tabled: Applicant(s) FOOTHILLS BUILDERS(TERRE MAJESTIC Application Type Site Plan 17-2022 _HOLDINGS LLCM Owner(s) Russell Thomas SEQR Type Type II Agent(s) Hutchins Engineering(T.Center) Lot size 1.17 acres(lot 10), 1.39 acres(lot 9) Location Highpoint Drive Ward: 1 ( Zoning Classification: MDR Tax ID No. 296.5-1-17 Ordinance Reference ( 179-3-040, 179-9-020, 179-6-060 Cross Reference ( SUB 4-1993,SUB 4-1993 Mod.(2006) Warren Co.Referral March 2022 Public Hearing ( March 22,2022,March 29,2022 ( Site Information Project Description: The applicant owner of lot 9 of Highpoint Drive proposes to install a 3,200 sq ft driveway within the deeded easement area on the parcel of 23 Highpoint Drive,lot 10.The driveway to be 10%plus grade.There will be two driveways located at 23 Highpoint Drive,lot 10,the proposed driveway to be adjacent to the existing driveway.Lot 9 is currently under construction for a single family home.The project includes stormwater management along the new driveway area.Pursuant to chapter 179-3-040, 179-9-020, 179-6-060,development of the driveway at a 10% grade shall be subject to Planning Board review and approval. _Applicant(s) I BRETT&PAMELA WEST Main House Application Type J Site Plan 51-2021 Owner(s) Same as applicants SEQR Type Type II Agent(s) EDP Lot size J 0.91 acre Location �� 106 Bay Parkway Ward: 1 Zoning Classification: WR Tax ID No. 226.15-1-17 �� Ordinance Reference ( 179-3-040, 179-6-065, 147 Cross Reference 53-2017 septic var.;AV 47-2007&SP 39-2007- Warren Co.Referral August 2021, boathouse;SP PZ 89-2016&SP PZ 210-2016& February 2022(stormwater device) AV 95-2016-addition;SP 37-2009; AV 57-2021, SP 52-2021 Public Hearin September 28,2021,November 16,2021,December Site Information APA,CEA,LGPC g 16,2021,February 22,2022,March 29,2022 Project Description: (Revised 111812022)Applicant proposes to demo existing home plus shed and construct a new 2 story home with a 5,436 sq.ft. footprint with a garage.Also,included is installation of permeable pavers for patio and driveway areas,a covered walkway between the two properties. The new floor area will be 8,670 sq.ft.where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house,septic,stormwater management.Project includes a lot line adjustment but no change to lot size.Pursuant to chapter 179-3-040, 179-6- 065, 147,site plan for new floor area in a CEA and hard surfacing within 50 ft.of the shoreline are subject to Planning Board review and approval. New Business: Applicant(s) SHARON SERINI Application Type Site Plan Freshwaterr Wetlands Permit 2-2022 Owner(s) Same as applicant _SEQR Type Tyke 1I J Agent(s)� EDP-Chris Keil Lot size 2.28 acres Location Cleverdale Off Road Ward: 1 Zoning Classification:WR Tax ID No. J 240.9-1-16.12 ( Ordinance Reference 179-3-040, 179-6-065,179-6-050, 179-6-060 Cross Reference SUB 8-2000,SUB 2-2008,AV 49-2009,SUB(M) I Warren Co.Referral March 2022 2-2008(2�,PZ 92-2016 Public Hearing I March 29,2022 1 Site Information APA,LGPC,CEA Project Description: Applicant proposes construction of new 4 bedroom home with a footprint of 2,445 sq.ft.and a detached garage of 416 sq.ft. Total floor area is 3,510 sq.ft.Project includes connecting to the existing shared driveway to Cleverdale and installation of a new well and septic system.Pursuant to chapter 179-3-040, 179-6-065, 179-6-050, 179-6-060,site work for a new floor area in a CEA,site work for a beach area,shoreline planting plan and other associated development shall be subject to Planning Board review and ap Koval. Old Business Applicant(s) HARRIS BAY YACHT CLUB Application Type Site Plan 18-2022 Special Use Permit 1-2022 Owner(s) ( Same as applicant SEQR Type Type II Agent(s) SRA Engineers Lot size ( 17.16 acres Location { 2712 State Route 9L _ � Ward: 1 Zoning Classification: WP,LC Tax ID No. f 240.4-23.1 Ordinance Reference 179-3-040, 179-10-070,179-5-060 Cross Reference SP 24-91,SV 112-1993,UV 111-1993,AV I 1-2022 Warren Co.Referral March 2022 Public Hearing March 29,2022 Site Information APA,LGPC,CEA Project Description: Applicant proposes to remove and replace the cashier building of 109 sq ft and the storage building of 209 sq ft located on Dock C. The existing club house of 3,172 sq ft has no improvements proposed and will remain the same.The project includes replacing the floating dock system,including 271 seasonal berthing slips for members,winter storage for up to 300 vessels,sales and service of marine products,fuel sales,and onsite pump out services.The project also includes replacing existing steel piles with driven PVC reinforces piles and replacing the existing concrete pads at the shoreline.New lines for water,sewer and electric will be installed as part of the project.Upgrades will include fire safety and lighting on the docking system.Pursuant to chapter 179-3-040, 179-10-070, 179-5-060,site plan for work at the marina,special use permit for marina operations,and hard surfacing within 50 feet of the shoreline shall be subject to Planning Board review and approval. -Any further business which may be properly brought before the Board- Site Plan 17-2022 @ Highpoint Road Foothills Builders (Terre Majestic Holdings) Public Hearing Scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 29, 2022 Site Plan 17-2022 Foothills Builders (Terre Majestic Holdings) Highpoint Drive/Moderate Density Residential/Ward 1 SEQR Type II Material Review: site plan application, site plan, septic, narrative Parcel History: SUB 4-1993, SUB 4-1993 Mod. (2006) Warren Co Referral sent: March 2022, County comments: Concur w/local board. Requested Action Planning Board review and approval for installation of driveway on deeded easement. Resolutions 1. PB decision Project Description The applicant owner of lot 9 of Highpoint Drive proposes to install a 3,200 sq ft driveway within the deeded easement area on the parcel of 23 Highpoint Drive, lot 10. The driveway to be 10%plus grade. There will be two driveways located at 23 Highpoint Drive, lot 10, the proposed driveway to be adjacent to the existing driveway. Lot 9 is currently under construction for a single family home. The project includes stormwater management along the new driveway area. Pursuant to chapter 179-3-040, 179-9-020, 179-6-060, development of the driveway at a 10% grade shall be subject to Planning Board review and approval. Staff Comments • Location-The project activity is located on Lot 10 at 23 Highpoint Drive to install a 3,200 sq ft driveway within an easement area identify for access to Lot 9 • Arrangement-There is an existing home and driveway at 23 Highpoint Drive Lot 10. • Site Design- The new driveway will be located in a designated easement area/designated right-of-way on Lot 10 specifically for Lot 9 access • Building—There is an existing home on Lot 10 that is to remain and then on Lot 9 there is a home under construction. • Grading and drainage plan, Sediment and erosion control-The applicant has proposed stormwater management for the new driveway area with trench areas. The information has been forwarded to the Town Designated Engineer for review and comment. • Site details-The project area was subject to a subdivision in 1993 for 23 Lots on 18.9 acres where 15 of the lots would be developed on a culdesac. The filed plat shows Lot 9 and Lot 10 with a common driveway; notes on the plat" 1) common access drives for Lot 9 and 10 have a minimum of al ft width travel area, 24 ft wide cleared area,room to pass two vehicles along access at approximate point and room for a turn- around area near the houses." The owner of Lot 10 had a subdivision modification in 2006 where the driveway that had been constructed was partially on Lot 11, so the Planning Board granted a lot line adjustment. The plat for the lot line adjustment has noted"easement for the benefit of Lot 9." • Utility details-There are no changes to the utilities on either site. • Elevations, Floor plans-Not applicable. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, 1. landscaping, n traffic, o. commercial alterations/construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver as the project is for the construction of a driveway. The applicant has provided information j. stormwater, k. topography. Also noting the application materials for the house and the driveway • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The application had been tabled from the 3/22/2022 meeting. The applicant has completed a site plan application for the construction of driveway of 10% grade. The plans show the location and the details of the construction. Meeting History: March 22, 2022 Town of Queensbury Community Development Office ` 742 Bay Road, Queensbury,NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 17-2022 FOOTHILLS BUILDERS (TERRE MAJESTIC HOLDINGS, LLC.) Tax Map ID: 296.5-1-17/Property Address: Highpoint Drive/Zoning: MDR The applicant has submitted an application to the Planning Board: The applicant owner of lot 9 of Highpoint Drive proposes to install a 3,200 sq ft driveway within the deeded easement area on the parcel of 23 Highpoint Drive, lot 10. The driveway to be 10% plus grade. There will be two driveways located at 23 Highpoint Drive, lot 10, the proposed driveway to be adjacent to the existing driveway. Lot 9 is currently under construction for a single family home. The project includes stormwater management along the new driveway area. Pursuant to chapter 179-3-040, 179-9-020, 179-6-060, development of the driveway at a 10% grade shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on 3/22/2022 and continued the public hearing to 3/22/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 17-2022 FOOTHILLS BUILDERS (TERRE MAJESTIC HOLDINGS, LLC.); Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Page 1 of 2 Phone: S18.76i.8220 I Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent)for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Motion seconded by Duly adopted this 29t"day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 53.8.761.82201 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 51-2021 @ 106 Bay Parkwy Brett & Pamela West (Main House) Public Hearing Scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Ow Community Development Department Staff Notes March 29, 2022 Site Plan 51-2021 Brett& Pamela West (Main House) 106 Bay Parkway/Waterfront Residential/Ward 1 SEQR Type II Material Review: application, site plans, floor plans, elevations, deed, stormwater management, revised plans November, December, January Parcel History: 53-2017 septic var.; AV 47-2007 & SP 39-2007 -boathouse; SP PZ 89-2016 & SP PZ 210-2016 &AV 95-2016—addition; SP 37-2009; AV 57-2021, SP 52-2021 Warren Co Referral sent: January 2022, County comments: Concur w/local board. Requested Action Planning Board review and approval for demolition of existing home and shed in order to construct new home and garage. Resolutions 1. PB decision Project Description Applicant proposes to demo existing home plus shed and construct a new 2 story home with a 5,436 sq. ft. footprint with a garage. Also, included is installation of permeable pavers for patio and driveway areas, a covered walkway between the two properties. The new floor area will be 8,670 sq. ft. where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, stormwater management. Project includes a lot line adjustment but no change to lot size. Pursuant to chapter 179-3-040, 179-6-065, 147, site plan for new floor area in a CEA and hard surfacing within 50 ft. of the shoreline are subject to Planning Board review and approval. Staff Comments • Location-The project is located at 106 Bay Parkway on a parcel of 0.91 acres. • Arrangement- The project involves a tear down and construction of a new home. The project includes installation of a new septic system, stormwater management, and drive-way area. The existing home is a log style home building approximately in 1941. • Building—The home to be constructed is 5,436 sq ft footprint includes a porte-cochere and an attached garage. The patio are to be installed is 1,800 sq ft. The project includes a covered walkway of 692 sq ft that is to extend from the proposed house to a new home on the adjoining property. The new floor area is 8,670 sq ft. • Site conditions-The property is an odd configuration where most of the site will be disturbed for construction but minimal disturbance of the shoreline. • Grading and drainage plan, Sediment and erosion control-The project includes 0.54 acres of disturbance and plans show the silt fence location on the property. The grading of the property is also shown between 323 to 325 for the finished floor. The project is subject to a major stormwater permit as the project consists of greater than 15000 sq ft of disturbance. The plans show the rain garden locations. The project has been referred to the Town Engineer for review and comment. • Landscape plan-The project site is located on Lake George and is subject to the shoreline buffer review. The applicant has indicated a new set of plantings to occur around the house. No plantings along the shoreline are to be removed.There are some new plantings on the east shoreline proposed. Below are the guidelines from the shoreline buffer code section o Shoreline Buffer-Section 179-8-040 -Minimum width 35 ft(Lake George) -For every 700 sgft of shoreline buffer area—one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover-7—24 in native shrubs; 14 herbaceous plants Project site -465 ft of shoreline per survey -Shoreline buffer 465 ft X 35 ft width is 16,275 sq ft -Shoreline buffer area-16,275 /700=23.25 round up to 24—twenty-four large trees at 3 inch diameter -Ground cover-16,275/350=46.5 round up to 47(X7)=329 native shrubs and 47(X14)herbaceous plants=658 o Shoreline Cutting restrictions- Section 179-6-050 — Shoreline lots are allowed water access and beaches where 30%of the shoreline or maximum of 75 ft whichever is less — 465 ft Shoreline X 30%= 139.5 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). — Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan-Lighting information was not provided and Staff suggests confirming residential light fixtures are downward cast cutoff. • Utility details-The plan shows anew holding tank system to be installed. Approved by the local BOH.The water supply is drawn from the lake. • Elevations-The elevations show the view of the home,an attached porte cochere(second garage),an attached garage and the covered open walkway. • Floor plans-The first floor plan shows, living room area, kitchen,dining room,the porte-cochere,media room, small office,game room, and a three car garage. Note the area labeled wet bar will have no kitchen elements. The second floor plan shows bathrooms, closets,bedrooms,and the garage area will be open with no second floor. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting,h. signage,n traffic, o. commercial alterations/construction details,r. construction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information on j. stormwater, k. topography, 1. landscaping p floor plans,q. soil logs. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant.The Board is to review the waivers and to determine if they are to be granted. Nature of Variance Granted 3/23/2022.The new home is to be located 46 ft.to the east shoreline, 35 ft.to the west shoreline where 50 ft. is required. The covered walkway is to be 0 ft.from the west side setback where a 20 ft. setback is required. The project proposes two garages where only one is allowed—the porte-cochere is considered a garage due to width of open sides allowing vehicles. Relief is also requested for setbacks for stormwater device Note:Permeability 77.9%is proposed where 75%is required-no permeability relief is requested. The floor area proposed is 8,670 sq ft where 8,687 sq ft is the maximum size allowed—no floor area relief is requested. Summary The applicant has completed a site plan application for the teardown and new building of a new home. The project includes site work for septic and stormwater management. The plans include landscaping for the site and shoreline. Meeting History: PB: 9/28/2021, 11/16/2021, 12/16/2021, 2/22/2022; ZBA: 9/29/2021, 10/27/2021, 12/15/2021, 2/16/22 Town of Queensbury Community Development Office 742 Bay Road, Queensbury,NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 51-2021 BRETT&PAMELA WEST(MAIN HOUSE) Tax Map ID: 226.15-1-17/Property Address: 106 Bay Parkway/Zoning: WR The applicant has submitted an application to the Planning Board: (Revised 1/18/2022) Applicant proposes to demo existing home plus shed and construct a new 2 story home with a 5,436 sq. ft. footprint with a garage. Also, included is installation of permeable pavers for patio and driveway areas, a covered walkway between the two properties. The new floor area will be 8,670 sq. ft. where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, stormwater management. Project includes a lot line adjustment but no change to lot size. Pursuant to chapter 179-3-040, 179-6-065, 147, site plan for new floor area in a CEA and hard surfacing within 50 ft. of the shoreline are subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 2/15/2022; the ZBA approved the variance requests on 3/16/2022; The Planning Board opened a public hearing on the Site plan application on 2/22/2022 and continued the public hearing to 3/22/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/22/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 51-2021 BRETT & PAMELA WEST (MAIN HOUSE); Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Page 1 of 2 Phone: 518.761.8220 I Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Motion seconded by Duly adopted this 291h day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.8220 I Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 15-2022 & Freshwater Wetlands 2-2022 @ Cleverdale Off Road Sharon Serini Public Hearing Scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes March 29, 2022 Site Plan 15-2022 & SHARON SERINI Freshwater Wetlands 2-2022 Cleverdale Off Road/Waterfront Residential/Ward 1 SEQR Type II Material Review: site plan application, site plans, elevation and floor plans, freshwater wetland Parcel History: SUB 8-2000, SUB 2-2008,AV 49-2009, SUB (M) 2-2008 (2010), PZ 92-2016 Warren Co Referral sent: March 2022/Comments: Concur w/local board. Requested Action Planning Board review and approval for construction of a new 4 bedroom home. Resolutions 1. PB decision Project Description Applicant proposes construction of new 4 bedroom home with a footprint of 2,445 sq. ft.. Total floor area is 3,094 sq. ft. Project includes connecting to the existing shared driveway to Cleverdale and installation of a new well and septic system. Pursuant to chapter 179-3-040, 179-6-065, 179-6-050, 179-6-060, site work for a new floor area in a CEA, site work for a beach area, shoreline planting plan and other associated development shall be subject to Planning Board review and approval. Staff Comments • Location-The project site is located off of Cleverdale Road from Private Road#1 • Site Design-The site is currently vacant and a new home with shared driveway, well, and septic is to be constructed. • Building—The new home is to have a footprint of 2,445 sq ft and a floor area of 3,094 sq ft. There is no garage proposed at this time. The applicant is aware additional review will be required for a garage. • Grading and drainage plan, Sediment and erosion control-The applicant proposes eave trenches, shallow depressions and raid garden area for stormwater management. The submission was provided to Labella for engineering review and comment. • Landscape plan-The applicant has provided information on the existing plantings/trees on the site and has include the ones to be removed. In addition the plans show the new planting plan for the shoreline area and the beach area. Below are the guidelines from the shoreline buffer code section o Shoreline Buffer- Section 179-8-040 -Minimum width 35 ft(Lake George) -For every 700 sgft of shoreline buffer area—one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover-7—24 in native shrubs; 14 herbaceous plants Project site -172 ft of shoreline per survey -Shoreline buffer 172 ft X 35 ft width is 6020 sq ft -Shoreline buffer area-6020/700 = 8.6 round up to 9-nine large trees at 3 inch diameter -Ground cover-6020/350 = 17.2 round up to 18 (X7) =126 native shrubs and 18 (X14)herbaceous plants=252 o Shoreline Cutting restrictions- Section 179-6-050 - Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 172 ft Shoreline X 30%= 51.6 feet of the shoreline buffer cut to allow a view, access and to reduce runoff(such as angled across the lot). - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan-The plans should indicate lighting to be cutoff down cast fixtures. • Site details-The applicant does not plan on a garage at this time. • Utility details-The plans show a septic system and well to be installed on site. • Elevations-The plans indicate the building is to be a slab on grade • Floor plans- The plans show four bedrooms on the second floor and the kitchen/great room/dining area etc is on the main floor. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details,p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested-Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Freshwater Wetland The driveway work to access the new home is within 100 ft of a wetland. The driveway is to be asphalt and to access the existing private drive that is also an existing shared access drive with the adjoining lot. There is no work proposed on the existing private drive other than connecting the driveway . Summary The applicant has completed a site plan application for the construction of a new home on a 2.28 ac parcel. The project includes construction of the new home, driveway area; installation of a well and on site septic system. The project includes installation of stormwater management and landscaping for the shoreline area. Meeting History: 1 sc Meeting LaBeLLa Pov�ered by partnership. March 10, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net RE: Serini Residence Town of Queensbury,Warren County, New York LaBeila Project#2220706.10 Queensbury Ref#SP 15-2022 Dear Mr. Brown: LaBeila has received a submission package from your office for the above referenced project. The Applicant is proposing to develop a vacant lot off of Cleverdale Road.This will include the construction of a 4-bedroom house, paved driveway, detached garage, grading on site stormwater/wastewater management on site drilled well and shoreline modifications. • Summary Narrative, prepared by EDP, dated February 15, 2022 • Site Plan Review Application,Signed and dated February 7, 2022 • Site Plans, Prepared by EDP, Dated February 15, 2022 • Architectural plans prepared by D. Freeman Architect, dated November 15, 2021 • Survey Map, Provided by Van Dusen &Steves Land Surveyors, Dated January 21, 2008 • Deed, Provided by Warren County, Dated October 28, 2021 Your office has requested that we limit our review to the design of stormwater system as it relates to compliance of local, state or relevant codes and regulations. Based upon our review, LaBeila offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the site plan review application,the proposed site improvements will disturb less than one (1) acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity(GP-0-20-001). However,this project falls within the Lake George watershed and therefore is subject to the stormwater management requirements set forth in Section 147-11 of the Town Code for projects within the Lake George Park. Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2. According to the site plan review application, this project proposes to disturb 12,000 square feet which would be classified as a minor project. With the minor project classification, the Applicant has opted to use the alternative stormwater calculation method described in Town code section 147-11.1(2)(a), which states that a flat rate of 1.5 gallons of stormwater can be used for every square foot net increase in impervious area, where net increase is the difference between predevelopment and post development conditions. 20 Elm Street 1 Suite 110 I Glens Falls. NY 128o1; p(518) 812-0513 www.isbcAL apc.corn Q-1 3. It does not appear that there is sufficient contours and spot grades for the rain garden to verify the ponding depth.The Applicant to add additional contours or spot grades accordingly. 4. The applicant has inconsistent labels for the SMA's. For example, the applicant has shown on sheet 3 that SMA#2 is adjacent to the driveway, however, on sheet 4 this is labeled as SMA#3. The applicant to clarify. 5. It is difficult to discern what pre-treatment practices are proposed prior to entry to the rain garden and shallow vegetated depression.The Applicant to clarify or revise accordingly. 6. In accordance with 147-11.1(2)(a) that states the location of the infiltration deices shall be determined based upon soil test results,the Applicant shall perform deep soil and infiltration tests within the bounds of each practice.The Applicant to provide the results. 7. Section 147-11.1(2)(a) of the Town code states, "All water from newly created impervious areas which would otherwise run off the parcel shall be directed to an infiltration device. Location of the infiltration devices shall be determined based upon soil test results." It does not appear that the runoff from the side of the house closest to the lake (western) is directed to an infiltration device. The applicant to revise accordingly. 8. Erosion and sediment controls typically utilized during construction (i.e.,concrete washout)should be included on the erosion and sediment control plan. ESCs should be detailed and shown in plan view. 9. It appears retaining walls are proposed on the site plans. The NYS Standards and Specifications for Erosion and Sediment Control (SSESC)states, "The design of any retaining wall structure must address the aspects of foundation bearing capacity, sliding, overturning, drainage and loading systems. These are complex systems that should be designed by a licensed professional engineer."The Applicant to provide the design for the wall prior to construction so long as the Town does not take exception to this approach. The design shall be developed in accordance with the NYS SSESC and other regulating documents (for example,the residential building code). 10.The Applicant may be required to execute a stormwater maintenance agreement with the Town in accordance with Section 147-10.D of the Town Code.Applicant should submit a draft stormwater maintenance agreement if required by the town. 11.The grass depression and rain garden are located in the 100-foot wetland setback. The Applicant to state who is the AHJ (DEC or Town) of the wetland/buffer. The Applicant to clarify if there are restrictions within the wetland buffer. Also, the Applicant to clarify if the AHJ has reviewed the plans. 2 Conclusion &Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at(518) 824-1926. vi -V't7- Sean M. Doty, P.E., LEED AP, CPMSM Senior Civil Engineer/ Regional Leader La Bella Associates cc: Shauna Baker, Town Planning Office Specialist(via email) Laura Moore,Town Land Use Planner(via email) File 3 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 15-2022 & FRESHWATER WETLANDS 2-2022 SHARON SERINI Tax Map ID: 240.9-1-16.12/Property Address: Cleverdale Off Road/Zoning: WR The applicant has submitted an application to the Planning Board: Applicant proposes construction of new 4 bedroom home with a footprint of 2,445 sq. ft. and a detached garage of 416 sq. ft. Total floor area is 3,510 sq. ft. Project includes connecting to the existing shared driveway to Cleverdale and installation of a new well and septic system. Pursuant to chapter 179-3-040, 179-6-065, 179-6-050, 179-6-060, site work for a new floor area in a CEA, site work for a beach area, shoreline planting plan and other associated development shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on 3/29/2022 and continued the public hearing to 3/29/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/29/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 15-2022 & FRESHWATER WETLANDS 2- 2022 SHARON SERINI; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Page 1 of 2 Phone: 518.761.8220 1 Fax: 5i8.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff. i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 29th day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.762.8220 1 Fax: S18.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 18-2022 & Special Use Permit 1-2022 @ 2712 State Route 9L Harris Bay Yacht Club Public Hearing Scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board QW, Community Development Department Staff Notes March 29, 2022 Site Plan 18-2022 & HARRIS BAY YACHT CLUB Special Use Permit 1-2022 2712 State Route 9L/Waterfront Residential, Land Conservation/Ward 1 SEQR Type II Material Review: site plan, special use permit-marina, site plan, elevations, lighting, safety Parcel History: SP 24-91, SV 112-1993, UV 111-1993,AV 11-2022 Warren Co Referral sent: March 2022/Comments: Concur w/local board. Requested Action Planning Board review and approval for removal of cashier and storage buildings including improvements and replacements to the current docking system. Resolutions 1. PB decision Project Description Applicant proposes to remove and replace the cashier building of 109 sq ft and the storage building of 209 sq ft located on Dock C. The existing club house of 3,172 sq ft has no improvements proposed and will remain the same. The project includes replacing the floating dock system, including 271 seasonal berthing slips for members, winter storage for up to 300 vessels, sales and service of marine products, fuel sales, and onsite pump out services. The project also includes replacing existing steel piles with driven PVC reinforces piles and replacing the existing concrete pads at the shoreline. New lines for water, sewer and electric will be installed as part of the project. Upgrades will include fire safety and lighting on the docking system. Pursuant to chapter 179-3-040, 179-10-070, 179-5-060, site plan for work at the marina, special use permit for marina operations, and hard surfacing within 50 feet of the shoreline shall be subject to Planning Board review and approval. Staff Comments • Location-The project is located at 2712 State Route 9 L on a 17.16 ac parcel. • Arrangement- There are no changes to the building locations or the floating dock system. The board only has purview over the hard surfacing and the 209 sq ft storage building. • Building—The storage building of 209 sq ft is and located at the shores edge. The current building is not in good shape and instead of a repair the applicant is replacing it in kind. • Site conditions-The site is an existing marina with the main marina building, a storage building at the shore, a cashier building on the docks, The concrete landing areas for each of the docks is to be replaced in the same location at the shoreline (5 concrete pads) • Traffic- There are no changes to the parking arrangement or site access. The current marina permit indicates 281 parking spaces. There are no changes to the parking arrangements. • Grading and drainage plan, Sediment and erosion control-The applicant has indicated erosion and sediment control measures will be implemented around the concrete landing pads during construction. • Landscape plan-The applicant has indicated there are no changes. • Site lighting plan-The plans show lights on the outside of the storage building doors. • Utility details-There is to be replacement for new buried water, sewer and electric utilities. The plans also show location for the installation of car charging station area. • Signage-There are no changes to the signage for the site. • Elevations-The elevation plans show the storage building to have a single door and an overhead door. The structure is to have two wall light units and the exterior to be consistent with the main building. • Floor plans- Floor plans were no provided and could be considered a waiver as no building on the site is changing in footprint or use. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details,p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested—Staff finds it reasonable to request a waiver for these items as the building and hard surface areas are replacement inkind. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Special Use Permit Criteria: A special use permit is required as outlined in Section 179-10-070. • Harmony with the Comprehensive Plan — There are no changes proposed to the site other than upgrading the existing dock in kind as well as the cashier building, storage building, concrete dock pads • Compatibility — The project site is located in the Waterfront residential Zone which allows Marina's through review • Access, circulation and parking — There are no changes to the traffic, parking arrangements on the Marina's property. • Infrastructure and services-The applicant proposes upgrading the underground utilities as part of the project. • Environment and natural features- There are no changes to the layout of the dock arrangement. The existing elements of the Marina—ie docks, storage, and utilities are being improved with intent to make it safer for the environment. • Long-term effects — The improvements to the marina will have a positive long-term effect that will be beneficial to the marina with users and adjoining properties. Specific criteria for Class A marinas. All marinas shall comply with the standards for Class A and Class B marinas as adopted by the Lake George Park Commission in 6 NYCRR Part 646, as may be amended. Lake George Park Commission Excerpt.....Section 646-1.2 Class A Marinas. In addition to the requirements of other sections of this Subpart, all Class A marinas servicing the waters of Lake George shall comply with the following: (a) General requirements. (1)No person shall construct, expand, or operate a Class A marina servicing the waters of Lake George, or alter or expand the number or type of services or recreational activities offered without obtaining a permit from the commission, or if a permit has been issued for the subject facility, a modification to the permit for that facility which authorizes the new or expanded services or recreational uses. Permits shall be issued for a maximum of five years. The applicant has an existing Class A Marina Permit, Permit 9 5234-45-17. The applicant has indicated the Park Commission may not request a new or revised permit. (2) No permit shall be issued for the construction, operation or expansion of a quick launch facility which was not in existence and operating, or for which no permit was issued, prior to the effective date of these regulations. The facility does not allow a quick launch facility. (3) Permits issued pursuant to Section 646-1.2 (a) (1) of this Title may be issued only to the owner of the facility or in the alternative to a lessee of the facility and shall authorize activities and uses at that facility. A permit may not be relocated to other facilities unless a permit for the different facility has been issued by the Commission. Marina permits will be modified to reflect a sale or transfer of the facility to another owner subject to a determination by the Commission that the facility is in accordance with the requirements of this Subpart and permits issued in accordance with this Subpart. Lakefront marina facilities at separate locations under common ownership shall require separate permits pursuant to Section 646-1.2 (a) (1) of this Title. The applicant has indicated the facility has been owned since 1983 (4) Special Permits. A special permit is a permit granted by the Commission to operate any new recreational activity as defined in Section 646-2.4 (1) of this Title or the recreational activities or uses contained in Section 646-1.4 of this Subpart. Special permits are not transferrable to another location and shall not be leased or transferred to another location, facility or operator. (b) Specific Requirements: No Class A marina shall be constructed, expanded or operated without providing the following: (1) Restrooms, including toilet facilities, for the use by customers, which shall be available at all times from May 1 to October 31 of each year. The applicant has indicated on site rest rooms are available when the marina is open (2) One on-site parking space or adequate off-site parking for each vessel berthed. Where the Class A marina offers rides, instruction or water-based recreation for a fee, adequate parking must be provided for customers of the Class A marina. The applicant has indicated the parking arrangement on the site is not altered and is to remain the same. (3)An adequate storage area for trailers or the storage of trailers shall be prohibited. The applicant has indicated the site has adequate storage for trailers. (4) Where applicable, proof of compliance with New York State fire code standards and DEC bulk storage standards for the storage of gasoline and hazardous materials. If applicable, no permit application shall be complete until proof of compliance is submitted to the Commission. The applicant has indicated there is an existing DEC Petroleum Bulk Storage Permit. The plans for the existing and replacement are in accordance with NY Fire Codes. (5) For each Class A marina with a petroleum sales facility, a plan relative to the inspection and maintenance of petroleum storage facilities and all associated equipment, and appropriate measures relative to spill prevention and countermeasures. Such plan shall include: (i) the inspection of all plumbing and related pumping equipment, not less than daily, to guard against leakage of petroleum products into the waters of the Park; (ii) the training of each person pumping motor fuels in procedures to guard against the spillage of such motor fuels into the waters of the park and procedures to respond to a spill; and (iii) the maintenance, in close proximity to the pumping facilities, of such equipment as is necessary to respond to any spill of petroleum products into the waters of the Park or on to land or structures where it may flow into the waters of the Park. i-iii...The applicant has indicated a spill prevention plan is in place at the facility (6) Adequate garbage and debris disposal facilities with leak proof containers, which must be properly maintained. The applicant has indicated the garbage containers are located onsite. (7) Facilities for the disposal of sanitary wastes from vessels with on-board sanitary equipment including: (i) on-site pump out facilities, or proven access to pump out facilities, for use by vessels which use the services of the Class A marina; and (ii) facilities for the disposal of waste from portable marine toilets, or proven access to such facilities, for use by vessels which use the services of the Class A marina. Such facilities shall be designed, installed, operated and maintained to prevent the discharge of contaminants from marine toilets to the waters of the Park or the ground from which they may flow into the waters of the Park. For the purposes of this paragraph, vessels using the services of the Class A marina shall include vessels which moor, dock or are quick launched by the marina. Written proof of access to disposal facilities for a period equal to the life of the permit shall be required. Off-site facilities must be located within a reasonable distance from the Class A marina. i-ii...The applicant has indicated there is an existing sanitary vacuum pump out system that is to remain —and is pumped out a on regular basis. (8)A boat cleaning area that is designed, operated and maintained in such a manner to prevent contamination of the waters of the Park shall be provided, or boat cleaning shall be prohibited. Boat cleaning and swimming are prohibited at the marina (9) All Class A marina owners or operators engaged in the rental of personal watercraft (PWC) as that term is defined in Section 646- 2.3 (a) (3) of this Title upon the waters of Lake George shall in addition to the regulations governing PWC contained in Subpart 646-2 of this Title comply with the following regulations: (i) The owner or operator of a PWC shall ensure that prior to operation all users of PWC have read the rules and regulations governing their operation as contained in this Subpart, as well as Subpart 646-2 of this Title. All users shall sign a form prepared by the owner or operator that indicates the user has read said rules and regulations. The owner or operator shall maintain written records that the above requirements have been complied with. The records are subject to inspection by the Commission upon reasonable notice. (ii) If the PWC is part of a rental fleet or group of PWCs, a tour guide shall operate a vessel with the fleet or group. (iii) A fleet or group shall not consist of more than six (6) PWC. The tour guide shall guide the operations and behavior of the fleet or group. The tour guide shall not be in charge of more than one (1) fleet or group at any time. i-iii...Not applicable No PWC are rented at the marina. Nature of Variance Granted 3/16/2022. The applicant proposes to replace the storage building, being the same size and in the same location, that is to be located 0 ft from the shoreline where a 50 ft shoreline setback is required. Summary The applicant has completed a site plan application and special use permit for the proposed upgrades to the property including new hard-surfacing and the storage shed. Note-SUP needs a term of use Permanent, Temporary or Renewable—staff would suggest permanent. Meeting History: PB: 3/15/222; ZBA: 3/16/22 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION—Grant/Deny Site Plan Approval SITE PLAN 18-2022 & SPECIAL USE PERMIT 1-2022 HARRIS BAY YACHT CLUB Tax Map ID: 240.4-23.1/Property Address: 2712 State Route 9L/Zoning: WR,LC The applicant has submitted an application to the Planning Board: Applicant proposes to remove and replace the cashier building of 109 sq ft and the storage building of 209 sq ft located on Dock C. The existing club house of 3,172 sq ft has no improvements proposed and will remain the same. The project includes replacing the floating dock system, including 271 seasonal berthing slips for members, winter storage for up to 300 vessels, sales and service of marine products, fuel sales, and onsite pump out services. The project also includes replacing existing steel piles with driven PVC reinforces piles and replacing the existing concrete pads at the shoreline.New lines for water, sewer and electric will be installed as part of the project. Upgrades will include fire safety and lighting on the docking system. Pursuant to chapter 179-3-040, 179-10-070, 179- 5-060, site plan for work at the marina, special use permit for marina operations, and hard surfacing within 50 feet of the shoreline shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 3/15/2022; the ZBA approved the variance requests on 3/16/2022; The Planning Board opened a public hearing on the Site plan application on 3/29/2022 and continued the public hearing to 3/29/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 3/29/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 18-2022 & SPECIAL USE PERMIT 1-2022 HARRIS BAY YACHT CLUB; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. Page 1 of 2 Phone: 518.761.82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable,the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey,floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 29th day of March 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: S18.76i.8220 I Fax: 5i8.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net