Loading...
Site Plan Application TOWN OF QUEENSBURY OL Site Plan Review Application Review Process• 1. Required Pre-submission meeting with staff to determine general completeness to be held no later than 1 week prior to deadline day. Call (518) 761-8265 or(518) 761-8220 for an appointment. 2. Submittal of complete application: 1 original and 14 copies of the application package by monthly deadline. 3. Determination of application completeness. All necessary information must be provided and appropriate fee(s)paid for consideration for placement on an agenda for that month. 4. Incomplete applications will not be considered for placcnient on any acenda until all missing information has been submitted. 5. Submittal to Warren County Planning, if applicable. 6. Planning Board meeting, generally the third & fourth Tuesday of each month. You will be advised in writing as to which meeting to attend. 7. Following the meeting you will be provided with a copy of the resolution stating the Board's decision on your application. If your application was approved, the next likely step is a Building Permit. Final drawings must be provided for the next phase of review. If your application was denied, your project cannot proceed as submitted. DOCUMENTATION REQUIREMENTS (hard copv & electronic): Please submit 1 original& 14 conies of the completed application package to include: ■ Completed Application pages 2-9, signed & dated • Pre-Submission Meeting Notes: signed by staff ■ Copy of Deed • Checklist& Plot Plan ■ Environmental Assessment Form for any non-residential project + Fee: $100 (0 — 10,000 sq. ft.); $250 (10,001 — 30,000 sq. ft.); $500 (30,001 -100,000 sq. ft.); $1,000 (100,000+ sq. ft.) Staff& Contact Information: Craig Brown, Zoning Administrator craigb(a,pueensbury.net Laura Moore, Land Use Planner lmoore(amueensbury.net Sunny Sweet, Office Specialist—Planning sunnys(7a.Queensbury.net (518) 761-8220 Visit our website at www.ciueensbury.net for further information and forms 1 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road,Queensbury,NY 12804 General Information Tax Parcel ID Number: 288.-1-58 Zoning District: Commercial Intensive Lot size: 1.92 acres Detailed Description of Project [includes current&proposed use]: The pruposgd action is a mixed use site plan consisting of tWU buildi ngs7 one mixed use and one self storap proposed mixed use building has a footprint of 8,950 sqft.It will consist of a 2,000 sqft drive thru restaurant,2,500 sqft restaurant and 4,450 sqft retail.The second building will be a outdoor self storage 24 unit building with a 3,422 sqft footprint. Location of project: 1471 State Route 9,Lake George,NY 12845 Applicant Name: Faden Enterprises Address: 165 Lake Ave,Saratoga Springs,NY Home Phone Cell: 518-796-3716 Work Phone Fax E-Mail: russellfaden@yahoo.com Agent's Name: Lansing Engineering Address: 2452 State Route 9 Suite,Malta,NY Home Phone Cell: Work Phone Fax 518-899-5243 E-mail ysl@lansingengineering.com Owner's Name Saratoga Prime Properties Address 215 Ballard Road,Wilton,NY 12831 Home Phone Cell Work Phone Fax E-mail 2 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road,Queensbury,NY 12804 Site Develo ment Data Area/Type Existing sq. ft. Proposed Total sq. ft. Additions . ft. A. Building footprint 3,699 8,950 8,950 B. Detached Garage C. Accessory Structure(s) D. Paved, gravel or other hard surfaced area 16,312 43,979 43,979 E. Porches/Decks _ F. Other _ 3,422 3,422 G. Total Non-Permeable [Add A-F] 20,011 56,351 56,351 H. Parcel Area [43,560 sq. ft./acre] 81,375 81,375 81,37581,375 I. Percentage of Impermeable Area of Site [I=G/H] 24.6% 69.24% 69.24% Setback Requirements Area Required Existing Proposed Front[1] 75' 53' 79' Front [2] Shoreline Side Yard [1] 20' 31' 26' Side Yard [2] 20' 85' 23' Rear Yard [1] 30' 376' 140' Rear Yard [2] Travel Corridor Height [max] 40' 40' 40' Permeability 30% 75% 30.75% No. of parking spaces 56 24 66 3 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road,Queensbury,NY 12804 Additional Project Information 1. Will the proposal require a Septic Variance from the Town Board of Health? no 2. If the parcel has previous approvals, list application number(s): 3. Does this project require coverage under the New York State Pollutant Discharge Elimination System (SPDES) Permit Program ? yes 4. Estimated project duration: Start Date 5/1/2022 End Date 5/1/2024 5. Estimated total cost of project: 1,200,000 6. Total area of land disturbance for project: 59,600S F Floor Area Ratio Worksheet FLOOR AREA RATIO (FAR) -- The relationship of building size to lot size, derived by dividing the total building floor area by the lot size in square feet, yielding a percentage. Zoning District Symbol Floor Area Ratio [FAR] Waterfront Residential WR 0.22 Commercial Moderate/Intensive 7 CM/Cl 0.3 A. The combined area of all square footage, as measure from exterior walls of all structures on the property, including all floors of the structures, garages, basements and attics with more than five (5) feet of ceiling height and covered porches. Building square footage does not include: Open deck, docks and that portion of covered docks extending over water and one storage shed of one hundred twenty (120) square feet or less. Any additional sheds will be included. (See "FLOOR AREA RATIO"). B. Commercial or industrial: the total area in square feet as measured from the exterior of the outside walls of a building or structure, and when applicable, the sum total of all floor areas of the principal and accessory buildings or structures on the project site. A. Parcel Area 81,375 s . ft. B. Existing Floor Area 3,699 s . ft. rsee above definition] C. Proposed Additional Floor Area - s . ft. D. Proposed Total Floor Area 12,372 s . ft. E. Total Allowable Floor Area 24,412.5 (Area x •3 f see above table *If D is larger than E. a variance or revisions to your plan may be needed. Consult with Staff. 4 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road,Queensbury,NY 12804 § 179-9-080 Requirements for Site Plan Approval. The Planning Board shall not approve a Site Plan unless it first determines that such site plan meets the following Standards. Please prepare responses to each of the following topics: STANDARDS A. The proposed project furthers or is consistent with the policies of the Town's Comprehensive Plan. B. The proposed project complies with all other requirements of this Chapter,including the site plan review standards as set forth in Paragraph F of this section,the dimensional,bulk and density regulations of the zoning district in which it is proposed to be located(Article 3 and Table 1),the applicable requirements of all other Articles that apply. C. The site plan encourages pedestrian activity internally and,if practicable,to and from the site with pedestrian paths or sidewalks connected to adjacent areas. D. The site plan must conform to Chapter 136 Sewage and Sewage Disposal,Chapter 147 Stormwater Management Local Law,and other applicable local laws. E. The proposed use shall be in harmony with the general purpose or intent of this Chapter,specifically taking into account the location, character and size of the proposed use and the description and purpose of the district in which such use is proposed,the nature and intensity of the activities to be involved in or conducted in connection with the proposed use and the nature and rate of any increase in the burden on supporting public services and facilities which will follow the approval of the proposed use. F. The establishment,maintenance and operation of the proposed use will not create public hazards from traffic;traffic congestion or the parking of vehicles and/or equipment or be otherwise detrimental to the health,safety or general welfare of persons residing or working in the neighborhood or to the general welfare of the town. Traffic access and circulation,road intersections,road and driveway widths and traffic controls will be adequate. G. Off-street parking and 19oading facilities will be appropriately located and arranged and sufficient to meet traffic anticipated to be generated by the new use. The establishment of vehicle links between parking areas of adjacent properties are provided where feasible. This furthers the Town's goal of reducing curb cuts and reducing congestion. A twenty-foot wide connection is required. If adjacent properties are either undeveloped or previously developed without having made provision for future linkage,then a future connection must be identified and provided for in the site plan under review for such future linkage when the time arises. The Planning Board may require proof that the applicant has made contact with adjacent property owners for purposes of coordinating linkages with adjacent properties. H. The project shall not have an undue adverse impact upon the natural,scenic,aesthetic,ecological,wildlife,historic,recreational or open space resources of the town or the Adirondack Park or upon the adequate provision of supporting facilities and services made necessary by the project,taking into account the commercial,industrial,residential,recreational or other benefits that might be derived from the project. In making the determination hereunder,the Planning Board shall consider those factors pertinent to the project contained in the development considerations set forth herein under§ 179-9-080 of this Chapter,and in so doing,the Planning Board shall make a net overall evaluation of the project in relation to the development objectives and general guidelines set forth in§ 179-9-080 of this Article. I The provision for and arrangement of pedestrian traffic access and circulation,walkway structures,control of intersections with vehicular traffic and overall pedestrian convenience shall be safe and adequate for pedestrian movement. Pedestrian connections between adjacent sites shall be provided to encourage pedestrian use. J. Stormwater drainage facilities will prevent an increase of post development drainage flows as compared to pre-development drainage flows. Drainage of the site shall recharge ground water to the extent practical. Surface waters flowing off-site shall not degrade any streams or adversely affect drainage on adjacent properties or public roads. Facilities shall be in conformance with the drainage standards of Chapter 147 of the Town Code and the Town of Queensbury Subdivision Regulations where applicable. K. The water supply and sewage disposal facilities will be adequate and will meet all applicable and current requirements set forth by Department of Health regulations and Chapter 136 of the Town Code. I The adequacy,type and arrangement of trees,shrubs and other suitable plantings,landscaping and screening shall effectively provide a visual and/or noise buffer between the applicants and adjoining lands, including the maximum retention of existing vegetation and maintenance,including replacement of dead or deceased plants. M. Fire lanes,emergency zones and fire hydrants will be adequate and meet the needs and requirements of emergency service providers. N. The design of structures,roadways and landscaping in areas susceptible to ponding,flooding and/or erosion will minimize or avoid such impacts to the maximum extent practicable. O. The site plan conforms to the design standards,landscaping standards and performance standards of this chapter. 5 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road,Queensbury,NY 12804 § 179-9-050 Checklist-Application for Site Plan Review. Application materials and site plan shall include sufficient information for the Board to review and provide a decision. The applicant is to provide a site plan drawing and all attachments that address items A-V. The applicant may request a waiver from A-V and is to provide reasons for waiver(s) requested. Please label information to be submitted. REQUIREMENTS Sheet# A. A vicinity map drawn at the scale that shows the relationship of the proposal to existing community facilities which affect or serve it,such as roads,shopping areas,schools,etc. The map shall also show all properties,identify owners, subdivisions,streets and easements within 500 feet of the property. Such a sketch may be superimposed on a United States Geological Survey map of the area. B. The site plan shall be drawn at a scale of forty feet to the inch(1"=40 feet)or such other scale as the Planning Board may deem appropriate,on standard 24"x 36"sheets,with continuation on 81/2"x I F sheets as necessary for written information. The information listed below shall be shown on the site plan and continuation sheets. C. Name of the project,boundaries,date,north arrow,and scale of the plan. D. Name and address of the owner of record,developer,and seal of the engineer,architect or landscape architect. If the applicant is not the record owner,a letter of authorization shall be required from the owner. E. The location and use of all existing and proposed structures within the property,including all dimensions of height and floor area,all exterior entrances,and all anticipated future additions and alterations. F. The location of all present and proposed public and private ways,off-street parking areas,driveways,outdoor storage areas, sidewalks,ramps,curbs,paths,landscaping,walls and fences. Location,type and screening details for all waste disposal containers shall also be shown. G. The location,height,intensity and bulb type(sodium,incandescent,etc.)of all external lighting fixtures. The direction of illumination and methods to eliminate glare onto adjoining properties must also be shown in compliance with§ 179-6-020. H. The location,height,size,materials and design of all proposed signs. 1. The location of all present and proposed utility systems including: 1. Sewage or septic system; 2. Water supply system; 3. Telephone,cable and electrical systems;and 4. Storm drainage system including existing and proposed drain lines,culverts,catch basins,headwalls,endwalls, hydrants,manholes and drainage swales. J. Plans to prevent the pollution of surface or groundwater,erosion of soil both during and after construction,excessive runoff and flooding of other properties,as applicable. A Stormwater Pollution Prevention Plan(SWPPP)for all land development activities(excluding agricultural activities)on the site that results in land disturbance of one acre or more. A SWPPP shall comply with the requirements of the DEC SPDES MS-4 General Permit and Chapter 147 of the Town of Queensbury Code. It shall be at the discretion of the Planning Board as to whether a SWPPP or an erosion and control plan shall be required for a site plan review project land disturbance of less than one acre. K. Existing and proposed topography at two-foot contour intervals,or such other contour interval as the Planning Board shall allow. All elevations shall refer to the nearest United States Coastal and Geodetic Bench Mark. If any portion of the parcel is within the 100-year floodplain,the area will be shown and base flood elevations given. Areas shall be indicated within the proposed site and within 50 feet of the proposed site where soil removal or filling is required,showing the approximate volume in cubic yards. I A landscape plan showing all existing natural land features than may influence the design of the proposed use such as rock outcrops,stands of trees,single trees eight or more inches in diameter,forest cover and water sources and all proposed changes to these features,including sizes and types of plants. Water sources include ponds,lakes,wetlands and watercourses,aquifers,floodplains and drainage retention areas. M. Land Use District boundaries within 500 feet of the site's perimeter shall be drawn and identified on the site plan,as well as any Overlay Districts that apply to the property. 6 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury,NY 12804 REQUIREMENTS (CONTINUED) Sheet# N. Traffic flow patterns within the site,entrances and exits,loading and unloading areas,as well as curb cuts on the site and within 100 feet of the site. The Planning Board may,at its discretion,require a detailed traffic study for large developments or for those in heavy traffic areas,which shall include: 1. The projected number of motor vehicle trips to enter or leave the site,estimated for weekly and annual peak hour traffic levels; 2. The projected traffic flow pattern including vehicular movements at all major intersections likely to be affected by the proposed use of the site; 3. The impact of this traffic on levels of service on abutting public streets and at affected intersections. Existing and proposed weekly and annual peak hour traffic levels and road capacity levels shall also be given. 0. For new construction or alterations to any structure,a table containing the following information shall be included: 1. Estimated area of structure to be used for particular purposes such as retain operation,office, Storage,etc.; 2. Estimated maximum number of employees; 3. Maximum seating capacity,where applicable;and 4. Number of parking spaces existing and required for the intended use. p. 1. Floor Plans. 2. Elevations at a scale of one-quarter inch equals one foot(1/4"= 1 foot)for all exterior facades of the proposed structure(s) and/or alterations to or expansions of existing facades,showing design features and indicating the type and color of materials to be used. Q. Soil logs,water supply well and percolation test results,and storm water runoff calculations as needed to determine and mitigate project impacts. R. Plans for disposal of construction and demolition waste,either on-site or at an approved disposal facility. S. Plans for snow removal,including location(s)of on-site snow storage. T. An Environmental Assessment Form("EAF")as required by the SEQRA regulations,with Part 1 completed by the Applicant shall be submitted as part of the application. If the proposed project requires a special use permit and an EAF has been submitted in conjunction with a special use permit application,a duplicate EAF is not required for the site plan application. U. If an application is for a parcel or parcels on which more than one use is proposed,the applicant may submit a single application for all such uses,provided the proposed uses are accurately delineated on a site plan drawn pursuant to the requirements set forth above. The Planning Board may grant the application with respect to some proposed uses and not others. For purposes of reviewing an application(and for SEQRA compliance)all proposed uses on a single parcel or on contiguous parcels shall be considered together. V. A brief narrative statement on how the project proposed for review furthers or is consistent with the vision,goals and policies in the Town's Comprehensive Plan. 7 Site Plan Review application—Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury,NY 12804 Signature Page This page includes the 1.) Authorisation to Act as Agent Form: 2.) Engineering Fee Disclosure: 3.) Authorization for Site Visits: 4.) Other Pernut Responsibilities:5.)Official Meeting Disclosure and 6.)Agreement to provide documentation required. OWNER'S AGENT FORA: Complete the following if the OWNER of the propem•is not the same as the applicant Owner: Saratoga Prince Properties Designates: Lansing Engineering .As agent regarding: Variance X Site Plan Subdivision For Tax iIvlap No.: Section T—Block -39—Lot Deed renew� e -� ok 797-Page �7IT-Date OWNER SIGNATURE��i�. .Q of ti�Xfd DATE: 3 2. o.12.. Apmx'ANT'S AGE Ni,FOR1i: Complete the followvine,if[lie APPLICANT is unable to attend the meeting or wishes to be represented by another path-: Owner: raden Enterprises Designates: Lansing Engineering As agent regarding: Variance k Site Plan Subdivision For Tax Map No.: _ZST Section T—Block Lot Deed Reference: -W Book -T9T Page 7TIT-)date OWNER SIGNATURE: - DATE: 3 2. ENGINFERl G FEF, DISCLOSURE: Applications ma} lac: rcle1Tud to the To►'n con-milling engincer for rcviett of s;opiic design, Munn dminriu�e. etc as delennined hi,the/.oning or Planning thparbnent. fees for engineering revic►ti•se.-mice4►vill he cluirged direLtlr-to alit applicant. Fees for engineering review will not exceed S I.(K)0 without notilicalton ao the applicant A0 1HORIZATION EQR SITE VISITS: 13,� signing this page and submitting die application materials attached herein,die Owner,Applic,'int, and IwAier0eir agenl('s i hcrehv anthoriie lh,� Zoning Board or Planning Hoard and Tour Sla1T to enter the tilihiLet properties for the purpow of reviewing die application stihinitted. -4j OTHER P.RMIT RESPONS1D-1—L1TJES- Other pemtils nia%-be required for consmiction or alteration activity subscNuent to approval by the T.nnine f3otud ur l'itinriirns [3uartl. ]l is$te agsplis:ttnl's rrsponKihilil�•to obtiiin anv ud[lilivat;il permits. 5.1 0 TWI L MEETF.NG MTXtiTES DISC LOW Or: It is the practice (1l'the Conintimily Dcvclopawnt Department to have a designated Stenographer tape:retord the proceedings of tnxtinex rrxulting lrom application, and nti rttit)rd pri oxdings. nutc, trttn u x�d 1'mtn nt those taps s(OnslEltltCS tale ot11C1a1 ail,i]1 �. AGRE �7GN t TO PRO►ODE DOCI]MENTATlON RE ll;RED: 1.the undmNi,gncd.have thoroughly raid and understand the insttucuons iar.ul,mitisian; id agnti let case submission rcxluir mentti,1 ticknoultslge no constntciion actiyitics sloth be comintnced prior to issuancc of a valiel]ktTnit 1 certifi'that ills ;splilicaltaai.plane altd Supl)nrtinL tntiteiial,rut a ulue Watt rntnplCIC tilrilenieriL/dC;criplian ui the existing ennililions and die tvttrk pni]KrticY[.grief ilia[till 1LUIl� ll tkl lt�] 71drn1exl iri aCC[}r[laelCz v+salt the approved ptwix and in contonmince a ith local•✓.oning mg-tilalions. I r+cf:ttouledgc 4tat pris,r to uc[uli►itt��ilt4 fist ilrtic�propost d,1+tr rat► a=eius.will ohwiil a curtiliutle of oci:taptaicl its rtz�essrtn', l also uttderstarid 1hal llat oast Ix re yuiritl In tiro►i[le rent as built scan e� h� i uctttpunc� lircnu d land mirver•or of all newly constructed lltcilitie;prior to issuttncc[tl t 4'cTlllll'tilt[1I - - - 1 have read and agree to the abovc. 51g1 attrrc JApplicantl Print Namc (Applicwitl Date signed Signature [Agent] Print Namc [Agent) Date signed Site Plan Rc6evv applienlion- Revised Oclober 2016 9 Town of Queettshury Planning Office-742 Bay Road.Queensbury,IVY 12804 Page 1 of 3 Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 – Project and Sponsor Information Name of Action or Project: Project Location (describe, and attach a location map): Brief Description of Proposed Action: Name of Applicant or Sponsor:Telephone: E-Mail: Address: City/PO: State: Zip Code: 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. NO YES 2. Does the proposed action require a permit, approval or funding from any other government Agency? If Yes, list agency(s) name and permit or approval: NO YES 3. a. Total acreage of the site of the proposed action? __________ acres b. Total acreage to be physically disturbed? __________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? __________ acres Check all land uses that occur on,DUHadjoining RU near the proposed actioQ  8UEDQRural (non-agriculture),ndustrial Commercial Residential (suburban) $TXDWLF2WKHU 6SHFLI\ ƑForest Agriculture ƑParkland 1471 Route 9 site Plan 1471 State Route 9, Lake George, NY 12845 The proposed action is a mixed use site plan consisting of two buildings; one mixed use and one self storage units on 1.92 acres. The proposed mixed use building has a footprint of 8,950 sqft. It will consist of a 2,000 sqft drive thru restaurant, 2,500 sqft restaurant and 4,450 sqft retail. The second building will be a outdoor self storage 24 unit building with a 3,3422 sqft footprint. The proposed project will be serviced by public water and public sanitary sewer. Stormwater is proposed to be mitigated on site. Faden Enterprises Inc (Russel Fadden) 518-796-3716 russellfaden@yahoo.com 165 Lake Ave Saratoga Springs NY 12866 ✔ ACOE, DEC, SHPO ✔ 1.92 1.5 1.92 ✔ Page 2 of 3 5. Is the proposed action, a. A permitted use under the zoning regulations? b. Consistent with the adopted comprehensive plan? NO YES N/A 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?NO YES 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? If Yes, identify: ________________________________________________________________________________ NO YES a. Will the proposed action result in a substantial increase in traffic above present levels? EAre public transportation services available at or near the site of the proposed action? FAre any pedestrian accommodations or bicycle routes available on or near WKHsite of the proposed action? NO YES 9. Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 10. Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable ZDWHU: _________________________________________ _____________________________________________________________________________________________ NO YES 11. Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: ______________________________________ _____________________________________________________________________________________________ NO YES D'RHVWKHSURMHFWVLWHFRQWDLQRULVLWVXEVWDQWLDOO\FRQWLJXRXVWRDEXLOGLQJDUFKDHRORJLFDOVLWHRUGLVWULFW ZKLFKLVOLVWHGRQWKH1DWLRQDORU6WDWH5HJLVWHURI+LVWRULF3ODFHVRUWKDWKDVEHHQGHWHUPLQHGE\WKH &RPPLVVLRQHURIWKH1<62IILFHRI3DUNV5HFUHDWLRQDQG+LVWRULF3UHVHUYDWLRQWREHHOLJLEOHIRUOLVWLQJRQWKH 6WDWH5HJLVWHURI+LVWRULF3ODFHV" DUFKDHRORJLFDOVLWHVRQWKH1<6WDWH+LVWRULF3UHVHUYDWLRQ2IILFH 6+32 DUFKDHRORJLFDOVLWHLQYHQWRU\" NO YES  D. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? EWould the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES E,VWKHSURMHFWVLWHRUDQ\SRUWLRQRILWORFDWHGLQRUDGMDFHQWWRDQDUHDGHVLJQDWHGDVVHQVLWLYHIRU ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ To be determined. EEAF Mapper Summary Report Tuesday, February 22, 2022 8:28 AM Disclaimer:The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources in order to obtain data not provided by the Mapper. Digital data is not a substitute for agency determinations. Part 1 / Question 7 [Critical Environmental Area] No Part 1 / Question 12a [National or State Register of Historic Places or State Eligible Sites] No Part 1 / Question 12b [Archeological Sites] Yes Part 1 / Question 13a [Wetlands or Other Regulated Waterbodies] Yes - Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. Part 1 / Question 15 [Threatened or Endangered Animal] No Part 1 / Question 16 [100 Year Flood Plain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Part 1 / Question 20 [Remediation Site] No 1Short Environmental Assessment Form - EAF Mapper Summary Report