Loading...
01053.16 220315 Maint. Storage SP BndrJARRETT Engineers, PLLC Civil & Environmental Engineering Transmittedviaemail/HandDelivered March 15, 2022 Mr. Stephen Traver, Planning Board Chairman Town of Queensbury 742 Bay Road Queensbury NY 12804 Re: ‘Maintenance’ Storage Application for Site Plan By Great Escape Theme Park, LLC Dear Chairman Traver and Planning Board Members, In conjunction with its parent company, Six Flags, Inc., Great Escape Theme Park, LLC (“Great Escape” or the “Applicant”) hereby seeks site plan review for the construction of new ‘maintenance’ storage. The area of the proposed ‘maintenance’ storage falls within Park Area ‘A’ of Great Escape Theme Park (the “Park”) in the maintenance area of the Park, located to the north of the “Steamin’ Demon” rollercoaster and the “Desperado Plunge” log flume ride. Great Escape seeks this approval to further improve parts and equipment storage necessary to maintain rides, attractions and facilities within the Park. Enclosed please find an original and 15 copies of a Site Plan Application for members of the Planning Board (the “Board”), which includes the following project description or narrative. Also enclosed please find a check in the amount of $100.00, representing the fee for the site plan application. I. General Project Description The Great Escape wishes to improve covered storage of parts and equipment within the ‘maintenance’ area of the Park. The need for the improved/additional storage is a result of previous, pending and potential future interior alterations (storage and office space) to other existing ‘maintenance’ buildings to improve function and streamline inventory tracking. No changes to the exterior of the other ‘maintenance’ buildings or use/function of the other buildings is to occur. The improved ‘maintenance’ storage is to consist of (8) 8’w x 8’6” h x 40’ l intermodal shipping containers placed side by side. The containers are to be set at grade on a new crushed stone pad. A new 8’ high stockade fence is proposed to screen the storage containers along the north, west and south side. II. SEQR/Site Plan Review Requirements Queensbury Planning March 15, 2022 Re: Site Plan: ‘Maintenance’ Storage Page 2 of 5 On July 11, 2001, the Town of Queensbury Planning Board, as lead agency, adopted a Final General Environmental Impact Statement (“FGEIS”) and Findings Statement (the “2001 Findings”), that considered the general direction of future development at the Great Escape Theme Park (the “Park”). The FGEIS and 2001 Findings were then further supplemented and amended by a Supplemental Generic Environmental Impact Statement (“SGEIS”) and Supplemental Findings Statement (the “2004 Findings”). As identified in the FGEIS, Park Area A is a 237.6 acre portion of lands owned by Great Escape east of U.S. Route 9, which has traditionally been utilized for amusements and attractions, and has been a theme park since 1954. This area is presently zoned RC (Recreation Commercial). Significant acreage within Area A is “developable” or ideal for siting amusement park rides, attractions, facilities and support facilities such as the proposed ‘maintenance’ storage. The DGEIS anticipated that, in the future, Great Escape may add new attractions and facilities in order to remain competitive with other amusement/theme parks. See pp. 1-2, 2-17 and 2-18 of the DGEIS. The 2001 Findings (as supplemented by the 2004 Findings) adopted developmental impact thresholds for various significant environmental factors. As long as these thresholds are not exceeded by proposed new development, the 2001 Findings held that a State Environmental Quality Review Act or “SEQRA” review is not required. Instead, the Board must approve new rides, attractions and facilities within Park Area A on the basis of site plan review and area variance approval, if required, provided that they are consistent with the impact assessment and thresholds generically adopted in the 2001 Findings. A. Traffic The 2001 Findings refer to a traffic study detailed in the FGEIS which states that “traffic impacts will occur as traffic associated with the growth in the Park’s attendance increases.” See p. 9 of the 2001 Findings. The FGEIS sets forth “Improvement” measures designed to handle increased traffic, measures which are tied to attendance level thresholds. See pp.4-18 and 4-19. In other words, when attendance at the Park reaches specific levels, various mitigation measures could be required. However, the 2004 Findings ultimately dictated that traffic counts, as opposed to Park attendance, would be the trigger for traffic-related mitigation measures. Traffic counts, as identified in biennial traffic reports performed by Creighton Manning Engineering, LLP (“CME”), would determine whether Six Flags must implement mitigation measures. Conversely, the construction of rides, attractions and facilities would not directly dictate mitigation measures. As restated by CME in its September 2021 report, “Phase 3 improvements are required when the combined volume of traffic in the southbound through lane and the eastbound right-turn lane at either [the US Route 9/I-87 Exit 20 Northbound Ramp or US Route 9/Gurney Lane (County Road 23)] intersections reaches the traffic threshold listed in the … Findings Statement.”1 1 According to the 2004 Findings ( p.8), the relevant threshold for Phase 3 mitigation measures is “[w]hen combined traffic volumes reach 1,320 or 1,368 during weekday AM peak hour and 1,454 or 1,404 at the Saturday AM peak hour, respectively at the US Route 9/Exit 20 and US Route 9/Gurney Lane intersections.” Per Creighton Manning, existing 2021 volumes are 592 and 517 for weekday AM peak hour at US Route 9/Exit 20 and US Route 9/Gurney Lane intersections respectively, and 931 and 801 for Saturday AM peak hour for Route 9/Exit 20 and Route 9/Gurney Lane respectively. Phase 3 measures include, but are not limited to, widening the eastbound approach of the I-87 Exit 20 northbound off-ramp, widening the west side of US Route 9 in order to create a second southbound through lane from Exit 20 to Gurney Lane, and constructing a four- leg intersection at Round Pond Road and US Route 9 by constructing the southern piece of the new ring road. See 2004 Findings Section D(2) at p.7 for a complete discussion of the timing of mitigation measures, and description of those measures. Queensbury Planning March 15, 2022 Re: Site Plan: ‘Maintenance’ Storage Page 3 of 5 Because existing 2021 traffic volumes fell well below the Phase 3 threshold for both weekday and weekend peak hours, Great Escape has not yet crossed the threshold wherein the FGEIS called for the implementation of the next phase of mitigation measures. Great Escape has always been proactive in implementing measures designed to effectively manage and direct traffic. When and if additional mitigation measures are dictated, Great Escape will certainly see them through to completion. No additional vehicular traffic is anticipated to be generated by the improved ‘maintenance’ storage by virtue of the fact that this proposed facility is neither a ride nor attraction that would foster a more exciting or pleasurable guest/visitor experience. Therefore, no additional mitigation measures will be required, and currently existing parking lots will be well suited to handle parking needs. B. Sound The 2001 Findings state that “[w]hen a new ride or attraction (facility) is proposed on Six Flags properties, the Planning Board shall review its sound characteristics. Any facility or attraction that will result in an increase of the L90 by 5 DBA or more above baseline at one of the three [residential receptor] monitoring locations shall be subject to additional environmental review.” See Section 5(g)(7). The 2021 sound study performed by Alliance (O’Brien & Gere) indicates that generally, sound level ranges were similar to those measured in 2018 at the required community locations.2 The improved ‘maintenance’ storage is not expected to generate any additional noise compared to the existing unused facility (former Ghost Town Train Tunnel) that is to be removed as part of this project, therefore will not generate the noise level typically associated with roller coasters and other such attractions. As a result, the addition of the ‘maintenance’ storage should not exceed permissible sound thresholds. Therefore, we can be reasonably certain that the Attraction will not result in a material deviation from the sound levels indicated in the sound study. The closest residential receptor point, in the likely direction of sound projection, would be the northern portion of the Twicwood Estates development a distance greater than 1/4 mile to the south. The 2018 sound study indicates that only minimal weekend audible noise from the Six Flags properties (“Park”) was noted during the weekday and weekend measurements. The ‘maintenance’ storage is not predicted exceed the permitted sound thresholds let alone contribute any noise above existing levels documented in the 2021 sound study. Six Flags will continue to comply with Section 5(g)(6) of the 2001 Findings which requires that annual noise monitoring be conducted at the three residential receptor locations detailed therein. C. Stormwater Section 5(c)(4) of the 2001 Findings refer to, and summarize, Great Escape’s proposed implementation of a stormwater management system. In the Findings, the Planning Board expresses its concern with the protection of the Glen Lake Fen’s water quality, and goes on to set forth certain mitigation measures to ensure the protection of the environment and water quality. 2 For example, background L90 sound levels as a result of sound at the Park were within or below the range of sound levels measured in 2018 at Courthouse Estates, at Glen Lake Shore, and Twicwood Estates. Weekend nighttime (while the park is closed) L90 measurements were found to be within or below the range of sound levels measured in 2018 as well. September 2, 2021 Alliance (O’Brien & Gere) Annual Community Sound Survey - 2021. Queensbury Planning March 15, 2022 Re: Site Plan: ‘Maintenance’ Storage Page 4 of 5 The Applicant anticipates a 1,673± square foot reduction of impervious cover in the project area as part of the development of the ‘maintenance’ storage. The Six Flags properties have long since exceeded the one (1) acre of disturbance threshold requiring compliance with the New York State Department of Environmental Conservation’s State Pollutant Discharge Elimination System (SPDES) - Phase II stormwater regulations and Town of Queensbury local stormwater regulations. However, given the proposed reduction in impervious area it is the desire of the Applicant to request a waiver from the design and construction of any new stormwater control measures from improvements within the project area. D. Wastewater No new restrooms, locker rooms or food service stands and associated sanitary wastewater discharges are proposed in conjunction with the ‘maintenance’ storage. All sanitary wastewater generated on Park properties is discharged to the municipal sewer. E. Soils, Geology and Topography; Ecology Because the land where the storage is proposed has been previously developed, the proposed redevelopment will not disturb any existing woodlands. Only limited areas of existing lawn, vegetation and landscaping will be impacted, with similar proposed landscaping to augment any lost vegetation will be provided. No disruption of any animal or plant species is expected, nor will there be any impact to open space, agricultural, forest or mineral resources. In accordance with 2001 Findings Section 5(b)(3), Great Escape will provide the Planning Board with a detailed landscape planting plan during site plan review. III. Waiver Requests Exterior Lighting: The Great Escape wishes to seek waiver from the design standards for exterior lighting since no new exterior lighting is being proposed as part of this project. Landscaping: The Great Escape wishes to seek a waiver from the design standards for landscaping since the proposed project is to occur in place of the existing Tunnel Structure and the existing open area is largely devoid of woody vegetation. Where practical the plan is to leave the existing vegetation largely intact. A wooden stockade fence, similarly utilized elsewhere in the Park will be utilized to improve screening towards Route 9. Stormwater Controls: The Great Escape wishes to seek a waiver from the design standards for stormwater controls due to the decrease of impervious cover and nominal new grading within the project area. We believe this mitigates the need for new stormwater control measures. IV. Required Approvals and Attachments Great Escape anticipates that governmental approvals required for the proposed ‘maintenance’ storage will be the Site Plan Review from the Town of Queensbury. To assist in your review, the following are inclusive of this submission: Queensbury Planning March 15, 2022 Re: Site Plan: ‘Maintenance’ Storage Page 5 of 5 1. Cover Letter 2. Application Fee(s): Site Plan ($100.00) 3. Site Plan Application w/ questions/answers 4. (4) Full size and (11) 11x17 drawings (1-5) entitled ‘Maintenance Storage Site Plan’ The Great Escape. Revision ‘A’ dated 3-14-2022 5. Deed 6. 2021 Alliance (O’Brien & Gere) Sound Study 7. 2021 Creighton Manning Traffic Study 8. Demo Permit DEMO-0822-2021 Please feel free to contact us at (518) 792-2907 or via email at bholmes@jarrettengineers.com if you have any questions or comments regarding the above or attached. Thank you for your consideration of this application. Sincerely, JARRETT Engineers, PLLC Robert U. Holmes II, P.E. Project Manager Ecopies: Rebecca Wood – Great Escape Joe Martinez – Great Escape Dean Hyatt – Great Escape F:\DataFile\2001 Project Files\Grt Esc Proj\01-053 Grt Esc Util\01-053.16 Maint Storage SP\Work Docs\01053.16 22xxxx Maint Storage SP\Srce Files\01054.16 220310 Maint Storage SP Cover Ltr.doc Digitally signed by Gail Morehouse Date: 2022.03.15 12:18:07 -04'00' 1 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 TOWN OF QUEENSBURY Site Plan Review Application Review Process: 1. Required Pre-submission meeting with staff to determine general completeness to be held no later than 1 week prior to deadline day.Call (518) 761-8265 or (518) 761-8220 for an appointment. 2. Submittal of complete application: 1 original and 14 copies of the application package by monthly deadline. 3. Determination of application completeness. All necessary information must be provided and appropriate fee(s) paid for consideration for placement on an agenda for that month. 4.Incomplete applications will not be considered for placement on any agenda until all missing information has been submitted. 5. Submittal to Warren County Planning, if applicable. 6. Planning Board meeting, generally the third & fourth Tuesday of each month. You will be advised in writing as to which meeting to attend. 7. Following the meeting you will be provided with a copy of the resolution stating the Board’s decision on your application. If your application was approved, the next likely step is a Building Permit. Final drawings must be provided for the next phase of review. If your application was denied, your project cannot proceed as submitted. DOCUMENTATION REQUIREMENTS (hard copy & electronic): Please submit 1 original & 14 copies of the completed application package to include: x Completed Application pages 2-9, signed & dated x Pre-Submission Meeting Notes:signed by staff x Copy of Deed x Checklist & Plot Plan x Environmental Assessment Form for any non-residential project x Fee:$100 (0 – 10,000 sq. ft.); $250 (10,001 – 30,000 sq. ft.); $500 (30,001 -100,000 sq. ft.); $1,000 (100,000+ sq. ft.) Staff & Contact Information: Craig Brown, Zoning Administrator craigb@queensbury.net Laura Moore, Land Use Planner lmoore@queensbury.net Sunny Sweet, Office Specialist – Planning sunnys@queensbury.net (518) 761-8220 Visit our website at www.queensbury.net for further information and forms 2 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 General Information Tax Parcel ID Number: ____________________ Zoning District: ____________________ Lot size: _____________________ Detailed Description of Project [includes current & proposed use]: __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ Location of project: ________________________________________________________________________________ Applicant Name: Address: Home Phone Cell: Work Phone Fax E-Mail: Agent’s Name:Address: Home Phone Cell: Work Phone Fax E-mail Owner’s Name Address Home Phone Cell Work Phone Fax E-mail 288.20-1-20 RC 237.6 Acres Proposed project includes the removal of the existing former ghost town train tunnel structure (5,054 sf). Proposed development includes a gravel leveling pad (3,381 sf) for eight storage container units (2,560 sf total) for maintenance area storage. A wooden stockade fence to match existing facility style fencing is proposed to help screen proposed storage containers from Route 9. 1172 State Route 9, Queensbury, NY 12804 Great Escape Theme Park, LLC 1172 Route 9, Queensbury 518-792-3500 rwood@sftp.com Jarrett Engineering, PLLC. 12 E Washington St, Glens Falls, NY 12801 (518) 792-2907 bholmes@jarrettengineers.com Same as Above 3 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 Site Development Data Area / Type Existing sq. ft. Proposed Addition sq. ft. Total sq. ft. A. Building footprint B. Detached Garage C. Accessory Structure(s) D. Paved, gravel or other hard surfaced area E. Porches / Decks F. Other G. Total Non-Permeable [Add A-F] H. Parcel Area [43,560 sq. ft. / acre] I. Percentage of Impermeable Area of Site [I=G/H] Setback Requirements Area Required Existing Proposed Front [1] Front [2] Shoreline Side Yard [1] Side Yard [2] Rear Yard [1] Rear Yard [2] Travel Corridor Height [max] Permeability No. of parking spaces (Perimeter of Storage Containers) 'Project Area' 5,054 -5,054 0 000 0 2,560 2,560 0 821 821 000 000 5,054 3,381 3,381 18,945 18,945 18,945 26.68% 0% 17.85% 30' 136' 137' 30' N/A N/A 75' NA NA 20' 1,544' 1,582' 20' 1,663' 1,689' 20' 1,543' 1,531' 20' NA NA NA NA NA 175' (per FGEIS) 12'± 8.5' 30%85.2±%85.2±% No New Parking Required NA NA Route 9 Towards Glen Lake Road Towards Round Pond Road Towards Bike Path Parcel: Project Area:26.68%17.85% 4 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 Additional Project Information 1. Will the proposal require a Septic Variance from the Town Board of Health? _______________ 2. If the parcel has previous approvals, list application number(s): _________________________ 3. Does this project require coverage under the New York State Pollutant Discharge Elimination System (SPDES) Permit Program ? _______________ 4. Estimated project duration: Start Date __________ End Date __________ 5. Estimated total cost of project: _______________ 6. Total area of land disturbance for project: _______________ Floor Area Ratio Worksheet FLOOR AREA RATIO (FAR) -- The relationship of building size to lot size, derived by dividing the total building floor area by the lot size in square feet, yielding a percentage. Zoning District Symbol Floor Area Ratio [FAR] Waterfront Residential WR 0.22 Commercial Moderate/ Intensive CM/ CI 0.3 A. The combined area of all square footage, as measure from exterior walls of all structures on the property, including all floors of the structures, garages, basements and attics with more than five (5) feet of ceiling height and covered porches. Building square footage does not include: Open deck, docks and that portion of covered docks extending over water and one storage shed of one hundred twenty (120) square feet or less. Any additional sheds will be included. (See “FLOOR AREA RATIO”). B. Commercial or industrial: the total area in square feet as measured from the exterior of the outside walls of a building or structure, and when applicable, the sum total of all floor areas of the principal and accessory buildings or structures on the project site. A. Parcel Area ___________________________ sq. ft. B. Existing Floor Area ___________________________ sq. ft. [see above definition] C. Proposed Additional Floor Area ___________________________ sq. ft. D. Proposed Total Floor Area ___________________________ sq. ft. E. Total Allowable Floor Area ___________________________ (Area x _____) [see above table] *If D is larger than E. a variance or revisions to your plan may be needed. Consult with Staff. No See Attachment No 4/1/2022 12/31/2022 $30,000.00± 7,885 s.f. 5 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 § 179-9-080 Requirements for Site Plan Approval. The Planning Board shall not approve a Site Plan unless it first determines that such site plan meets the following Standards. Please prepare responses to each of the following topics: STANDARDS A.The proposed project furthers or is consistent with the policies of the Town’s Comprehensive Plan. B.The proposed project complies with all other requirements of this Chapter, including the site plan review standards as set forth in Paragraph F of this section, the dimensional, bulk and density regulations of the zoning district in which it is proposed to be located (Article 3 and Table 1), the applicable requirements of all other Articles that apply. C.The site plan encourages pedestrian activity internally and, if practicable, to and from the site with pedestrian paths or sidewalks connected to adjacent areas. D.The site plan must conform to Chapter 136 Sewage and Sewage Disposal, Chapter 147 Stormwater Management Local Law, and other applicable local laws. E.The proposed use shall be in harmony with the general purpose or intent of this Chapter, specifically taking into account the location, character and size of the proposed use and the description and purpose of the district in which such use is proposed, the nature and intensity of the activities to be involved in or conducted in connection with the proposed use and the nature and rate of any increase in the burden on supporting public services and facilities which will follow the approval of the proposed use. F.The establishment, maintenance and operation of the proposed use will not create public hazards from traffic, traffic congestion or the parking of vehicles and/or equipment or be otherwise detrimental to the health, safety or general welfare of persons residing or working in the neighborhood or to the general welfare of the town. Traffic access and circulation, road intersections, road and driveway widths and traffic controls will be adequate. G.Off-street parking and l9oading facilities will be appropriately located and arranged and sufficient to meet traffic anticipated to be generated by the new use. The establishment of vehicle links between parking areas of adjacent properties are provided where feasible. This furthers the Town’s goal of reducing curb cuts and reducing congestion. A twenty-foot wide connection is required. If adjacent properties are either undeveloped or previously developed without having made provision for future linkage, then a future connection must be identified and provided for in the site plan under review for such future linkage when the time arises. The Planning Board may require proof that the applicant has made contact with adjacent property owners for purposes of coordinating linkages with adjacent properties. H.The project shall not have an undue adverse impact upon the natural, scenic, aesthetic, ecological, wildlife, historic, recreational or open space resources of the town or the Adirondack Park or upon the adequate provision of supporting facilities and services made necessary by the project, taking into account the commercial, industrial, residential, recreational or other benefits that might be derived from the project. In making the determination hereunder, the Planning Board shall consider those factors pertinent to the project contained in the development considerations set forth herein under § 179-9-080 of this Chapter, and in so doing, the Planning Board shall make a net overall evaluation of the project in relation to the development objectives and general guidelines set forth in § 179-9-080 of this Article. I.The provision for and arrangement of pedestrian traffic access and circulation, walkway structures, control of intersections with vehicular traffic and overall pedestrian convenience shall be safe and adequate for pedestrian movement. Pedestrian connections between adjacent sites shall be provided to encourage pedestrian use. J.Stormwater drainage facilities will prevent an increase of post development drainage flows as compared to pre-development drainage flows. Drainage of the site shall recharge ground water to the extent practical. Surface waters flowing off-site shall not degrade any streams or adversely affect drainage on adjacent properties or public roads. Facilities shall be in conformance with the drainage standards of Chapter 147 of the Town Code and the Town of Queensbury Subdivision Regulations where applicable. K.The water supply and sewage disposal facilities will be adequate and will meet all applicable and current requirements set forth by Department of Health regulations and Chapter 136 of the Town Code. L.The adequacy, type and arrangement of trees, shrubs and other suitable plantings, landscaping and screening shall effectively provide a visual and/or noise buffer between the applicants and adjoining lands, including the maximum retention of existing vegetation and maintenance, including replacement of dead or deceased plants. M.Fire lanes, emergency zones and fire hydrants will be adequate and meet the needs and requirements of emergency service providers. N.The design of structures, roadways and landscaping in areas susceptible to ponding, flooding and/or erosion will minimize or avoid such impacts to the maximum extent practicable. O.The site plan conforms to the design standards, landscaping standards and performance standards of this chapter. Stephen Traver, Chairman, and Planning Board Members March 14, 2022 Re: Great Escape Maintenance Storage Page 1 of 4 § 179-9-080 Requirements for Site Plan Approval. The Planning Board shall not approve a Site Plan unless it first determines that such site plan meets the following Standards. Please prepare responses to each of the following topics: Standards A. The proposed project furthers or is consistent with the policies of the Town’s Comprehensive Plan. The Great Escape has been in existence for decades, and is located within the Route 9 North Commercial Corridor. The Great Escape property is presently zoned Recreational Commercial. Fitting in with a significant goal identified in the Town of Queensbury’s Comprehensive Land Use Plan (the desire for pedestrian-friendly development), the 2001 Great Escape Generic Environmental Impact Statement (GEIS) and the 2004 Supplemental Generic Environmental Impact Statement (SGEIS), the Great Escape is very pedestrian friendly. Access throughout the park is predominantly via walking. The proposed on-site storage container project is necessary to improve material support to the daily operation of the Great Escape Theme Park. The proposed project is located to the north of the existing theme park within the existing ‘maintenance area’. The proposed storage units will redevelop/replace the long since used ‘Ghost Town Train’ tunnel and structure. Having on-site storage for parts, materials, replacement equipment, etc. necessary to support existing rides and facilities is vital to assure an ‘exciting and pleasurable’ experience for guests and patrons visiting The Great Escape. B. The proposed project complies with all other requirements of this Chapter, including the site plan review standards as set forth in Paragraph F of this section, the dimensional, bulk, and density regulations of the zoning district in which it is proposed to be located (Article 3 and Table 1), the applicable requirements of all other Articles that apply. As mentioned above, the proposed container storage project to be located in the maintenance area of the Park located to the north of the Steamin’ Demon roller coaster and the Desperado Plunge log flume ride. The project entails the removal of the former ‘Ghost Town Train’ tunnel and structure then placement of a crushed stone pad and (8) containers for storage. Placement of the new containers will comply with dimensional, bulk and density requirements of the Recreational Commercial zone. C. The site plan encourages pedestrian activity internally and, if practicable, to and from the site with pedestrian paths or sidewalks connected to adjacent areas. The project does not facilitate the need pedestrian activity within the maintenance areas other than to allow maintenance personnel access to the storage. Sidewalks are not proposed since there will be no pedestrian access required. D. The site plan must conform to Chapter 136 Sewer and Sewage Disposal, Chapter 147 Stormwater Management Local Lay, and other applicable local laws. Existing sewage disposal facilities at the Great Escape Maintenance areas will remain. The proposed improvements will not precipitate the need to modify or Stephen Traver, Chairman, and Planning Board Members March 14, 2022 Re: Great Escape Maintenance Storage Page 2 of 4 increase existing sanitary sewers. The project will not generate additional stormwater runoff since impervious cover within the project area is to be decreased in size by approximately 1,700 sf. E. The proposed use shall be in harmony with the general purpose or intent of this Chapter, specifically taking into account the location, character and size of the proposed use and the description and purpose of the district in which such use is proposed, the nature and intensity of the activities to be involved in or conducted in connection with the proposed use and the nature and rate of any increase in the burden on supporting public services and facilities which will follow the approval of the proposed use. The proposed use is in harmony with the general purpose and intent of the Comprehensive Plan and Zoning Law in that the site is zoned RC (Recreational Commercial). Activity and use intensity are expected to remain consistent with current activity. The proposed project will not increase the burden on supporting public services or facilities. F. The establishment, maintenance and operation of the proposed use will not create public hazards from traffic, traffic congestion or the parking of vehicles and/or equipment or be otherwise detrimental to the health, safety or general welfare of persons residing or working in the neighborhood or to the general welfare of the town. Traffic access and circulation, road intersections, road and driveway widths, and traffic controls will be adequate. The proposed improvements will not create a public hazard from traffic, traffic congestion or the parking of vehicles or maintenance equipment or be detrimental to the health, safety, or general welfare of the neighborhood. The project will be generally in conformance with the existing GEIS, the SGEIS and the studies’ respective findings statements (the “Findings”). G. Off-street parking and loading facilities will be appropriately located and arranged and sufficient to meet traffic anticipated to be generated by the new use. The establishment of vehicle links between parking areas of adjacent properties are provided where feasible. This furthers the Town’s goal of reducing curb cuts and reducing congestion. A twenty-foot wide connection is required. If adjacent properties area either undeveloped or previously developed without having made provision for future linking, then a future connection must be identified and provided for in the site plan under review for such future linking when the time arises. The Planning Board may require proof that the applicant has made contact with adjacent property owners for purposes of coordinating linkages with adjacent properties. Additional off-street parking and loading facilities are not proposed as part of this project. No additional traffic is anticipated to be generated by the new maintenance storage use. Existing parking and traffic flow patterns in the maintenance area of the Park will remain unchanged. No changes in traffic, curb cuts, off-street parking, and/or loading facilities will be required as part of this proposed project. Per the GEIS and the 2001 Findings, and the 2004 Findings, the implementation of mitigation measures for the expansion of Great Escape vehicle parking (parking lots) is dictated by the ‘overall’ park attendance. H. The project shall not have an undue adverse impact upon the natural, scenic, aesthetic, ecological, wildlife, historic, recreational or open space resources of the town or the Adirondack Park or upon the adequate provision of supporting facilities and service made necessary by the project, taking into account the Stephen Traver, Chairman, and Planning Board Members March 14, 2022 Re: Great Escape Maintenance Storage Page 3 of 4 commercial, industrial, residential, recreational or other benefits that might be derived from the project. In making the determination hereunder, the Planning Board shall consider those factors pertinent to the project contained in the development considerations set forth herein under § 179-9-080 of this chapter, and in so doing, the Planning Board shall made a net overall evaluation of the project in relation to the development objectives and general guidelines set forth in § 179- 9-080 of this Article. Per the GEIS and the 2001 Findings, no threatened or endangered species were found to be located within the Park. Additionally, there are no historic or archeological sites located in Park Area A (as defined in the GEIS and 2004 Findings) where construction is proposed. Please see the Narrative for additional details. Also, please note the proposed project area is located in an area prior disturbance and development. I. The provisions for and arrangement of pedestrian traffic access and circulation, walkway structures, control of intersections with vehicular traffic and overall pedestrian convenience shall be safe and adequate for pedestrian movement. Pedestrian connections between adjacent sites shall be provided to encourage pedestrian use. The proposed project is located in a non-public area of the Park and does not facilitate the need pedestrian activity within the maintenance areas other than to allow maintenance personnel access to the storage. The area of the project is located well away from public roads and controlled intersections. Vehicular and pedestrian traffic is typically limited to Park maintenance personnel. J. Stormwater drainage facilities will prevent an increase of post development drainage flows as compared to pre-development drainage flows. Drainage of the site shall recharge ground water to the extent practical. Surface waters flowing off-site shall not degrade any streams or adversely affect drainage on adjacent properties or public roads. Facilities shall be in conformance with the drainage standards of Chapter 147 of the Town Code and the Town of Queensbury Subdivision Regulations where applicable. The proposed project decreases existing impervious covers by approximately 1,700 sf, therefore, no increase in stormwater is expected. No changes in stormwater runoff flows and drainage characteristics is anticipated. K. The water supply and sewage disposal facilities will be adequate and will meet all applicable and current requirements set forth by Department of Health Regulations and Chapter 136 of the Town Code. The proposed project will not increase the water demand or sanitary sewer discharge over and above currently existing volumes. Therefore, no improvements to potable water service or sanitary sewer facilities are proposed. L. The adequacy, type and arrangement of trees, shrubs and other suitable plantings, landscaping and screening shall effectively provide a visual and/or noise buffer between the applicants and adjoining lands, including the maximum retention of existing vegetation and maintenance, including replacement of dead or deceased plants. Existing vegetated buffer exists between the proposed maintenance storage area and adjacent land uses. This existing vegetated buffer is to remain predominantly undisturbed during construction. Additionally, a wooden stockade fence, painted a Stephen Traver, Chairman, and Planning Board Members March 14, 2022 Re: Great Escape Maintenance Storage Page 4 of 4 green/brown color, is proposed to screen proposed storage area from Route 9 and adjacent properties. A waiver for landscaping is being requested. M. Fire lanes, emergency zones and fire hydrants will be adequate and meet the needs and requirements of emergency service providers. The proposed project is to be constructed in an area of previous development. Existing fire lanes, emergency zones and fire hydrants will not be impacted as part of the project. N. The design of structures, roadways and landscaping in areas susceptible to ponding, flooding and/or erosion will minimize or avoid such impacts to the maximum extent practicable. Soil and site conditions in the vicinity of the project area are not typically susceptible to ponding, flooding and/or erosion do to the presence of highly permeable under lying sandy soils. O. The site plan conforms to the design standards, landscaping standards and performance standards in this chapter. The Great Escape wishes to seek waivers from the design standards for stormwater controls, landscaping and exterior lighting. Due to the decrease of impervious cover and nominal new grading within the project area we believe mitigates the need for new stormwater control measures. Existing vegetative growth and buffers within the project area are proposed to remain largely unchanged. In conjunction with the existing vegetation and the installation of stockade fencing to further screen the storage area we believe meets the need for additional landscaping and screening. No additional exterior lighting is proposed as part of this project. It is our belief that existing lighting within the maintenance is sufficient to support the proposed storage. F:\DataFile\2001 Project Files\Grt Esc Proj\01-053 Grt Esc Util\01-053.16 Maint Storage SP\Work Docs\01053.16 22xxxx Maint Storage SP\Srce Files\01053.16 220310 SP Quest.doc 6 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 § 179-9-050 Checklist-Application for Site Plan Review. Application materials and site plan shall include sufficient information for the Board to review and provide a decision. The applicant is to provide a site plan drawing and all attachments that address items A-V. The applicant may request a waiver from A-V and is to provide reasons for waiver(s) requested. Please label information to be submitted. REQUIREMENTS Sheet # A.A vicinity map drawn at the scale that shows the relationship of the proposal to existing community facilities which affect or serve it, such as roads, shopping areas, schools, etc. The map shall also show all properties, identify owners, subdivisions, streets and easements within 500 feet of the property. Such a sketch may be superimposed on a United States Geological Survey map of the area. B.The site plan shall be drawn at a scale of forty feet to the inch (1” = 40 feet) or such other scale as the Planning Board may deem appropriate, on standard 24” x 36” sheets, with continuation on 8 l/2 “x 11” sheets as necessary for written information. The information listed below shall be shown on the site plan and continuation sheets. C.Name of the project, boundaries, date, north arrow, and scale of the plan. D.Name and address of the owner of record, developer, and seal of the engineer, architect or landscape architect. If the applicant is not the record owner, a letter of authorization shall be required from the owner. E.The location and use of all existing and proposed structures within the property, including all dimensions of height and floor area, all exterior entrances, and all anticipated future additions and alterations. F.The location of all present and proposed public and private ways, off-street parking areas, driveways, outdoor storage areas, sidewalks, ramps, curbs, paths, landscaping, walls and fences. Location, type and screening details for all waste disposal containers shall also be shown. G.The location, height, intensity and bulb type (sodium, incandescent, etc.) of all external lighting fixtures. The direction of illumination and methods to eliminate glare onto adjoining properties must also be shown in compliance with § 179-6-020. H.The location, height, size, materials and design of all proposed signs. I.The location of all present and proposed utility systems including: 1. Sewage or septic system; 2. Water supply system; 3. Telephone, cable and electrical systems; and 4. Storm drainage system including existing and proposed drain lines, culverts, catch basins, headwalls, endwalls, hydrants, manholes and drainage swales. J.Plans to prevent the pollution of surface or groundwater, erosion of soil both during and after construction, excessive runoff and flooding of other properties, as applicable. A Stormwater Pollution Prevention Plan (SWPPP) for all land development activities (excluding agricultural activities) on the site that results in land disturbance of one acre or more. A SWPPP shall comply with the requirements of the DEC SPDES MS-4 General Permit and Chapter 147 of the Town of Queensbury Code. It shall be at the discretion of the Planning Board as to whether a SWPPP or an erosion and control plan shall be required for a site plan review project land disturbance of less than one acre. K.Existing and proposed topography at two-foot contour intervals, or such other contour interval as the Planning Board shall allow. All elevations shall refer to the nearest United States Coastal and Geodetic Bench Mark. If any portion of the parcel is within the 100-year floodplain, the area will be shown and base flood elevations given. Areas shall be indicated within the proposed site and within 50 feet of the proposed site where soil removal or filling is required, showing the approximate volume in cubic yards. L.A landscape plan showing all existing natural land features than may influence the design of the proposed use such as rock outcrops, stands of trees, single trees eight or more inches in diameter, forest cover and water sources and all proposed changes to these features, including sizes and types of plants. Water sources include ponds, lakes, wetlands and watercourses, aquifers, floodplains and drainage retention areas. M.Land Use District boundaries within 500 feet of the site’s perimeter shall be drawn and identified on the site plan, as well as any Overlay Districts that apply to the property. Cover C1 Cover Cover EX1 C1 Waiver Req. N/A N/A Waiver Request EX1, C1 EX1 Cover EX1, EX2, C1 EX2, C1 EX1, EX2, C1 EX2, C1 EX2, C1 Cvr, EX1, EX2 7 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 REQUIREMENTS (CONTINUED)Sheet # N.Traffic flow patterns within the site, entrances and exits, loading and unloading areas, as well as curb cuts on the site and within 100 feet of the site. The Planning Board may, at its discretion, require a detailed traffic study for large developments or for those in heavy traffic areas, which shall include: 1. The projected number of motor vehicle trips to enter or leave the site, estimated for weekly and annual peak hour traffic levels; 2. The projected traffic flow pattern including vehicular movements at all major intersections likely to be affected by the proposed use of the site; 3. The impact of this traffic on levels of service on abutting public streets and at affected intersections. Existing and proposed weekly and annual peak hour traffic levels and road capacity levels shall also be given. O.For new construction or alterations to any structure, a table containing the following information shall be included: 1. Estimated area of structure to be used for particular purposes such as retain operation, office, Storage, etc.; 2. Estimated maximum number of employees; 3. Maximum seating capacity, where applicable; and 4. Number of parking spaces existing and required for the intended use. P.1. Floor Plans. 2. Elevations at a scale of one-quarter inch equals one foot (1/4” = 1 foot) for all exterior facades of the proposed structure(s) and/or alterations to or expansions of existing facades, showing design features and indicating the type and color of materials to be used. Q.Soil logs, water supply well and percolation test results, and storm water runoff calculations as needed to determine and mitigate project impacts. R.Plans for disposal of construction and demolition waste, either on-site or at an approved disposal facility. S.Plans for snow removal, including location(s) of on-site snow storage. T.An Environmental Assessment Form (“EAF”) as required by the SEQRA regulations, with Part 1 completed by the Applicant shall be submitted as part of the application. If the proposed project requires a special use permit and an EAF has been submitted in conjunction with a special use permit application, a duplicate EAF is not required for the site plan application. U.If an application is for a parcel or parcels on which more than one use is proposed, the applicant may submit a single application for all such uses, provided the proposed uses are accurately delineated on a site plan drawn pursuant to the requirements set forth above. The Planning Board may grant the application with respect to some proposed uses and not others. For purposes of reviewing an application (and for SEQRA compliance) all proposed uses on a single parcel or on contiguous parcels shall be considered together. V.A brief narrative statement on how the project proposed for review furthers or is consistent with the vision, goals and policies in the Town’s Comprehensive Plan. Traffic Study Applicatio n, C1 N/A N/A Demo Per C1 Attached N/A Attached No Change (Traffic Study Ref. only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igitally signed by Gail Morehouse Date: 2022.03.15 11:58:05 -04'00' 9 Site Plan Review application – Revised October 2016 Town of Queensbury Planning Office-742 Bay Road, Queensbury, NY 12804 Signature Page This page includes the 1.)Authorization to Act as Agent Form: 2.)Engineering Fee Disclosure; 3.)Authorization for Site Visits; 4.) Other Permit Responsibilities; 5.) Official Meeting Disclosure and 6.)Agreement to provide documentation required. OWNER’S AGENT FORM: Complete the following if the OWNER of the property is not the same as the applicant Owner: ____________________________________ Designates: ____________________________________ As agent regarding: _____ Variance _____ Site Plan _____ Subdivision For Tax Map No.: _____ Section _____ Block _____ Lot Deed Reference: _____ Book _____ Page _____ Date OWNER SIGNATURE: ___________________________________DATE: _______________ APPLICANT’S AGENT FORM: Complete the following if the APPLICANT is unable to attend the meeting or wishes to be represented by another party: Owner: ____________________________________ Designates: ____________________________________ As agent regarding: _____ Variance _____ Site Plan _____ Subdivision For Tax Map No.: _____ Section _____ Block _____ Lot Deed Reference: _____ Book _____ Page _____ Date OWNER SIGNATURE: ___________________________________DATE: _______________ 2.) ENGINEERING FEE DISCLOSURE: Applications may be referred to the Town consulting engineer for review of septic design, storm drainage, etc. as determined by the Zoning or Planning Department. Fees for engineering review services will be charged directly to the applicant. Fees for engineering review will not exceed $ 1,000 without notification to the applicant. 3.) AUTHORIZATION FOR SITE VISITS:By signing this page and submitting the application materials attached herein, the Owner, Applicant, and his/her/their agent(s) hereby authorize the Zoning Board or Planning Board and Town Staff to enter the subject properties for the purpose of reviewing the application submitted. 4.) OTHER PERMIT RESPONSIBILITIES:Other permits may be required for construction or alteration activity subsequent to approval by the Zoning Board or Planning Board. It is the applicant’s responsibility to obtain any additional permits. 5.) OFFICIAL MEETING MINUTES DISCLOSURE: It is the practice of the Community Development Department to have a designated stenographer tape record the proceedings of meetings resulting from application, and minutes transcribed from those tapes constitutes the official record of all proceedings. 6.) AGREEMENT TO PROVIDE DOCUMENTATION REQUIRED: I, the undersigned, have thoroughly read and understand the instructions for submission and agree to the submission requirements, I acknowledge no construction activities shall be commenced prior to issuance of a valid permit. I certify that the application, plans and supporting materials are a true and complete statement/description of the existing conditions and the work proposed, and that all work will be performed in accordance with the approved plans and in conformance with local zoning regulations. I acknowledge that prior to occupying the facilities proposed, I or my agents, will obtain a certificate of occupancy as necessary. I also understand that I/we may be required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy I have read and agree to the above. ____________________________ ___________________________ __________________ Signature [Applicant] Print Name [Applicant] Date signed ____________________________ ___________________________ __________________ Signature [Agent] Print Name [Agent] Date signed Great Escape Theme Park,LLC JARRETT Engineers,PLLC xx 1 20 Great Escape Theme Park,LLC JARRETT Engineers,PLLC xx I have read and agree to the ______________________ Signature [Applicant]Print Name [Applicant]Date signed p _______________ ference:_____Book_______Page _____Date ___________________________________DATE: _______________ RM: the APPLICANT is unable to attend the meeting or wishes to be represented by another party ____________________________________ tes:____________________________________ t regarding:_____ Variance _____ Site Plan _____ Subdivision Map No.:_____ Section _____ Block _____ Lot ference:_____ Book _____ Page_______ Date ___________________________________DATE: _______________ DISCLOSURE: Applications may be referred to the Town consulting engineer for review of septi by the Zoning or Planning Department. Fees for engineering review services will be charged directly t will not exceed $ 1,000 without notification to the applicant. OR SITE VISITS:By signing this page and submitting the application materials attached herein, the Ow eby authorize the Zoning Board or Planning Board and Town Staff to enter the subject properties for mitted. PONSIBILITIES:Other permits may be required for construction or alteration activity subsequent to oard. It is the applicant’s responsibility to obtain any additional permits. G MINUTES DISCLOSURE: It is the practice of the Community Development Department to ha proceedings of meetings resulting from application, and minutes transcribed from those tapes constit OVIDE DOCUMENTATION REQUIRED: I, the undersigned, have thoroughly read and understand the submission requirements, I acknowledge no construction activities shall be commenced prior to issu lication, plans and supporting materials are a true and complete statement/description of the existing co work will be performed in accordance with the approved plans and in conformance with local zoning cupying the facilities proposed, I or my agents, will obtain a certificate of occupancy as necessary. I also ide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance o Great Escape Theme Park,LLC JARRETT Engineers,PLLC x x e above. _______ _______________________________________________ P i t N [A li t]D t i d Digitally signed by Gail Morehouse Date: 2022.03.10 09:08:59 -05'00'Robert U. Holmes II, P.E. 3/10/22 Short Environmental Assessment Form 3DUW3URMHFW,QIRUPDWLRQ Instructions for Completing Part 1 - Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 - Project and Sponsor Information Name of Action or Project: Project Location (describe, and attach a location map): Brief Description of Proposed Action: Name of Applicant or Sponsor: Telephone: E-Mail: Address: City/PO: State: Zip Code: 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. NO YES 2. Does the proposed action require a permit, approval or funding from any other governmental Agency? If Yes, list agency(s) name and permit or approval: NO YES 3.a. Total acreage of the site of the proposed action? ___________ acres b. Total acreage to be physically disturbed? ___________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? ___________acres 4. Check all land uses that occur on, adjoining and near the proposed action.  Urban  Rural (non-agriculture)  Industrial  Commercial  Residential (suburban)  Forest  Agriculture  Aquatic  Other (specify): _________________________  Parkland 1BHFPG The Great Escape - Maintenance Storage Site Plan Near Route 9, north of the Steamin' Demon roller coaster, behind Northlind Sports Outfitters 1172 State Route 9, Queensbury, NY 12804 Proposed project includes the removal of the existing former ghost town train tunnel structure (5,054 sf). Proposed development includes a gravel leveling pad (3,381 sf) for eight storage container units (2,560 sf total) for maintenance area storage. A wooden stockade fence to match existing facility style fencing is proposed to help screen proposed storage containers from Route 9. Jarrett Engineering, PLLC. (518) 792-2907 bholmes@jarrettengineers.com 12 E Washington St, Glens Falls, NY 12801 Glens Falls NY 12801 ✔ ✔ 237.6 0.18± 237.6 ✔✔ Page 2 of  5. Is the proposed action, a. A permitted use under the zoning regulations? b. Consistent with the adopted comprehensive plan? NO YES N/A 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? NO YES 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? If Yes, identify: __________________________________________________________________________ _______________________________________________________________________________________ NO YES 8. a. Will the proposed action result in a substantial increase in traffic above present levels? b. Are public transportation service(s) available at or near the site of the proposed action? c. Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? NO YES 9. Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: _______________________________________________________________________________________ _______________________________________________________________________________________ NO YES 10. Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable water: ______________________________________ _______________________________________________________________________________________ NO YES 11. Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: ________________________________ _______________________________________________________________________________________ NO YES 12. a. Does the site contain a structure that is listed on either the State or National Register of Historic Places? b. Is the proposed action located in an archeological sensitive area? NO YES 13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _______________ _______________________________________________________________________________________ _______________________________________________________________________________________ NO YES 14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: † Shoreline † Forest † Agricultural/grasslands † Early mid-successional † Wetland † Urban † Suburban 15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or Federal government as threatened or endangered? NO YES 16. Is the project site located in the 100 year flood plain?NO YES 17. Will the proposed action create storm water discharge, either from point or non-point sources? If Yes, a. Will storm water discharges flow to adjacent properties?† NO † YES b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? If Yes, briefly describe: † NO † YES _______________________________________________________________________________________ _______________________________________________________________________________________ NO YES ✔ ✔ ✔ ✔Name:Glen Lake, Reason:Benefit to human health, natural setting, Agency:Queensbury, Town of, Date:11-30-89 ✔ ✔ ✔ ✔ ✔ Potable water supply not required as part of this project. ✔ Wastewater treatment facilities not required as part of this project. ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ Karner Blue, Frosted Elfin 18. Does the proposed action include construction or other activities that result in the impoundment of water or other liquids (e.g. retention pond, waste lagoon, dam)? If Yes, explain purpose and size: ____________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ NO YES 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste management facility? If Yes, describe: _________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ NO YES 20. Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or completed) for hazardous waste? If Yes, describe: __________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ NO YES I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: ___________________________________________ Date: ___________________________ Signature: _______________________________________________________ 1BHFPG ✔ ✔ ✔ PRINT FORM GE nsor nannnnnnnnnnnnnnnnme: ____________________________________________________________________________________________________________________________Date: ____________________________________________________ ______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Page 1 of 2 $JHQF\8VH2QO\>,IDSSOLFDEOH@ 3URMHFW 'DWH 6KRUW(QYLURQPHQWDO$VVHVVPHQW)RUP 3DUW,PSDFW$VVHVVPHQW Part 2 LVWREHFRPSOHWHGE\WKH/HDG$JHQF\ Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept “Have my responses been reasonable considering the scale and context of the proposed action?” No, or small impact may occur Moderate to large impact may occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? 2. Will the proposed action result in a change in the use or intensity of use of land? 3. Will the proposed action impair the character or quality of the existing community? 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Environmental Area (CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or affect existing infrastructure for mass transit, biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? 7. Will the proposed action impact existing: a. public / private water supplies? b. public / private wastewater treatment utilities? 8. Will the proposed action impair the character or quality of important historic, archaeological, architectural or aesthetic resources? 9. Will the proposed action result in an adverse change to natural resources (e.g., wetlands, waterbodies, groundwater, air quality, flora and fauna)? 10. Will the proposed action result in an increase in the potential for erosion, flooding or drainage problems? 11. Will the proposed action create a hazard to environmental resources or human health? PRINT FORM Page 2 of 2 For every question in Part 2 that was answered “moderate to large impact may occur”, or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short- term, long-term and cumulative impacts. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. ________________________________________________________________________________________________ Name of Lead Agency Date _________________________________________________ _______________________________________________ Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer _________________________________________________ _______________________________________________ Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from Responsible Officer) 4IPSU&OWJSPONFOUBM"TTFTTNFOU'PSN 1BSU%FUFSNJOBUJPOPG4JHOJGJDBODF "HFODZ6TF0OMZ<*GBQQMJDBCMF> 1SPKFDU %BUF PRINT FORM EAF Mapper Summary Report Y f W...__.....M..-...»--..,..—..—..._._._..._.,...,«.»...—,...-------........-'""'-- —•--. •--"....._..»_..._.,,_.......,.......,,_,.„,..,..„„, GAS .. WARREN 'COUNTY" CLERK RECORDING CGvER SHEET EMP, INITIALS INSTRMIFNT 9 NO. OF PAGES TYPE OF DOC, J I ram' ADDTL,. 'PEE TOWN ADDTL., NAMES' TRANSFER TAX ACTT„ $'_ MORTGAGE AMT, $ MORTGAGE TAX TRANSFER TAX STAMP MORTGAGE TALC STAMP r4 RECEIVED Cit EA1. STATE M A`Y 1 1997 TRANSFER TAX WARREN COUM-Y Please fill to blanks below before submic,ting for reeordiag,. GRANTOR/MORTGAGOR/ASSIGNOR t GSI NTEE/MORTGAGEEJASSTGNEE d- c S" care41 RECORDEDs: x -_Y/ll/l/fY///!/l/td//Or"///I/ p RECORDING ,STS RETURN TO: "G Cj e r f1 ,"kl LI YI t t` A RNJrCD L ..,tWC 7Nt Upon recording thin page becomes a part of the FkEC0iDED document. ($3.00) f b xu4• y,F w A r Kq 3 7F RECORD AND CRr;ii-tj tN"roe C)arcr Marks Fa Uphsurra ht,R' 8n5 Third Avenue Ncw York,New York 10022 Aucation: Barbara E.ChArupoux,Esq. THIS INDENTURE rade as of the day of° .r11 pc..r _, 1997 between PRE-MIER PARKS INC., a corporation organized nod existing under t1)e law of the State of New York with all address of'122 East 42nd Street, New York, New York, p=arty of the first ,part,and GRr,A.f ESCAPh THEME PAID LLC, a lirniwd liability companty orgunizecl and existing under the laws of tire State of New York, with art address of 122 East 42nd S"irect, New York, New York, party of the second part,. WITNESSETH, that the party of the first part, in consideration of One and 0/100 Dollars($1.00) lawful money of Rias United Staines, paid by the party of the second part,does ha ruby grant and release:unto the.party of the second part, its successors and assigns forever, ata undivided snincly-tone per nt (99%)interest in all that certain plot, piece or parcel of land lying and being the Couanty of Warren, State of New York, heing designated as the following tax parcels; Secaimi 7q,Mock 1,Lot 02,2 Sectia m 74,Black 1,Lot 02,3 Section 36,Mock 2,Lot 3,t i and being more particularly described as follows: See Attached Schedule "A" TOGETHER with the appurtenances and all the estate and rights of the party of tine first part in and to said premises, i TO HAVE ANIS TO HOLD the premises here itn granted unto the party of the second part, its successors and assigns forever, And the party of the first part covenants as followrsu FIRST, that the patty of the second part shall quietly enjoy the said premises; SECOND, that the party of Cite first part will forever WARRANT the title to said premises; and THIRD, that in compliance with,Section 13 of the Lien Law, the grantor will receive Rile consideration for th'iis comweyattec and will hold the tight to receive such consideration as a trust fund to be applied first for the purpose of paying the crest of the improvement and will apply tale same first to the payinent of the cost of Cite improvement before using any part of the total of the saawe for any other purpose. i 1 230166.t•1Earasr12rr•ia:23M ti i. t. a,• wiz a:: l I Ms conveyance is made with the consent of(lie members of the grantor and does not constitute a transfer of all or substantially all of the assets of the grantor. IN WITNESS WHEIMOF, the party or the first part has caused Its seal to k- bercuillo affixed,and tficn,presents to be signed by its duly authurized agent this daY of May, 1997. 1,-L PREMIER PARKS INC. 13YffJames F. Dannhauser Ccl,hief Financial Officer 2 7 v3 71j— STATE OF NEW YORK SS,,. COUNTY CDC NEW YORK) } a On tills h1L day of ' 1 97, before me Personally carte,TAMES E, 0 DANNHA>il 5ER, (o nic persomlily Strom, wht), beumti;dttly sworn by me, dial depose and say that he has am address at 121 East 42rld atrett, Nedy York, New yoria that Ire is t@rc Chief Financial Officer of Premier Parks Inc., the corporatism described in and which executed the fareguing instrument; and that he signed his name thereto by order of the board of directors of said corporatism. jNourtaut It y J&t t?GOODE mtote:vFtlik saaloaatNow YN4 No.a1-4 als253 0U01H 10 iaaqawYGrk cwnty Cir atllcala fHledIr New YcTk Co112ewYcTkCo11 gee;nruE.,rlrrruEx;lraaMaNh2%Gi1,,. 1 r r,rss.m riccsrrssr•rt 3 r r o SCHEDULE A DESCMPTfON POiltYNO.:9603-26621 PARCEL i LLL 1&14T CRTA IN PARCEL OF La ND situate if) the Town of Qup-e us bury, Warreen County, New York, located easterly of New York a, ROU-nd Pond Road mid westerly of Ash Drivo, and whichLakeRead, northerly o, S- Route 9, sOutherly of Glen parcel is bounded and descri'tod as follows, REGIUNING at a point in the easterly hounds of New York U. S, Route 9 at a divtancs of 350 feet, norrhgrly, measured Along said easterly bounds fro'M the northerly bound$ of Round Pond Road, and which, point Or boginning ialso the northwest corner of lands of David L. beater and others, whose deed in recorded in the Warren County Clark's Office in Seek 698 cf 4)apds at page 59; runningn thencg front the place of begj;,.,njng, the ft:11owing seven courses and distances along the easterly bounds of said Route 9, vj7, 1) North 13 degrees 4; mintites west, 2918,20 feLc; 2) North 28 degrees 48 m1 notes 40 seconds west, .483.03 3) North 13 degrees 32 minutes West, 82.19 feet; 4) South 60 degrees 50 minutes 40 seconds Ease„ 129,00 feet; 5) Uarth 29 degrees 01 minute 10 seconds Fast,, 45,0 feet; 6) North 60 degrees se minutes 40 seconds West, 179,0 feet, and 7) V*-'t)l 31 clegrees 50 minutes 20 seconds WtSr, 731.16 feet to tile wexsout, tL corner of lands of Edward G. and -Xornta Saprzschi,- thence North 53 degrees n minutes 40 SacOndS Fast for as distance of 153,0 ecet to the southeast corner of said last mentioned premises; thence Vvrth 32 degroes 07 minutes 20 seconds west for a distance of 106.52 feet t0*the tort'jeact corner of said last mentioned premises; thence South 54 degrees 31 minutes 40 seconds West for a riistance` of 149-52 feet to the northwest corner of said last mOnticnPd premisen;'thence the following ctrue c0uTses and di seances along tile easterly botulds of New York U. S. Route 9, viz; 1) North 32 degrees 38 minute; 30 seconds West, 252.20 feet; 2) North 24 degrees 53 minutes 40 seconds West, 843,36 feet, and 31 North 29 degrees C4 Minutes 30 seconds West, 289.0 feet to the most southerly corner of lands of mijuar, and Dorothy Latham, whose deed is recorded in the Warren County Clerk's Office in Book 695 of Coeds at payE!'895; thence North 04 degrees 0 minutes East for a distance of 134.35 feet to the -southwest corner of the 3rd descrited parcel of 10 acres in the deed frcin Ileadow sun Develoottent Corp. to Attractions Land, Znc,, by deed dated April 20, 1529 and recorded in said Clerk's office in acov,. 151 of Deeds at. page, 554 chenre kqorrjj a, degree 26 tt?'nuz:ely East, alcng the easrerl7 line of said lands of Latham, for a CONTIMED rrecnt a Policy Ncr.:5603-26921 SCHEDULEEA DESCRIPTION (Continued)M= I distance of 4.92,0 feet to the aaaathaaaat corner of those byAttractionsLand, Inc, to Hu adcw Run o0velogarraent Corp., by prs*prices dated conveyed l1985, and recorded in said clerk's office iDnRoOh. '7 A o eadedat pa e 93, 2tl„ thence .south 53 degrees 34 minutes 50 seconds 5arr for a distance of 108,29 feettothenaucheastcornerofsaidlastMentionedpremises; thence dlort0t degreesdegrees069 :5 minutes 10 seconds East Por a distaoca of 156).0 feat to a pt,iint th 06 ther. sourherl"y bounds Of Glen Lake Road, and the ntortheurt tsasner of said l.asFast,. stmerstioa3,xgd Premises,, thence South U degrees 11saidso,road bounds, for a, distance of42040.a0t4eer t;onthedno'arthwest,lCattleOflandsnoworj!crnwerly at Iress :hj. Tompkins, whose deed is recorded in saidma, clerk°o Office, it, Pock 777 of J)eeds at pads 31; thence South 06 degrees 2S'raird la 10 ow nd are West icor a, disotance of 150.0 fC'-C to the 600claaaUsc corner tateznictlandsnowarformerlyofTompkins; thence South 83 degrees 3!A aninotes 5p seconds 'East, along the southatly line of said Lazarmencioaaz?d promises and, alongrt}e 50u,thearly line of Sands of tdwi.n Winchi;p, wsoae deed is rec,arde^,¢d in saidcfficeingoods719ofDeedsettoago142, fo, a llssta,-4Ce of 300,0 :set tothesoutheastcornerofsaidlandsofWinship; thence Ncrth, Q6 de,a,sees 2,s, minutes 10 seconds East Ear a distancebouof 150,0 feet tc a. point in, the souther?y thence of Glen OwinLake [load, and. the northeast corner of said. lands of Winch,ip;thence the following fourteen coursea and distances along the Southerly LboundeofUlanlakeRoad, viz,. 1) south 83. degrees 34 minutss' So seconds 'East, 47.91 feet; 21 North 70 degrees 30 minutes a0 seconds East, 450.48 feet; 3) [North, 72 degrees 4:7 minutes East, 2'31.8Q feet; 4) North 66 degrees 22 minutes East, 162.96 feet; 5) North 57 degrees 17 minutes East, 137..50 feet; 61 North: 40 degrees 17 minutes East, 322,.19 feet; 7) North 63 degrees 37 minutes East, 1.56.44 fees;. 8) North 67 degrees 47 minutes East, 127.55 feet; 9) North 16 degrees 1-«2 minutes East, 2,17.55 feet; w 10) North 84 degrees 47 minutes East, 297,95 feet; 11.) North. 75' degrees So minutes East, 1,54,29 feet; 1.2) North 58 degrees 34 minutes 40 seconds East, 115.40 feet; 131' Norah 49 degrees 12 minutes 40 seconds East 122.,40 feet„ and. 14.) North 60 degrees 58 minutes 10 seconds East, 36.27 feet to the westerlyboundsofAshDrive; thence the following seveaa courses and distances along saidwesterlybooundr, viz: R 2 a p a'. ea m SCHEDULE A DESCRPTION(Continued) pollicyNo.:9601-26821 W ^ t 11 South 71 degree:; 25 minutes 50 Seconds East, 49.69 feet; rY' South 41 degrees 5o minutes 10 seconds East, 66,79 feet; 3) South 38 degrees 37 minutes 30 seconds East, 5*.27 feet; G>"1 41 South 53 degrees 07 minutes 20 seconds East, 107.43 feet; rv. 5) South 46 degrees 39 minutes East, '70.31 feet; w 61, South 40 degrees 16 minute's 5o seconds East. 256.87 feet; and 7) South 37 degrees 22 atrinutes 50 seconds East, 204.83 feet to the westerlyC' line of lands Of Niagara, Xchawk Power corp.; thence the following nine courses axrd distances along the -4escerly line of said carver comnxny lands, viz. I) SOutherlY, along a curve to the, left having a central angle of 241 431 26»" and a radius of 612.36 feet, an arc distance of 254,5n fe'eca 2) South 26 degrees 21 minutes .2.0 seconds East, 179.70 fe.er to aF curve; of 3) Southerly, along a curve to the right having a central angle of 301 17' 2.5^' and a radius of 533.01 fact, an arc distance of 281.79 feet; 4.) North 62 degrees 50 Minutes 20 second, West,, 21,x.6 feet; 5) South 07 degrees o9 minute_- 40. seconds West, 30.0 feet,,N' r 6) North 82 degrees 50 minutes 20 seconds West, 22.0 meeC7 7) South. 07 degrees 09 minutes 40 seconds Hest, 433.5 feet; 8) Southerly„ along a curve to the left having a central angle of 120 1.2' oo. and having a radius of 093.66 feet, an arc distance of L90.29 feet, and 91 South 05 degrees 02 minutes 20 seconds East., 34.44 feet to the na the=lylineoflandsofB'o'nn and Carol Whalen, whose' deed is recorded in the ldarren couetY C'lerk's Office in Boor, Sala of heeds At page 426; tharace north 91 degseus 43 minutes 20 seconds West, and running along the northerly line of Lot 55, in the Second Division of the Queensbury Patent, for a distance of 1134.20 feet to the northwest corner of said Lot 55; thence South 07 degrees 5o minutes 40 seconds Hest, aloe the westerly19r line fo Lotsots 55 and 54, and the westerly lireoflandsofWhalen, for a distance of 1189.0 feet to she souchwe,sc corner of said ,sands of Whalen, and the southwest carter of Lot 54; thence: South 81 degrees 43 minutes 20 seconds East, along the southerly lino of said lands of Winaxlen and along the division line between 'Lot 54, cn the North, and Lot 53, on the south. .for a distance of 994.49 feet to the northwesc corner of hands ofThomasW7. Alberi„co, whose deed is recorded in the "Warren County clerk,, office in Hook 703 of Oe,e s at page 21o; thence Sou't'h 07 degrees 35 X4minuteS 30 seconds. West, along the westerly line of said 'lands of Alheri:cca, and along the westerlylineoflandsofGuidoP"assarelli, whose deed is recorded in said clerk's office utErrn.; s 3 I 1 t a 1 t m , SCHEDULE A DESCRIPTION(CanflnUed) v PaPJcy NG-, 9503•26921 in Book 680 of deeds at page less, for'a distance. of 1368.1.3 fec:;t to a. point in jthenortherlyboundsofRoundPondLoad; thence the following three courses anddistancesalongthe: northerly bounds of said road, ,i 1) CJorth d8 degrees 2,9 sminutes 2C seconds West, 275,0 feet E 2) South 90 degrees 37 minutes 30 seconds West, 387,7s feet, and M 39 North 80 degrees 12 minutes 40 seconds Wesr, 145.o feet to file sokat"neat w. corner of land's of David L. Renter and ochsrrs; thenen Vorth 06 degrees 39 minutes •&0 seconds East for a distance of 422.15 feet ten t,Gae nOreneast corner of r said last rnentfcned premises; thence South;. 71 degrees 410 minutes West for a. distance of 870„29 feet to the place of beginning, and conzaininq 237.64 acresK) of land alore or less, P:LRCE'..L Si ALL uilraT C=:R"CAIN PARCEL. Op LAfM situate in the °Lp,4n of Queensbury, WarrenCouneya, New York:,, located 44esferly of New York U. S. Route 9 and Easterly ofInterstate 'Route 87, also known a, the ;Wi,rondack Nort,h'way, and which, parcel .is bou(sded and described as follows s 9EGIt'DtZNG at aa. point In the Westerly bounds of flew York U. S. Route 9 and at the Scutheaet corner of lands of: Moadow Run Devolcpment, Corp., and which point of beginning is also the Northeast corner of a 9769,7 Square Foot ,parcel conveyed by Meadow Run Development Corp, to Attractions Land, Inc., by deed dated may e, 1989 and recorded in t.lae Warren County Clarks office in Book 7 4 of i7eo,d.o at Page 161, and which point, of beginning is situate at a distance of 40.12 feet, Northerly, measured along the Westerly bounds of said Route; 9 from the Southeast corner of choose premises conveyed by Charles R. Wood to Meadow Run Development Corp. by deed dated March 1S, 196E, and recorded in said Clerks office in. Rook 476 of Deeds at Page 308; running thence from the point, of beginning, the fallowing five, courses and distances along the Westerly bounds of Route 9, Viz; 1) South 32 degrees io minutes East, 333.43 feet; 2) Scut% 27 degrees 2',4, minutes 40 seconds Ras`, 3015.23 feet; 3) South 63 degrees 15 minutes 20 seconds West, 96.00 feet; r 4) South 52 degrees 47 minutes 40 seconds ".East. 2131.00 feet,; 51 South 2.2 degrees 51 minutes East, 2'20,95 feet to the Northeast corner of those premises conveyed by William H. Pcrkins to Donald, J. Daniels, by deed dated October 2.4,, 1958 and recorded in Sock 737 of Deeds at Pane 225, and being also the Southeast .corner of those premises conveyredby the Estate of William W. PerYins to Attractions Land. Ino, by decd dated November 7, 1960 and recorded in Book. 635 of Deeds'at Page 769; thence South 62 degrees 41 minutes 30 seconds West, 131.66 .feetto the Ncrthuest corner of said lands conveyed to Daniels; thence North 29 degrees 41 minutes 30 seconds West, and running along the. Easterly line of those premises conveyed by Alcan fdm L tnanix to E+a,sizan H. v.; Canistra.ro by deed dated Fe..bruang 3, 1986 and recorded in the Warren County a i. etEcrav ll 9 ate tw i t SCHEDULE A DESCRIPTION(ConthiPd) 6t P011cy Nll,:4603-26121 su Xu Clerks C1f'°ico in aOQk 678 of Deeds at page 970, for a distance of 1.42,72 feet to. the lfortheast carrier of said last mentioned premises; thence, the following seven coursoa and distances along the Northwesterly and. Norcherly line of said last mentioned pre-mises, vir: 00 I 1) South 22 degrees 21 minutes 30 seconds West, 32,44 feet; 2) South 07 degree's 57 minutes 30 seconds West, 111.94 feet,. 3.) South 03 degrees 06 minutes 30 soconds East, 124,35 feet; i 4) South 04 degrees 17 minutes 30 second's West, 53.15 feet; u Si South. 41. dearees 03 minutes 30se:.ceands. west, 79,05 feet; 6) youth 60 degrees 3.2. minutes 30 seconds r1esc, 13L 56 feet, 7) South 37 degrees ,1S minuters, 30 seconds West, 42.53 feet, to tite f;'crtFwesst corner of lands conveyed by S.'4anoi..x to. Cani st.ra.rca„ thence South 40 degrees So minutes 30 seconds East for 4a distance of 2,65.15 feet; to the Southwest corner of said lands of Canist:arc; Chance North 59 degrees 02 minutes 30 seconds East, along the Scrathe,rly line of ,said lase mentioned premises, far a distance of 496.50 feet to a point in the wfescerly kacrxnds of New York t1'. S Roasts 9X thence South 30, degrees 57 minutes 343 stfonds EasC, along $arid Westerly bounds, for a distance of 20.00 feet to the Northeasc corner of those premises conveyed by Carlton ax;d Martha Freibergcr to Rogar and Lena Laronta,i,ne by deed dated January1„ 1992 and recorded in said Cler.k,s office in Eotnk 645 of JDeeds at Page 757; thence South 59 degrees, 02 minutes 30 seconds West, along the Northerly lire of 'said last mentioned premises, for a distance of 53.3,23 feet, to an angle point therein, thence North 73 degrees 51 Minutes .30' seconds West. for a distance of 393.00 fait to a point in the Easterly bounds of interstate croute 97, also ;Vn0VnastheAdirondackNtarthway; thence North.18 degrees 43 minutes: West,, alorsg saidEasterlybounds, and ozonising a stream known as '"Meadox Run,` for a distance of 3,358.39 feet to the South`+rest corner of these pre.nsi.ses conveyed by Charles a1. 4locad to Meadow Ruck Development Corp, lay the afoarement.icned deed, recorded in sock 476 of ,peed, at Page 308; thence North 8'4 degrees 14 m,inutes 20 seconds Cast,a.lorcg the ,southerly line of said last mnnt tined promises;, for a di;srance of 50.95 feet to a point which is located, at a distaa.nce, of 42.2S feet Westerly on acourseofSouthe4degrees19minutes20secondsWearfromtheNorthwestcnceser Of a triangular parcel of land conveyed by Attractions Land Inc. to ffeadow me De;veloprnent Corp- by deed. dated 4ayr 8, 1569 and recorded in the, Warrent CountyClerksofficein50ok754oftweedsatpage159; thence .South 2.3 degrees 07 Otintttes 50 seconds East for za distazioc. of 52,07 ;feet to a point which is located at a distance of 4;0„00 feet Westerly ors a course of South 61 degrees 52 minur,as 20 seconds West from tiro Southwest coruk-r of Baird tri,ana3arlar parcel.;. thence North 61 degrees 52 Minutes 20 seconds East for as dista.rtce of 323.74 feet to the Easterly corner of said triangular parcel and which point is also the teorthwest corner of a 9769.7 Sgcsare Footparcel: convaved by Meadow Faun Develcapnenc Corp„ to Attractions Land Inc. by deed dated ftay 0, 1999 and recorded in said, ClerksOfficeinBook7S4ofHeedsatPagei61; thence Continuing North 61 degrees 52 minutes 21) s,econda Sees, along the hlorCherly. line of said 9769.7 Square Fcot.Parcel. and ,partof the, wary along the Souris„,sly face of a stone masonry wall, for rtecccaN 5 0 Jr z M 4 rv._. 1...., »«.. R« M x. ...:..w •..,...a..x w. _....., ,..... '.«.w, gyp. ,.t. ' t r A Policyo,:960326821 w i a d'i'stance at 231.67feet to the point of beginning and containing 19.3Q acres y9ofland, more or 1es8. I 1 r PARCEL III u AEP, '6'kiAT CEVITAZU PARCEL OF P: ,M situate in. the Town cf Crueenzbtary, Wareen,County, New York, Located on the Westerly side of Interstate pc.ute 97, alsoknownastheAdirondackNorthway, anti which parcel is bounded and deacribsd asEotlovs; to BE"GItaTING at a point in rhe Westerly hounds of Incerstace Routs 47, and •.shier CD iraiant of beginning is also the Northwesterly corner at those premises conveyedbyAlfousoGrubhofertotheSc4ceoftIewYorkinconnectic", 'with the construx.ricrn of said Route 87, and which parcel is. denigrated 1jf,::el 244 on a. z;.ap prepared by the State of New York and filed in the Wat'raen County ClerksOffice, and which paint of beginning is also the Soucheast turner of lands of n P4ayrllis h1. Nolo, where deed is recorded in the Warren County Clerks Office inEPook564ofDeedsatPage468; running thence Troon the point of beg'ani,n,g, SaUCh10degrees27minr,ntes 40 seconds East, along the Westerly bcapsnds Of sapid drInterstateRour,s a7 fc':c a di.ntassace. of f".:S fe'etto an angle point therein;. rheanc-1 South 19 deg=eas 51 minutes East, cantinu,ir. along said Westerly bounds„ for a distance of 702 feet, niore or less, to the w—rtherly bank of a stream known asmeadowThin", thence in a Westerly direction along the Northerly bank of said stream, And along the Northerly edge' of lit,sh Pond, and also running along theBParthe:rl;y litre of those lands ccaVeyeci to The Town of Qaxeen,sb=y by Carlton and 4Y Martha 2reibetger, by deed dated July 6, 1955, andrecorded in tha Warren CountyClathsOfficeinBook344, of Deeds at Page 115, for a d%rscaace of 1:000 feet,, mora or leaps, thence in a Northwesterly direction for a distance of 300 feet, more Or leas, to a point an the Northerly edge of said Ponds thence in a Southerly direction, along the Easterly Line of those' premise's conveyed byAJ.C, Titus to William Griffin, by deed dated April 8. 1968 and recorded in said Clerks office in Sook 19 of 6eed:e at page 166, and along the westerly lime Of said lands conveyers tea the gPovr of Queehsbut—t', for a distance of 9:59 feet, store or less„ to the, Southeast corner of said lands 'conveyed to Griffin; thence in a. Westerly dfrecti:cn, along the Southerly Tine of eai.d tacft; Of Griffin, for a distance of 330 feet, more or less, to a point in ax marsh, and! which point is the mcat Weacerly corner of said lands conveyed to the Town of Queensbury; thence North 91 degrees 59 minutes $0 seco'nd's Hast, and running along the oortherlyr line of lands of Carlton and Hartha, Freiberger, whose deed is dated lay 24-, 1966, and recorded in the Warren County nark. Office in Book 466 of Deeds at page 526, for a distance of 990 f'e'et, more or less, to an ,iron pipe marking the Southwesterly corner of the aforementioned premises conveyed to Griffin, and being also the Southwesterly corner of the herein described parcel, thence North 06 degrees 38 Minutes 20 seconds East;, along the Latterly lint, of lands of Guido Paasa,rell.L, Whose, dead Is recorded in said Clerks office in Dock 692 of o.eeds, at page 1037, and also running along the remains of a wire fence marking the division lime between asst 73 of the Frost Division of the Queensbury Patent, an t!a West, grad Lot 6G of said Pauten:t. on the East, for, a distance of 1,'450,84 feet to a three inch ironwood t.reaa 'thence. North. 06 degrees CS Minutes 30 seconds 'E:asr, far a distance of 206 feet, snore or le,sn. to an iron pipe' rrscruw 6 is pW• X. i e SCHEDULE A DESCMPTIQN(Con inuej) PoHry No.:96q.3-25921 mar9cinc3 the South-dant corner cf the attsreunencioned, premises oweaed by Phyllis la„ I Holtz; thence South 85 degrees 03 mjnratas East, along the southerly lane, of saidHoltzpremises, for a diatance of 2014.7 feet to the point of beginning, acid a Pcontaining approximately 77 acnes of land. The above described parcels being all of those lands c:ooveyact by tracernational,Broadcasting Corp. to 5torytown U.S.A., Inc'. by deed dated na:cember 3, 1952 and recorded in Book 970 of deeds at PaLgo 42, c sept a 3353 square foot parcel which is the subject of a Roundry Line Agreement batween Meadow Hon Development Corp.and Storytowo v.S.A_ let, dated as of December ,' 1996 and recorded in theWarrenCounty, Clerks office, p w Mia above described pr1rcels arc intended to tile sable Parcels conveyed in thatcertandeeddatedDecember3, 19996 between Great ascape LLC, ran.tor andPreana.er Larks Inc., grantee resortedin the office of thxe arrcda7 County Clerk anDecemberVia, 19915 in Lff r 1002 of Deeds page 113. t4 i i 7 September 2, 2021 Six Flags Great Escape Theme Park and Lodge Rebecca Wood, President 1172 State Route 9 Queensbury, NY 12804 RE: Annual Community Sound Survey – 2021 Six Flags Great Escape Theme Park and Lodge AQM-2021-0012 Dear Ms. Wood, Alliance Source Testing, LLC (Alliance) is pleased to provide this report of the 2021 community sound level survey for the Six Flags Great Escape Theme Park and Lodge (Park) in Queensbury, New York. The purpose of the survey is to provide annual sound monitoring as required in the Park’s 2001 approval for expansion. Survey methodology and results are presented below. Methodology The methodology was consistent with sound surveys conducted for the Park for the past several seasons. A-weighted and octave band sound level measurements were conducted at four locations surrounding the Park. The locations are presented in Figure 1 and identified below:  Courthouse Estates (ML-N),  Twicwood Estates (ML-S),  Glen Lake Shore near the driveway entrance to 86 Ash Drive (ML-AD), and  Great Escape West – Park parking lot west of Route 9 and south of Martha’s (ML-PL). Three of the monitoring sites were located in the community surrounding the Park. ML-N was located on the corner of Hawthorne Road and Northwood Drive, and characterizes private residences in the Courthouse Estates community north of the Park. ML-S was located on a cul-de-sac at the end of Greenwood Lane and characterizes private residences in the Twicwood community south of the Park. ML-AD was located next to the driveway entrance to a private residence adjacent to the southwest shore of Glen Lake and characterizes residences along the shoreline of Glen Lake. The fourth site, ML-PL, was located in a Great Escape parking lot between Route 9 and Interstate 87 (I-87), southwest of the Park, and characterizes sound levels along Route 9 west of the Park. At each of the four monitoring locations, sound levels were measured during the following three scenarios: 1) Park operating, weekday (August 20); 2) Park closed (August 20, evening); and 3) Park operating, weekend (August 21). For each scenario, sound levels were measured for a 20-minute period using a portable Type I sound level meter (analyzer) with integral 1/3 octave band filter. The analyzer measured A-weighted and 1/3 octave band sound levels at a rate of 32 samples per second, and automatically stored time-averaged data into memory. During each measurement period, notes were made onto field forms documenting weather conditions, intrusive noise sources, and traffic, as applicable. All measurements were conducted while winds were calm to light (≤3 mph) and there was no rain. Field data forms are included in Attachment 1 and copies of analyzer calibration certificates are in Attachment 2. Results Results of the sound survey are presented in Table 1 and field observations are summarized in Table 2. As indicated in Table 1, near-continuous (background) sound levels (L90) at the three community monitoring locations ranged from 38 to 46 dBA while the Park was operating, and from 51 to 55 dBA while the Park was closed. L90 sound levels while the Park was closed were noticeably elevated above L90 sound levels while the Park was operating due to continuous noise at high frequencies from crickets. Energy-average sound levels (Leq) at the community monitoring locations ranged from 45 to 60 dBA when the Park was operating, and from 52 to 59 dBA when the Park was closed. Notes on audible Park sounds taken during measurements when the Park was operating indicate the following:  Courthouse Estates – The Park (loudspeaker) was audible above the background sound level during the weekday measurement (1 dBA over L90) and weekend measurement (7 dBA over L90).  Twicwood Estates – The Park was not audible during either weekday or weekend measurements  Glen Lake – The Park was audible at times (voices) during the weekday measurement, but at no increase to the background sound level. During weekend measurements, the Park was not audible. A tabulated comparison of 2021 background sound levels with 2018 and 2019 results is presented in Table A. Note that sound level measurements were not conducted in 2020 due to the COVID-19 Pandemic. Table A. Background Sound Level Summary - 2018 to 2021a Sound Measurement Location (ID) Background Sound Level (L90 in dBA) Park Operating Park Closed Weekday Weekend Weekendb 2018 2019 2021 2018 2019 2021 2018 2019 2021c Courthouse Estates (ML-N) 45 45 42 44 43 46 40 41 58 Twicwood (ML-S) 44 43 40 42 41 44 38 39 51 Glen Lake (ML-AD) 43 40 38 40 38 41 37 37 55 Community Average 44 43 40 42 41 43 38 39 55 Great Escape West (ML-PL) 54 53 52 52 52 52 46 49 57 a No testing was performed in 2020; Park closed due to COVID-19 pandemic. b Sound levels were measured on a Friday evening or Saturday morning when the Park was closed. c 2021 sound levels were taken on Friday evening when the Park was closed and were elevated due to cricket noise. Overall, at the three community locations, 2021 background sound levels while the Park was operating averaged within one dBA of the average sound level range measured during 2018 and 2019. When the Park was closed, average background sound levels for the three community monitoring locations were higher in 2021 than in 2018 and 2019 due to ambient noise from crickets at the higher frequencies (2000 to 8000 hertz). At ML-PL, background and energy-average sound levels were higher than at the community monitoring locations due to the location’s closer proximity to the Park, Route 9, and Interstate. Compared with measurements from the last two years of testing, the 2021 background sound levels at ML-PL while the park was operating were within the sound level ranges measured at ML-PL during 2018 and 2019. We appreciate the opportunity to provide you these services. If you have any questions regarding this report, please contact me at (315) 506-2699 or at scott.manchester@stacktest.com. Yours sincerely Alliance Source Testing, LLC Scott Manchester Director, Ambient Services Attachments: Table 1 – Sound Level Measurement Results Table 2 – Sound Survey Observations Summary Figure 1 – Community Sound Survey Locations Attachment 1 – Field Data Forms Attachment 2 – Calibration Certificates Tables 1. Sound Level Measurement Results 2. Sound Survey Observations Summary Table 1 Sound Level Measurement Results The Great Escape August 2021 A-weighted Sound Levels (dBA)Residual (L90) Octave Band Sound Levels (dB at each hertz frequency) Lmin L90 L50 L10 L01 Lmax Leq 31.5 63 125 250 500 1000 2000 4000 8000 Park Operating - Weekday 20-Aug 14:40 20:01 41 42 48 57 62 75 54 52 49 43 39 38 37 28 24 25 Park Closed (evening)20-Aug 21:06 20:01 56 58 59 60 61 71 59 48 49 44 40 39 41 48 53 47 Park Operating - Weekend 21-Aug 12:16 20:01 45 46 50 60 65 71 56 38 43 43 40 43 42 31 30 30 Park Operating - Weekday 20-Aug 15:54 20:02 39 40 44 53 54 57 49 47 48 45 39 34 33 29 27 25 Park Closed (evening)20-Aug 22:49 20:01 50 51 52 52 54 60 52 28 35 39 38 35 36 44 46 39 Park Operating - Weekend 21-Aug 12:46 20:01 43 44 47 65 70 71 60 35 41 46 42 39 37 32 32 30 Park Operating - Weekday 20-Aug 15:15 20:01 36 38 41 46 55 61 45 45 43 40 32 29 29 25 28 29 Park Closed (evening)20-Aug 22:15 20:01 53 55 55 55 57 70 55 28 32 35 33 32 32 46 50 45 Park Operating - Weekend 21-Aug 11:46 20:01 40 41 42 46 61 73 50 28 32 33 31 32 32 27 29 31 Park Operating - Weekday 20-Aug 14:02 20:01 50 52 54 57 62 71 55 57 57 51 45 45 48 43 35 29 Park Closed (evening)20-Aug 20:29 20:01 56 57 58 59 61 63 58 57 57 50 44 46 50 50 51 41 Park Operating - Weekend 21-Aug 11:08 20:01 50 52 55 58 62 66 56 43 48 48 45 48 49 42 35 32 a ML-AD located approximately 230 feet northwest of the ML-AD location used in earlier years due to restricted access to property at 86 Ash Drive. Notes: Lmin - Minimum sound level (slow meter response). Lnn - Sound level occurring nn% of the test period. Lmax - Maximum sound level (slow meter response). Leq - Energy-average sound level duing test period. Glen Lake Shorea (ML-AD) Great Escape West (ML-PL) Monitoring Location Sample Type Date Start Time (EDT) Elapsed Time (mm:ss) Courthouse Estates (ML-N) Twicwood Estates (ML-S) Table 2. Sound Survey Observations Summary Monitoring Location Major Background Sound Sources Sound Increases of Major Sound Sourcesa Vehicle Traffic Park Sound Park Open; Weekday – August 20, 2021 Courthouse Estates (ML-N) Glen Lake Rd. traffic Intermittent: Northwood Dr. traffic Vehicle traffic: Glen Lake Rd.: 16 dBA Northwood Drive.: 14-20 dBA Bird: 30 dBA Park ride sounds: up to 7 dBA Glen Lake Rd.: 2 per minute Northwood Dr.: 8 in 20 minutes Park audible at times (speaker) Twicwood Estates (ML-S) Lawnmower Distant traffic to west Lawnmower: 12-14 dBA Birds/Cicadas: 2-4 dBA Leaf Blower: 4-13 dBA Greenwood Ln.: 3 in 20 minutes Park sound not audible. Glen Lake (ML-AD) Lawnmowers Local traffic: 14-18 dBA Voices: 6 dBA Lawn mower: 3-4 dBA Lake traffic: 2-6 dBA Airplane: up to 6 dBA Ash Drive: 2 in 20 minutes Park discernable at times (voices) Great Escape West (ML-PL) I-87/Rt.9 Traffic Cars entering ML-PL parking lot Route 9 traffic: up to 2 dBA Airplane: 12 dBA Park sounds: 4-7 dBA Route 9: 20 per minute Park: Coaster, air compressor, rider cheers and voices Park Closed (evening) – August 20, 2021 Courthouse Estates (ML-N) Glen Lake Rd. Distant traffic to west Crickets Vehicle traffic: Glen Lake Rd.: 3-6 dBA Glen Lake Rd.: 10 in 20 minutes Northwood Dr.: None None – Park closed Twicwood Estates (ML-S) I-87/Rt.9 Traffic Crickets Sirens and voices: up to 2 dBA Dogs barking: 1-3 dBA Jet airplane: 2-3 dBA Greenwood Ln.:None None – Park closed Glen Lake (ML-AD) I-87/Rt.9 Traffic Crickets Ash Drive traffic: 1-15 dBA Ash Drive: 2 in 20 minutes None – Park closed Great Escape West (ML-PL) I-87/Rt.9 Traffic Crickets Route 9 traffic: 1-6 dBA Vehicle horn: 8 dBA Route 9: 20 per minute None – Park closed Park Open; Weekend – August 21, 2021 Courthouse Estates (ML-N) Glen Lake Rd. traffic Intermittent: Northwood Dr. traffic Glen Lake Rd. traffic: 10-19 dBA Crickets: up to 2 dBA Park: up to 1 dBA Glen Lake Rd.: 5 per minute Northwood Dr.: 3 in 20 minutes Park audible at times (speaker) Twicwood Estates (ML-S) I-87/Rt.9 Traffic Lawnmower Local traffic: 9-13 dBA Airplane: 4-5 dBA Lawnmower: 8 to 26 dBA Greenwood Ln.: 3 in 20 minutes Park sound not audible. Glen Lake (ML-AD) I-87/Rt.9 Traffic Local traffic: 14-31 dBA Birds and cicadas: 1-3 dBA Airplane: 3-5 dBA Ash Drive: 5 in 20 minutes Park sound not audible. Great Escape West (ML-PL) I-87/Rt.9 Traffic Route 9 traffic: 6-13 dBA Cicada: 3-4 dBA Park sounds: 3-10 dBA Route 9: 17 per minute Park: Coaster, air compressor, rider cheers and voices a Sound levels represent decibels increase to the average background sound level for the period (L90) Figure 1 Community Sound Survey Locations 1/1 Figure 1. Community Sound Survey Locations – August 20 to 21, 2021 ML-N ML-AD ML-S ML-PL Attachment 1 Field Data Forms Attachment 2 Calibration Certificates September 22, 2021 Ms. Rebecca Wood The Great Escape P.O. Box 511 Lake George Road Lake George, NY 12845 RE: 2021 Biennial Traffic Counts, US Route 9, Town of Queensbury, The Great Escape GEIS, CM Project No. 121-234 Dear Ms. Wood: The Findings Statement for the Great Escape Generic Environmental Impact Statement (GEIS) included a traffic monitoring plan, which was modified to every two years in 2016, the last report being in 2019. The traffic monitoring plan requires that traffic counts be collected during the morning peak hours of the generator on a typical Tuesday and Saturday in August at the following intersections:  US Route 9/I-87 Exit 20 Northbound Ramps  US Route 9/Gurney Lane (County Road 23) Creighton Manning (CM) conducted intersection turning movement counts on Saturday, August 7, 2021, and Tuesday, August 10, 2021, from 9:30 a.m. to 11:30 a.m. at the above intersections. The peak hour counts are shown on Figure 1. The GEIS indicates that the Great Escape is responsible for conducting annual traffic counts to determine if the implementation of phased traffic improvements is warranted based on traffic volume thresholds. Phase 3 improvements are required when the combined volume of traffic in the southbound through lane and the eastbound right-turn lane at either of the above intersections reaches the traffic threshold listed in the GEIS Findings Statement. A comparison between existing 2019, 2021 traffic volumes and Phase 3 volume thresholds is provided in the following table. Due to the covid-19 pandemic traffic volumes have decreased. Comparison of Traffic Counts and GEIS Thresholds During the August Peak Hour of the Great Escape Intersection Tuesday Entering Peak Hour Saturday Entering Peak Hour Phase 3 Threshold Existing 2019 Volumes Existing 2021 Volumes Phase 3 Threshold Existing 2019 Volumes Existing 2021 Volumes US Rt. 9/I-87 Exit 20 NB Ramps 1,320 810 592 1,454 968 931 US Rt. 9/Gurney Ln 1,368 874 517 1,404 1,010 801 The combined existing traffic volumes in the southbound through lane and the eastbound right-turn lane at the two subject intersections do not meet Phase 3 volume thresholds during the weekday and Saturday peak hours Page 2 of the generator. This analysis indicates that the Great Escape is not currently required to implement Phase 3 traffic improvements as stated in the GEIS. Please call if you have any questions regarding the traffic count data. Respectfully submitted, Creighton Manning Engineering, LLP Kenneth Wersted, P.E., PTOE Associate Attachments Cc: Charles Dumas, Lemery Greisler, LLC Kevin Franke, The LA Group John Strough – Town of Queensbury N:\Projects\2021\121-234 Great Escape - Traffic Monitoring\Working\Traffic\Reports\traffic monitor 2021.docx N N:\Projects\2021\121-234 Great Escape - Traffic Monitoring\Working\CADD\dgn\figures\GE-traf_figs_8_21.dgnPROJECT: DATE: FIGURE:01 WARREN COUNTY, NEW YORK THE GREAT ESCAPE EXPANSION 121-234 08/2021 TRAFFIC VOLUMES 2021 PEAK HOUR N GURNEY LN US ROUTE 9US ROUTE 9GURNEY LN WEEKDAY PEAK HOUR SATURDAY PEAK HOUR 99 9 9 23 23 NB RAMP I-87 EXIT 20 NB RAMP I-87 EXIT 20 MUNICIPAL CENTER WARREN CO. MUNICIPAL CENTER WARREN CO.649158450402 282536 149418268 300264412127 253 409528153438169 273 7 9 78 5 2971922 28 27 21 27355657 NOTE # SEE DRAWING # FOR NOTE DETAIL # SEE DRAWING # FOR DETAIL DETAIL REFERENCE TAG: NOTE REFERENCE TAG: SECTION CUT DIRECTION SECTION LETTER SEE DRAWING # FOR SECTION SECTION REFERENCE TAG: POND INDICATOR: SUB-CATCHMENT INDICATOR: REACH INDICATOR: LEGEND: REVISION INDICATOR: 1 D1 A D1 NOTE: G-1 C1 X 1S 1P 1R TP # PT # PERCOLATION TEST: TEST HOLE: EXISTING STRUCTURES/OBJECTS/UTILITIES SURVEYED AND OR FIELD VERIFIED: EXISTING STRUCTURES/OBJECTS/UTILITIES NOT VERIFIED BY SURVEY OR FIELD DOCUMENTATION: PROPOSED STRUCTURES/OBJECTS/ UTILITIES: LINE TYPE: SYMBOLS/ABBREVIATIONS: POTABLE WATER FIRE LINE GRAVITY SANITARY SEWER PRESSURE SANITARY SEWER STORM SEWER GAS LINE OVERHEAD POWER LINE UNDERGROUND POWER LINE PROPERTY LINE: EXISTING MAJOR CONTOUR LINES: EXISTING MINOR CONTOUR LINES: TREE LINE: SHORELINE/STREAM: FENCES: CHAIN LINK, WOODEN: PROPOSED MINOR CONTOUR LINES: PROPOSED MAJOR CONTOUR LINES:100 100 99 99 SANITARY MANHOLE FIRE HYDRANT WATER VALVE UTILITY POLE LIGHT FIXTURE OVERHEAD COMMUNICATION LINE UNDERGROUND COMMUNICATION LINE STORM MANHOLE D SWALE: S (IN FEET) 0100'50'100'200' SITE LOCATIONGRID -LOCATION PLAN SCALE: N.T.S. REV #DATE ISSUED / REVISIONSMAGNETIC1PROJECT OVERVIEW SCALE: SEE GRAPHIC SCALE PROJECT DESCRIPTION DRAWING:DRAWING TITLE SHEET: COVER COVERSHEET 1 OF 5 EX1 EXISTING PROPERTY PLAN 2 OF 5 EX2 EXISTING CONDITIONS & DEMO PLAN 3 OF 5 C1 SITE PLAN 4 OF 5 EC1 ENVIRONMENTAL CONTROL DETAILS 5 OF 5 3-14-2022 A ISSUED TO THE TOWN OF QUEENSBURY FOR SITE PLAN REVIEW "DOCUMENTS PROVIDED IN SUPPORT OF THIS DESIGN MAY BE USED ONLY FOR THE USE SPECIFIED IN THE "ISSUE/REVISION" BLOCK ABOVE. THEY MAY NOT BE USED FOR ANY OTHER 385326(125,1&25325$7(',1$1<68%6(48(17'(6,*1:25.:,7+2877+(:5,77(1&216(172)¬-$55(77(1*,1((563//&21/<'2&80(176/$%(/('$6,668(')25 &216758&7,210$<%(86(')256$0(86(56+$//+2/'¬-$55(77(1*,1((563//&+$50/(66$1''()(1'-$55(77(1*,1((563//&)520$1<81$87+25,=('86( THE GREAT ESCAPE MAINTENANCE STORAGE SITE PLAN U.S. ROUTE 9 TOWN OF QUEENSBURY, NEW YORK 12 EAST WASHINGTON STREET GLENS FALLS, N.Y.PHONE: (518) 792-2907 PRO # JARRETT En gineers , PLLC Civil & Environmental En gineerin g 01053.16 GENERAL NOTES: G-1) SURVEY & MAP INFORMATION PROVIDED TO THE GREAT ESCAPE BY THOMPSON & FLEMING LAND SURVEYOR'S P.C., W.J. ROURKE ASSOCIATES, LICENSED LAND SURVEYORS AND LIMITED FIELD MEASUREMENTS PERFORMED BY JARRETT ENGINEERS, PLLC. G-2) MAGNETIC NORTH PER VAN DUSEN & STEVES LAND SURVEYORS, "MAP OF A TOPOGRAPHIC SURVEY MADE FOR SIX FLAGS GREAT ESCAPE AND SPLASHWATER KINGDOM". DATE: JANUARY 3, 2007 G-3) CONTRACTOR TO LOCATE EXISTING UTILITIES PRIOR TO CONSTRUCTION; CONTACT DIG SAFELY NEW YORK (1-800-962-7962) AND RECORD FILE #. VERIFY BUILDING CONNECTIONS, LOCATION AND ELEVATION, PRIOR TO INITIATING CONSTRUCTION; CONFLICTS OR DISCREPANCIES SHALL BE REPORTED TO THE OWNER OR ENGINEER IMMEDIATELY. NOTIFY ENGINEER IMMEDIATELY IF SITE CONDITIONS ARE NOT AS INDICATED. U.S.ROUTE 9 INTERSTATE 87 (ADIRONDACK NORTHWAY) GREAT ESCAPE PROPERTY SITE LOCATION TO LAKE GEORGE TO GLENS FALLS U S R O U T E 9 JOHNNY ROCKETS NORTHLIND SPORT OUTFITTERS MAINTENANCEWAREHOUSE MAINTENANCEOFFICEPAINTSHOP ELECT RI C SHOPWELD SHOP PARKING AREA EXISTING FORMER GHOST TOWN TRAIN TUNNEL AUTO MAINT. SHOP DESPERADO PLUNGE BUILDING CONSTRUCTION SHOP ST E A M I N ' DE M O N ST A T I O NPARKING LOTPARKING LOTNORTH GATE GRID-ZONING LOCATION MAP SCALE: N.T.S. RC - RECREATIONAL COMMERCIAL GREAT ESCAPE PROPERTY LAND USE DISTRICT BOUNDARIES AND OVERLAY DISTRICTS LC-42A - LAND CONSERVATION 42 ACRE I -87 500' RESIDENTIAL BUFFER UNDERGROUND UTILITY OVERLAY ZONE TRAVEL CORRIDOR OVERLAY DISTRICT MDR - MODERATE DENSITY RESIDENTIAL RR-3A - RURAL RESIDENTIAL 3 ACRE APPROXIMATE LOCATION OF EXISTING BOUNDARY LINE BETWEEN ZONES LC42 AND RC, (100' OFFSET FROM USGS 400' CONTOUR) ZONE: RC ZONE: LC-42 APPROXIMATE LOCATION OF USGS 400' CONTOUR 100' (IN FEET) (IN FEET) 0200'100'200'400'MAGNETICONLY COPIES OF THIS DRAWING WITH A BLUE SEAL SHALL BE CONSIDERED TRUE AND VALID ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED ENGINEER IS UNLAWFUL. 12 EAST WASHINGTON STREET GLENS FALLS, N.Y. COPYRIGHT ” PLOTTED / REVISED: DRAWING: PHONE: (518) 792-2907 JARRETT En gineers , PLLC Civil & Environmental Engineering EXISTING PROPERTY PLAN EX1 MAINTENANCE STORAGE SITE PLAN THE GREAT ESCAPE U.S. ROUTE 9 TOWN OF QUEENSBURY, NEW YORK FEBRUARY 2022 PRO # 01053.16 SHEET: 3 OF 5 BASESHEET: 22 x 34 03/14/22 12:00 PM H. THOMAS JARRETT P.E. # 57509 2021 U S R O U T E 9 REV #DATE ISSUED / REVISIONS 3-14-2022 A ISSUED TO THE TOWN OF QUEENSBURY FOR SITE PLAN REVIEW "DOCUMENTS PROVIDED IN SUPPORT OF THIS DESIGN MAY BE USED ONLY FOR THE USE SPECIFIED IN THE "ISSUE/REVISION" BLOCK ABOVE. THEY MAY NOT BE USED FOR ANY OTHER 385326(125,1&25325$7(',1$1<68%6(48(17'(6,*1:25.:,7+2877+(:5,77(1&216(172)¬-$55(77(1*,1((563//&21/<'2&80(176/$%(/('$6,668(')25 &216758&7,210$<%(86(')256$0(86(56+$//+2/'¬-$55(77(1*,1((563//&+$50/(66$1''()(1'-$55(77(1*,1((563//&)520$1<81$87+25,=('86( 2 EXISTING PROPERTY PLAN SCALE: SEE GRAPHIC SCALE EXISTING PROPERTY LINES, (TYP.) EXISTING PROPERTY LINES, (TYP.) APPROXIMATE LOCATION OF EXISTING BOUNDARY LINE BETWEEN ZONES LC42 AND RC, (100' OFFSET FROM USGS 400' CONTOUR) U S R O U T E 9JOHNNYROCKETSNORTHLIND SPORT OUTFITTERS APPROXIMATE LOCATION OF EXISTING BOUNDARY LINE BETWEEN ZONES LC42 AND RC, (100' OFFSET FROM USGS 400' CONTOUR) APPROXIMATE LOCATION OF USGS 400' CONTOUR ZONE BOUNDARY CONTINUES OFF PROPERTY ZONE: LC-42 ZONE: RC137' 1,689' 1,531' 1,582' 100' 288' (IN FEET) 020'10'20'40' REV #DATE ISSUED / REVISIONS 3 EXISTING CONDITIONS & DEMO PLAN SCALE: SEE GRAPHIC SCALE 3-14-2022 A ISSUED TO THE TOWN OF QUEENSBURY FOR SITE PLAN REVIEW "DOCUMENTS PROVIDED IN SUPPORT OF THIS DESIGN MAY BE USED ONLY FOR THE USE SPECIFIED IN THE "ISSUE/REVISION" BLOCK ABOVE. THEY MAY NOT BE USED FOR ANY OTHER 385326(125,1&25325$7(',1$1<68%6(48(17'(6,*1:25.:,7+2877+(:5,77(1&216(172)¬-$55(77(1*,1((563//&21/<'2&80(176/$%(/('$6,668(')25 &216758&7,210$<%(86(')256$0(86(56+$//+2/'¬-$55(77(1*,1((563//&+$50/(66$1''()(1'-$55(77(1*,1((563//&)520$1<81$87+25,=('86( ONLY COPIES OF THIS DRAWING WITH A BLUE SEAL SHALL BE CONSIDERED TRUE AND VALID ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED ENGINEER IS UNLAWFUL. 12 EAST WASHINGTON STREET GLENS FALLS, N.Y. COPYRIGHT ” PLOTTED / REVISED: DRAWING: PHONE: (518) 792-2907 JARRETT En gineers, PLLC Civil & Environmental Engineering EXISTING CONDITIONS & DEMO PLAN EX2 MAINTENANCE STORAGE SITE PLAN THE GREAT ESCAPE U.S. ROUTE 9 TOWN OF QUEENSBURY, NEW YORK FEBRUARY 2022 PRO # 01053.16 SHEET: 3 OF 5 BASESHEET: 22 x 34 03/14/22 12:00 PM H. THOMAS JARRETT P.E. # 57509 2021 EXIS T I N G F O R M E R G H O S T T O W N TRAI N T U N N E L S T R U C T U R EMAGNETIC EXISTING FORMER GHOST TOWN TRAIN TUNNEL STRUCTURE (5,054 SQ. FT.) TO BE REMOVED AND DISPOSED OF PROPERLY OFF-SITE EXISTING VEGETATION TO BE MINIMALLY DISTURBED DURING DEMOLITION AND REMOVAL OF EXISTING TUNNEL STRUCTURE EXISTING VEGETATION TO BE MINIMALLY DISTURBED DURING DEMOLITION AND REMOVAL OF EXISTING TUNNEL STRUCTURE PROPOSED EROSION CONTROL 1 EC1 TOTAL PROJECT AREA: 18,945 SQ. FT. APPROXIMATE LIMITS OF DISTURBANCE: 7,885 SQ. FT. DEMOLITION AND SOLID WASTE NOTES: DS-1) DEMOLITION OF THE EXISTING 'GHOST TOWN' TRAIN BUILDING/STRUCTURE TO OCCUR IN CONFORMANCE WITH THE ISSUED TOWN OF QUEENSBURY DEMOLITION PERMIT #DEMO-0822-2021, ISSUED 11/19/2021. DS-2) ALL SOLID WASTE AND CONSTRUCTION DEBRIS REMOVED FROM THE GREAT ESCAPE PROPERTY TO BE HAULED BY A LICENSED WASTE HAULER AND DISPOSED OF AT LICENSED WASTE FACILITY. DS-3) ALL EXISTING UTILITIES IN THE VICINITY OF THE PROJECT TO BE LOCATED AND PROTECTED/RELOCATED AS REQUIRED DURING CONSTRUCTION . DS-4) EXISTING STRUCTURES TO REMAIN TO BE PROTECTED DURING DEMOLITION. APPROXIMATE LOCATION OF EXISTING BOUNDARY LINE BETWEEN ZONES LC42 AND RC, (100' OFFSET FROM USGS 400' CONTOUR) APPROXIMATE LOCATION OF USGS 400' CONTOUR ZONE: LC-42 ZONE: RC 100' (IN FEET) 010'5'10'20' REV #DATE ISSUED / REVISIONS 4 SITE PLAN SCALE: SEE GRAPHIC SCALE 3-14-2022 A ISSUED TO THE TOWN OF QUEENSBURY FOR SITE PLAN REVIEW "DOCUMENTS PROVIDED IN SUPPORT OF THIS DESIGN MAY BE USED ONLY FOR THE USE SPECIFIED IN THE "ISSUE/REVISION" BLOCK ABOVE. THEY MAY NOT BE USED FOR ANY OTHER 385326(125,1&25325$7(',1$1<68%6(48(17'(6,*1:25.:,7+2877+(:5,77(1&216(172)¬-$55(77(1*,1((563//&21/<'2&80(176/$%(/('$6,668(')25 &216758&7,210$<%(86(')256$0(86(56+$//+2/'¬-$55(77(1*,1((563//&+$50/(66$1''()(1'-$55(77(1*,1((563//&)520$1<81$87+25,=('86( ONLY COPIES OF THIS DRAWING WITH A BLUE SEAL SHALL BE CONSIDERED TRUE AND VALID ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED ENGINEER IS UNLAWFUL. 12 EAST WASHINGTON STREET GLENS FALLS, N.Y. COPYRIGHT ” PLOTTED / REVISED: DRAWING: PHONE: (518) 792-2907 JARRETT En gineers, PLLC Civil & Environmental En gineering SITE PLAN C1 MAINTENANCE STORAGE SITE PLAN THE GREAT ESCAPE U.S. ROUTE 9 TOWN OF QUEENSBURY, NEW YORK FEBRUARY 2022 PRO # 01053.16 SHEET: 4 OF 5 BASESHEET: 22 x 34 03/14/22 12:00 PM H. THOMAS JARRETT P.E. # 57509 2021 PROPOSED WOODEN STOCKADE FENCE (123.5 LFT) TO SCREEN PROPOSED STORAGE CONTAINERS. PROPOSED FENCE TO MATCH EXISTING FACILITY STYLE WOODEN STOCKADE FENCING PROPOSED STORAGE CONTAINERS (8' X 40' = 320 SF. EA.) FOR MAINTENANCE AREA STORAGE. 8 TOTAL PROPOSED STORAGE CONTAINERS = 2,560 SQ. FT. TOTAL PROPOSED STORAGE CONTAINERS (8' X 40' = 320 SF. EA.) FOR MAINTENANCE AREA STORAGE. 8 TOTAL PROPOSED STORAGE CONTAINERS = 2,560 SQ. FT. TOTAL PROPOSED #2 CRUSHED STONE LEVELING PAD FOR PROPOSED MAINTENANCE AREA STORAGE CONTAINERS. 3,381 SQ. FT. TOTAL PROPOSED CRUSHED STONE PROPOSED #2 CRUSHED STONE LEVELING PAD FOR PROPOSED MAINTENANCE AREA STORAGE CONTAINERS. 3,381 SQ. FT. TOTAL PROPOSED CRUSHED STONE EXISTING FORMER GHOST TOWN TRAIN TUNNEL STRUCTURE (5,054 SQ. FT.) TO BE REMOVED AND DISPOSED OF PROPERLY OFF-SITE EXISTING FORMER GHOST TOWN TRAIN TUNNEL STRUCTURE (5,054 SQ. FT.) TO BE REMOVED AND DISPOSED OF PROPERLY OFF-SITEMAGNETIC 3 C1 1 C1 2 C1 3 C1 2 C1 TOTAL PROJECT AREA: 18,945 SQ. FT. 436.00 438.10 437.18 435.08 430432434436438428430 432 434 428 4384 3 6 4 3 4 4 3 2 4 3 0 PROPOSED LIMITS OF DISTURBANCE: 7,885 SQ. FT. SNO W S T O R A G E A R E A SNO W S T O R A G E A R E A SNO W S T O R A G E A R E A 1 C1 STOCKADE FENCE (SIMILAR) SCALE: N.T.S. 2 C1 TYPICAL STORAGE CONTAINER SCALE: N.T.S. 3 C1 GRAVEL LEVELING PAD DETAIL SCALE: N.T.S.8.5'40' 8' ALL DISTURBED PERMEABLE SURFACES TO REMAIN: PROVIDE MINIMUM 4" OF TOPSOIL, SEED AND MULCH 8' MIN. REV #DATE ISSUED / REVISIONS 3-14-2022 A ISSUED TO THE TOWN OF QUEENSBURY FOR SITE PLAN REVIEW "DOCUMENTS PROVIDED IN SUPPORT OF THIS DESIGN MAY BE USED ONLY FOR THE USE SPECIFIED IN THE "ISSUE/REVISION" BLOCK ABOVE. THEY MAY NOT BE USED FOR ANY OTHER 385326(125,1&25325$7(',1$1<68%6(48(17'(6,*1:25.:,7+2877+(:5,77(1&216(172)¬-$55(77(1*,1((563//&21/<'2&80(176/$%(/('$6,668(')25 &216758&7,210$<%(86(')256$0(86(56+$//+2/'¬-$55(77(1*,1((563//&+$50/(66$1''()(1'-$55(77(1*,1((563//&)520$1<81$87+25,=('86( ONLY COPIES OF THIS DRAWING WITH A BLUE SEAL SHALL BE CONSIDERED TRUE AND VALID ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED ENGINEER IS UNLAWFUL. 12 EAST WASHINGTON STREET GLENS FALLS, N.Y. COPYRIGHT ” PLOTTED / REVISED: DRAWING: PHONE: (518) 792-2907 JARRETT En gineers, PLLC Civil & Environmental En gineering ENVIRONMENTAL CONTROL DETAILS EC1 MAINTENANCE STORAGE SITE PLAN THE GREAT ESCAPE U.S. ROUTE 9 TOWN OF QUEENSBURY, NEW YORK FEBRUARY 2022 PRO # 01053.16 SHEET: 5 OF 5 BASESHEET: 22 x 34 03/14/22 12:00 PM H. THOMAS JARRETT P.E. # 57509 2021 10' MAXIMUM 8" MIN. (TYP.) 4" MIN. 1'-8" 1'-4" 1'-4" 1'-8" 8" 1'-4" 1'-4" 24" (MAX.) TYP. GEOTEXTILE FABRIC WRAPPED AROUND HAY BALES, AS SHOWN ABOVE 2" x 2" HARDWOOD STAKES OR RE-BARS DRIVEN FLUSH WITH BALE; 2 STAKES PER BALE REQUIRED, ONE VERTICAL, ONE ANGLED OVERLAP FABRIC @ STAKE 1 EC1 SEDIMENT CONTROL BARRIER (SHEET FLOW) SCALE: N.T.S. TYPICAL TIE POINTS STEEL OR 2" x 2" HARDWOOD POSTSGEOTEXTILE FABRIC MEETING NYSSSESC SPECIFICATIONS SECURELY FASTEN WIRE FENCE TO POSTS & FABRIC TO FENCE STEEL OR HARDWOOD POST GEOTEXTILE FABRIC 4"x6" TRENCH WITH COMPACTED BACKFILL GEOTEXTILE FABRIC 3 4" (MIN.) DRAIN ROCK (IF REQUIRED) SAND BAGS LAID TIGHT END TO END, PERPENDICULAR TO DIRECTION OF FLOW HARD SURFACE WOVEN WIRE FENCE 4' MIN.B 4' MIN. DIKE CONSTRUCTED USING CRUSHED STONE AND LIGHT RIP RAP ORIGINAL GRADE NON-WOVEN GEOTEXTILE FABRIC LIGHT RIP RAP (TYP.) NOTES: 1) THIS DETAIL IS APPLICABLE TO SHEET FLOW DRAINAGE ON A TEMPORARY OR SEMI-PERMANENT BASIS (1 YEAR MAXIMUM) FOR EROSION CONTROL. 2) SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 3) ALL MATERIALS AND INSTALLATION SPECIFICATIONS SHALL BE AS FOUND IN THE LATEST VERSION OF THE NYSSSESC. 4) INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT AS NEEDED; 9" (MAX.) RECOMMENDED STORAGE HEIGHT. 5) REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 6) DETAIL SHOWN IS EQUIVALENT TO A "REINFORCED" SILT FENCE. REFERENCES MADE TO "STANDARD" AND "SUPER" SILT FENCE, SEE NYSSSESC. SHEET FLOW BARRIER DEVICE SYMBOL: BUTT BALES TOGETHER, I.E.: NO GAP SHEET FLOW DRAINAGE BEDDING DETAIL (CONTRACTOR MAY USE ANY OF DETAILS SHOWN ABOVE FOR SEDIMENT CONTROL OF SHEET FLOW ONLY) (CONTRACTOR MAY REFER TO NEW YORK STANDARDS AND SPECIFICATION FOR EROSION AND SEDIMENT CONTROL "BLUE BOOK" FOR OTHER METHODS OF EROSION AND SEDIMENT CONTROL (CONTACT ENGINEER PRIOR TO MAKING SUBSTITUTIONS) NOTES: 1) THESE DETAILS ARE APPLICABLE TO SHEET FLOW DRAINAGE ON DISTURBED SOILS, HAY BALE DIKES ARE NOT SUITABLE FOR STREAM CHANNELS. 2) HAY BALE DIKES MAY BE USED FOR TEMPORARY (180 DAYS MAXIMUM) EROSION CONTROL. SAND BAGS SILT FENCE STRAW BALE DIKE A 1 NOTES: 1) THIS STRUCTURE IS SUITABLE FOR EROSION CONTROL OF SHEET FLOW DRAINAGE ON MODERATE SLOPES, OR AS A CHECK DAM SEDIMENT TRAP IN A DRAINAGE DITCH; IF USED AS A CHECK DAM, PROVIDE OVERFLOW CAPABILITY. 2) "A" TO BE 2 OR GREATER FOR TEMPORARY DIKES AND 2.5 OR GREATER FOR PERMANENT EARTH DIKES. 3) "B" TO BE HEIGHT SHOWN ON PLAN OR EQUAL TO HEIGHT OF ADJOINING GROUND OR MAXIMUM 18" HIGH. 4) SEDIMENT TO BE REMOVED WHEN 25% OF THE DIKE'S FUNCTIONAL VOLUME HAS BEEN LOST. 5) DIKES TO BE REMOVED AND AREAS STABILIZED WITH AN APPROPRIATE VEGETATION THAT MATCHES SURROUNDING AREAS AND MULCHED TO PREVENT EROSION. STONE / EARTH DIKE (CONTRACTOR MAY USE THE DETAIL SHOWN ABOVE FOR SEDIMENT CONTROL FOR CONCENTRATED FLOWS) (CONTRACTOR MAY REFER TO NEW YORK STANDARDS AND SPECIFICATION FOR EROSION AND SEDIMENT CONTROL "BLUE BOOK" FOR OTHER METHODS OF EROSION AND SEDIMENT CONTROL (CONTACT ENGINEER PRIOR TO MAKING SUBSTITUTIONS) EROSION & SEDIMENT CONTROL: ESC-1) LAND DISTURBANCE IS DEFINED AS DISRUPTION OF ESTABLISHED GROUND COVER/SOIL, AND NO LAND DISTURBANCE SHALL TAKE PLACE UNLESS PROVISIONS ARE IN PLACE TO CONTROL EROSION AND SEDIMENTATION. LAND DISTURBANCE SHALL NOT EXCEED LIMITS SHOWN ON DRAWING WITHOUT APPROVAL OF THE PERMITTING AUTHORITY. ESC-2) FROM DAY 1 OF CONSTRUCTION UNTIL FINAL SITE STABILIZATION, ALL EARTHWORK SHALL BE CONTROLLED TO PREVENT EROSION & SEDIMENTATION IN ACCORDANCE WITH PROVISIONS SHOWN ON THESE PLANS AND THE "NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL" (NYSSSESC), ISSUED BY THE NYSDEC, LATEST EDITION. ALL ESC DEVICES SHALL BE MAINTAINED IN ACCORDANCE TO THE NYSSSESC. EROSION CONTROL OPTIONS INCLUDE: A) GRADE DISTURBED AREA AND SEED (TEMPORARY OR PERMANENT) IMMEDIATELY AFTER CURRENT WORK IS COMPLETED OR TEMPORARILY SUSPENDED, B) MULCH WITH STRAW, BARK MULCH, STONE, ETC., C) APPLY EROSION CONTROL MATTING, OR D) OTHER, AS APPROVED. ESC-4) FROM DAY 1 OF CONSTRUCTION UNTIL FINAL SITE STABILIZATION, SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN FULL OPERATIVE CONDITION UNTIL PERMANENT SITE STABILIZATION IS COMPLETE AND PERMANENT GROUND COVER ESTABLISHED AS DEFINED BY NYSDEC STANDARDS. ESC-5) FOR PROJECTS IN THE LAKE GEORGE BASIN: ESC-5A) WITHIN 500 FEET OF THE MEAN HIGH WATER OF ANY LAKE, POND, RIVER, STREAM, OR WETLAND, NO LAND AREA, INCLUDING AREAS STOCKPILED WITH EARTHEN MATERIALS, WHICH HAS BEEN CLEARED MAY BE MADE OR LEFT DEVOID OF GROWING VEGETATION FOR MORE THAN 24 HOURS WITHOUT A PROTECTIVE COVERING SECURELY PLACED OVER THE ENTIRE AREA AND/OR EROSION CONTROL DEVICES PROPERLY INSTALLED TO PREVENT SEDIMENTS FROM ENTERING THE WATER BODY. ACCEPTABLE PROTECTIVE COVERINGS INCLUDE NATURAL MULCH OF A DEPTH OF TWO INCHES, ROCK RIP-RAP, NON-DEGRADABLE MATERIALS SUCH AS PLASTIC OR CANVAS COVERINGS, AND IMPERVIOUS STRUCTURES. ESC-5B) IN AREAS WHERE SOIL DISTURBANCE ACTIVITY HAS BEEN TEMPORARILY OR PERMANENTLY CEASED, TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES SHALL BE INSTALLED AND/OR IMPLEMENTED WITHIN SEVEN (7) DAYS FROM THE DATE THE SOIL DISTURBANCE ACTIVITY CEASED. THE SOIL STABILIZATION MEASURES SELECTED SHALL BE IN CONFORMANCE WITH THE MOST CURRENT VERSION OF THE TECHNICAL STANDARDS, NEW YORK STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AND IN THE LAKE GEORGE BASIN SHALL BE IN ACCORDANCE WITH LGPC REGULATION 646-4.15(C). ESC-5C) GROUND CLEARING OR GRADING ACTIVITIES WHICH OCCUR DURING THE PERIOD OCTOBER 15TH TO APRIL 15TH, DURING WHICH GERMINATION OF VEGETATION TYPICALLY WILL NOT TAKE PLACE, SHALL BE REQUIRED TO INCORPORATE EXTRA MEASURES DURING REVEGETATION IN ORDER TO REDUCE EROSION AND MAINTAIN WATER QUALITY. THESE EXTRA MEASURES INCLUDE, BUT ARE NOT LIMITED TO, THE USE OF SCREEN MESH, NETTING, EXTRA MULCH, AND SILTATION FENCES. ESC-6) ALL CONSTRUCTION ACTIVITY SHALL STOP IF EROSION AND/OR SEDIMENTATION IS EVIDENT, INCLUDING IF IN PLACE CONTROLS ARE DAMAGED OR DESTROYED OR ARE INADEQUATE. CONSTRUCTION ACTIVITY SHALL NOT RESUME UNTIL SUCH TIME AS CONTROLS ARE IN PLACE TO PREVENT FURTHER ENVIRONMENTAL IMPACT AND UNTIL SUCH TIME AS THE PRIOR IMPACT IS REMEDIATED. ESC-7) DETAILS SHOWN ON THIS DRAWING ARE ONLY EXAMPLES OF APPLICABLE EROSION AND SEDIMENT CONTROL SYSTEMS; CONTRACTOR TO DETERMINE "BEST MANAGEMENT PRACTICE(S)" AND SUBMIT TO OWNER/ ENGINEER FOR APPROVAL. EARTHWORK & TURF ESTABLISHMENT: ET-1) ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION UNLESS OTHERWISE DIRECTED ON THESE PLANS OR BY OWNER.FOR AREAS OF SITE THAT HAVE SEEN VEHICULAR TRAFFIC, SOILS RESTORATION TO BE AS FOLLOWS: SOILS RESTORATION REQUIREMENTS AS DEFINED IN CHAPTER 5.1.6 OF "NEW YORK STATE STORMWATER DESIGN MANUAL": APPLICATION OF 3" OF COMPOST, TILLING COMPOST INTO SUB-SOIL A MINIMUM DEPTH OF 12". APPLICATION OF TOPSOIL TO A DEPTH OF 6". VEGETATE AS REQUIRED PER LANDSCAPING PLAN, IF APPLICABLE, OR AT THE DIRECTION OF OWNER. ET-2) TOPSOIL, PLANT/SEED, AND MULCH DISTURBED AREAS TO ESTABLISH PERMANENT VEGETATIVE GROWTH (GRASS OR OTHER NATIVE/NATURALIZED GROUNDCOVERS); CONTACT OWNER AND/OR LOCAL SOIL CONSERVATION SERVICE FOR RECOMMENDED MATERIALS AND APPLICATION. ET-3) CONTRACTOR TO PROTECT EXISTING STRUCTURES & PERSONAL PROPERTY DURING WORK. WHERE POSSIBLE, ROUTE VEHICLES AND COMPLETE ALL WORK OUTSIDE OF ROOT ZONES OF MAJOR TREES AND AROUND OTHER FEATURES, AS PRACTICAL AND AS DIRECTED BY OWNER. ET-4) NO CLEARING OR GRUBBING BEYOND THE CLEARING LIMITS LABELED SHALL OCCUR UNLESS APPROVED IN ADVANCE BY ENGINEER AND PERMITTING AUTHORITY(IES). COMPOST FILTER SOCK 2"X2" WOODEN STAKES PLACED AT 10' O.C. MAX. SPACING 8' EXISTING CONTOURS 2"X2" WOODEN STAKES PLACED 10' O.C. 1' MIN. COMPOST FILTER SOCK PER NYSSSESC 1.) COMPOST FILTER SOCKS WILL BE PLACED ON THE CONTOUR WITH BOTH TERMINAL ENDS OF THE SOCK EXTENDED 8 FEET UP SLOPE AT A 45 DEGREE ANGLE TO PREVENT BYPASS FLOW. 2.) DIAMETERS DESIGNED FOR USE SHALL BE 12"-32" EXCEPT THAT 8" DIAMETER SOCKS MAY BE USED FOR RESIDENTIAL LOTS TO CONTROL AREAS LESS THAN .25 ACRES. 3.) COMPOST SOCKS SHALL BE ANCHORED IN EARTH WITH 2" X 2" WOODEN STAKES DRIVEN 12" INTO THE SOIL ON 10 FOOT CENTERS ON THE CENTERLINE OF THE SOCK. 4.) THE MAXIMUM SLOPE LENGTH ABOVE A COMPOST FILTER SOCK SHALL NOT EXCEED THE FOLLOWING LIMITS DITCH STABILIZATION GUIDELINES (GUIDELINES ARE PROVIDED TO OFFER ALTERNATIVES FOR STABILIZATION, AS NEEDED; ADDITIONAL OR MORE AGGRESSIVE TREATMENTS MAY BE NECESSARY DEPENDING ON SITE CONDITIONS) DS-1) 0-6%: SEED & MULCH DS-2) 6-10%: SEED & MULCH W/ TEMPORARY EROSION CONTROL MATTING (EX. NORTH AMERICAN GREEN MODEL: P300 OR APPROVED EQUIVALENT) DS-3) 10-15%: SEED & MULCH W/ TEMPORARY OR PERMANENT EROSION CONTROL MATTING (EX. NORTH AMERICAN GREEN MODEL: C350 OR APPROVED EQUIVALENT) DS-4) 15%+: SEED & MULCH W/ PERMANENT EROSION CONTROL MATTING (EX. NORTH AMERICAN GREEN MODEL: P550 OR APPROVED EQUIVALENT) OR OTHER APPROVED MEASURES (STONE CHECK DAMS AND/OR RIP RAPPED CHANNEL) SLOPE STABILIZATION GUIDELINES (GUIDELINES ARE PROVIDED TO OFFER ALTERNATIVES FOR STABILIZATION, AS NEEDED; ADDITIONAL OR MORE AGGRESSIVE TREATMENTS MAY BE NECESSARY DEPENDING ON SITE CONDITIONS) SS-1) 0-25%: SEED & MULCH SS-2) 25-33%: SEED & MULCH W/ TEMPORARY EROSION CONTROL MATTING (EX. NORTH AMERICAN GREEN MODEL: S75BN OR APPROVED EQUIVALENT) SS-3) 33-50%: SEED & MULCH W/ TEMPORARY OR PERMANENT EROSION CONTROL MATTING ON SLOPES (EX. NORTH AMERICAN GREEN MODEL: S150BN OR APPROVED EQUIVALENT) SS-4) 50-100%: SEED & MULCH W/ PERMANENT EROSION CONTROL MATTING ON SLOPES (EX. NORTH AMERICAN GREEN MODEL: SC150BN OR APPROVED EQUIVALENT) SS-5) 100%+: CONTACT ENGINEER FOR GUIDANCE. DIAMETER (IN.) SLOPE% 2 5 10 20 25 33 50 8 225*200 100 50 20 -- 12 250 225 125 65 50 40 25 18 275 250 150 70 55 45 30 24 350 275 200 130 100 60 35 32 450 325 275 150 120 75 50 EROSION & SEDIMENT CONTROL CONSTRUCTION NOTES: 1) CONTACT PERMITTING AUTHORITIES REGARDING CONSTRUCTION START DATE, AND ENGINEER TO SCHEDULE A PRE-CONSTRUCTION MEETING, PRIOR TO START OF CONSTRUCTION. 2) EROSION & SEDIMENT CONTROL TO BE INSTALLED PRIOR TO ANY OTHER CONSTRUCTION. 3) NYSDEC TRAINED PERSONNEL IN EROSION AND SEDIMENT CONTROL SHALL INSPECT SITE DAILY AND MAINTAIN LOG/REPORT BOOK. (NEW YORK STANDARDS AND SPECIFICATION FOR EROSION AND SEDIMENT CONTROL "BLUE BOOK" CAN BE FOUND AT: http://www.dec.ny.gov/chemical/29066.html OTHER ENVIRONMENTAL CONTROLS: 1.) PROTECT SITE DURING CONSTRUCTION IN ACCORDANCE WITH NYSDEC STORMWATER DESIGN MANUAL AND NYS EROSION & SEDIMENT CONTROL GUIDLINES ("BLUE BOOK"); LATEST EDITION 2.) TEMPORARY FUEL TANKS SHALL BE PROVIDED WITH SECONDARY CONTAINMENT EQUAL TO 100% OF TANK CONTENTS; AND AREA UNDER FUEL LINES SHALL BE COVERED IN WOODCHIPS, ABSORBENT MATTING, OR OTHER APPROVED ABSORBENT MATERIALS. COMPOST FILTER SOCK WOVEN WIRE FENCE (MIN. 14 GAUGE W/ MAX. 6" MESH SPACING) ON REINFORCED SILT FENCE * LENGTH IN FEET CONSTRUCTION ENTRANCE SPECIFICATIONS CS-1) AGGREGATE: A) STONE SIZE - USE #3 OR #4 (1"-4") STONE OR RUBBLE. B) THICKNESS: NOT LESS THAN 6". CS-2) LENGTH: A) TYPICAL COMMERCIAL/INDUSTRIAL ENTRANCE LENGTH= RECOMMENDED 50' MIN. B) A SINGLE RESIDENCE LOT ENTRANCE LENGTH= RECOMMENDED 30' MIN. CS-3) WIDTH: RECOMMENDED 12' MIN. WIDTH WITH SEPARATE ENTRANCE & EXITS TO SITE B) RECOMMENDED 24' MIN WIDTH WITH COMBINED ENTRANCE & EXITS TO SITE CS-4) GEOTEXTILE: A) TO BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING STONE. B) NOT REQUIRED ON A SINGLE FAMILY RESIDENCE LOT C) FABRIC SPECIFICATIONS: LIGHT DUTY ROAD= MIRAFI 100X OR APPROVED EQUIVALENT HEAVY DUTY ROAD= MIRAFI 600X OR APPROVED EQUIVALENT CS-5) SURFACE WATER: ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCE SHALL BE PIPED BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES MAY BE CONSTRUCTED CS-6) MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANING OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR DEPOSITED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. CS-7) WASHING: WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA OF STABILIZED STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. CS-8) INSPECTION: PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN PROVIDE CONSTRUCTION ENTRANCE AS REQUIRED TO PREVENT TRACKING ONTO HIGHWAY. CONSTRUCTION ENTRANCE