Loading...
Site PlansCall Before You DigWait The Required TimeConfirm Utility ResponseRespect The MarksDig With Care800-962-7962www.digsafelynewyork.comDigNew YorkHutchins Engineering PLLC GSPGSPGSPESPRREFRETAINING WALL LOADINGDOCKTSBCONCRETECONCRETE ASPHALTASPHALT CONCRETE SIDEWALKCB - TF=467.04CB - TF=465.6087.56' 6ƒ (386.15'6ƒ :1ƒ :150.48'1ƒ (232.72'1ƒ (130.81'6ƒ (34.25'6ƒ ( 83.86' CONCRETE SIDEWALKCB - TF=466.16CB - TF=467.25CB - TF=464.96CB - TF=467.38CB - TF=471.04CB - TF=473.67DW - TF=467.566" PVC INV = 465.76INV 24" PIPE (N) = 469.12INV 24" PIPE (S) = 469.02INV 24" CONC. PIPE (N) = 466.64INV 24" CONC. PIPE (S) = 466.64INV 24" CONC. PIPE (N) = 462.83INV 24" CONC. PIPE (S) = 462.78INV 12" CPP (SE) = 464.44INV 12" CPP (N) = 462.16INV 12" CPP (S) = 462.02INV 12" CPP (N) = 464.27INV 12" CPP (S) = 464.22INV 12" CPP (NW) = 463.70INV 12" CPP (SW) = 463.65INV 12" CPP (N) = 463.38INV 12" CPP (S) = 463.42INV HOLE IN STRUCTURE (W) = 464.09INV HOLE IN STRUCTURE (E) = 464.10CONCRETE COVERSEWER MANHOLE61,873.33 sq.ft.1.42 acresAREARIM =469.32BRICK CROSS WALK SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWOODEDTRASH7'-6" X 7 '-0"RECYCLE7'-0" X 5 '-6"SFSFEEGASGASGASWWWWSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFHutchins Engineering PLLC291175A-01-S2 Hutchins Engineering PLLC 291175A-01-S3 Hutchins Engineering PLLC 291175A-01-S4 GSP GSP GSP SPR REF TSB WOODED TRASH 7'-6" X 7'-0"RECYCLE 7'-0" X 5'-6"EEGASGASGASWWWWHutchins Engineering PLLC 291175A-01-S5 Renovations & Additions to909 Route 9Queensbury, New York 12804Y:\Queensbury Square\2021 Modifications and Additions\A-1.2 Concept Plans.dwg, 3/14/2022 7:08:07 AM, pdfFactory.pc3