Loading...
Erosion, Sediment & Pollution Control PlansSITEUTILITY LOCATION DISCLAIMERTHE UTILITIES ARE SHOWN AS PER THE LOCATION OF POLES, MANHOLES, VALVES,PEDESTALS, ETC., EXISTING DRAWINGS AND INFORMATION PROVIDED BY UTILITYPERSONNEL. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARETHE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARELOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE.RW30' MBLPROPERTY LINE/RIGHT OF WAY (IRON ROD, IRON PIPE, CONCRETE MONUMENT)PROPERTYEXISTINGPROPOSEDEASEMENTBUILDING SETBACK LINEWWMBFPPPFHFDCESSUTILITIESEXISTINGPROPOSEDSANITARY SEWERWATER MAIN W/METER, BACKFLOW PREVENTORFIRE DEPT. CONNECTION, FIRE HYDRANT, AND VALVESSOVERHEAD POWERTOVERHEAD TELEPHONETVOVERHEAD CABLEEUNDERGROUND POWERTUNDERGROUND TELEPHONETVUNDERGROUND CABLEGUNDERGROUND GAS<<STORM DRAINAGE W/ FLARED END SECTION,GRATE INLET, CURB INLET & STORM MANHOLE150.00150TOPOGRAPHYEXISTINGPROPOSEDCONTOURS, SPOT ELEVATIONDITCH, SWALE●●●●●SPECIESLANDSCAPEEXISTINGPROPOSEDWOODS LINETREE (EXISTING, REMOVE, PRESERVE)PAVEMENT HATCHINGEXISTINGPROPOSEDASPHALT PAVINGCONCRETE PAVINGGRAVEL PAVINGHEAVY DUTY ASPHALT PAVINGASPHALT PAVINGHEAVY DUTY CONCRETE PAVINGCONCRETE PAVINGHEAVY DUTY GRAVEL PAVINGGRAVEL PAVINGUNPAVED ROAD/PATHUNPAVED WALKWAYUNPAVED ROADWAYDEMOLITIONHATCHINGLEGENDPROJECT DATAOWNER/DEVELOPER:24HR CONTACT:AREA OF PROJECT:TAX MAP & PARCEL:ZONING CLASSIFICATION:TOTAL BUILDING AREA:PROPOSED USE:PARKING SPACES PROVIDED:DISTURBED AREA:IMPERVIOUS AREA:SHJ CONSTRUCTION GROUP124 EAST THOMPSON STREETTHOMASTON, GEORGIA 30286JOHN WELLS706-975-19833.83 ACRES303.15-1-12CI6,815 S.F.AUTOMATED EXPRESS TUNNELCARWASH270.98 ACRES2.33 ACRESPARKING SPACES REQUIRED:3PROJECT LOCATION: 708 QUAKER ROAD, QUEENSBURY,NEW YORK 12804706-647-0414LOCATION MAPNOT TO SCALEEMC ENGINEERING SERVICES, INC.ENVIRONMENTAL- MARINE - CIVIL - SURVEYPROJECT LOCATION:REVISION DESCRIPTIONENVIRONMENTALCIVILMARINEPrepared forEROSION, SEDIMENT, AND POLLUTION CONTROL PLANSFORDATEEMC ENGINEERING SERVICES, INC. 349 MARGIE DRIVE, SUITE 220WARNER ROBINS, GA 31088PH: (478) 333-4110FAX: (229) 439-7979warnerrobins@emc-eng.comwww.emc-eng.comALBANY • AUGUSTA • BRUNSWICK • COLUMBUS • GREENVILLE, SCSAVANNAH • STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINSEXCELSIORBRIAN HILL BRAU N 1002946/4/21SHJ CONSTRUCTION GROUPQUEENSBURY, WARREN COUNTY, NEW YORKQUEENSBURY, WARREN COUNTY, NEW YORK708 QUAKER ROADJUNE 2021EMC PROJECT# 20-6446TIDAL WAVE AUTO SPA---------------------SHEET INDEXSHEET NO. DESCRIPTIONEC1.0EROSION & SEDIMENTATION CONTROL COVEREC2.0EROSION & SEDIMENTATION CONTROL INITIAL PHASEEC3.0EROSION & SEDIMENTATION CONTROL INTERMEDIATE PHASEEC4.0EROSION & SEDIMENTATION CONTROL FINAL PHASEEC5.0EROSION & SEDIMENTATION CONTROL DETAILSEC5.1EROSION & SEDIMENTATION CONTROL DETAILSBRIAAU N 5' LANDSCAPE BUFFERQUAKER ROAD(COUNTY ROUTE 70) (PUBLIC)BARRETT DRIVEMAP 303.15, BLOCK 1, LOT 12LANDS N/F OFSMART WASH OF S.G.F., LLCB. 5946 P. 272MAP 303.15, BLOCK 1, LOT 13LANDS N/F OFE. JAMES BARRETT &WILLIAM M. BARRETTB. 1209 P. 320MAP 303.15, BLOCK 1, LOT 11LANDS N/F OFGARVEY PARTNERSHIPB. 5351 P. 45MAP 303.15, BLOCK 1, LOT 4LANDS N/F OFSWITCHCO LLCB. 4542 P. 217 (PRIVATE) (SEE NOTE 10 )ACCESSACCESS DIX AVENUE (COUNTY RO U T E 4 2 ) ( P U B L I C ) 10' LAND S C A P E B U F F E R 20' SIDE BUILDING SETBACK25' REAR BU I L D I N G S E T B A C K20' SIDE BUILDING SETBACK10' LANDSCA P E B U F F E R10' LANDSCAPE BUFFER10' LANDSCAPE BUFFER5' LANDSCAPE BUFFER5' LANDSCAPE BUFFERINLET PROTECTIONTYPE IVINLET PROTECTIONTYPE IISILT FENCESILT FENCEINLET PROTECTIONTYPE IVLIMITS OF DISTURBANCELIMITS OF DISTURBANCE75' FRONT BUILDINGSETBACKXXXXXXXXXXXXXXXXXXXXXXXINLET PROTECTIONTYPE IIEROSION CONTROL MEASURES - INITIAL PHASE:1. CONTRACTOR IS TO INSTALL ALL TEMPORARY EROSION CONTROL DEVICES.2. CONTRACTOR TO UTILIZE DUST CONTROL AND OTHER EROSION CONTROL MEASURES AS NEEDED.3. CONTRACTOR IS TO ENSURE THAT SEDIMENT LADEN DOES NOT UNDERMINE SEDIMENT BARRIERS. IT ISRECOMMENDED THAT THE CONTRACTOR PERIODICALLY CHECKS SILT FENCE DURING STORM EVENTSAND MAKES REPAIRS AS NEEDED.4. THE DISTURBED AREA FOR THE INITIAL PHASE IS ±0.1 ACRES..EROSION CONTROL NOTES:1. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSIONCONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THEAPPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION ANDSEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENTSOURCE.3. ANY AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITHA HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.4. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZEDBY A SECTION 404 PERMIT.5. THE OVERALL DISTURBED ACREAGE FOR THIS PROJECT IS ±0.98 ACRES.6. THERE ARE NO STATE WATERS AND/OR LOCATED ON OR WITHIN 200' OF THE PROJECT SITE. THEPROJECT RECEIVING WATER IS TRIBUTARY OF GLEN FALLS FEEDER CANAL.***THIS SHEET FOR EROSION CONTROL MEASURES ONLY***NRCS - WEB SOIL SURVEYSOIL SUMMARYSYMBOL NAMEHYDROLOGICGROUPDEPTH24 HOUR CONTACT:JOHN WELLS706-975-1983FaBFARMINGTON LOAMDCL,ML,SC,SMGC,GM0-17"0-60"SM,SP-SMAOAKVILLE LOAMY FINE SANDOaBSHEETOFPrepared for:SURVEY DATE:SERVICES, INC. EMC ENGINEERING SCALE:DATE:PROJECT NO.:SURVEYED BY:CHECKED BY:DESIGNED BY:DRAWN BY:GRAPHIC SCALE: 1" =0'ENVIRONMENTALCIVILMARINE349 Margie Drive, Suite 220Warner Robins, GA 31088Ph: (478) 333-4110Fax: (229) 439-7979warnerrobins@emc-eng.comwww.emc-eng.comALBANY• AUGUSTA • BRUNSWICK • COLUMBUS • GREENVILLE, SCSAVANNAH • STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINSDATENO.REVISION DESCRIPTIONEXCELSIORBRIAN HILL BRAU N 1002946/4/21EROSION & SEDIMENTATION CONTROL INITIAL PHASE708 QUAKER ROADQUEENSBURY, WARREN COUNTY, NEW YORKTIDAL WAVE AUTO SPASHJ CONSTRUCTION GROUP20-6446JMAJMACP1-21-21RAP1" = 30' 6/4/21EC2.01730' 30' 30' 15'-- --- --- --- --- --- --- -BRIAAU NNNN 5' LANDSCAPE BUFFERQUAKER ROAD(COUNTY ROUTE 70) (PUBLIC)BARRETT DRIVEMAP 303.15, BLOCK 1, LOT 13LANDS N/F OFE. JAMES BARRETT &WILLIAM M. BARRETTB. 1209 P. 320MAP 303.15, BLOCK 1, LOT 11LANDS N/F OFGARVEY PARTNERSHIPB. 5351 P. 45MAP 303.15, BLOCK 1, LOT 4LANDS N/F OFSWITCHCO LLCB. 4542 P. 217 (PRIVATE) (SEE NOTE 10 )ACCESSACCESS DIX AVENUE (COUNTY RO U T E 4 2 ) ( P U B L I C ) 10' LAND S C A P E B U F F E R 20' SIDE BUILDING SETBACKLIMITS OF DISTURBANCE25' REAR BU I L D I N G S E T B A C K20' SIDE BUILDING SETBACKLIMITS OF DISTURBANCE10' LANDSCA P E B U F F E R10' LANDSCAPE BUFFER10' LANDSCAPE BUFFER5' LANDSCAPE BUFFER5' LANDSCAPE BUFFERINLET PROTECTIONTYPE IVINLET PROTECTIONTYPE IISILT FENCESILT FENCEINLET PROTECTIONTYPE IVCONCRETEWASHOUTAREA75' FRONT BUILDINGSETBACKXXXXXXXXXXXXXXXXXXXXXXXCOMPOST FILTERSOCKINLET PROTECTIONTYPE IIEROSION CONTROL NOTES:1. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSIONAND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LANDDISTURBING ACTIVITIES.2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THEAPPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL SEDIMENTCONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.3. ANY REVISION TO THE ES&PC PLAN AFTER FINAL APPROVAL OR DURING CONSTRUCTION WHICHAFFECTS A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.4. THE OVERALL DISTURBED ACREAGE FOR THIS PROJECT IS ±0.98 ACRES.5. THERE ARE NO STATE WATERS AND/OR WETLANDS LOCATED ON OR WITHIN 200' OF THE PROJECT SITE.THE PROJECT RECEIVING WATER IS TRIBUTARY OF GLEN FALLS FEEDER CANAL.EROSION CONTROL MEASURES - INTERMEDIATE PHASE:1. CONTRACTOR IS TO MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES. CONTRACTOR TO INSTALLCONCRETE WASHOUT AREA BMPS.2. CONTRACTOR TO UTILIZE DUST CONTROL AND OTHER EROSION CONTROL MEASURES AS NEEDED.3. INLET PROTECTION - TYPE II IS TO BE USED IN PLACE OF TYPE IV UNTIL PAVING IS FINISHED. AFTERPAVING IS COMPLETE CONTRACTOR SHOULD INSTALL TYPE IV WHERE APPLICABLE.4. CONTRACTOR IS TO ENSURE THAT SEDIMENT LADEN DOES NOT UNDERMINE SEDIMENT BARRIERS. IT ISRECOMMENDED THAT THE CONTRACTOR PERIODICALLY CHECKS SILT FENCE DURING STORM EVENTSAND MAKES REPAIRS AS NEEDED.5. THE DISTURBED AREA FOR THE INTERMEDIATE PHASE IS ±0.98 ACRES.***THIS SHEET FOR EROSION CONTROL MEASURES ONLY***SHEETOFPrepared for:SURVEY DATE:SERVICES, INC. EMC ENGINEERING SCALE:DATE:PROJECT NO.:SURVEYED BY:CHECKED BY:DESIGNED BY:DRAWN BY:GRAPHIC SCALE: 1" =0'ENVIRONMENTALCIVILMARINE349 Margie Drive, Suite 220Warner Robins, GA 31088Ph: (478) 333-4110Fax: (229) 439-7979warnerrobins@emc-eng.comwww.emc-eng.comALBANY• AUGUSTA • BRUNSWICK • COLUMBUS • GREENVILLE, SCSAVANNAH • STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINSDATENO.REVISION DESCRIPTIONEXCELSIORBRIAN HILL BRAU N 1002946/4/21EROSION & SEDIMENTATION CONTROL INTERMEDIATE PHASE708 QUAKER ROADQUEENSBURY, WARREN COUNTY, NEW YORKTIDAL WAVE AUTO SPASHJ CONSTRUCTION GROUP20-6446JMAJMACP1-21-21RAP1" = 30' 6/4/21EC3.01730' 30' 30' 15'-- --- --- --- --- --- --- -24 HOUR CONTACT:JOHN WELLS706-975-1983BRIAAU NNNNNNNNNN 5' LANDSCAPE BUFFERQUAKER ROAD(COUNTY ROUTE 70) (PUBLIC)BARRETT DRIVEMAP 303.15, BLOCK 1, LOT 13LANDS N/F OFE. JAMES BARRETT &WILLIAM M. BARRETTB. 1209 P. 320MAP 303.15, BLOCK 1, LOT 11LANDS N/F OFGARVEY PARTNERSHIPB. 5351 P. 45MAP 303.15, BLOCK 1, LOT 4LANDS N/F OFSWITCHCO LLCB. 4542 P. 217 (PRIVATE) (SEE NOTE 10 )ACCESSACCESS DIX AVENUE (COUNTY RO U T E 4 2 ) ( P U B L I C ) 10' LAND S C A P E B U F F E R 20' SIDE BUILDING SETBACK25' REAR BU I L D I N G S E T B A C K20' SIDE BUILDING SETBACK10' LANDSCA P E B U F F E R10' LANDSCAPE BUFFER10' LANDSCAPE BUFFER5' LANDSCAPE BUFFER5' LANDSCAPE BUFFER75' FRONT BUILDINGSETBACKEROSION CONTROL MEASURES - FINAL PHASE:1. CONTRACTOR IS TO ESTABLISH PERMANENT VEGETATIVE COVER ON DISTURBED UNPAVED SURFACES.2. ONCE PERMANENT STABILIZATION OF VEGETATIVE GROUND COVER IS ACHIEVED, CONTRACTOR IS TOREMOVE ALL TEMPORARY SEDIMENT CONTROL MEASURES.3. THE DISTURBED AREA FOR THE FINAL PHASE IS ±0.0 ACRESHATCH LEGEND:SEE LANDSCAPE PLAN FOR FINAL GROUND COVERSODDED AREAS***THIS SHEET FOR EROSION CONTROL MEASURES ONLY***THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSIONCONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THEAPPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION ANDSEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.EROSION CONTROL NOTES:1. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSIONAND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LANDDISTURBING ACTIVITIES.2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THEAPPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL SEDIMENTCONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.3. ANY REVISION TO THE ES&PC PLAN AFTER FINAL APPROVAL OR DURING CONSTRUCTION WHICHAFFECTS A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.4. THE OVERALL DISTURBED ACREAGE FOR THIS PROJECT IS ±0.98 ACRES.5. THERE ARE NO STATE WATERS AND/OR WETLANDS LOCATED ON OR WITHIN 200' OF THE PROJECT SITE.THE PROJECT RECEIVING WATER IS TRIBUTARY OF GLEN FALLS FEEDER CANAL.SHEETOFPrepared for:SURVEY DATE:SERVICES, INC. EMC ENGINEERING SCALE:DATE:PROJECT NO.:SURVEYED BY:CHECKED BY:DESIGNED BY:DRAWN BY:GRAPHIC SCALE: 1" =0'ENVIRONMENTALCIVILMARINE349 Margie Drive, Suite 220Warner Robins, GA 31088Ph: (478) 333-4110Fax: (229) 439-7979warnerrobins@emc-eng.comwww.emc-eng.comALBANY• AUGUSTA • BRUNSWICK • COLUMBUS • GREENVILLE, SCSAVANNAH • STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINSDATENO.REVISION DESCRIPTIONEXCELSIORBRIAN HILL BRAU N 1002946/4/21EROSION & SEDIMENTATION CONTROL FINAL PHASE708 QUAKER ROADQUEENSBURY, WARREN COUNTY, NEW YORKTIDAL WAVE AUTO SPASHJ CONSTRUCTION GROUP20-6446JMAJMACP1-21-21RAP1" = 30' 6/4/21EC4.01730' 30' 30' 15'-- --- --- --- --- --- --- -24 HOUR CONTACT:JOHN WELLS706-975-1983BRIARAU N SHEETOFPrepared for:SURVEY DATE:SERVICES, INC. EMC ENGINEERING SCALE:DATE:PROJECT NO.:SURVEYED BY:CHECKED BY:DESIGNED BY:DRAWN BY:ENVIRONMENTALCIVILMARINE349 Margie Drive, Suite 220Warner Robins, GA 31088Ph: (478) 333-4110Fax: (229) 439-7979warnerrobins@emc-eng.comwww.emc-eng.comALBANY • AUGUSTA • BRUNSWICK • COLUMBUS • GREENVILLE, SCSAVANNAH • STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINSDATENO.REVISION DESCRIPTIONEXCELSIORBRIAN HILL BRAU N 1002946/4/21EROSION & SEDIMENTATION CONTROL DETAILS708 QUAKER ROADQUEENSBURY, WARREN COUNTY, NEW YORKTIDAL WAVE AUTO SPASHJ CONSTRUCTION GROUP20-6446JMAJMACP1-21-21RAPN/A6/4/21EC5.017-- --- --- --- --- --- --- -NOT TO SCALESOD INSTALLATION NOTESNOT TO SCALETEMPORARY SEEDING NOTESBRIARRAU NNNNNNNNNNNN SHEETOFPrepared for:SURVEY DATE:SERVICES, INC. EMC ENGINEERING SCALE:DATE:PROJECT NO.:SURVEYED BY:CHECKED BY:DESIGNED BY:DRAWN BY:ENVIRONMENTALCIVILMARINE349 Margie Drive, Suite 220Warner Robins, GA 31088Ph: (478) 333-4110Fax: (229) 439-7979warnerrobins@emc-eng.comwww.emc-eng.comALBANY • AUGUSTA • BRUNSWICK • COLUMBUS • GREENVILLE, SCSAVANNAH • STATESBORO • THOMASTON • VALDOSTA • WARNER ROBINSDATENO.REVISION DESCRIPTIONEXCELSIORBRIAN HILL BRAU N 1002946/4/21EROSION & SEDIMENTATION CONTROL DETAILS708 QUAKER ROADQUEENSBURY, WARREN COUNTY, NEW YORKTIDAL WAVE AUTO SPASHJ CONSTRUCTION GROUP20-6446JMAJMACP1-21-21RAP1" = 20' 6/4/21EC5.117-- --- --- --- --- --- --- -NOT TO SCALETYPE III INLET PROTECTION DETAILNOT TO SCALEINLET PROTECTION NOTES NOT TO SCALESILT FENCE NOTES NOT TO SCALEETAIL INLET PROTECTION DETYPEIIINOT TO SCALECONCRETE WASHOUT AREA NOTES