Loading...
CanopyMARK DATE DESCRIPTIONSHEET TITLEDRAWN BY: D.S.A7.1TIDAL WAVE AUTOSPAAUXILIARYSTRUCTURESCarwash at 708Quaker Rd.708 Quaker Rd.Queensbury, NY 12804EAST THOMPSON STREETTHOMASTON, GEORGIA 30286PROJECT DATE: XPROJECT NUMBER: XOWNER:PERMIT SUBMITTAL SET1/6/21PAY CANOPY9'-11 7/8"9'-11 7/8"SEE CIVIL PLANS FOR LENGTHSEE CIVIL PLANS FOR LENGHT28'-0"(##) - 26' BAYS (TYPICAL)34'-0"28'-0"26'-0" TYPICAL INTERIOR BAYPRE-FINISHED METAL ROOFINGASSEMBLY. MATCH CAR WASHBUILDING ROOF.PRE-ENGINEERMETAL BUILDINGSTRUCTURE. PAINT.PRE-ENGINEERMETAL BUILDINGSTRUCTURE. PAINT.PRE-ENGINEERMETAL BUILDINGSTRUCTURE. PAINT.ENCLOSED BOTH GABLE ENDS.COVER BOTH SIDES OFEACH GABLE WITH EIFS ASSEMBLYPEMB BRACED BAY.COORDINATE LOCATION W/PEMB SHOP DWGS PRIOR TOSTART. COORDINATE WITHFOOTING POUR.FACE OF CURBFACE OF CURB VACUUM CANOPY1/8"=1'-0"VC TYPICAL SIDE ELEVATION TYPICAL END ELEVATIONO P E N O P E N O P E N O P E NO P E N124124PLAN - VAC CANOPYRIDGEDEFFERRED SUBMITTALS:PRIOR TO CANOPY FABRICATION OR INSTALL,PROVIDE DETAILED DESIGN SHOP DRAWINGSPREPARED BY A STRUCTURAL ENGINEER HIRED OREMPLOYEED BY CANOPY MANUFACTURER. SUCHDRAWINGS SHALL BE CERTIFIED/STAMPED ANDSIGNED BY THE RELATED DESIGN ENGINEER. SUBMITTO LOCAL AUTHORITIES FOR REVIEW AND APPROVALPRIOR TO START OF ANY RELATED WORK.COLORS:COLORS TO MATCH MAIN CAR WASH BUILDING.COORDINATE WITH TIDAL WAVE, INC PRIOR TO STARTCANOPY IS A PRE-ENGINEERD METAL BUILDING STRUCTURE.PEMB BRACED BAY.COORDINATE LOCATION W/PEMB SHOP DWGS PRIOR TOSTART. COORDINATE WITHFOOTING POUR.DG16'-0"8'-0"4'-0"(3) 12" TR(4) 7" R3'-4"8'-0"7'-0"12"6"8'-0"2'-6 1/8"4 1/8"18" DIA.FOOTING10'WSDWSDWSD8" CMUSEEEXTERIORELEVATIONSFORVENEERSBOLLARDSGATE ASSEMBLY.3 1/2" DIA. SCHED.40 STEEL PIPECOLUMNMASONRYSERVICE STEPS(3) 7" RISERS3'H 1 1/2" DIA.METALHANDRAILGUARDRAIL ATLANDINGPREFINISHED METAL FLASHINGSIGNAGE. "EMPLOYEES ONLY"GATE ASSEMBLY.SEE DETAIL "DG"3/4" DIA. 20"LCANE BOLTASSEMBLIESSTUCCO OVER CMUPREFINISHED METALFLASHINGHM DOOR/FRAME.SEE DETAILS #DJ &#DH. TYPICAL(3) 6"H 2 PC. STEEL SLEEVEHINGES EA. GATE.THE TOP 3" SECTION OF EA.SLEEVE TO BE FREE MOVINGAND BOTTOM 3" SECTION TOBE WELDED ALL AROUND.2"X2"X3/16" SQUARE STEELGATE FRAMING ALL AROUND ATEDGES AND DIAGONAL "X"BRACE.STUCCO OVER 8" CMUBRICKEIFS WATERTABLE8" CMU . TOP @ 36" ABVTOP LANDING. PROVIDE1 1/2" DIA METAL TOP RAILWITH TOP AT 42" ABV TOPLANDING - SECURE TOTOP OF CMU.PLAN - DUMPSTER ENCLOSURE1/4"=1'-0"DEUPREAR ELEVATIONFRONT ELEVATIONSIDE ELEVATIONOPPOSITE ELEVATION IS SIMILAR1/4"=1'-0"1/4"=1'-0"1/4"=1'-0"ALL FINISHES, MATERIALS, ANDCOLORS TO MATCH MAIN CARWASH BUILDINGSEE CIVIL DRAWINGS FOR LAYOUTPLAN1/4"=1'-0"D1SEE CIVIL FOR ORIENTATION