Loading...
Site PlansHutchins Engineering PLLC TOWN OF QUEENSBURY ZONING REQUIREMENTS RR-3A - RURAL RESIDENTIAL 3-ACRE MINIMUM LOT SIZE: 3-ACRES BUILDING SETBACKS SHORELINE SETBACK:75' FRONT SETBACK: 100' SIDE SETBACKS: 75' REAR SETBACK:100' MAX BUILDING HEIGHT:35' LOT WIDTH:400' ROAD FRONTAGE:400' PERCENT PERMEABLE:75% ADIRONDACK PARK AGENCY LAND USE WEST OF BAY ROAD: RURAL USE 8.5-AC PER LOT DENSITY SHORELINE SETBACK: 75' EAST OF BAY ROAD: LOW INTENSITY USE 3.2-AC PER LOT DENSITY SHORELINE SETBACK: 75' 0+001+002+003+00 4+00 5+00 6+00 7+008+009+0010+0011+000+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+00Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York Hutchins Engineering PLLC 0+001+002+003+00 4+00 5+00 6+00 7+008+009+0010+0011+004+005+006+007+008+00Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York Hutchins Engineering PLLC Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York 0+00Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York 0+001+002+003+00 4+00 5+00 6+00 7+008+009+0010+0011+00Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York 0+000+501+001+502+002+503+003+504+004+505+005+506+006+507+007+508+008+509+009+5010+0010+5011+0011+50540 545 550 555 560 565 570 575 580 585 590 595 600 605 610 615 620 625 630 635 640 645 650 655 660 665 670 540 545 550 555 560 565 570 575 580 585 590 595 600 605 610 615 620 625 630 635 640 645 650 655 660 665 670 5.00%PVC STA.0+25.00PVC ELEV.550.25PVI STA.0+50.00PVI ELEV.551.50PVT STA.0+75.00PVT ELEV.554.0050.00VC 100.00SD5.00%10.00% 10.00K-Val 12.00 %PVC STA.0+75.00PVC ELEV.554.00PVI STA.1+00.00PVI ELEV.556.50PVT STA.1+25.00PVT ELEV.559.5050.00VC 1000.00SD10.00%12.00% 25.00K-Val 12.00 % 5.00%PVC STA.4+75.00PVC ELEV.601.50PVI STA.5+00.00PVI ELEV.604.50PVT STA.5+25.00PVT ELEV.605.7550.00VC 119.94SD12.00%5.00% 7.14K-Val PVC STA.5+75.00PVC ELEV.608.25PVI STA.6+00.00PVI ELEV.609.50PVT STA.6+25.00PVT ELEV.612.5050.00VC 71.43SD5.00%12.00% 7.14K-Val 12.00 % 12.00 % 6.00%PVC STA.10+25.00PVC ELEV.660.50PVI STA.10+40.00PVI ELEV.662.30PVT STA.10+55.00PVT ELEV.663.2030.00VC 125.76SD12.00%6.00% 5.00K-Val 4.00%PVC STA.10+75.00PVC ELEV.664.40PVI STA.10+80.00PVI ELEV.664.70PVT STA.10+85.00PVT ELEV.664.9010.00VC 337.29SD6.00%4.00% 5.00K-Val Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York PERSPECTIVE SECTION Drawing Not To Scale 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the slope by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" (30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3.Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. 5.Consecutive RECPs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire RECPs width. Drawn on: 3-16-11 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5" (5-12.5cm) 3B 4 2 5 1 3A 6" (15cm) 6" (15cm) *NOTE: In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. 3"(7.5cm) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-772-2040 www.tensarnagreen.com ASPHALT PAVEMENT DETAIL Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig Safely. New York STANDARD SPECIFICATIONS FOR MULCHINGSEDIMENT CONTROL FENCE DETAIL STANDARD SPECIFICATIONS FOR SILT FENCE CONSTRUCTION SPECIFICATIONS · · · · · EROSION CONTROL BLANKET DETAIL SLOPE LENGTH/FENCE LENGTH (FT.) SLOPE STANDARD REINFORCED SUPER <2%300/1500 N/A N/A 2-10%125/1000 250/2000 300/2500 10-20%100/750 150/1000 200/1000 20-33%60/500 80/750 100/1000 33-50%40/250 70/350 100/500 >50%20/125 30/175 50/250 STANDARD SPECIFICATIONS FOR STABILIZED CONSTRUCTION ACCESS CONSTRUCTION SPECIFICATIONS · · · · · · · · · STABILIZED CONSTRUCTION ACCESS DETAIL INFILTRATION TRENCH DETAIL EROSION & SEDIMENT CONTROL NOTES · · · · · · · · · STABILIZATION SITE CONSTRUCTION SEQUENCING · · · · · · · · · · · · PLANTING NOTES MAINTENANCE - EROSION CONTROL · · · SMP MAINTENANCE NARRATIVE THE HOMEOWNER WILL PROVIDE THE MAINTENANCE NEEDED IN ORDER TO ENSURE CONTINUOUS AND EFFECTIVE OPERATION OF THE STORMWATER CONTROL PRACTICES BOTH IN THE SHORT AND LONG TERMS. SEDIMENT REMOVAL IN THE CONVEYANCE TRENCHES AND VEGETATED DETENTION AREAS SHOULD BE PERFORMED ANNUALLY OR SEMI-ANNUALLY. IF REDUCED INFILTRATION IS REALIZED IN THE SMPs, REPLACEMENT OF THE STONE AND/OR TOPSOIL MAY BE REQUIRED. MOWING AND TRIMMING OF THE VEGETATED LAWN AREAS SHOULD BE PERFORMED AS NEEDED THROUGHOUT THE SPRING, SUMMER AND FALL, TYPICALLY WEEKLY. ANY ERODED AREAS SHALL BE IMMEDIATELY REPAIRED, RETOPSOILED, REVEGETATED AND COVERED WITH EROSION CONTROL BLANKETS. DRIVEWAY SECTION DETENTION BASIN OUTLET DETAIL VEGETATED DETENTION BASIN DETAIL MAJOR STORMWATER REQUIREMENTS LAKE GEORGE PARK COMMISSION STORMWATER CONTROL VOLUME REQUIREMENT FOR MAJOR PROJECTS (15,000 SF+ OF TOTAL LAND DISTURBANCE): - RUNOFF VOLUME REDUCTION FOR 10-YR DESIGN STORM IN DEVELOPED VS. UNDEVELOPED, WOODED CONDITIONS - RUNOFF RATE REDUCTION FOR 25-YR DESIGN STORM IN DEVELOPED VS. UNDEVELOPED, WOODED CONDITIONS A SITE SPECIFIC SITE PLAN IS TO BE PREPARED AND SUBMITTED TO THE LAKE GEORGE PARK COMMISSION FOR SITE PERMIT, PRIOR TO BEGINNING EARTHWORK . A RIGHT-OF-WAY WORK PERMIT MUST BE OBTAINED FROM NYSDOT FOR THE ENTRANCE DRIVEWAY . RIP RAP DITCHLINE DETAIL CONSTRUCTION DETAIL SHEET prepared for: Jeffrey & Joanne Mann TAX MAP # 265.-1-23.1 & 23.2 Bay Road & Pickle Hill Road Town of Queensbury, Warren County, NY 291682A-01-D2 291682B-01-D2