Loading...
2003-812 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY'12804-5902 (518)761=8201 Community Development-Building&Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number; P2.0030812 Date Issued: Wednesday,:September 15, 2004 This is to certify that work requested to be done as shown by Permit Number P20030812 has been completed. Tax Map Number: 523400-278.000-0001-008-000-0000 Location: STATE ROUTE 149 Owner: JOHN HUGHES Applicant: JOHN HUGHES This structure may be occupied as a: By Order of Town Board Garage-2 Cars Attached TOWN OF QUEENSBURY Single Family Dwelling Director of BuRding&Code Enforcement. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development-Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20030812 Application Number: A20030812 Tax Map No: 523400-278-000-0001-008-000-0000 Permission is hereby granted to: ORN HI KTNF.S For property located at: STATE ROUTE 149 in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value. Owner Address: 'JOHN HUGHES 1 ROCKLANU Dar Garage-'2 Cars Attached LAKE GEORGE NY 12845 Single Family I7weiling. $85,000.00 Total Value $85,000.00 Contractor or Builder's Name /Address Electrical Inspection Agency t s . Plans&Specifications 2003-812 #6 LEISURE LANE 1352 sq ft SINGLE FAMILY DWELLING WITH 2-CAR DETACHED GARAGE AS PER PLOT PLAN SPECIFICATIONS $212.84 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday, October 08, 2004 (If a longer period is required,an application for an extension muist.be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the T Quee ay, October 08,2003 SIGNED BY for the Town of Queensb ury. ry. Director of Building&Code Enforcement Building Permit Application Town of Queensbury-Dept of Community Development,742 Bay Road,Queensbury,NY (518)761-8256 A permit must be obtained before beginning construction. Permit File No. No inspection will be made until applicant has received a Fee Paid valid building permit. All applicants' spaces on this Ree. Fee Paid application must be completed and must appear on the Reviewed By. application form. U-If Applicant: Owner: Address: 12 CL weAddress: f N=fl A 7 F.— _U Vh= Phone# 3 Vs Phone _SE_R-9 5 2o03 r0WV()F QUE'ENSBU Property Location: Lot Number: e- / House Number 6 f 5 jY_1Ci rtW=n Y Subdivision Name: lzfv�f&- . Tax Map Number: a-)9-I- &r�New Building: resid /commercial Estimated Market Value of Construction: $ 9S, �- c3 Addition: residence/ commercial If an Addition,what will use of new addition be? .0 Alteration: residence/ commercial 0 No change to exterior size: residence coni'l u Other work(describe Check OccupancyInformation I"Floor 2"d Floor Other floor Below sq.ft. sq.ft. sq.ft. S�UarrcFeet LU Single family dwelling u' Two family dwelling U Townhouse Ll Multifamily dwelling #of units U Office 0 Mercantile U Manufacturing 0 1 car detached garage U 2 car detached garage C3 3 car detached garage 0 1 car attached garage Ua- 2 car attached garage U 3 car attached garage 0 Storage building- commercial La Storage building- residential U Other What is the proposed height of the structure feet s inches Will any second-hand or ungraded lumber be used? If so, for what? Type of Heating System: electric 1 oil wood /forced hot air baseboard other: Number of Fi Iaces to be installed lvcjve- Number of Woodsloves to be installed List below the person(s)responsible for supervision of work as regards to building codes: Name Address Phone Number Builder s Yv ke s Re>a 4--49 of-1 7 99 2,3.1 5 Plumber Mason Electrician If Declaration: please sign below after you have carefully read the statement: To the best of my knowledge the statements contained in this application,together with the plans and specifications submitted,are a true and complete statement of all proposed work to be done on the described premises and that all provisions of the Building Code,the Zoning Ordinani;e and all other laws pertaining to the proposed work shall be complied with,whether specified ornoted,and that such work is authorized by the owner.-Further,it is understood that I/we shall submit,prior to a Certificate of Occupancy or Certificate of Compliance being issued,as requested by the Zoning Administrator or Director of Building and Codes,an As Built Survey by a licensed surveyor;drawn to scale,-showing actual location of all new construction. Signature: owner,owner's agent,architect,contractor (7 Im- Queensbury Building & Code Enforcement - Residential Final Inspection Office No.(518)761-8256 Arrive: D art: :� am/ rn 3i 'Date Inspection request received: lnspector's Initi �, NAME: �,7 P IT#: LOCATION: ATE: TYPE OF STRUCTURE: ► Comments Y N N/A Chimney Ht./"B"Vent/Direct Vent Location Fresh Air Intake 3 inch Plumb Vent through roof minimum 6" Roof Complete/Exterior Finish Co,m lete Guard 30 in.or more a7 stairs,decks,patios Guard at stairwell at 34 in. or more Guard at deck,porches 36 in.or more Exterior Finish Complete Interior/Exterior Railings 34 in.to 38 in. Platform at all exterior doors Interior Handrails stairs 2 or more risers Enclosed Stairs Sheetrock Underside minimum %Z" Gypsum Grade away from foundation 6 in.with 10 ft. Handrail Termination at Newell Post or Wall 6 inch clearance to sill plate .Gas Valve"shut-off exposed/regulator 18"above grade Gas Furnace shut-off within 30 ft.or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off bailer Relief Valves installed/Heat Trap/Water Temp 110 Interior privacy/trim/doors/main entrance 36 in. Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Detectors: Every level: / Every Bedroom: Outside every bedroom area: Inter Connected: / Battery backup: Carbon Monoxide Detector Bathroom Fans, if no window Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 sf Emergency egress below grade Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/'/a hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Attic access 30 in.x 22 in.x 30 in.(ht.)In accessible area Crawl S _aces 18"x 24"access, i s . ft.-150 s . ft.vents Building No./Address visible from road Final Electrical Site Plan /Variance required Final Survey Plot Plan As Built Septic S stem/Sewer Dept. Inspection Sticker Flood Plain Certification, if required Okay to issue C/C or C 10 Temporary/Permanent J L:\PamW\Building&Codes\inspection FormslRes. Final Inso.form 2.docLast printed 2/12/04 COMMONWEALTH ELEdRICklSiNSPECTION SERVICE INC; ^1 Main Office'l7b Doe Run Road - Manheim, PA 17545 MUNICIPAL CERTIFICATE to ELECTRICAL APPROVAL � ► t Not iN11!lt►r►ttltfiHfrititflftttitttttftCe i /+� 7 5 9 19 Cut-i Permin Card No.N fl►tt##/tftii#ttirofoifftf### toll Len 6 6r V1 6TW V!Wks V 1*nerf ifffiifit!###t#tiffH!lrlq}t#trtffrft frffft►ittitt!!!fflfrfolifffftttttf ttrttfir ittofftrototftt!#t##►#rtiftNllt#ttttl#lfor ltfllfti►►►►t;rtNilifttif{tiff# l ifr! Wl Locata71,� 1, tHif♦ !flat ltrfgllNttt tot Ni r►ft t ion itttti flfflfllfti#lift Nfflfill##it#It11fflflittlttiMf!!lutiirtrfttft.tftrtttttrotfrftolNttfft/tt!!f#tltoolftlftti Installation Consisting o 0111ft ftlf#f1#itiit tfftuifftil#4 1ii#Ittiiaut�tia/titfjttl ii►riltlittnifilNii#!i iival.f♦fliiluriffflfl#uitufffffti attlNl►1i � Mrs ill! lti rfffioto$ trrl!##f!!if IfHI.♦♦lffffl� f i ffifrf lrt lMl it tiii!lttflitttiNNlHffgii Ntiitioilff iii toot!if Olt•/tint too♦fifrrrI oorrti♦.ottitflr f otoom# l..titfiit MfNlf!!llffrfrNl/1tl tfttoHtott♦lot t f&tooftf 6 fl lfttl♦iir 61Af6ol- 9, t Installed By.... t!!1Hllitilirllf ♦♦L+ci No, .ffftittf.1.t..#ii}�itiliftttiititft}ffttt♦NYit11 The conditions following governed the issuance of this certificate, and any certificate previously issued is cancelled; - This certificate only covers the electrical equipment and installation conditions as of date. Upon the t introduction of additional equipment or alterations, application shall he promptly trade for inspection. Inspectors of this Company shall have the privilege of makl inspections at any time, and if its p p rules are violated, the Company shall have the righ0#too ke thi ce ificatef swoj - atetoll tlltit► ttt008416116 frfoiiftfiftNfifffrt INSPECTOR t#ifN/lrotoff pot If 1644t14f0441 lr tottittfr if 19ff0ttitr4ffifR#iiltttl MSI t Member NIPtAt,I#AlEtI# c,, Ueensbury Building & Code Enforcei-nent - Residential Final Inspection 0 Office No.(518)761-8256 Arrive: anI m 2!pa a m Date Inspection request received: 0 Inspector's Initi`� a NAME: �h1L, IT#: 00 1" b I.q, LOCATION: .ATE: TYPE OF STRUCTUR : 6 Comments Y N N/A Chimney Ht./"B"Vent/Direct Vent Location Fresh Air Intake 3 inch,Plumb Vent through roof minimum 6" Roof Complete/Exterior Finish Com lete Guard 30 in.or more @ stairs,decks,patios Guard at stairwell at 34 in. or more Guard at deck,porches 36 in.or more Exterior Finish Complete Interior/Exterior Railings 34 in.to 38 in. Platform at"all exterior doors " Interior Handrails stairs 2 or more risers Enclosed Stairs Sheetrock Underside minimum '/" G sum w Grade away from foundation 6 in. with 10 ft. Handrail Termination at Newell Post or Wall 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18"above grade Gas Furnace shut-off within 30 ft. or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valves installed/Heat Trap/Water Temp, 110 z Interior privacy/trim/doors/main entrance 36 in. Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Dete tars: Every level: / Every Be 'room: x/ Outside every bedroom area Inter Connected: u/ / Battery backupe/ Carbon Monoxide Detector ✓ Bathroom Fans, if no window Plumbing fixtures Foundation insulation Floor truss,draft stopping fmished basement 1,004 sf � � Emergency egress below grade Basement stairs closed rise>4 inches Garage Floor Pitched Gara e.fire roofing/3/4 hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Attic access 30 in.x 22 iii.x 30 in.(ht.)In accessible area' Crawl Spaces I8"x 24"access, I s . ft.-150 s . ft.vents Building No./Address visible from road Final Electrical Site Plan l Variance required Final Survey Plot Plan As Built Septic System/Sewer Dept.Inspection Sticker Flood Plain Certification, if required Okay to issue C/C or C/O Temporary/Permanent L:\PamWlBuilding&Codesllnspection Forms\Res.Final Insp. form 2.docLast printed 2/12/04 Framing 1 Firestopping Inspection Report Office No. (518)761-8256 Date Inspection request received: 4�,1,9-ee'71 Queensbury Building&Code Enforcement Arrive: a �pn Depai pm 742 Bay Road, Queensbury,NY 112804 Inspector's Initia NAME: PERMIT#: LOCATION: INSPECT ON: �--TYPE OF STRUCTURE: > 01-4 Y N Framing COMMENTS Jack Studs Headers Bracing Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in.or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate I V2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft,floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2, 3,4 hour Fir stopping Venetration sealed 16 inch insulation in*cavity min. Garage Fire Separation House side V2inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in.(H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade LASuel-lerningway\Building.Codes.Inspection.FORMS\Frarning Firestopping Inspection Report.doc January 28,2003 . c Framing /FirestoPpin ,Inspection Report Tck�is Office No. (518)761-8256 Date Inspection request received: 1�1 Queensbury Building&Code Enforcement Arrive: am/pm Depart: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: n NAME: PERMIT#: 66. 't LOCATION: INSPECT ON: L 7--ot ay TYPE-OF STRUCTURE: Y N NIA Framing COMMENTS �r . Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in.' Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes I Bearing Walls Metal Strapping for Notches Top Plate 1 l2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1,2,3 hour ire wall,2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %Z inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above I below grade 5.0 sf grade L:\Suellemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 _ l � - Rough Plumbing 1 Insulation Ixspection Report Office No. (518)761-8256 Date Inspection request received: . Queensbury Building&Code Enforcement . Arrive: am/pm Depart: am/pm. 742 Bay Road,Queensbury,NY 12804 Inspector's Initials: NAME: PERMIT #: LOCATION:.. INSPECT ON:FIL TYPE OF STRUCTURE: �- Y N NIA. PVC: R-1,.R-2,I0,R-4-Drain/Vents Cast Iron, Copper,Drain/Vent 1 Comm. Plumbing Vent/-Vents in Place Rough Plumbing/Nail Plates'. 1 1/ inch min.Drain Size W ing Machine Drain 2 inch min. ead;or Air Supply Test = 4 Drain and Vents 5 TSI.or 10 feet above highest connection for 15 minutes Cleanout every 100 feet 1 change of direction Water Supply Piping ` Cooper Commercial "er,CPVC,Pex One and Two-Family 1,41fs-ulation]Residential Check 1 Commercial Check Proper Vent,Attic Vent Duct 1 Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properlyNo duct tape COMMENTS:, L:\sueHemingway\Buiiding.Codes,Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003" Rough Plumbing / Insulation Re port eport Office No. (518) 761-8256 Date Inspection request received: JL -AL ' !"�� Queensbury Building&Code Enforcement Arrive: am/1 D part: /pm p 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: V NAME: PERMIT #: LOCATION: INSPECT ON: 44 TYPE OF STRUCTURE: Y r$ N/A fVC: R-1,R-2,R-3,R4 Drain/Vents /Cast]Lron,Copper Drain/Vent/Comm. -Plidn bin g.Vent./Vents in Placp,, ough Plumbing/Nail Plates'W)A ia,-- I % inch min.Drain Size P"A's ing Machine Drain 2 inch min. "Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction Water Supply Piping Cooper Commercial Cooper,CPVC,Pex One and Two-Family Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed prope Ul No duct tape.COMMENTS: Ck,� l 1 �� �70 L-\SueHemingway\Building.CGdes.hispection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003 FV Framing /Firestopping-Inspection Report Office No. (518)761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Airive:- am/p part am/pm 742 Bay Road,Queensbury,NY 1.2804 Inspector's Initials: NAME: Wo JNQO PERMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: .-�S N 1vtA COMMENTS raming Tack Studs/Headers Bracing/Bridging Joist hangers6 '� Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. - Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 Vz(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2,3 hour. Fire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation• House side %a inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling1wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2Q43 Foundation Inspection Report Office No. (518)761-8256 Date Inspection request received: ' Queensbury Building&&Code Enforcement Arrive: am/p l .' arn/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: PERMIT#: LOCATION: INSPECT ON: — TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump. Footing Drain Stone: 12 inch width 6 inch a ove footing 6 0l for wet areas under slab ackfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:1SueHenzingway\Building.Codes.Inspection.FORMS\Foundation Inspection Reportdoc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection Ourceiv : 6 Queensbury Building&.Code Enforcement Arrive: r epart:742 Bay Rd., Queensbury,NY 12804 Inspector's Intl Z' ) Nam: P Z#: LOCATION: SPECT ON: F TYPE OF STRUCTURE: Comments Y N NIA outings . Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump. Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior 1 Exterior R- Rough Grade 6 inch drop within 10 ft. L:1SucHemingway\Bttilding.Codes.Inspection.FORMS\Foundation Inspection Reportdoe January 28,2003 Jab Site Address; ,s l Date: Owner: �, s Application No. File No. �. WINDOW SCHEDULE �n+�' � '�,�,k�'u ,�,J �.;;.«Q 1 D�JQQ�y`raj�t' ,,,�a�w�t'tk�t��tt��'•''�'. •t�':�>`t"w�';�.:,?::',s•�y::,�: . •14'� 4, T�Y��.Y ,,..int.+r�eil;:iw� i :La%Nf'i:Gn..•.1:•.`wr:�:. Window Window Mfg, Window Unit or " ': .> ..`: Cle Number .,::.rw :y,� . ,. 5 's; G Special Hardware or ber or Name Model Stock OpeCt Qpen�ng Gla�ssrb" "la �ss� 1' e e n er hG Instructions Letter onp Or Type Number c7 7' ' .•r��JOSt�,,� '�7�`�a�.��y •��� fR ;�q�1°i C 2"`4M` 6 P y ;?r�ylt Ill 3�o t t Plan 1ci i 7a 7 9a! t t�yJ •7 v, Call Site rvu7tt !1 Ti C 4 F11 7 t C 7 s h S p,t�tFp t� U#�fA� r i t Big �r 32,s�y ���i7 d,2.6 Vi 3� 3m ryj j 1t Z� 3 �Vy 31611 yl�fi, ?V 61 i 7 1303o <y 3s% V'3 �v� 35'rZsr'� .d, --PHIS LINE HAS EXAMPLES OF SAMPLE ENTRIES Temper ` x i�'•. „L+ Xff, .}",' " 1' 1 (� !< Jly°i� �Ltx� �)Y��i,!t;x ,.�fn}'t' , ,��t �r%'� � °:' r >� Jtl , ,`' ,,�1` r{f;•t"� d e A '� M "f� ' '`,��,t�::SA ,'�.�"•1;r• '!, t r'{�hh'¢i q ��'t �. •'$ti W 6 .J.'s.: , r• Glazing ed '�^ 'n�" .i{�, ° .�� ���' �,.tr •,��;.. ,. Kra Y iJ�ti,.,.�;;, y ��{'t ,`�H ,��,�;¢ � Yt7�, � $�' ' ? uj�t ��' ,„4`,. �,,d, yi '� Sq7�� � �, T. f ht+•'iY � 9`���i:�l,'��y4 1�.a�.,�yn, rd'r'J U. �lla�"+;,t.r;��'•.. :1�,'t'fk•r:j1YAK+'�h' Si�°r11�:. .g di.1Tx';' �;"r�»ifrn.b: .r6�:'M n,�r^?,yi'.' �i� L,,1SueHemingwaySuilding,Perm!LFORMSIWindow Schedule.doc Job Site Address: 4. Date: q•41.03 Owner: Application No. File No. Building Penult— Calculation Sheet Natural Light, Ventilation & Emergency Egress Requirements Habitable Area of . Req.Light Actual Req,Vent Actual Sq.Ft, Remarks Room Room &%of Room Light. 4%of Room Vent Opeu hg for in Area Square Area Square Egress Square : t Footage Footage Feet .zy Atf IV4 44 - &zr Rz ma�' All L,ISueHemingwaylBuilding.Permit,FQRMS1Nat,Light.Venhl,Calculagon.Sheet,doe ix J Pe ber 10 0-17 REScheek Compliance Certificate Checked By/DatJ 1995 MEC ' REScheckSoftware Version 3.5 Release lb Data filename:Untitled.rck TITLE:John Hughes CITY: Glens Falls ®�F(,�U� 200, STATE:New York HDD:7635 CONSTRUCTION TYPE: Single Family DATE:09/25/03 DATE OF PLANS: 9/25/03 PROJECT INFORMATION: 6 Leisure Lane COMPLIANCE:Passes Maximum UA=265 Your Home UA.=228 14.0%Better Than Code(UA) Gross Glazing Area or Cavity Cont. or Door Perimeter R-Value R-Value U-Factor UA Ceiling 1:Flat Ceiling or Scissor Truss 1352 38.0 0.0 41 Wall 1:Wood Frame, 16"o.c. 340 19.0 0.0 16 Window 1:Vinyl Frame:Double Pane with Low-E 76 0.340 26 Wall 2: Wood Frame, 16"o.c. 172 19.0 0.0 8 Door 1: Solid 36 0.330 12 Wall 3:Wood Frame, 16"o.c. 357 19.0 0.0 18 Window 2: Metal Frame with Thermal Break:Double Pane with Low 59 0.340 20 Wall 4:Wood Frame, 16"o.c. 187 19.0 0.0 10 Window 3:Vinyl Frame:Double Pane with Low-E 21 0.340 7 Crawl 1:Masonry Block with Integral Insulation 1040 0.0 10.0 70 Wall height: 7.0' Depth below grade:6.5' Insulation depth: 5.0'. Furnace 1:Forced Hot Air,80 AFUE COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 1995 NEC requirements in RESchecMrsion 3.5 Release lb (formerly MECchenl and to comply with the mandatory requirements listed in the RESchecklaspection Checklist. Builder/Designer GYM Date_jjX-0 3 REScheck Inspection Checklist 1995 MEC REScheckSoftware Version 3.5 Release lb DATE:09/25/03 TITLE:John Hughes Bldg. I Dept. Use Ceilings: 1. Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Above-Grade Walls: 1. Wall 1:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: 2. Wall 2:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: 3. Wall 3:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: - 4. Wall 4:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: Windows: 1. Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.340 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: 2. Window 2:Metal Frame with Thermal Break:Double Pane with Low-E,U-factor:0.340 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments 3. Window 3:Vinyl Frarue:Double Pane with Low-E,U-factor: 0.340 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: 1. Door 1: Solid,U-factor:0.330 Comments: Crawl Space Walls: 1. Crawl 1:Masonry Block with Integral Insulation,7.0'ht/6.5'bg15.0'insul, R-10.0 continuous insulation Comments: Applies to walls of unventilated crawl spaces. Heating and Cooling Equipment: 1. Furnace 1:Forced Hot Air,80 AFUE or higher Make and Model Number Air Leakage: Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage must be sealed; , Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly with a.0.5"clearance from combustible materials.If non-IC rated,the fixture must be installed with a I 3"cleaiance from insulation. Vapor Retarder: [ ] I Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. I Materials Identification: [ ] I Materials and equipment must be identified so that compliance can be determined. Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. [ ] I Insulation R-values,glazing U factors;and heating equipment efficiency must be clearly marked on I the building plans or specifications. I Duct Insulation: [ ] I Ducts in unconditioned spaces must be.insulated to R-5. Ducts outside the building must be insulated to R 8.0. Duct Construction: - [ ] I All ducts must-be sealed with mastic and fibrous backing tape. Pressure-sensitive tape may be used I for fibrous ducts: Duct tape is not permitted. [ ] I The HVAC system must provide a means for balancing air and water systems. Temperature Controls: [ ] I Thermostats are required for each separate HVAC system. A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided. I Circulating Hot Water Systems: [ ] I Insulate circulating hot water pipes to the levels in Table 1. I - Swimming Pools: [ l I All heated swimming pools must have an on/off heater switch and require a cover unless over 20% of the heating energy is.from non-depletable sources. .Pool pumps require a time clock. I . I Heating and Cooling.Piping Insulations [ ] I HVAC piping conveying fluids above 120 OF or chilled fluids below 55 OF must be insulated to the i ,levels in Table 2. - Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes. Insulation Thickness in Inches by Pipe Sizes Heated Water Non-Circulating Runouts Circulating Mains.and Runouts Temperature(F) up to VI Up to 1.2511 1.511 to 2.0" Over 211 170480 0.5 L,0 1.5 2.0 140-160 0.5 0.5 1.0 1.5 100-130 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thickness for RVA C Pipes. Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range(F) 2"Runouts V and Less 1.25"to 2" 2,5"to 4" Heating Systems Low Pressurefremperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1.0 1.5 Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water,Refrigerant, 40-55 0.5 0.5 0.75 1.0 and Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD (Building Department Use Only) , It�� ar � Po red GArAyl G I u! ,i 1 1 r