Loading...
Draft Resolution Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804-5902 Town of Queensbury Planning Board RESOLUTION TO APPROVE / DISAPPROVE SITE PLAN 5-2012 DKC HOLDINGS Tax Map ID 308.12-1-7.1 Applicant proposes after the fact A site plan application has been made to the Queensbury Planning Board for the following: approval for a material storage area on lands within the CLI zone of the parcel. Further, applicant seeks approval for the grading and stabilization of those lands currently utilized as material storage within the MDR zone on the parcel. Construction Company in a CLI zone and disturbance of more than one acre requires PB review and approval. A public hearing was advertised and held on 5/17/2012; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SITE PLAN NO. 5-2012 DKC HOLDINGS, Introduced by _________ who moved for its adoption, seconded by __________: 1)Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; 2)The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative / Positive Declaration; 3)If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; 4)The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; 5)Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; 6)The applicant must submit a copy of the following to the Town: a)The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit or for coverage under an individual SPDES prior to the start of any site work. b)The project NOT (Notice of Termination) upon completion of the project; 7)The applicant must maintain on their project site, for review by staff: a)The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; b)The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. 8)Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; “Home of Natural Beauty-A Good Place to Live” 9)As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy; Duly adopted this 17 day of May 2012, by the following vote: th AYES: NOES: Cc: Van Dusen & Steves; Nace Engineering “Home of Natural Beauty-A Good Place to Live”