Loading...
Nace Engineering.10.25.200010-2S-2000 7:39AM �OM STEVES/NACE/MILLER S18 74P8S11 P.1 O T 2 5 ZO 169 Haviland Road, Queensbury, NY 12804 Phone- 518.745- 400 Fax .518-792-8511 0 ;q October 25, 2000 Job # 47309 Mr. Chris Round VIA FAX — 745-4437 Queensbury Planning Department Town Hall 742 Bay Road Queensbury, NY 12804 RE: Site Plan No. 51-2000 Garden Time/Barrett Auto Sales Dear Mr. Round: I have received a copy of the revised Site Plan and Grading Plan for the referent project. I have reviewed the changes in these plans to determine their impact on the previously prepared Stormwater Management Report. The two changes are the elimination of the Quaker Road driveway and parking area and the lengthening of the culvert adjacent to the existing Garden Time parking lot. The size of this culvert has also been increased from 30 inch diameter to 36 inch_ The elimination of the Quaker Road driveway and parking lot decreases the amount of impervious surface and reducees the runoff into the proposed detention areas. I have checked the proposed 36-inch, 91-foot long culvert and find that it has much more than the needed capacity. In conclusion the proposed changes have only a positive impact on the drainage design for this site. Please let me know if there are any further questions or concerns. Sincerely, 01-�� Thomas W. Nace, P.E. cc: Garden Time, Inc. — Fred Troelstra