Loading...
Site PlansCall Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York Hutchins Engineering PLLC X X X X X X X X X X X CIRF CIRFIPF CIRF IPF IRF Garage Adjoining House Adjoining Garage Adjoining House Two Story Wood F r a m e H o u s e Boat House Shed Lean ToSlate Walk B.M. Top Nail in Root = 337.00' Patio Remains Screen PorchF.F. Elev.=329.97'F.F. Elev.=33 0 . 1 8 'ConcreteDock Dock Wood Cover Concrete w/ Wood Cover Concrete Walk Concrete Walk Retaining Wall Conc. Wire Fence Well Casing  “7R6KRUH  “7R6KRUH  “$ORQJ6KRUH 6ƒ ( 177.02'1ƒ (59.73'165.95' 1ƒ : Area 10406.1 Sq. Feet 0.24 Acres “ “ “ “ “ “  “ “ “Vinyl Fence310 Cleverdale Road Lands N/F of Joseph & Carolyn Potvin B:1442 P:13 226.12-1-81 304 Cleverdale Road Lands N/F of Carol B. Wright & Paul J. Scilipoti B:5770 P:68335U.P. NM38 .CMG )GQTIG 5CPF[ $C[ 226.12-1-83 308 Cleverdale Road Lands of Robert & Jean Tarrant B:779 P:261 226.12-1-82 226.12-1-10 311 Cleverdale Road Lands N/F of Bray 226.12-1-9 309 Cleverdale Road Lands N/F of Craft 226.12-1-8 307 Cleverdale Road Lands N/F of Eafrato REPUTED LAKE WATER SUPPLY REPUTED LAKE WATER SUPPLY LAKE WATER SUPPLY REPUTED COMMUNITY WATER SUPPLY WELL HOLDING TANK PER BLDG PERM. 89-528 REPUTED COMMUNITY WATER SUPPLY ETU & SAND FILTER BEHIND HOUSE APPV'D BOH VARIANCE REQUESTS MAY 2,2022 SEPTIC IN REAR PER BLDG PERM. 95-373 ESTIMATED W/W SYSTEM ESTIMATED EXISTING W/W SYSTEM UNKNOWN W/W SYSTEM .CMG )GQTIG  “ “ “  “DECKDECK DOCK 20" CEDAR 20" CEDAR 18" CEDAR 18" CEDAR 18" CEDAR 18" CEDAR 22" CEDAR 36" CEDAR Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York 291791-01-S2MagneticWWWWW X X X X X X X X X X X CIRF CIRFIPF CIRF IPF IRF Garage Adjoining House Adjoining Garage Adjoining House Two Story Wood F r a m e H o u s e Boat House Shed Lean ToSlate Walk B.M. Top Nail in Root = 337.00' Patio Remains Screen PorchF.F. Elev.=329.97'F.F. Elev.=33 0 . 1 8 'ConcreteDock Dock Wood Cover Concrete w/ Wood Cover Concrete Walk Concrete Walk Retaining Wall Conc. Wire Fence Well Casing  “7R6KRUH  “7R6KRUH  “$ORQJ6KRUH 6ƒ ( 177.02'1ƒ (59.73'165.95' 1ƒ : Area 10406.1 Sq. Feet 0.24 Acres “ “ “ “ “ “  “ “ “Vinyl Fence310 Cleverdale Road Lands N/F of Joseph & Carolyn Potvin B:1442 P:13 226.12-1-81 304 Cleverdale Road Lands N/F of Carol B. Wright & Paul J. Scilipoti B:5770 P:68335U.P. NM38 .CMG )GQTIG 5CPF[ $C[ 226.12-1-83 308 Cleverdale Road Lands of Robert & Jean Tarrant B:779 P:261 226.12-1-82 226.12-1-10 311 Cleverdale Road Lands N/F of Bray 226.12-1-9 309 Cleverdale Road Lands N/F of Craft 226.12-1-8 307 Cleverdale Road Lands N/F of Eafrato REPUTED LAKE WATER SUPPLY REPUTED LAKE WATER SUPPLY LAKE WATER SUPPLY REPUTED COMMUNITY WATER SUPPLY WELL HOLDING TANK PER BLDG PERM. 89-528 REPUTED COMMUNITY WATER SUPPLY ETU & SAND FILTER BEHIND HOUSE APPV'D BOH VARIANCE REQUESTS MAY 2,2022 SEPTIC IN REAR PER BLDG PERM. 95-373 ESTIMATED W/W SYSTEM ESTIMATED EXISTING W/W SYSTEM UNKNOWN W/W SYSTEM .CMG )GQTIG  “ “ “  “ GARAGE IRF DECKDECK DOCK SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFFM FM FM FM FM FM FM FM WWW W W W W W W W W W W W W 20" CEDAR 20" CEDAR 18" CEDAR 18" CEDAR 18" CEDAR 18" CEDAR 22" CEDAR 36" CEDAR Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York 291791-01-S3Magnetic Hutchins Engineering PLLCCall Before You DigWait The Required TimeConfirm Utility ResponseRespect The MarksDig With Care800-962-7962www.digsafelynewyork.comDigNew York291791-01-S4 Drawing Not To Scale 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the slope by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" (30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3.Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. 5.Consecutive RECPs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire RECPs width. Drawn on: 3-16-11 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5" (5-12.5cm) 3B 4 2 5 1 3A 12"(30cm) 6" (15cm) 6" (15cm) *NOTE: In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. 3"(7.5cm) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-772-2040 www.tensarnagreen.com Hutchins Engineering PLLC Call Before You Dig Wait The Required Time Confirm Utility Response Respect The Marks Dig With Care 800-962-7962 www.digsafelynewyork.com Dig New York 291791-01-S5