Loading...
Pre_ApplicationTown of Queensbury Site Plan Pre-Submission Conference Form / Section 179-9-040 1. Applicant Name: __________________________________________________ 2. Tax Map ID ________________ Location: _______________________ 3. Zoning Classification __________ 4. Reason for Review: __________________________________________________________ 5. Zoning Section #: ________________________ 6. Pre-Submission Meeting Notes: Provided Outstanding; Please provide by Deed ____ _____________ General Information complete ____ _____________ Site Development Data Complete ____ _____________ Setback Requirements Complete ____ _____________ Additional Project Information Complete ____ _____________ FAR addressed ____ _____________ Requirements for Site Plan-Standards ____ _____________ Checklist items addressed ____ _____________ Environmental Form completed ____ _____________ Signature Page completed ____ _____________ Staff Representative: ________________________________ Applicant / Agent: ________________________________ Date: ___________ Southern Gateway Renewables 303.8-1-1(54.37ac), 303.12-1-3(25.24ac)West Side of Queensbury Avenue south of airport CLI Project includes 27 acre fenced area with 8.25 ac of ground mounted 5.MW solar array farm on property of the County Airport 179-5-140 Renewable, 179-10 SUP Solar, 179-3-040 CLI x x x NA X X X recehck tax id numbers none difficult with North and South together " " Chris Clark & Dallas Manson? titles needed Laura Moore via email 07/07/2022 Applicant proposes to utilize 27 acres of the 80 ac parcel for a 8.25 acre 6.5MW or 5.0MW? solar farm on land of the Warren County Airport. Project work includes fencing, stormwater management, and equipment areas. The hard surfacing total with existing and proposed is 1.07 ac of hard surfacing with equipment pads. Site disturbance of 27.4ac. Panel height is 16.5 to 19.5 ft. Review required is Site Plan, Special Use Permit. Items reviewed: site plan application, site plan drawings, SWPPP 1) Clarification needed on MW 6.5 (EAF) or 5.0 (Narrative) 2) Separate North and South - Project Narrative, Site Plan Review Requirements, Special Use Permit general criteria and specific criteria, and EAF 3) will need dimensions on the equipment unit and individual concrete pad 4) confirm with emergency service road width needs and drive length 5) any lighting needs? 6) is there a glare study? 7)South D7 Sheet C301 D, B2 Sheet C304 D -symbol looks like wetland square - or is it just denoted as wet but not a wetland? 8) signature page - will need names and titles as part of signature page 8