Loading...
Signed Inspection Report (Mon Aug 1, 2022 at 339 PM)INSPECTION WORKSHEET (RPLUM-019894-2022) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0591-2021 Case Module:Permit Inspection Date:Mon Aug 1, 2022 Inspection Status:Partial Pass Inspector:Smith, Mark Inspection Type:Rough Plumbing Job Address:Parcel Number:26 WHITBECK DR Queensbury, NY, 12804 289.19-1-27 Contact Type Company Name Name Contractor BBL Construction Services Granted Permission BBL Construction Services Architect HCP Architects, LLP Applicant BBL Construction Services Primary Owner Rosetti Acquisitions LLC Checklist Item Status Permit Card Visible From Road Failed Building Inspector Notes Failed 4/26/22 partial approval for rough plumbing - plumbing under slab approved. 7/15/22 partial approval for rough plumbing - duct sealing verified, two units at east end of building, second floor not completed, call for recheck when ready. 8/1/22 partial approval for rough plumbing - plumbing for domestic water supply approved - sanitary drains and vents approved - install missing nail plates as discussed on site, call for recheck Plumbing Under Slab Passed Aug 01, 2022 Page (1) INSPECTION WORKSHEET (RPLUM-019894-2022) Checklist Item Status 4/26/22 partial approval for rough plumbing - plumbing under slab approved. Sanitary plumbing tested with air head test, holding 5 psi for 15 minutes. Rough Plumbing / Nail Plates Failed Install missing nail plates as discussed on site, call for recheck Plumbing Vent Vents in Place Passed 3" Vent Through Roof - 18" min Passed 1 ½ inch minimum Drain Size Passed Washing Machine Drain 2 inch minimum Passed Washing Machine Trap: 18"-42" discharge Passed 5 psi or 10 ft. above highest conn. for 15 minutes Passed Sanitary plumbing verified with water head test. Water Supply Piping Passed Air Head Passed 50 P.S.I for 15 minutes Passed Holding 60 psi for 15 minutes Air Test Gas Piping 10 psi for 10 Minutes Failed Aug 01, 2022 Page (2) INSPECTION WORKSHEET (RPLUM-019894-2022) Checklist Item Status All Return Air Hard Duct Work Passed Duct Insulation - if required in unheated spaces Failed Duct work sealed properly Passed 7/15/22 partial approval for rough plumbing - duct sealing verified, two units at east end of building, second floor not completed, call for recheck when ready. Aug 01, 2022 Page (3) Smith, Mark