Loading...
CC-0085-2022 1 Office Use Only ADDITION/ALTERATION PERMIT Permit#: C4,— 0065— V)2Z�, APPLICATION Permit Fee:$ M02 .br-� Town of Queensbury 742 Bay Road,Queensbury,NY 12804 Invoice#:�IeCQ 1 P:518-761-8256 www.gueensbury.net G Flood Zone? Y gReviewed By: { 'L Project Location: STARBUCKS COFFEE 607 AVIATION RD, QUEENSBURY, NY 12804 Tax Map ID#: 302.6-1-41 Subdivision Name: PROJECT INFORMATION: TYPE: Residential X Commercial, Proposed Use: —Single-Family —Two-Family _Multi-Family(#of units ) _Townhouse _Business Office _Retail _Industrial/Warehouse _Garage (#of cars_) _Other (describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 3,436 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement (habitable space): Basement(habitable space): Total sq ft: Total sq ft: 3,436 Scope of work to be done: RENOVATION TO THE EXISTING STARBUCKS COFFEE SHOP INTERIOR SCOPE: � � _ w •.NEW INTERIOR PARTITIONS , • NEW CEILING & SOFFITS • NEW FLOOR, WALL AND CEILING FINISHES MAR -o • NEW CASEWORK $ 20Z? • NEW FURNITURE & EQUIPMENT TOy�N • NEW PLUMBING FIXTURES OF QUEENSBURY • NEW LIGHTING BUILDING� CODES • REPLACEMENT OF WALK IN COOLER EXTERIOR SCOPE: • NEW BUILDING SIGNAGE (TO BE FILED UNDER SEPERATE PERMIT) • NEW EXTERIOR FINISHES • NEW TRASH ENCLOSURE Addition/Alteration Application Revised January 2021 ti ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ $250,000 2. Source of Heat (circle one):LE3 _Oil _Propane Solar Other Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? YES --a) Explain: 4. Are there any easements on the property? _YES NO SITE INFORMATION: • Is this a corner lot? _YES NO • Will the grade be changed as p rpstilt of the construction? _YES NO • What is the water source? I PUBLIC _PRIVATE WELL • What type of wastewater system is on the parcel? SEWER PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans, additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of certificate of occupancy. I have read and agree to the above: PRINT NAME: DANIEL B N -STARBUCKS PERMIT AGENT SIGNATURE: DATE: 03/03/22 Addition/Alteration Application Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): DANIEL BRENNAN -STARBUCKS PERMIT AGENT Mailing Address, C/S/Z: 8 STONEGATE LANE, SALEM NH 03079 Cell Phone: ( 603) 505 5633 Land Line: 603 )505 5633 Email: DPBPERMITS@GMAIL..CbM • Primary Owner(s): Name(s): PETER BALTIS Mailing Address, C/S/Z: 141 SWIFT ROAD, VOORHEESVILLE, NY 12186 Cell Phone: ( ) (518)475-0088 Land Line: �_)(518)475-0088 Email: PBALTIS@YAHOO.COM ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): TBD Contractor Trade: Mailing Address, C/S/Z: Cell Phone:�_) Land Line: _L_) Email: **Workers' Comp documentation must be submitted with this application** Arch itects)/E nit!neer(s): Business Name: BERGMANN -Architects I Engineers I Planners Contact Name(s): Heather VanTrieste I Senior Designer Mailing Address, C/S/Z: 181 WASHINGTON STREET, CONSHOHOCKEN, PA 19428 Cell Phone:() 484.567.7681 Land Line: _�)(610) 834-4080 Email:hvantrieste(-Qbergmannpc.com Contact Person for Compliance in regards to this project: DANIEL BRENNAN -STARBUCKS PERMIT AGENT Cell Phone: 603-505-5633 Land Line: 603-505-5633 Email: DPBPERMITS(&GMAIL.COM Addition/Alteration Application Revised January 2021 BERGMANN ARCHITECTS ENGINEERS PLANNERS March 25, 2022 Starbucks—Queensbury Fire Marshal's Office Town of Queensbury 742 Bay Road Queensbury; NY 12804 Michael Palmer, Please see the following comment response for review comments received from the Plan Review for the Starbucks Coffee submission to be located at 607 Aviation Rd, Queensbury Rd 12804: 1. Verify fire extinguisher location and inspection. Fire extinguisher is located in the workroom per sheet 1101, keynote#21. 2. Verify location of exit/emergency lighting. Function test will be required. All exit signs and- emergency lighting are.shown on architectural sheets 1103 8t 11011 (RCP& Lighting plans) and electrical sheet E102. Function test will be coordinated with on site GC team and Starbucks Construction manager. 3. Verify paths of egress. Paths of egress are shown on sheet G002. There are (2) exits located in the cafe for em'ployee:and customer egressing as well as (1) exit in the workroom. 4. Verify storage. There will be a new standard walk in cooler installed that is,replacing.the existing cooler like for like. S. Verify clearances to the electrical service panels. The electrical panels are located within their own . separate area in the workroom along the rear shell wall. They:all have 3' clear for access. 6. CO detection is required, if source is present._ There are no new CO detectors called out as we are re- using equipment and plan to keep the existing. 7. ,Verify Knox Box keys.are correct. We have added a general note on sheet G001 for the GC to confirm this item in the field. 8. Verify exterior emergency light function. GC to verify condition of.all exterior_emergency lighting on site and replace if necessary.A general note has been added to,sheet 1103. 9. NFPA 72 letter of compliance required if any changes or relocation of.fire alarm devices. This will need to be submitted by the fire alarm contractor as this.is a delegated design. We have informed the CM to coordinate this item. 10. NFPA 13 letter of compliance required for any alterations to'the sprinkler system. This will need to be submitted by-the sprinkler vendor as this is a delegated design. We have informed the CM to coordinate this item. 11..Contractor to exercise caution and provide protection for all fire alarm and sprinkler devices, during construction as per Chapter 33 IFC. A general note has been added to sheet 1103. 0Sinc ly,- t Wrasman DISCIPLINE LEADER, BERGMANN - 1524 Delancey St. TEL:215.735.1524. Philadelphia,PA 19102 www.bergmannpc.com GBm25 aw4r &44z~ High Efficiency Grease Interceptor Technical Data Submittal I Special Precautions I Specifications I Installation I Application Specific Details /2711 41/4" (10.8 cm) 15" (38.1 cm) 10s/A.- (27.3 cm) 21„ a (53.3 cm) SUBMITTAL STAN DARD:3'plain end inlet/outlet I Capacities-Liquid:22 gal,(83 L);Grease:75 lbs.(34 kg)(10.4 gal./39.3 L);Solids:6.4 gal.(24 L) Light Duty,bolted,gas/water tight polyethylene covers.(450 lbs.when direct buried,2500 Ibs,when using the SR-16 Riser) OPTIONS: APPROVAL: ❑ 2'Plain End SCH.40 Inlet/Outlet TeleGlide Risers ❑ 2'Male Thread Inlet/outlet ElSR16>2-1/8°—16° Signature: ❑ 3"Male Thread Inlet/Outlet ❑ CC16>2-1/8'—16'with Integrated Date: Pumpout Port(Small) Membrane Clamping Collar Kit Company: Specifying Engineer: Engineering Firm: SCHIER MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G B-25 25 GPM-22 gallon capacity INTERCEPTORSLIFETIME GUARANTEED GREASE PART tt:4015-001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: 00 00 a Copyright 2016 Schier.All Rights Reserved page 1 of 6 AN SPECIAL PRECAUTIONS AMFor All Schier Grease Interceptor Installation Instructions High Temperature Kitchen Water Installation instructions and additional components are located inside If water is entering the interceptor at excessive temperature(over 140°F), the interceptor.Read all instructions prior to installation,This interceptor a drain water tempering valve(DN)must be installed.Most state and is intended to be installed by a licensed plumber in conformance with all local plumbing codes prohibit water above 140°F being discharged into local codes. the sanitary sewer.Water above 140°F will weaken or deform PVC Schedule 40 pipe,poly drainage fixtures like interceptors and erode the o®o o 0 0 oog®mg coating of cast iron(leading to eventual failure).Failure to follow this Oo��gg guidance voids your warranty. o woo w oo o O H $v S � o gg�X� $o$ INsfaltAflp e 8 0 high temperature drain water S o$$ IpN6 effluent(>140°F) tempering valve(DN) ®Sovo cold water supply line Interceptor When Installing Interceptor Inside +i� If your dishwashing,sink(s)discharges into a floor drain/sink(drain),you High Water Table Installations must regulate the flow into the drain to avoid an overflow of water onto Interceptors and risers are not designed to withstand water table height in the kitchen floor.This can be done by installing a valve or flow restriction excess of the top of the unit when buried(see figure).If it is possible for this cap on the sink piping that discharges into the drain.See drawing below to occur,install the interceptor and risers in a water-tight concrete vault or for guidance.For detailed guidance on indirect connections,go to: backfill with concrete or flowable fill(wet concrete and flowable backfill httpVAvebtools.schierproducts,com/Technical_Data/Indirect_Connections.pdf should be poured in stages to avoid crushing the interceptor).At risk areas include but are not limited td tidal surge areas,floodplains and areas that Fernco or similar receive storm water.Failure to follow this guidance voids your warranty. rubber flow Models G13-50,G13-75,and GB-250 that are direct buried in high water restriction end cap table scenarios must be installed with model AK1 anchor kit or warranty _ _ is void. O _ max water table height for O direct burial Interceptor Interceptor Hydrostatic Slabs-(or Pressure Slabs) model AK1 When installed under a hydrostatic slab(slab designed to withstand anchor kit upward lift,usually caused by hydrostatic pressure)interceptor must be enclosed in a watertight concrete vault.Failure to follow this guidance voids your warranty. concrete slab Interceptor subject to hydrostatic pressure watertight concrete vault MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G B-25 25 GPM-22 gallon capacity - PART n:4015=001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: page 2 of 6 SPECIFICATIONS Outlet (Optional) NOTES 1. 3"plain end inlet/outlet 2. Unit weight-w/standard covers:31lbs, INLET utlet"B" 3. Maximum operating temperature:1400 F continuous o (Standard) 4. Capacities-Liquid:22 gal.;Grease:75 lbs.(10.4 gal.); A , A Solids:6.4 gal. 5. Built-in Flow control, 21" , J 6. For gravity drainage applications only. 7. Do not use for pressure applications. S. Cover placement allows full access to tank for proper maintenance. 9. Vent not required unless per local code. 10.Engineered inlet and outlet diffusers are removable Outlet"C" to inspect/clean piping. (Optional) 6-1/4" 11.Integral air relief/Anti-siphon/Sampling access. DIFFUSION FLOWTECHNOLOGY The inlet diffuser splits influent into three paths,creating 16"Cover laminar flow and utilizing the entire liquid volume of the tank for efficient grease separation.The calibrated openings greatly reduce effluent turbulence.The effluent enters the main chamber without disturbing the existing grease or of plain end See Note#10 sediment layers. in et and outlet The integral air relief/anti-siphon in the top of the outlet diffuser allows pressure stabilization within the unit during operation.The bottom of the outlet diffuser allows only 4-1/4" effluent which is free of grease to exit the tank.It can easily _ _______ _ be attached to any of the three outlets provided to ease jobsite piping layouts. 15" U 0 ENGINEER SPECIFICATION GUIDE 10-3/4" Static water 9"invert Schier Great Basin TM grease interceptor model#GB-25 line shall be lifetime guaranteed and made in USA of seamless, rotationally-molded polyethylene.Interceptor shall be furnished for above or below grade installation.Interceptor shall be certified to ASME A112.14.3(type C)and CSA B481.1, with field adjustable riser system,built-in flow control,built-in LEngineered inlet and test caps and three outlet options.Interceptor flow rate outlet diffuser shall be 25 GPM.Interceptor grease capacity shall be 75 lbs. (see.description) Cover shall provide water/gas-tight seal and have minimum 450 lbs.load capacity. SECTION A-A CERTIFIED PERFORMANCE Great Basin hydromechanical grease interceptors are third . party performance-tested and listed by IAPMO to ASME 22-1/4" #A112.14.3 and CSA B481.1 grease interceptor standards and greatly exceed requirements for grease separation and 21" storage.They are compliant to the Uniform Plumbing Code and the International Plumbing Code. Up0 Up0 O O C O OUTLET i VIEW OMERMODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Greas;1nter;ceptoJr GB-25 . 25 GPM-22 gallon capacity PART tt:4015-001-XX DWG BY:C.O'Boyle DATE:10/O8/2015 REV: 2 07/07/20 66 page 3 of 6 INSTALLATION oof3) Native soil Backfill Concrete slab WARNING!DO NOTAIR TEST UNIT OR TELEGLIDE Well packed base RISER SYSTEM!Doing so may result in property damage, Finished grade personal injury or death. 450 Max Load LEAK/SEAL TESTING ❑ Cap/plug-all base unit plumbing connections and remove covers.For base unittesting,fill with water tojust above the highest connection.For • riser system testing(if required)fill with water to finished grade level. „ CAUTION:Risers must be supported before filling with water to ° prevent tipping.Filled risers will be heavy. Inspect unit,connections Flush with floor installation and all gaskets and clamps(if applicable)for leaks.Check water level ate specific time intervals per local code. Flow �& Riser Max Load . GENERAL INSTALLATION INSTRUCTIONS control Reber Max Load Schier grease interceptors are rated and manufactured with an internal plate —. flow control system.They do not require an external flow control system ❑ O or air intake vent.Schier grease interceptors are not to be installed in any other manner except as shown.Consult local codes for separate trapping IL I I requirements,cleanout locations and additional installation instructions. 1. The flow control plate is installed on this unit.When the unit is installed in a low flow/low head pressure condition(with a flow rate below 25 GPM),the flow control plate may be removed,Consult a Riser Installation Schier Representative before removing flow plate. (see page 4 for more details) 2. Set unit on level solid surface as close as possible to fixtures being served, S. Connect outlet diffuser to the desired outlet(A,B,C).Unit is shipped with FLOWCONTROL the outlet diffuser in location B and sealing caps on locations A and C. PLATE DETAIL BACKFILL DETAIL 4. Connect inlet and outlet drainage lines to unit.Mechanically couple pipes to unit.Do not solvent weld. NOTE:Do not install below a hydrostatic slab. Vent INTERIOR BELOW GRADE INSTALLATION INSTRUCTIONS EXCAVATION „ 1. Install unit(s)as close as possible to fixtures being serviced. 2500 ibs 2. Width and length of excavation shall be a minimum of 6'greater than Max Load the tank on all sides and depth shall be 6°deeper than tank bottom. 3. Set the tank level on a 6'deep layer of well-packed crushed aggregate material(approximately 3/4'size rock or sand with no fines)and connect waste piping per General Installation Instructions. BACKFILL 16'MAX 1. Preparation of sub grade per geotech recommendations. 2. Stabilize and compact sub grade to 95%proctor. 3. Fill unit with water before backfilling to stabilize unit and prevent float-out during backfilling.Secure covers and risers(if necessary)to the unit. SIDE VIEW DETAIL 4. Backfill evenly around tank using crushed aggregate(approximately 3/4' size rock or sand,with no fines).Do not compact backfill around unit. TOPVIEW 18' 18 FINISHED CONCRETE SLAB min min Slab must extend 18'minimum outside the unit footprint. - Concrete Slab i--i-i -�i � -��44- i-T-j 18'min Pedestrian traffic orgreenspace areas:4°Thick reinforced concrete slab required, Y I I I --I--t�-'-+--H—+—y 18'min '� T ELEVATION VIEW Finished grade 2' -------------- CONCRETE SLAB DETAIL(Vehiclular Traffic Areas) 4' • r] SCHIER MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G���� 25 GPM-22 gallon capacity LIFETIME GUARAI%NTEED GREASEINTERCEPTO - PART tt:4015=001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: 00 00 o Copyright 2016 Schier,All Rights Reserved page 4 of 6 INSTALLATION (2 of 3) Remove Cover TELEGLIDE RISER(16 SERIES) INSTALLATION GUIDELINES ellow Tools needed:Silver marker(included),tape measure,and Phillips Ins P Gaskketet Ring head screw driver.Jigsaw,circular saw or reciprocating sawwill be needed if risers need to be cut Riser Assembly Instructions/Steps 1. If unit is to be buried,you will need an SR16 Riser Kit(sold pu separately). The 16 Series TeleGlide Riser System for these models allows riser heights from 2-1/8'above standard unit up to 16°. Only ONE riser may be used per base unit to allow for sufficient access to internal serviceable components. 2. If more than 16"of riser height is needed,you will need to adjust jobsite requirements OR purchase the next available model with a 24 Series TeleGlide Riser System which allows for taller riser heights, 3. Once unit is set so that pipe connections line up with jobsite Riser Installation • piping,remove cover from the unit. Fasten yellow gasketed SR16 Gasket Ring to unit with hardware provided in separate riser kit. Ring flange with 4 bolt notches faces down agains the unit. 4. Push riser into ring until it stops(about 1 inch). 5. Measure the distance from the top edge of the riser down to the Measure'X' finished floor. Make sure to account for any future tile work in your measurement. Install Riser X. Finished 6. Remove the riser from the ring.Take measurements from step 5 f Floor and measure from the BOTTOM of the riser upward s towards the + top of the riser, Mark a line around the riser at this level and cut with a handsaw,jigsaw,or reciprocating saw. Remove debris from the cutting edge with a scraper,utility knife,or leather gloves. ❑ 7. Place the cut riser back into the ring on the unit until it stops. no Fasten cover from unit onto the top of the riser with the same four bolts that were connecting it to the top of the unit.Unit is ready to be water tested and backfilled.Install finished floor. InstallationRiser • 1 Riser Re-Install Cover Re-Install Riser. Finished Floor Remove Riser Mark line and cut Bolts ! 0t�Measure E— i x• X , t SR16 J Gasket Ring ' Riser Kit Riser Installation • . • • •. Installation MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Gr] SCHIER rease Interceptor G���� 25 GPM-22 gallon capacity LIFETIME GUARANTEEE11, GREASE • PART tt:4015-001-XX DWG BY:C.O'Boyle DATE:10/OS/2015 REV: 2 07/07/2016 ECO: 00 00 o Copyright 2016 Schier,All Rights Reserved page 5 of 6 RISER HEIGHT DETAILS ° a �2-1/8"Min. 16"Max. ❑ a ° a a Minimum Riser Height to Finished,Floor Maximum Riser Height to Finished Floor APPLICATION SPECIFIC DETAILS .�titgo.��<,gum'_ �g+�.�..,`��ui:''•`i B Others O - (s; ,.,^. � 3,�'mow.,,,p �•�„�,•,'�� , Inside a ?qua .Yt'iti. y(c�iYz z,;dxiz-u•ss: Flow . • • Concrete Unit Basement Installation with Remote Pump-out Vent must terminate above the top rim of the sink Vent Stack Flow Milo. ;•:,:-•::>:;: ;..-,;:,;.,: Kitchen Floor 0 ® Add this vent if unit is installed one or more Must be Fully floors below the O fixtures being served supported ryFlow'y SuspendedRecessed and Floor-Below 0 MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G B-25 25 GPM-22 gallon capacity _ PART st:4015=001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: page 6 of 6 : BERGMANN ARCHITECTS ENGINEERS PLANNERS April 8, 2022 Starbucks—Queensbury Building &Code Enforcement Town of Queensbury 742 Bay Road Queensbury, W 12804 Mark Smith, Please see the following comment response for review comments received from the Plan Review for the Starbucks Coffee submission to be located at 607 Aviation Rd, Queensbury Rd 12804: 1. Please provide the specifications for the grease trap that is being installed. Please see attached for reference. The unit is a Schier GB-25. 2. What company will be performing the HVAC air balancing. Northeast Heating, Cooling & Refrigeration Co., Inc.will be performing the HVAC air balancing at this site. 3. The access aisles at the handicap parking spaces shown on the site details page A-005 must be at least 8'wide as stated in the 202ONYS building code section 1106.1.1. We have called out an 8' min dimension at the HC accessible space plan west and the two spaces that are plan east are existing with a dimension of 11'wide as shown on A005. All spaces are existing, however we are doing some re-striping to accommodate a buffer zone around the seating area. 4. The slope of the ramp leading to the cafe area is not stated on the plans. A pitch not steeper than one unit vertical in 12 units horizontal is required as stated in the 2020 building code of NYS section 1012.2. The ramp.slope is indicated at detail 5/A501. The ramp slope is intended to be no steeper than 1:12 as stated above. 5. - A 22"x 30'access to the dead space in the walls at the top of the ramp to the_cafe area will be required. As discussed, sheets 1103 and 1501.1 have been revised to include fire stopping GWB inside shaft wall adjacent to ramp.: 6. Please provide worker compensation information for all contractors who will be working at this site. Please:see attached for worker compensation information. Sincere) cott Wrasman DISCIPLINE LEADER; BERGMANN 1524 Delancey St. TEL:215.735.1524 Philadelphia,PA 19102 www.bergmannpc.com - .GB=25 awla va&w. High Efficiency Grease Interceptor Technical Data Submittal I Special Precautions I Specifications I Installation I Application Specific Details �27,. —= —--- (10.8 cm) 15" (38.1 cm) 103/4.. (27.3 cm) 21" (53.3 cm) SUBMITTAL STANDARD:3"plain end inlet/outlet I Capacities-Liquid:22 gal.(83 L);Grease:75 lbs.(34 kg)(10.4 gal./39.3 L);Solids:6.4 gal.(24 L) Light Duty,bolted,gas/water tight polyethylene covers.(450 lbs.when direct buried,2500 lbs.when using the SR-16 Riser) OPTIONS: APPROVAL: ❑ 2"Plain End SCH.40 Inlet/Outlet TeleGlide Risers Signature: ❑ 2°Male Thread Inlet/Outlet ❑SR16>2-1/8°—16" ❑ 3"Male Thread Inlet/Outlet ❑ CC16>2-1/8"—16"with Integrated Date: ❑ Pumpout Port(Small) Membrane Clamping Collar Kit Company: Specifying Engineer: Engineering Firm: momMODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor 3 G B-25 25 GPM-22 gallon capacity PART tt:4015-001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: page 1 of 6 PECIAL PRECAUTIONS • For All Schier Grease Interceptor Installation Instructions High Temperature Kitchen Water Installation instructions and additional components are located inside If water is entering the interceptor at excessive temperature(over 140'F), the interceptor.Read all instructions prior to installation.This interceptor a drain water tempering valve(DTV)must be installed.Most state and is intended to be installed by a licensed plumber in conformance with all local plumbing codes prohibit water above 140'F being discharged into local codes. the sanitary sewer.Water above 140'F will weaken or deform PVC Schedule 40 pipe,poly drainage fixtures like interceptors and erode the coating of cast iron(leading to eventual failure).Failure to follow this 0oo�1'i WE- o guidance voids your warranty. g d S o o*o S®� IIiSfALLAtIp e o o' high temperature drain water SggS o o INSTflU00 effluent(>140'F) tempering valve(DTV) ®�J&V.&0 Sc�S$o$$aogoago. o g®o o $` cold water supply line Interceptor M* When Installing Interceptor Inside If your dishwashing sinks)discharges into a floor drain/sink(drain),you High Water Table Installations must regulate the flow into the drain to avoid an overflow of water onto Interceptors and risers are not designed to withstand water table height in the kitchen floor.This can be done by installing a valve or flow restriction excess of the top of the unit when buried(see figure).If it is possible for this cap on the sink piping that discharges into the drain.See drawing below to occur,install the interceptor and risers in a water-tight concrete vault or for guidance.For detailed guidance on indirect connections,go to: backfill with concrete orflowable fill(wet concrete and flowable backfill httpV/webtools.schierproducts.com/Technical_Data/Indirect_Connections.pdf should be poured in stages to avoid crushing the interceptor).At risk.areas include but are not limited to tidal surge areas,floodplains and areas that Fernco or similar n receive storm water.Failure to follow this guidance voids your warranty. rubber flow I I Models GB-50,GB-75,and GB-250 that are direct buried in high water restriction end cap fill table scenarios must be installed with model AKI anchor kit or warranty _-_ is void. O _ max water - `--- _ table height for O direct burial Interceptor Interceptor Hydrostatic Slabs(or Pressure Slabs) model AK1 When installed under a hydrostatic slab(slab designed to withstand anchor kit upward lift,usually caused by hydrostatic pressure)interceptor must be enclosed in a watertight concrete vault.Failure to follow this guidance voids your warranty. O concrete slab Interceptor subject to hydrostatic pressure watertight concrete vault SCHIER MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor LIFETIME GUARANTEED 1 71 ,1 GREASE G���� 25 GPM-22 gallon capacity INTERCEPTORS PART u:4015-001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2018 ECO: 00 00 o Copyright2016 Schier,All Rights Reserved page 2 of 6 SPECIFICATIONSOutl t"A„ (Optional) NOTES ' 1. 3°plain end inlet/outlet 2. Unit weight-w/standard covers:31 lbs. INLET utlet°B" 3. Maximum operating temperature:140'F continuous o (Standard) 4. Capacities-Liquid:22 gal.;Grease:75 lbs.(10.4 gal.); Solids:6.4 gal. A A 5. Built-in Flow control. 21" , 6. For gravity drainage applications only. — — — -— - 7. Do not use for pressure applications. S. Cover placement allows full access to tank for proper maintenance. 9. Vent not required unless per local code. 10.Engineered inlet and outlet diffusers are removable Outlet"ell to inspect/clean piping. (optional) 6-1/4" 11.Integral air relief/Anti-siphon/Sampling access, DIFFUSION FLOWTECHNOLOGY The inlet diffuser splits influent into three paths,creating laminar flow and utilizing the entire liquid volume of the tank 16"Cover for efficient grease separation.The calibrated openings greatly reduce effluent turbulence.The effluent enters the main chamber without disturbing the existing grease or of plain end See Note#10 sediment layers. in et and outlet The integral air relief/anti-siphon in the top of the outlet diffuser allows pressure stabilization within the unit during operation.The bottom of the outlet diffuser allows only 4-1/4" effluent which is free of grease to exit the tank.It can easily be attached to any of the three outlets provided to ease -_ __ jobsite piping layouts. - T I " Q ENGINEER SPECIFICATION GUIDE 10-3l4" Static water 9"invert Schier Great BasinI grease interceptor model#GB-25 line shall be lifetime guaranteed and made in USA of seamless, rotationally-molded polyethylene.Interceptor shall be furnished for above or below grade installation.Interceptor shall be certified to ASM E A112.14.3(type C)and CSA B481.1, with field adjustable riser system,built-in flow control,built-in LEngineered inlet and test caps and three outlet options.Interceptor flow rate outlet diffuser shall be 25 GPM.Interceptor grease capacity shall be 75 lbs, (see description) Cover shall provide water/gas-tight seal and have minimum 450 lbs.load capacity. SECTION A-A CERTIFIED PERFORMANCE Great Basin hydromechanical grease interceptors are third parry performance-tested and listed by IAPMO to ASME 22-1/4 #A112.14.3 and CSA B481.1 grease interceptor standards and greatly exceed requirements for grease separation and lit storage.They are compliant to the Uniform Plumbing Code and the International Plumbing Code, UPO UPOro Ill O C O OUTLET END VIEW W MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G 8-25 25 GPM-22 gallon capacity PART#:4015-001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: page 3 of 6 INSTALLATION o of 3) Native soil Backfill Concrete slab WARNING!DO NOTAIR TEST UNIT OR TELEGLIDE Well packed base RISER SYSTEM!Doing so may result in property damage, Finished grade personal injury or death. 450 Ib, Max Load LEAK/SEAL TESTING p Cap/plug all base unit plumbing connections and remove covers.For base unit testing,fill with water to just above the highest connection.For • riser system testing(if required)fill with water to finished grade level. 001 CAUTION:Risers must be supported before filling with water to prevent tipping.Filled risers will be heavy. Inspect unit,connections and all gaskets and clamps(if applicable)for leaks.Check water level at } Flush with floor installation specific time intervals per local code. I Riser Flow 2500lb. GENERAL INSTALLATION INSTRUCTIONS control Reber Max Load Schier grease interceptors are rated and manufactured with an internal plate flow control system.They do not require an external flow control system O or air intake vent.Schier grease interceptors are not to be installed in any other manner except as shown.Consult local codes for separate trapping requirements,cleanout locations and additional installation instructions. 1. The flow control plate is installed on this unit,When the unit is installed in a low flow/low head pressure condition(with a flow rate below 25 GPM),the flow control plate maybe removed.Consult a Riser Installation Schier Representative before removing flow plate. (see page 4 for more details) 2. Set unit on level solid surface as close as possible to fixtures being served. 3. Connect outlet diffuser to the desired outlet(A,B,C).Unit is shipped with FLOWCONTROL EXCAVATIONAND the outlet diffuser in location B and sealing caps on locations A and C. PLATE DETAIL BACKFILL DETAIL 4. Connect inlet and outlet drainage lines to unit.Mechanically couple pipes to unit.Do not solvent weld. NOTE:Do not install below a hydrostatic slab. Vent INTERIOR BELOW GRADE INSTALLATION INSTRUCTIONS EXCAVATION n 1. Install unit(s)as close as possible to fixtures being serviced. i 2500lbs 2. Width and length of excavation shall be a minimum of 6'greater than. the tank on all sides and depth shall be 6'deeper than tank bottom. Max Load 3. Set the tank level on a 6'deep layer of well-packed crushed aggregate material(approximately 3/4'size rock or sand with no fines)and connect waste piping per General Installation Instructions. BACKFILL 16'MAX . o 1. Preparation of sub grade per geotech recommendations. 2. Stabilize and compact sub grade to 95%proctor. 3. Fill unit with water before backfilling to stabilize unit and prevent float-out during backfilling.Secure covers and risers(if necessary)to the unit SIDE VIEW DETAIL 4. Backfill evenly around tank using crushed aggregate(approximately 3/4' size rock or sand,with no fines).Do not compact backfill around unit. TOP VIEW � 18' 18' FINISHED CONCRETE SLAB min min Slab must extend 18'minimum outside the unit footprint. i_-i-i J_�hx �_ Concrete Slab i - � i , 4 4 i T- 18'min Pedestrian traffic or greenspace areas:4'Thick reinforced concrete slab required, o- i--+— -+--+ +--�--+—y 18'min T ELEVATION VIEW Finished grade 2' --------------- CONCRETE SLAB DETAIL(Vehiclular Traffic Areas) 4' • SCHIER LIFETIME GUARANTEED MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G���� 25 GPM-22 gallon capacity GREASEINTERCEPTORS PART u:4015-001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: 00 00 o Copyright 2016 Schier,All Rights Reserved page 4 of 6 INSTALLATION (2 of 3) Remove Cover TELEGLIDE RISER(16 SERIES) INSTALLATION GUIDELINES Tools needed:Silver marker(included),tape measure,and Phillips Install yellow P Gasket Ring head screw driver.Jigsaw,circular saw or reciprocating saw will be needed if risers need to be cut Riser Assembly Instructions/Steps 1. If unit is to be buried,you will need an SR16 Riser Kit(sold separately). The 16 Series TeleGlide Riser System for these models allows riser heights from 2-1/8'above standard unit up to 16'. Only ONE riser may be used per base unit to allow for sufficient access to internal serviceable components. 2. If more than 16'of riser height is needed,you will need to adjust jobsite requirements OR purchase the next available model with a 24 Series TeleGlide Riser System which allows for taller riser heights. 3. Once unit is set so that pipe connections line up withjobsite Riser Installation step 3 piping,remove cover from the unit. Fasten yellow gasketed SR16 Gasket Ring to unit with hardware provided in separate riser kit. Ring flange with 4 bolt notches faces down agains the unit 4. Push riser into ring until it stops(about 1 inch). 5. Measure the distance from the top edge of the riser down to the Measure'x' finished floor. Make sure to account for any future tile work in your measurement. Install Riser X° Finished 6. Remove the riser from the ring.Take measurements from step 5 f Floor and measure from the BOTTOM of the riser upwards towards the i top of the riser. Mark aline around the riser at this level and cut with a handsaw,jigsaw,or reciprocating saw. Remove debris from the cutting edge with a scraper,utility knife,or leather gloves. ❑ 7. Place the cut riser back into the ring on the unit until it stops. an Fasten cover from unit onto the top of the riser with the same four bolts that were connecting it to the top of the unit.Unit is ready to be water tested and backfilled.Install finished floor. InstallationRiser • Riser Re-Install Cover Re-Install Riser Finished Floor Remove Riser Mark line and cut Bolts I+ �r Measure O x• X , SR16 Gasket Ring SR1' Riser Kit Riser Installation • . • • •.rately) Riser Installation step MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease;Interceptor G B-2c 25 GPM-22 gallon capacity . V PART tt:4015-0O1-XX DWG BY:C.OBoyle DATE:10/08/2015 REV. 2 07/07/2016 page 5 of 6 RISER HEIGHT DETAILS n d 2 11/8"Min: 16"Max. e d ae o d ° a oa Minimum Riser Height to Finished Floor Maximum Riser Height to Finished Floor d APPLICATION SPECIFIC DETAILS Fig B Others t:- OO ��rt y`� ��i,�'C�'Lo'I .��ri�zEEEI �" L..• :. L,. '" t.vim 7�i��:Cd.��ra.��C�.l�u �C�,yiv�,•< l��.I�y� ���14'�.,:�:.yc:+�o. av�t,.x2\ .: ^'t-• ',?r.'\*r3:r SY\!r_-tiM. {ifr3ti5k:\k Sk3:tli. "�.i:.,��r /-C¢'1�.. Lj �.i�,' aFca> Flow :a" 4z = '��rY Inside a Corroded Concrete Unit Basement Installation with Remote Pump-out Vent must terminate above the top rim of the sink I I I I I I Vent Stack I I I I I I I I Flow IIIII 000, a*s a:;,:•;,;-:,:--,;:,:;;:, ::-:,.:I:.:., :is% Kitchen Floor ® Add this vent if unit is installed one or more Must be Fully floors below the supported fixtures being served ~Flow ly- d and Suspended Additional Venting for Floor-Below SCHIER MODEL NUMBER: DESCRIPTION:Polyethylene High Efficiency Grease Interceptor G B-25 25 GPM-22 gallon capacity INTERCEPTORSLIFETIME GUARANTEED GREASE PART tt:4015-001-XX DWG BY:C.O'Boyle DATE:10/08/2015 REV: 2 07/07/2016 ECO: 00 00 9)Copyright 2016 Schier,All Rights Reserved page 6 of 6 Aug, 2. 2022 11 ; 18AM MDIA No. 9828 P, 3/6 MZDDL,E D�P.AI�,TI��I�1'� xNSP�C"I'I®N���NC�, YNC. �aXt.Cec that the electrical wiring to the electrical equipment listed below has been examined and is approved as being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date noted below and is issued subject to the following conditions. Owner: Starbucks Date: 07/24/2022 Occupant: Remodel Location: 578 Aviation Rd. Occupancy:Non-Residential Queensbury, Warren Co, NY Applicant: � Phoenix Electric 834 Seminary St. Fort Edward, NY 12828 ::••- •• • ....... Joseph A.Holmes No_ : 148099170283EL Equipment: 6-Switches; 86- Receptacles; 76:•FNtures;2=•30A-OV6I%, 1 -30A Dishwasher,2-Vent Fans; 8- Emergency Lights; 2- EAVEmergency Combos.; 1•-30A Coffee Machine; 2-50A Espresso Machines; 1 -20A Display Cooler This certificate applies to the electrical wiring to the electrical equipment listed immediately null and void. This certificate applies only to the use,occupancy and above and the installation inspected as of the above noted date based on a visual ownership as indicated herein- Upon a change in the use,occupancy Or ownership Inspection. No warranty is expressed or implied as to the mechanical safety,effi• of the property indicated above,this Cenifleate shall be immediately null and void. ciency or fitness of the equipment for any particular purpose, This certificate shall In the event that this certificate becomes invalid based upon the above conditions, be valid for a period of one year from the above noted date. Should the electrical this certificate may be revaildated upon reinspection by Middle Department system to which this certificate applies be altered in any way,Including but not lima- Inspection Agency,Inc. An application for inspection must be submitted to Middle ed to,Me introduction of additional electrical equipment and/or the replacement of Department Inspection Agency,Inc.to initiate the inspection and revalidation any of the components installed as of the above noted date,this certificate shall be process. A fee will be charged for this service.