Loading...
RC-0069-2022 Office Use Only WL ADDITION/ALTERATION PERMIT Permit#: - 00 toq• 2922 APPLICATION Permit Fee:$ Town of Queensbwy 742 Bay Road,Queensbury,NY 12804 Invoice#: P:518-761-8256 www.gueensbury.net Flood Zone? Y N Reviewed By: Project Location: 95 Richmond Hill Drive Tax Map ID#: 308.7-1-59 Subdivision N IM PROJECT INFORMATION:TYPE: X Residential Commercial, Propose X Single-Family _Two-Family _Multi-Family(#of units ) _Townhouse Business Office _Retail _Industrial/Warehouse _Garage (#of cars_) Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 230 SF 1st floor: 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement(habitable space):230 SF Basement (habitable space): Total sq ft: 460 SF Total sq ft: Scope of work to be done: Addition to the great room of the home. Expand the greatroom outward 12' from the existing exterior wall. Relocate the existing gas fireplace and exterior windows. Provide full foundation beneath entire addition to match existing foundation. Addition/Alteration Application Revised January 2021 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ $50,000 2. Source of Heat (circle one): X Gas _Oil _Propane _Solar_Other Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? YES X NO Explain: 4. Are there any easements on the property? YES X NO SITE INFORMATION: • Is this a corner lot? _YES X NO • Will the grade be changed as a result of the construction? _YES X NO • What is the water source? X PUBLIC _PRIVATE WELL • What type of wastewater system is on the parcel? _SEWER X PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of certificate of occupancy. I have read and agree to the above: PRINT NAME: Ethan P. Hall -Arc itectlAgent for the Applicant SIGNATURE: DATE: 23 Feb 2022 Addition/Alteration Application Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): Jodi Rothmann Mailing Address, C/S/Z: 95 Richmond Hill Drive, Queensbury NY 12804 Cell Phone: 201 )264-0878 Land Line: Email:jodibl3@optimum.net Primary Owner(s): Name(s): Jodi&Arthur Rothmann Mailing Address, C/S/Z: 95 Richmond Hill Drive, Queensbury NY 12804 Cell Phone: 201 )264-0878 Land Line: � ) Email:lodib13@optimum.net ❑ Check if all work will be performed by property owner only • Contractods): (List all additional contractors on the back of this form) Contact Name(s): TBD Contractor Trade: Mailing Address, C/S/Z: Cell Phone: Land Line: � ) Email: "Workers' Comp documentation must be submitted with this application" • Architect(s)/Englneeds): Business Name: Rucinski Hall Architecture Contact Name(s): Ethan P. Hall Mailing Address, C/S/Z: 134 Dix Ave, Glens Falls NY 12801 Cell Phone: ( Land Line: ( 518 )741-0268 Email: a h�allOnycap.rr.com Contact Person for Compliance in regards to this project: Ethan P. Hall Cell Phone: ( Land Line: 518 )741-0268 Email: a hn allannycap.rr.com Addition/Alteration Application Revised January 2021 FUEL BURNING APPLIANCE & office Use Only CHIMNEY APPLICATION Permit#: Q-C " 0�) `o • ZD2Z Permit Fee:$ Town of Queensbury 742 Bay Road,Queensbury,NY 12804 Invoice#: P:518-761-8256 www.gueensbury.net **ONE APPLICATION PER APPLIANCE** Project Location: _95- 1 ir �m Nl' I kTax Map 1D#: Room of Install: V-M M Planned Install Date: WlCiy DM4 FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: _Stove .Fireplace Insert _Fireplace. —Fuel Fired Equipment(Garage Only: 18" clearance per IMC 304,3) Fireplace,factory built** (**Manufacturer's name: Ape i F f `o Model#: LLD ) SOURCE OF HEAT: Wood —Coal Pellet Gas CHIMNEY INFORMATION: Masonry(require plans to be submitted): block —brick _stone _Flue: `tile steel size,in inches ,Material*: n n double-wall _triple-wall_insulated (*Manufacturer's name: Model#: ) Fuel Burning Appliance&Chimney Application Revised December 2020 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): , oA, Mailing Address, C/S/Z: 2i Cell Phone: u) ) �b�(_C�r,7?, Land Line: ) Email: • Primary Owner(s): Name(s): �raV1A� rt5 � Mailing Address, C/S/Z: Cell Phone:_( ) Land Line: _( ) Email: ❑ Check if all work will be performed by property owner only • Installer/Builder: Workers'Comp documentation must be submitted with this application Contact Name(s): -.4 t F Vw _�cc _� AIM � Contractor Trade: Mailing Address, C/S/Z:_ . Z12 Cell Phone:_( _)_ 5�,�7_� �, Land Line: _(_) Email: Contact Person for any questions regarding this project:_ 1 ,iU ffioA1' yk, Cell Phone: JP > ) " ._ )�1 Land Line: Email: Dar, m nc�.,= ,�s n - ADDITIONAL INFORMATION: 1. Two(2)inspections are required. A rough-in inspection, prior to installation and a final inspection, after installation. 2. Manufacturer's installation manual must be available at the time of inspection. 3. Masonry fireplaces&chimneys require plans to be submitted. 4. Twenty-four(24) hour notification is required for inspections. S. Workers'Comp insurance information is required with this application. Declaration:Construction/installation must conform to NYS Fire Prevention &Building Code and/or manufacturer requirements. The applicant or owner agrees to comply with all applicable laws,ordinances, regulations and all conditions that are part of these requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree_to the above: PRINT NAME: X�9.1� , ��I? A(`} Y SIGNATURE:_ DATE: 3A�da Fuel Burning Appliance&Chimney Application Revised December 2020 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (1 of 2) -Q,S Two (2)full sets of plans Over 1,500 sq. ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties Window schedule with glass size & main doors/Air leakage< .5 cfm for doors, < .3 cfm for windows/Tempered glass in bathrooms ,6 Door schedule/Main entrance 36" door fX� Emergency Escape or Bedrooms & Habitable Space ,JV Above-grade: 5.7 sq. ft. -cj Grade: 5.0 sq. ft. 24" (h) x 20" (w) minimum 44" maximum height above door Window control devices 24" or less 2nd story or 72" above grade Egress window from basement 5.0 sq. ft. ' Floor system sizing per table 502.3.1 Residential check ERI or Prescriptive method Driveway length: 300' or more-12' width required/500' or more,turnaround required Foundation drainage on plans, if required 6" drop in 10' exterior grade Framing cross section for each roof line, vertical fire stopping every 10' where required/joist spans pg. 127 Ice &snow shield—24" from exterior wall IS Platforms at exterior doors Al /� Stairway headroom 6'8"; all stairs 36" width Stair run and rise ti Winder run and rise " Spiral stairs meet requirements Smoke detectors—battery backup & proper location, interconnected. Bathroom fixtures—proper clearance Hall width-36" width Handrails more than four risers on open sides Railing &guards >30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas / Garage fire separation: %" gable end/5/8" under living space &%" on walls/20 min. door A � and closer Garage floor sloped Attic access: gasket seal & R-value equal to roof insulation Roof over 30"—22" x 30"/Crawl spaces 18" x 24" access Continued on back 4 4 Residential Plan Review Revised October 2021 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (2 of 2) Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected within 15' of sleeping area t*4 t Soil test results, if required Septic to well or water line separation S All paperwork signed Note on plans energy saving light bulbs 90% Blower door test agency paperwork rj 6 Floodplain Permit required—check map: 2 feet above flood elevation Hurricane clips required Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel Manuals S &J required for heating system. Cold air return hard piped Separate room for draft HVAC or hot water heater with fresh air HRV shown and calculations Baffles at eaves for insulations and knee walls J Makeup air for range hood >400 cfm nJ A Continuous header for garage doors to end wall A/ Chimney rain cap shown for fireplaces Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised October 2021 Generated by REScheck-Web Software i w Com Iiance Certificate EL rt 5 ly � FILE COPYCL ° Project Rothmann Addition j a = a Energy Code: 2018 IECC j 0 C 09 Location: Glens Falls, NeW.YOrk �� n=� Construction Type: Single-family Project Type: Addition y 6 (763 HDD) n-�� I" O� 0CI'mateZone: FEB CA Permit Date: Permit Number: TOWN OF QUEENSBURY -p BUILDING&CODES o O Construction Site:. . Owner/Agent: Designer/Contractor: N 95 Richmond Hill Drive Jodi Rothriann .: . Ethan P. Hall --' N Queensbury, NY 95 Richmond Hill Drive, Rucinski Hall Architecture REV WED FOR. Queensbury, NY 12845 134 Dix Ave _ 13@optimum.net Glens Falls, NY 12801 �Y�C �DEOMPLIANI�!E 518-741-0268 . ephall@nycap.rr.com 'Compliance: Passes using UA trade-off Compliance: 6.0%Better Than Code Maximum UA: 50 Your UA: 47 The.%Better or Worse Than Code index reflects how close to compliance.the house is based on code,trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered ih:the UA or.performance compliance path:in REScheck: Each slab-on-grade as in the specified climate zone mush meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies- Gross Area Cavity Cont. Prop. Req. Prop. Req. Perimeter Ceiling 1: Raised or Energy Truss 230 49.0 0.0 0.020 0.026 5 6 Well 1:Wood Frame, 16"o.c. 367 21.0 3.6 6.046 0.045 15 15 Window 1:Vinyl/Fiberglass Frame;Double Pane with 36 0.200 . 0.300 10 11 Low-E Basement Wall 1: Solid Concrete or Masonry Wall height: 7.9' 290 19.0 0.0 0.048 0.050 13 14 Depth below grade: 6.5' Insulation depth: 7.5' Window 2:Wood Frame:Double Pane with Low-E 14 0.290 0.300 4 4 Compliance Statement: The proposed building design.described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed.building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory require 4nt ,WqtREScheck Inspection Checklist. Ethan P. Hall-Architect Name-Title Signatu rs? v`°`i7 ,��� Date \4• .,n^-� ,.psi�. �"� Project Title: Rothmann Addition "°r`r Report date: 02/23/22 Data filename: Page 1 of 9 REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 100.06/o were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the usee-certifies.tha.t a code requirement will be met and how.th.at is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided: Section - Plans Verified- Field-Verified Pre=Inspection/Plan Review Complies?.. Comments/Assumptions & Req.ID Value Value 103J; I Construction drawings and !!❑Complies ;Requirement will be met. 103.2 ;documentation demonstrate ;❑Does Not [PR1]1 l energy code compliance for:the ;Location on plans spec:A- ❑Not Observable v ;building envelope:Thermal ;1 i envelope represented on !QNot Applicable j construction documents. l 103.1, 'Construction drawings and ❑Complies ;Requirement will be met. 103.2, documentation demonstrate l❑hoes Not 403.7 l energy code compliance for i 1 Location on plans/spec:A- [PR3]1 lighting and.mechanical systems. ❑Not-Observable ; 9" . g Y l 1 I Systems serving multiple ❑Not Applicable ldwelling units must demonstrate { ;compliance with the IECC (Commercial Provisions. 302.1, j Heating and cooling equipment is; Heating: ; Heating: ;❑Complies ;Requirement will be met. 403.7 I sized per ACCA Manual S based 1 Btu/hr Btu/hr. . 1❑D6es Not [PR2]2 Ion loads calculated per ACCA Cooling: 1 Cooling: 1 . I Location on plans/spec:A- Manual or other methods ❑Not Observable ,1 J approved by the code official. Btu/hr I Btu/hr . ❑Not Applicable 1 Additional Comments/Assumptions: 1 High Impact(Tier 1). _ 2 Medium Impact(Tier 2) . 3 Low Impact(Tier 3) Project Title: Rothmann Addition Report date: 02%23/22 Data filename: Page 2 of 9 Section Plans Verified Field Verified # `Foundation Inspection Complies? Comments/Assumptions . & Req.ID " Value- Value: . 402.1.1 ;Conditioned basement wall R- ; R- ;❑Complies ;See the Envelope Assemblies [F04]1 insulation R-value.Where interior! ; ;table for values. 1 insulation.is used,verification R- : R- ❑Does Not o I :❑Not Observable May need to occur during ;Insulation Inspection. Not 1❑Not Applicable required in warm=humid locations !in•Climate Zone 3. 303:2. ;Conditioned basement wall ;❑Complies ;Requirement will be met. [F05]1 insulation installed per I❑Does Not manufacturer's instructions. I Location on plans/spec:A- V ;❑Not Observable ; 1 ❑Not Applicable . 402.2.9 I Conditioried'basement wall ; ft ft ❑Complies :See the Envelope Assemblies [1`06]3. insulation depth of burial or :❑Does Not Itable for values. J I distance from top of wall. ;❑Not Observable ❑Not Applicable . .. 303.2.1 JA protective covering is installed ;❑Complies :Exception: Requirement is [FO11]2 to protect exposed.exterior I❑Does Not :n_of applicable. insulation and extends a { U I❑Not Observable j minimum of 6 in. below grade: 1❑Not Applicable . 403.9 I Snow-and ice- ,melting system ;❑Complies ;Exception: Requirement is [FO12]2 +controls installed: j�Does Not ;not applicable. leJ . ❑Not Observable ; j❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3E] Project Title: Rothmann Addition Report date: 02/23/22 bate filename:- Page 3 of 9 Section Plans Verified Field Verified- # Framing./Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;Glazing U-factor(area-weighted U- ; U- ;❑Complies ;See the Envelope Assemblies 402.3.1, average). PDoes Not ;table for values. 402.3.3,402:5 ;❑Not Observable � ; ' [FR2]1 ; Z❑Not Applicable 303.1.3 j U-factors of fenestration products{ ❑Complies ;Requirement will be met. [FR4]1 i are determined in accordance i :❑Does Not j with the NFRC test procedure or Not Observable ;Location on plans/spec:A- ;taken from the default table. I ❑ ;1 ❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier ; ❑Complies ;Requirement will be met. [FR23]1 :installed per manufacturer's I ❑Does Not instructions. I Location on plans/spec:A e' ❑Not Observable ;1 I tNot Applicable 402.4.3 ;Fenestration that is not site built ❑Complies ;Requirement will be met. [FR20]1 :is.listed and labeled as meeting ❑Does Not U AAMA M/DMA/CSA 101/1.5.2/A4401 or has infiltration rates per NFRC '❑Not Observable 1400 that do not exceed code } ❑Not Applicable limits. 402.4.5 ;IC-rated recessed lighting fixtures ❑Complies ;Exception: Requirement is [FR16]2 sealed at housing/interior finish I '❑Does Not :not applicable. ;and labeled to indicate :52.0 cfm ' ❑Not Observable leakage at 75 Pa. ❑Not Applicable 403.3.1 !Supply and return ducts in attics ❑Complies :Exception: Ducts located [FR12]1 Iinsulated >= R_-8 where duct is ,❑Does Not completely inside the ® 1>= 3 inches in diameter and >_ :building envelope. itR-6 where< 3 inches. Supply and I it Observable !return ducts in other portions of l ❑Not Applicable !the building insulated >= Rt 6 for I : ;diameter>= 3.inches and R-4.2 ;for< 3 inches in diameter. 403.3.2 ;Ducts,air handlers and filter ; ;❑Complies Requirement will be met. [FR13]1 boxes are sealed with I '❑hoes Not !joints/seams compliant with Location on plans/spec:A- 11011 International Mechanical Code or [:]Not Observable 1 1lnternational Residential Code, as; ;❑Not Applicable !applicable. I 403.3.5 :Building cavities are not used as ' ❑Complies !Requirement will be met. [FR15]3 'ducts or plenums. ! ❑Does Not 8' ! ❑Not Observable Location on plans/spec:A- ❑Not Applicable 1 403.3.7 Ducts declared to be within the ; ❑Complies ;Requirement will be met. [FR28]3 :conditioned space are either 1) ,❑Does Not completely within the continuous i location on plans/spec:A- ;air barrier and within the building ; ❑Not Observable 1 thermal envelope, 2) buried ; :❑Not Applicable within ceiling insulation in j ;accordance with Section I R403.3.6 and the air handler is ; located completely within the ; continuous air barrier and within ;the building thermal envelope and the duct leakage is <= 1.5 cfm/100 square feet of conditioned floor area served by. the duct system, or 3)the ceiling insulation R-value installed I against and above the insulated I duct>=to the proposed ceiling insulation R-value, less the R- value of the insulation on the 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Rothmann Addition Report date: 02/23/22 Data filename: Page 4 of 9 Section Plans Verified " Field Verified # Framing:/Rough-In Inspection Complies? Comments/Assumptions , & Req.ID Value Value.. 403.4 ;HVAC piping conveying fluids R R- ;❑complies :Exception, Requirement is [FR17]2 ;above 105.°F or chilled fluids Does Not not applicable. below 55°F are insulated to>_R- U 3 ; ;❑Not Observable ; . UNot:Applicable. 403.4.1 ;Protection of insulation on HVAC 13Complies ;Exception: Requirement is [FR24]1 (piping. { �❑Does Not !not applicable. i 1 tlNot Observable ; ❑Not Applicable . 403.5.3 !Hot water pipes are insulated to R- ; R= ;❑Complies' ;Exception: Requirement is [FR18]2 1 a:R-3. :ODoes Not not applicable. U ! ;❑Not Observable j❑Not Applicable . 403.6 'Automatic or gravity dampers are f❑complies Requirement will be met. [FR19]2 installed on all outdoor air i❑_Does Not intakes and exhausts. I Location on plans/spec:.A- []Not Observable ONot Applicable 1 Additional Comments/Assumptions: 1 High-Impact.(Tier-1). - 2 Medium Impact(Tier 2) . 3 Low Impact(Tier 3). Project Title: Rothniann Addition Report date: 02/23/22 Data filename: Page 5 of 9 Section Plans Verified .Field Verified_ # Insulation Inspection Complies? Comments/Assumptions Value Value,. 303.1 !All installed insulation is labeled (❑Complies ;Requirement will be met. [IN13]2 iorthe installed R-values i❑Does Not v provided. :f❑Not Observable i I 1❑Not.Applicable 402.1.1, ;Wall insulation R-value. If this is a; R- ; R- 0Complies ;See the Envelope Assemblies 402:2.5, mass wall with at least'/2 of the ❑ Wood ❑ Wood ;❑Does Not ;table for values. 402:2:6 !wall insulation on the wall [iN3]1 ;exterior,the ezterior.insulation ❑ Mass ❑ Mass :nNot.Observable 1 requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable i 303.2 ;Wall insulation is.installed per I❑Complies Requirement Will be met.' [IN4]1 manufacture n ions ❑Dos Not i e �Location on plans/spec:A- I❑Not.Observable ;1 j❑Not Applicable . Additional Comments%Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Rothmann Addition Report date: 02/23/22 Data filename: Page 6 of 9 Section Plans Verified Field Verified # Final'Inspection Provisions Value Value Complies? Comments/Assumptions. & Req.ID 402.1.1, ;Ceiling insulation R-value. ; R- R- ;❑Complies :See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood :❑Does Not ;table for values. 402.2.2, i ❑ Steel ❑ Steel bNot Observable 402.2.6 [FI1]? ; :❑Not Applicable , 303.1.1.1, ;Ceiling insulation installed per 4i4 ❑Complies ;Requirement will be.met. 3012 .manufacturer's instructions. I ;❑Does Not [FI2I Blown insulation marked every j - :Location on plans/spec:A- ;300 ft2. f bNot Observable ,1 I I❑Not Applicable 402.2.3 ;Vented-attics-With air permeable ; ❑Complies Requirement will be met. [FI22]2 !insulation.include baffle adjacent I :❑Does Not Ito soffit and eave vents that : Location on plans/spec:A- �extends over insulation. ❑Not Observable 1 I ; Not Applicable 4&2,.4 ;Attic access hatch and door R- R- ;❑Complies ;Requirement will be met. [FI3]1 :insulation.>_R-value of the '❑Does Not !adjacent assembly. :Location on plans/spec:A- ;❑Not Observable ;1 j :❑Not Applicable 402:4.1.2 j Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ;❑Complies Requirement will be met. [H17]1 ;ach in Climate Zones 1=2,and ❑Does Not I<=3 ach in Climate Zones 3-8. Location on plans/spec:A- ❑Not Observable ;1 ❑Not Applicable 403.3.3 ;Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies ;Exception:All ducts and air [FI27]1 'determine air leakage with : ft2 ft2 ❑Does Not handlers are located within either: Rough-in test:Total conditioned space: leakage measured with a ;❑Not Observable ;pressure differential of 0.1 inch ;❑Not Applicable Iw.g. across the system including ;the manufacturer's air handler enclosure if installed at time of test. Post construction test:Total ; ileakage measured with a pressure differential of 0.1 inch lw.g:across the entire system including the manufacturer's air ;handler enclosure. 463.3.4 I Duct tightness test result of<=4 ; cfm/100 cfm%100 ;❑Complies ;Exception:All ducts and air [FI4]1 Icfm/100 ft2 across the system or ft2 ft2 E]Does Not handlers are located within <=3 cfm/100 ft2 without air conditioned space. handler @ 25 Pa. For rough-in ❑Not Observable ;tests,verification may need to ;❑Not Applicable !occur during Framing Inspection. 403:3.2.1 ;Air handler leakage designated ![]Complies ;Requirement will be met. [F124]1 I by manufacturer at<=2%of i❑Does Not !design airflow. I Location on plans/spec:A- ❑Not Observable ❑Not Applicable j 1 403.1.1 ;Programmable thermostats ;❑Coomplies ;Requirement will be met. [FI9]2 :installed for control of primary ( ❑Does Not heating and cooling systems and I :Location on plans/spec:A, initially set by manufacturer to ; t❑Not Observable 1 ;code specifications. ; ,❑Not Applicable 403.1.2 !Heat pump thermostat installed ❑Complies ;Exception: Requirement is [FI10]2 lon heat pumps. j❑Does Not :not applicable. ❑Not Observable i❑Not Applicable 403.5.1 ;Circulating service hot water ; I❑Complies ;Exception: Requirement is [FI11]2 ;systems have automatic or i ;❑Does Not I not applicable. iaccessible manual controls: ❑Not Observable :❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Rothmann Addition Report date: 02/23/22 Data filename: Page 7 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 :All mechanical ventilation system ; ;❑Complies ;Requirement will be met. [FI25]2 'fans not part of tested and listed '❑Does Not HVAC equipment'rrieet efficacy f Location on plans/spec:A- and air flow limits per Table []Not Observable 1 R403.6.1. I :❑Not Applicable 403.2 ❑ i Hot water boilers supplying heat Complies ;Exception: Requirement is [FI26]2 ;through one-or two-pipe heating �❑Does Not !not applicable. systems have outdoor setback ; !control to lower boiler water " ❑Not Observable ;temperature based on outdoor ❑Not Applicable temperature. I i 403.5.1.1 ;Heated water circulation systems ;❑Complies Exception: Requirement is [FI28]2 )have a circulation pump.The I ❑Does Not not applicable. ;system return pipe is a dedicated I return pipe or a cold water supply,, ❑Not Observable pipe.Gravity and thermos- ❑Not Applicable i syphon circulation systems are not present. Controls for t circulating hot water system I 1 pumps start the pump with signal ! for hot water demand within the 1 occupancy. Controls automatically turn off the pump ; I when water is in circulation loop is at set=point temperature and ; ! no demand for hot water exists. ; 403.5.1.2 ;Electric heat trace.systems ❑Complies ;Exception: Requirement is [FI29]2 i comply with IEEE 515.1 or UL - ;❑Does Not ;not applicable. 1515.Controls automatically I ; adjust the energy input to the ( ;❑Not Observable heat tracing to maintain the ❑Not Applicable i desired water temperature in the !piping. 403.5.2 Demand recirculation water ; '❑Complies ;Exception: Requirement is [F130]2 1 systems have controls that t TIDoes Not :not applicable. manage.operation of,the pump + and limit the temperature of the ! ❑Not Observable water entering the cold water ❑Not Applicable piping to <= 1049F. ' 403.5.4 Drain water heat recovery units ; :[]Complies ;Requirement will be met. [FI31]2 tested in accordance with CSA f i❑Does Not B55.1. Potable water-side "Location on plans/spec:A- pressure loss of drain water heat ' ❑Not Observable 1 'recovery units < 3 psi for. ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water 1 heat recovery units< 2 psi for f individual units connected to three or more showers. 404:1 ;90%or 'more of permanent ; ❑Complies ;Requirement will be met. [F16]1 `fixtures have high efficacy lamps.I '❑Does Not Location on plans/spec:A- ! ❑Not Observable ;1 ! I ;❑Not Applicable 404.1.1 Fuel gas lighting systems have ( ❑Complies ;Requirement will be met: (F123]3 i no continuous pilot light. 4 ❑Does Not e' I 1 []Not Observable :Location on plans/spec:A- I I ❑Not Applicable 1 401.3 Compliance certificate posted. ; ❑Complies ;Re_quirement will be meta [F[7]2 i CIDoes Not } ❑Not Observable j ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Rothmans Addition Report date: 02/23/22 Data filename: Page 8 of 9 Section Plans Verified Field Verified # Finial'Inspection*Provisions Complies? `Comments/Assumptions & Req.ID Value Value. . 303.3 I Manufacturer manuals for I❑Complies ;Requirement will be met. [FI18)3 lmechanical and water heating I❑Does Not I systems have been provided. I { .i❑Not Observable ; f j❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) . 3 Low Impact(Tier 3) Project Title: Rothmanh Addition Report date: 02/23/22 Data filename: Page 9 of 9 2018 1ECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade-Wail 24.60 Below-Grade Wall 19.00 Floor 0.00 Ceiling/ Roof: 49.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.29 Door CoolingHeating & Heating System: Cooling System: Water Heater: Name: . Date: Comments