Loading...
Staff Notes for 8/25/2022STAFF NOTES AUGUST 25, 2022 Queensbury Planning Board Agenda j Second Regular Meeting: Thursday, August 25, 2022 / Time 7 - 11 pm Queensbury Activities Center @ 742 Bay Road Administrative Items Site Plan 34-2022 Par 27, LLC Accept Lead Agency & Reaffirm SEQR Tabled Items Applicant(s)____- ( _BRETT & PAMELA WEST (Main House) j _ Ap lip cation Type _J Site Plan 51-2021 & FWW 10-2022 _ Owner (s) Same applicants _ _ � _ SEQR Type - j Type II Agent(s) _j i EDP_ $ _ Lot size_0.91 acre___ -- _Location 106 Bay Parkw7A-B _Ward: 1 Zoning Classification: WRTax IDNo. 226.15-1-17 _ _Ordinance Reference j 179-3-040, 179-6-065, 147v- -- Cross Reference 53-2017 septic var.; AV 47-200 - - 7 - j Warren Co. Referral August 2021, - boathouse; SP PZ 89-2016 & SP PZ 210-2016 & February 2022 (stormwater device) AV 95-2016 - addition; SP 37-2009; AV 57-2021, July 2022 (FWW) SP 52-2021 Public Hearing _ September 28, 2021, November 16, 2021, December Site Information APA, CEA, LGPC 16, 2021, February 22, 2022, March 29, 2022, April 26, 2022, May 19, 2022, August 25, 2022 Project Description: (Revised 6/15/2022) Applicant proposes to demo existing home and shed to construct a new two story home with a 5,436 sq ft footprint with a garage. Also included is installation of permeable pavers for patio, driveway areas and a covered walkway between the two properties. The new floor area will be 8,670 sq ft where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, and stormwater management. The project includes a lot line adjustment but no change to lot size. Additionally, work to be done is within 100 feet of a designated wetland. Pursuant to chapter 179-3-040, 179-6-065, Chapter 94, Chapter 147, site plan for a new floor area in a CEA, work adiacent to wetland, and hard surfacing within 50 ft of the shoreline shall be subject to Planning Board review and approval. Old Business Applicant) _� JAMES BROWN- _______ 7 __Ap liR cation Tyke _ _ { Site Plan 54-2022 Owner (s) _� Same asapplicant_-_-- � SEQR Type --- - i Type II ----�---,_-_r_---------__-.__..' -Agents) JarrettEngineering --- J Lot size _ �f 15_75 acres Location 1918 Ridge Road, Shop Road �- Ward: 1-� Zoning Classification: LC-l0A_ ___J Tax ID No. --j 253.-1-23, 253.-1-22 (access road)- ( Ordinance Reference 179-3440, 179-4-050, Chapter 147, 179 6-060 Cross Reference SP 32-2018, Disc 06-2021, AV 41-2022 Warren Co. Referral August 2022 Public Hearing August 25, 2022 Site Information APA = Project Description: Applicant proposes to construct a new single family home with a 1,936 sq ft footprint. The access drive to the new home is from an existing private road ("Shop Road") through an adjoining property to the new home. The remaining driveway area is located on the applicant's property using some portions of previous logging roads. The project includes disturbance of an acre and will require a major stormwater permit. Pursuant to chapter 179-3-040, 179-4-050, Chapter 147, 179-6-060, site plan for construction of a new home within the LC10 zone in the APA, a new structure within 15% slopes shall be subject to Planning Board review and approval. Applicants) - a JEFFREY RANDLES j Application Type -J Site Plan 51-2022 Owner (s) Same as applicant - �J SEQR _ size 83 acres _EDP Lot ------___�------_--__-------_.-_-- E _-_-�-----------____._______.__ Location ; _42 Old Assembly Point Road Ward: 1 Zing onClassification: WR - Tax ID No. 239.12-2-11 --1 Ordinance Reference 1 179-3-040, Chapter 147 _ Cross Reference ' AV 36-2022 -� Warren Co. Referral j _August 2022 -�^ -- � Site Information APA, LGPC, Public Hearin CEA ` August 25, 2022 � Project Description: Applicant proposes alterations to an existing single family home with a second story addition and an attached garage. New floor i area to be 6,968 sq ft and the total footprint of the new house to be 3,348 sq ft. The additions include additional basement area. The main floor would alter the north side with a new dining area and a new garage. The south side bedroom areas to be added to the footprint of the structure. The second floor would include additionalliving space and storage. The project includes stormwater management and shoreline plantings. Pursuant to chapter 179- I 3-040, 147, site plan review for a new floor area and alterations to the existing home shall be subject to Planning Board review and approval. i Applicant(s) DARK BAY LANE, LLC.-- j Application Ty ems__ Site Plan 58-2022 Owner (s) Same as applicant _ — I SEQR Tyke ---] Ty e_1I —� — Agents) EDP Lot size .43 acres fLocation 40 Dark Bay Lane _— _ Ward: 1 Zoning Classification: WR Tax ID No. ( 239.18-1-37 j Ordinance Reference 1 179-3-040, 179-6-050, 179-4-010, 179-6-065 Cross Reference ( AV 43-2022 ,� Warren Co. Referral August 2022 ^ Public Hearing August 25, 2022 Site Information APA, LGPC, CEA Project Description: Applicant proposes to demolish an existing 2,000 sq ft home to construct a new home with a footprint of 2,658 sq ft. The new floor area is to be 4,378 sq ft. The project includes a new septic system, update to parking and shared access arrangement, shoreline planting areas, and stormwater management. Pursuant to chapters 179-3-040, 179-6-050, 179-4-010, 179-6-065, new floor area in a CEA and hard surfacing within 50 ft of shoreline shall be subiect to Planning Board review and approval. Old Business- Unapproved Development: Applicants) �] MORGAN GAZETOS/GREG FRANCIS — _Application Type —__j Site Plan 3_5-2022 _Owner (s) Gregory R Francis Trustee SEQR Type � __Type II Morgan Gazetos Lot size ------ ; .92acres___..._------._-_--_- Location E 2930 State Route 9L — vJ Ward: I _ ,� Zoning Classification: WR Tax ID_No. -j 239.20-1-19 — _j Ordinance Reference 179-3-040, 179-13-01_0__ Cross Reference SP 72-2014, AV 85-2014, AV 25-2022 } Warren Co. Referral ! June 2022 Public Hearing June 23, 2022, August 25, 2022 Site Information CEA, APA, LGPC Project Description: (Revised) Applicant requests approval for construction of a deck addition not constructed per approval. Additionally, the applicant has completed additional work without approval including deck area near shoreline, shoreline pathway decking, and a reconstructed shed/changing accessory structure near the shore. The existing house footprint of 1,285 sq ft to remain the same. The existing decking area today is 1,508 sq ft. where a previous approval was for 1,116 sq ft. The site work with the additional wooden walkway has an existing square footage of 2,384 where the proposed is ':. 2,074 sq ft. Updated plans show overlay of existing and previously approved. Pursuant to chapter 179-3-040, 179-13-010, site plan for hard surfacing within 50 ft of the shoreline and expansion of a non -conforming structure shall be subject to Planning Board review and approval. New Business: Ap lip cant s) ADIRONDACK WINERY LLC. _j Application Type Site Plan 53-2022 _ — __, _ Owner (s) 395 Big Bay Road LLC. — 1 SEQR Type_— AgentO) _ n/a _u --- -- —_-- —� _ Lot size----- — v� 2.07 acres Location 1 395 BigBay Road » _ Ward: 4 _ _ Zoning Classification: CLI Tax ID No. 309.17-1-14 Ordinance Reference 179-3-040, 179-5-020 Cross Reference ; SP 24-95, SP 26-2020 ; Warren Co. Referral August 2022____—_____._._—______—________.._•. Public Hearing August 25, 2022 _ _ _ i Site Information_ Project Description: Applicant proposes to install 180 ft of privacy fencing with a 6ft height along the entire length. The fence is to be placed on the Southern property line. The site contains an existing 17,750 sq ft wine manufacturing facility with wine tasting. The applicant received site plan approval in 2020 for an addition to the building to assist with manufacturing space. Pursuant to chapter 179-3-040, 179-5-020, site plan for fence installation for an existing business shall be subiect to Planning Board review and approval. Applicant(s) DAN HUNT Application Type Site Plan 52-2022 _ �- -_� Rezoning 3-2022 Owner (s) __—, Same as applicant _ — SEQR Type��— Agent(s) n/a _� Lot size (_8 acres Location 3 Pinello Road 4 Ward: 4 fi Zoning Classification: MDR Tax ID No. 308.15-1-58 ! Ordinance Reference 179-9_040, 113-17 Cross Reference i Warren Co. Referral August 2022 Public Hearing August 25, 2022 _ _ J Site Information_ _ Project Description: Applicant proposes to operate a 6 unit manufactured home park. The project proposes 4 new units to be installed with associated grass, plantings, blacktop roadway and new underground utilities. Two units were approved for the existing site; the park would contain 6 total. The project is part of rezoning where the mobile home overlay zone is proposed for this parcel pursuant to Chapter 179-9-040 referral from the Town Board where the Planning Board is to complete SEQR and provide recommendation to the Town Board. Pursuant to Chapter 113-17, 179-3-040, site plan for manufactured homes shall be subiect to Planning Board review and approval upon completion of rezoning. New Business- Unapproved Development: A licant s BRIAN HOGAN _ARRlication Typ_e___J Site Plan 50-2022 Owner (s) ! Same as applicant SEQR Ty_ e� i Tyke 1I Agent(s) � -_n/a _ J _Lot size �i _79 acres _Location _� 33 Holly Lane _ � Ward: 1 _ I Zoning Classification: WR Tax ID No. 239.12-2-37 Ordinance Reference__] 179-3-040 Cross Reference AV 68-2021 � Warren Co. Referral I__August 2022 _Public HearingA August 25, 2022 _� Site Information J APA, LGPC, CEA _ Project Description: Applicant proposes to complete a 529 sq ft pavilion at 15ft 2 inches to be constructed near the vicinity of the cottage that has been 1 demolished. The existing home of 1,460 sq ft is to remain with no changes. The project includes a lot line adjustment with the Town in regards to Holly Lane where 916 sq ft of hard surface is added to the applicant's site. Additionally, the project includes a 1,568 sq ft pickle ball court under review for minor stormwater management. Pursuant to chapter 179-3-040, site plan review for a new pavilion in the Waterfront Residential zone shall be subject to Planning Board review and approval. - Any further business which may be properly brought before the Board - Administrative Items: Site Plan 34-2022 @ 170 & 0 Su nnyside Road Par 27, LLC. Draft resolution- Accept Lead Agency, Reaffirm SEAR & Recommendation to Town Board for Zone Change Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 34-2022, Par 27, LLC. Petition of Zone Change 1-2022 170 & 0 Sunnyside Road/ Moderate Density Residential/ Ward 1 SEQR Type I Material Review: application, narrative, stormwater details, site plans, site photo Parcel History: Subdivision 8-2017 Warren Co Referral: Sent: June 2022 / Comments: Concur w/local board. Informal staff comments: Encouraged discussion with applicant for snow removal for off season use of project. Requested Action Planning Board accept lead agency, review application for SEQR and recommendation to the Town Board. Resolutions 1. Reaffirm Accept Lead Agency 2. Reaffirm SEQR 3. Reaffirm Recommendation Project Description Applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road (Vacant) from MDR to RR3A and to add Golf course to Rural Residential. The project includes construction of an addition of 1,850 sq ft and a porch of 322 sq ft to the existing 2,300 sq ft building. Pursuant to chapter 179-3-040, 179-15-040, site plan review, petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. Staff Comments • Location -The project site is located at 170 and 0 (vacant no 911 address) Sunnyside Road. The parcel at 170 Sunnyside is 10.56 ac and the parcel at 0 Sunnyside is 2.44 ac. • Arrangement- The building work occurs at 170 Sunnyside and change of zone will amend these two MDR zone Parcels to RR3A. In addition, the request for change of zone includes adding golf course to the Rural Residential Zone. • Building — The existing building is 2,300 sq ft and the addition is 1,850 sq ft with a porch of 322 sq ft. The addition would be construct on the west side of the existing building. The building is used for the clubhouse. • Site conditions -The parcel is used as Sunnyside Par 3 Golf Course and is to remain. • Traffic- The site has 27 parking spaces for the golf course and there is to be no changes to the parking area. • Grading and drainage plan, Sediment and erosion control -The applicant proposes an eave trench along the building of 40 ft by 5 ft to address stormwater from the new addition. • Landscape plan -There are no changes to the existing site landscaping. • Site lighting plan -There are no changes to the existing lighting. • Utility details -There are no changes to the existing utilities this includes on -site septic and municipal water. • Signage-There are no changes to the existing signage. • • Elevations -The plans show a building rendition with no dimensions — dimensions should be added. • Floor plans -The floor plans show the existing building and the proposed addition — dimensions will need to be clarified. • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested —Staff finds it reasonable to request a waiver as the project is for an addition to an existing building and does not change the use of the building and site as a golf course. The applicant has provided information for: j. stormwater. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. SUMMARY Updated as notice was needed to be provided to involved agencies. APA has provided a consent letter as an involved agency. Reaffirming -The applicant has completed a petition of zone change for the zone change of two parcels from MDR to RR3A and to add golf course as a listed use in the Rural Residential Zone requiring Site Plan. The Planning Board can accept Lead Agency as they are the only other involved agency and the Town Board consented in the referral resolution; the Planning Board may conduct SEQR and may provide a recommendation to the Town Board. Meeting History: 1st Meeting Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 wro; Town of Queensbury Planning Board RESOLUTION ACKNOWLEDGE LEAD AGENCY STATUS IN CONNECTION WITH SITE PLAN 34-2022 PAR 27, LLC. Tax Map ID: 290.5-1-50.1, 290.6-1-11 / Property Address: 170 & 0 Sunnyside Road / Zoning: MDR WHEREAS, the applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road (Vacant) from MDR to RR3A. The project includes construction of an addition of 1,613 sq ft to the existing 2,300 sq ft building. Pursuant to chapter 179-3-040, 179-15-040, site plan review, petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. WHEREAS, the Planning Board of the Town of Queensbury has determined to begin an environmental review process under the State Environmental Quality Review Act (SEQRA). WHEREAS, in connection with the project, the Town of Queensbury Planning Board, by resolution, previously authorized the Community Development Office to notify other involved agencies of the desire of the Town Board to conduct a coordinated SEQR review; WHEREAS, the Zoning Administrator has advised that other involved agencies have been notified and have consented to the Town of Queensbury Planning Board being lead agency; NOW, THEREFORE BE IT RESOLVED: MOTION TO ACKNOWLEDGE LEAD AGENCY STATUS IN CONNECTION WITH SITE PLAN 34- 2022 PAR 27, LLC, Introduced by who moved for its adoption, As per the draft resolution prepared by staff. Duly adopted this 161" day of August 2022 by the following vote: AYES: NOES Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board SEQR RESOLUTION — Reaffirm Previous SEQR SITE PLAN 34-2022 PAR 27, LLC. Tax Map ID: 290.5-1-50.1, 290.6-1-11 / Property Address: 170 & 0 Sunnyside Road / Zoning: MDR The applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road (Vacant) from MDR to RR3A. The project includes construction of an addition of 1,613 sq ft to the existing 2,300 sq ft building. Pursuant to chapter 179-3-040, 179-15-040, site plan review, petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; The proposed action considered by this Board is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury; No Federal or other agencies are involved; Part 1 of the Long EAF has been completed by the applicant; Whereas, the Planning Board adopted a SEQR Resolution on 6/23/2022 adopting SEQRA determination of non -significance, and Upon review of the information recorded on the EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency reaffirms that this project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. MOTION TO REAFFIRM NEGATIVE DECLARATION FOR THE PROPOSED SITE PLAN 34-2022 PAR 27, LLC, Introduced by who moved for its adoption, Duly adopted this 251" day of August 2022 by the following vote: AYES: NOES Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION -Planning Board Recommendation to the Town Board for Zoning Change Change from MDR to RR3A SITE PLAN 34-2022 PAR 27, LLC. Tax Map ID: 290.5-1-50.1, 290.6-1-11 /Address: 170 & 0 Sunnyside Road / Zoning: MDR WHEREAS, the applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road (Vacant) from MDR to RR3A. The project includes construction of an addition of 1,613 sq ft to the existing 2,300 sq ft building. Pursuant to chapter 179-3-040, 179-15-040, site plan review, petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. WHEREAS, the Town of Queensbury Town Board is proposing a zoning change to RR3A. The Town Board referred this proposed change to the Planning Board for an advisory recommendation pursuant to Section 179- 15-020, resolution number 210, 2022 dated on 5/16/2022; MOTION FOR RECOMMENDATION TO THE TOWN BOARD AS FAVORABLE/UNFAVORABLE FOR ZONING CHANGE FROM MDR TO RR3A; The Planning Board based on limited review has not identified any significant adverse impacts that cannot be mitigated with this proposal. Introduced by who moved for its adoption. Duly adopted this 251h day of August 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 51-2021 & Freshwater Wetlands 10- 2022 @ 106 Bay Parkway Brett &Pamela West (Main House) Public Hearing Scheduled Draft resolution- Table to September 2022 Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 51-2022 & BRETT & PAMELA WEST Freshwater Wetlands 10-2022 106 Bay Parkway / Waterfront Residential / Ward 1 SEQR Type II Material Review: application, site plans, floor plans, elevations, deed, stormwater management report, freshwater wetland permit application, revised Parcel History: 53-2017, AV 47-2007, SP 39-2007, SP 89-2016, SP 210-2016, AV 95- 2016, AV 57-2021, SP 52-2021, AV 30-2022 Warren Co Referral Sent: July 2022 (FWW) /Comments: Concur w/local board. Informal staff comments relating to identifying wetlands area and compliance with DEC guidelines. Requested Action Applicant to be tabled to September 27t' meeting pending ZBA meeting in September. Planning Board review and approval for demolition of existing home and shed to construct 2 story home and garage. Resolutions 1. PB decision Project Description (Revised 6/15/2022) Applicant proposes to demo existing home and shed to construct a new two story home with a 5,436 sq ft footprint with a garage. Also included is installation of permeable pavers for patio, driveway areas and a covered walkway between the two properties. The new floor area will be 8,670 sq ft where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, and stormwater management. The project includes a lot line adjustment but no change to lot size. Additionally, work to be done is within 100 feet of a designated wetland. Pursuant to chapter 179-3-040, 179-6- 065, Chapter 94, Chapter 147, site plan for a new floor area in a CEA, work adjacent to wetland, and hard surfacing within 50 ft of the shoreline shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 106 Bay Parkway on a parcel of 0.91 acres. • Arrangement- The project involves a tear down and construction of a new home. The project includes installation of a new septic system, stormwater management, and drive -way area. The existing home is a log style home building approximately in 1941. The project plans show the location of hard -surfacing site work within 50 ft of the shoreline. • Building — The home to be constructed is 5,436 sq ft footprint includes a porte-cochere and an attached garage. The patio are to be installed is 1,800 sq ft. The project includes a covered walkway of 692 sq ft that is to extend from the proposed house to a new home on the adjoining property. The new floor area is 8,670 sq ft. • Site conditions -The property is an odd configuration where most of the site will be disturbed for construction but minimal disturbance of the shoreline. • Grading and drainage plan, Sediment and erosion control -The project includes 0.54 acres of disturbance and plans show the silt fence location on the property. The grading of the property is also shown between 323 to 325 for the finished floor. The project is subject to a major stormwater permit as the project consists of greater than 15000 sq ft of disturbance. The plans show the rain garden locations. The applicant has provided an updated response package for the Town Designated Engineer to review. • Landscape plan- The project site is located on Lake George and is subject to the shoreline buffer review. The applicant has indicated a new set of plantings to occur around the house. No plantings along the shoreline are to be removed. There are some new plantings on the east shoreline proposed. Below are the guidelines from the shoreline buffer code section o Shoreline Buffer - Section 179-8-040 -Minimum width 3 5 ft (Lake George) -For every 700 sgft of shoreline buffer area -one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 - 24 in native shrubs; 14 herbaceous plants Project site -465 ft of shoreline per survey -Shoreline buffer 465 ft X 35 ft width is 16,275 sq ft -Shoreline buffer area-16,275 /700 = 23.25 round up to 24 -twenty-four large trees at 3 inch diameter -Ground cover-16,275/350 = 46.5 round up to 47 (X7) =329 native shrubs and 47 (X14) herbaceous plants=658 o Shoreline Cutting restrictions- Section 179-6-050 - Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 465 ft Shoreline X 30%= 139.5 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan -Lighting information was not provided and Staff suggests confirming residential light fixtures are downward cast cutoff. • Utility details -The plan shows anew holding tank system to be installed. Approved by the local BOH. The water supply is drawn from the lake. • Elevations -The elevations show the view of the home, an attached porte cochere (second garage), an attached garage and the covered open walkway. • Floor plans -The first floor plan shows, living room area, kitchen, dining room, the porte-cochere, media room, small office, game room, and a three car garage. Note the area labeled wet bar will have no kitchen elements. The second floor plan shows bathrooms, closets, bedrooms, and the garage area will be open with no second floor. • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details, r. construction/demolition disposal s. snow removal. • The waivers requested -Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information on j. stormwater, k. topography,1. landscaping p floor plans, q. soil logs. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Freshwater Wetland The applicant has provided an updated plan showing the location of the wetland area. The wetland area is about 1,019 sq ft as noted on the Freshwater wetland permit. The APA and the Army Corp have indicated the area as non- jurisdictional. Nature of Variance Granted 3/23/2022. The new home is to be located 46 ft. to the east shoreline, 35 ft. to the west shoreline where 50 ft. is required. The covered walkway is to be 0 ft. from the west side setback where a 20 ft. setback is required. The project proposes two garages where only one is allowed — the porte-cochere is considered a garage due to width of open sides allowing vehicles. Relief is also requested for setbacks for stormwater devices. Note: Permeability 77.9% is proposed where 75% is required- no permeability relief is requested. The floor area proposed is 8,670 sq ft where 8, 687 sq ft is the maximum size allowed — no floor area relief is requested. New Variance Applicant proposes the garage section of the home to be located 10 ft from the wetland area where 50 ft is required and relief from the shallow depression area is also being requested. Summary Pending ZBA Meeting History: PB: 9/28/2021, 11/16/2021, 12/16/2021, 2/22/2022, 3/29/2022, 4/26/2022, 5/19/2022, 8/16/2022; ZBA: 9/29/2021, 10/27/2021, 12/15/2021, 2/16/22, 3/23/2022 [a3 LaBeRa Po,x/ered by partnership. July 25, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: West Residence - Main House Town of Queensbury, Warren County, New York LaBella Project # 92100.38 Queensbury Ref #SP51-2021 Dear Mr. Brown: Labella has received the latest submission responding to comments offered by Labella on May 26, 2022. Based upon our review, we have no further comments as the Applicant is seeking variances for stormwater separation distances (additional plan review may be necessary depending on the outcome of the variances). In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Sincerely, Richard Adams, PE Senior Civil Engineer cc: Shauna Baker, Town Planning Office Administrator (via email) Laura Moore, Town Land Use Planner (via e-mail) File 20 Etm Street Suite 1io ! Glens Falls. NY 128o1 ! p (518) 812-0513 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — TABLE SITE PLAN 51-2021 & FRESHWATER WETLANDS 10-2022 BRETT & PAMELA WEST Tax Map ID: 226.15-1-17 / Property Address: 106 Bay Parkway / Zoning: WR (Revised 6/15/2022) Applicant proposes to demo existing home and shed to construct a new two story home with a 5,436 sq ft footprint with a garage. Also included is installation of permeable pavers for patio, driveway areas and a covered walkway between the two properties. The new floor area will be 8,670 sq ft where the maximum allowed is 8,687 sq ft. The project includes site work for new landscaping shoreline and residential house, septic, and stormwater management. Additionally, work to be done is within 100 feet of a designated wetland. Pursuant to chapter 179-3-040, 179-6-065, Chapter 94, Chapter 147, site plan for a new floor area in a CEA, work adjacent to wetland, and hard surfacing within 50 ft of the shoreline shall be subject to Planning Board review and approval. Variance: Relief is sought for setbacks to wetland. Planning Board shall make a recommendation to the Zoning Board of Appeals. MOTION TO TABLE SITE PLAN 51-2021 & FRESHWATER WETLANDS 10-2022 BRETT & PAMELA WEST. Introduced by who moved for its adoption Tabled until the September 27, 2022 Planning Board meeting pending Zoning Board decision. Duly adopted this 251h day of August 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 54-2022 @ 1918 Ridge Road James Brown Public hearing scheduled Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 54-2022 JAMES BROWN 1918 Ridge Road / Land Conservation / Ward 1 SEQR Type II Material Review: site plan application, survey, floor plan, elevation, stormwater management Parcel History: SP 32-2018, DISC 06-2021, AV 41-2022 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. Requested Action Planning Board review and approval for construction of a single family home. Resolutions 1. PB decision Project Description Applicant proposes to construct a new single family home with a 1,936 sq ft footprint. The access drive to the new home is from an existing private road ("Shop Road") through an adjoining property to the new home. The remaining driveway area is located on the applicant's property using some portions of previous logging roads. The project includes disturbance of an acre and will require a major stormwater permit. Pursuant to chapter 179- 3-040, 179-4-050, Chapter 147, 179-6-060, site plan for construction of a new home within the LC10 zone in the APA, a new structure within 15% slopes shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 1918 Ridge Road and portion of property at 104 Shop Road for access. The 1918 Ridge 15.75 ac and the 104 Shop Road is 66.67 ac. • Arrangement- The existing Shop Road site has an existing house that is to remain. The proposed driveway is in line with the parcel to be used for the proposed new home. • Site Design- The driveway area to be developed is part of an existing logging trail/road. • Building — The proposed home would be have a footprint of 1,336 sq ft with a porch/deck area of 600 sq ft. • Grading and drainage plan, Sediment and erosion control -The project has been referred to the Town Designated engineer for review and comment. The project includes disturbance of about 1 acre. The additional driveway area for the Brown lot through the neighbor lot would be 8,000 sq ft. • Landscape plan -The plans show a clearing plan for the house, septic, well and other associated items for house development. The applicant has indicated the trees and vegetation are to mostly to stay intake • Site lighting plan -The applicant is reminded lighting should be down cast fixtures. • Utility details -The new home will be serviced by a new well and new septic system. • Elevations- The applicant has provided a rendition of the house proposed for the site. • Floor plans- The floor plan provided indicates a one —story home • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested —Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information for: j. stormwater, k. topography, 1. landscaping, and p floor plans • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance Applicant requires relief for parcel access that does not have direct access to a public road. Summary Pending ZBA Meeting History: PB: 8/16/2022; ZBA: 8/17/2022 ;W"M LaBeLLa �t v._ Powered by oarinershin. August 18, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: Brown Residence Town of Queensbury, Warren County, New York LaBella Project # 2220706.35 Queensbury Ref #SP 54-2022 Dear Mr. Brown: LaBella has received a submission package from your office for the above referenced project. The Applicant is proposing to construct a single family residence, along with an access driveway, wastewater management and other associated utilities. Submitted information includes the following: • Project Narrative, prepared by Jarrett Engineers, dated June 28, 2022 • Site plan Application, Prepared by Jarrett Engineers, dated June 23, 2022; • Stormwater Management Report, prepared by Jarrett Engineers, dated June 14, 2022; • Site Plans, Prepared by Jarrett Engineers, dated June 2022; Your office has requested that we limit our review to the design of stormwater system as it relates to compliance with local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments: 1. According to the site plan application, the proposed project plans to disturb an area of approximately +/- 51,000 square feet and thus will require the preparation of a Stormwater Pollution Prevention Plan (SWPPP). In accordance with GP-0-20-001 Table 1, the project requires the preparation of a SWPPP that only includes Erosion and Sediment controls. A SWPPP has been provided. 2. According to the site plan, the Applicant is proposing to disturb +/- 51,000 sf. Projects that disturb greater than 15,000 SF are considered Major Projects per Town code section 147-11.E.(2). In accordance with Town code section 147-11.1.(3)(c), Major Project stormwater control measures shall be designed so that there will be no increase in runoff volume from a ten-year-frequency/twenty-four-hour- duration storm event following development over the predevelopment volume, and for storm events exceedingthe ten-year design storm, the stormwater controls measures shall function to attenuate peak runoff flow rates for a twenty -five-year frequency storm to be equal to or less than predevelopment flow rates. The Applicant has provided a twenty -five-year storm for analysis but has not provided a ten-year storm. The Applicant shall provide a ten-year storm for analysis in future submissions. 20 Elm Street Suite 110 Glens Falls, NY 128oi ; p (518) 812-0513 %ti'f'J?1.irfbi=`.i.E_t?Cj(..iv`i�i`f 1 A full review of the rate and volume standards will occur once the comments are addressed. 3. The Applicant has not provided pre and post development subcatchment maps for analysis and in support of the HydroCAD model. The Applicant to provide subcatchment maps in subsequent submissions. 4. Section 147-111(3)(c)[3] requires two feet of vertical separation between the bottom of an infiltration practice and the seasonal high groundwater. It does not appear that tests pits have been done in the infiltration areas that are adjacent to the lower portion of the proposed road. The Applicant shall provide soil test pit data to confirm vertical separation exists in the areas proposed for infiltration practices and confirm the soils have infiltrative capacity. 5. The applicant should model the proposed culverts. 6. The NYS SM DM states that "Infiltration practices cannot be located on areas with natural slopes greater than 15%" and "Infiltration practices cannot be located in fill soils". It appears the site has slopes throughoutthe site that exceed 15%, including in the locations of the infiltration practices (Rain Garden Q. Additionally, the infiltration practices appear to be located in fill soils. Previous correspondence received from the NYS DEC regarding projects with similar concerns of locating stormwater features in fill slopes has resulted in the following recommendations: `At a minimum, the designer must meet the following guidance and provide justification/demonstration of equivalence in the SWPPP: • Insitu/natural soil layer below the infiltration system has an infiltration rate greater than or equal to the 0.5 in/hr • Ground water and bedrock levels in insitu/natural soil should be at least 2 - 3 feet below grade • Fill material is an engineered fill that is tested after placement (by geotechnical firm) and demonstrated to be equivalent to a soil material acceptable for the installation of an infiltration system (i.e. infiltration rate greater than or equal to .5 in/hr, etc.). Infiltration rate of fill material should be similar infiltration rate as insitu/existing soil. • If there is a difference in the infiltration rates between the fill and insitu/native soil, the designer should use the more conservative (i.e. slower infiltration rate) when determining whether the infiltration system will dewater (exfiltrate) with the required 48 hours (see Section 6.3.2 "Conveyance' of the Design Manual) • Required vertical separation distances to groundwater/bedrock are maintained • Required horizontal separation distances to surface waters, wells, etc. are maintained • There is adequate fill along the edges of the infiltration system to prevent seeps/breakouts" DEC has indicated that with regards to the 15% limit, they have allowed designers to use the cut/fill approach provided the criteria above is met. As such, the Applicant should demonstrate compliance with the provisions outlined by the DEC. 7. A legally binding and enforceable maintenance agreement maybe required to be executed between the landowner and the Town ensuring that proper maintenance measures will be implemented for all proposed stormwater management practices in accordance with Section 147-10.D of the Town Code. 8. The Erosion and Sediment Control plans shall include all the notes of section 147-11.J of the Town Code. 9. The Applicant shall provide an unsigned copy of the MS4 SWPPP acceptance form within the SWPPP (and an executed copy with the final SWPPP). 10. The draft N01 is incomplete. Applicant to complete the N01 and provide in subsequent submissions. 11. Section I.F.8. and I.F.4 of the General Permit requires documentation in regard to archeological sensitive areas and endangered and threatened species. The Applicant's SWPPP does not appear to include the require documentation. The Applicant to revise accordingly. 12. The Applicant shall clarify who the Authority Having Jurisdiction is of the drainage crossing. 13. The tributary watershed map for the driveway drainage design is difficult to discern as the site features (i.e. proposed conveyance features) are not depicted. We recommend the applicant superimpose the drainage areas on the site plan to better understand the subcatchment areas. 14. The Applicant shall depict the check dams in plan view and verify if they will be permanent. 15. Based upon the site plan, there appears to be multiple design points for rate and volume analysis. However, it does not appear that multiple design points are analyzed in the HydroCAD model. Further the design points do not appear to be described in the stormwater report. Applicant to revise accordingly. 16. The Applicant is currently proposing an agridrain. The Applicant shall show the location of the agridrain in plan view and clarify its intent. 17. Town code section 147-111(3)(c)[5] prescribes the winter infiltration area for infiltration practices. The infiltrating rain gardens do not appear to include the winter infiltration area and shall be revised accordingly. 18. The Applicant shall depict downspouts as applicable. 19. Town code section 147-111(3)(c)[4] states "Infiltration devices for major projects shall be located a minimum of 100 feet from Lake George and any down gradient drinking water supply, lake, river, protected stream, water well, pond, wetland; a separation of more than 100 feet may be required in cases where contamination of the water supply is possible due to highly permeable soils, shallow groundwater and similar situations. The separation distance shall be a minimum of 50 feet from up - gradient water supplies. Designs shall mitigate adverse effects that groundwater recharge will have on adjacent wells, water supplies, wastewater treatment systems, buildings, roadways, properties and stormwater control measures. Stormwater recharge areas shall be located a minimum of 100 feet from the subsurface treatment system of a wastewater treatment system unless it is demonstrated that a lesser separation will not adversely affect the functioning of such leach fields. Currently the Infiltrating rain garden is within 100 feet of the downhill wastewater absorption system and in the direct path. Furthermore, the proposed upgradient water well is within 50 feet of the infiltrating rain garden. The Applicant to revise accordingly. Conclusion & Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Respectfully submitted, Richard Adams, PE Senior Civil Engineer cc: Shauna Baker, Town Planning Office Specialist (via email) Laura Moore, Town Land Use Planner (via email) File Town of Queensbury Community Development Office — 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 54-2022 JAMES BROWN Tax Map ID: 253.-1-23, 253.-1-22 / Property Address: 1918 Ridge Road / Zoning: LC-10A The applicant has submitted an application the Planning Board: Applicant proposes to construct a new single family home with a 1,936 sq ft footprint. The access drive to the new home is from an existing private road ("Shop Road") through an adjoining property to the new home. The remaining driveway area is located on the applicant's property using some portions of previous logging roads. The project includes disturbance of an acre and will require a major stormwater permit. Pursuant to chapter 179-3-040, 179-4-050, Chapter 147, 179-6-060, site plan for construction of a new home within the LC 10 zone in the APA, a new structure within 15% slopes shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 8/16/2022; the ZBA approved the variance on 8/17/2022; The Planning Board opened a public hearing on the Site plan application on 8/25/2022 and continued the public hearing to 8/25/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 8/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 54-2022 JAMES BROWN; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Page 1 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 251h day of August 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.763..82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 51-2022 @ 42 Old Assembly Point Road Jeffrey Randles Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 51-2022 JEFFREY RANDLES 42 Old Assembly Point Drive / Waterfront Residential / Ward 1 SEQR Type II Material Review: site plan application, site plans, elevations, floor plans, narrative Parcel History: AV 36-2022 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. Requested Action Planning Board review and approval for alterations and additions to an existing home. Resolutions 1. PB decision Project Description Applicant proposes alterations to an existing single family home with removal of the first floor to the foundation, reconstruct the first floor with interior alterations, add asecond story addition and an attached garage. New floor area to be 6,968 sq ft and the total footprint of the new house to be 3,348 sq ft. The additions include additional basement area. The main floor would alter the north side with a new dining area and a new garage. The south side bedroom areas to be added to the footprint of the structure. The second floor would include additionalliving space and storage. The project includes stormwater management and shoreline plantings. Pursuant to chapter 179-3-040, 147, site plan review for a new floor area and alterations to the existing home shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 42 Old Assembly Point Road on a 0.83 ac parcel • Arrangement- The site foundation is to remain and the new construction is to be consistent with the original home. • Building — The existing home has a footprint of 1,630 sq ft with 450 sq ft of deck/porch area. The new footprint will be 2,680 sq ft with 488 sq ft of deck/porch area and a floor area of 6,968 sq ft. The project includes removal of the first floor walls to the foundation, a garage addition, a second floor addition, screen porch, updated driveway area. • Grading and drainage plan, Sediment and erosion control -The plans indicate there is to be drip edge infiltration areas for the new construction and stone reservoir for the screen porch. There are to be shallow grass depressions on the site as well. The project was referred to the Town Designated Engineer for review and comment. • Landscape plan- The project site is located on Lake George and is subject to the shoreline buffer review. The plans indicate existing plantings and trees to remain as well as plantings to be installed. Below are the guidelines from the shoreline buffer code section o Shoreline Buffer - Section 179-8-040 -Minimum width 35 ft (Lake George) -For every 700 sgft of shoreline buffer area -one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 - 24 in native shrubs; 14 herbaceous plants Project site -68.47 ft of shoreline per survey -Shoreline buffer 195 ft X 35 ft width is 2937 sq ft -Shoreline buffer area -2397 /700 = 3.4 round up to 4 -four large trees at 3 inch diameter -Ground cover-2397/350 = 6.8 round up to 7 (X7) =49 native shrubs and 20 (X7) herbaceous plants=140 o Shoreline Cutting restrictions- Section 179-6-050 - Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 68.47 ft Shoreline X 30%= 20.5 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan -A reminder lighting should be down cast fixtures. • Utility details -The applicant proposes to use the 2016 system and has provided an engineering certification • Elevations -The elevations show the additions to the home with the height where the maximum height is at 27.84 ft • Floor plans -The project plans show the existing basement and new basement area. Then the first floor with the screen porch, alterations interior and the garage_ addition. Then the second floor with a bedroom areas. • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested -Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information for: j. stormwater, k. topography,1. landscaping, p floor plans • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance The applicant proposes the new home on the existing foundation. The home is to be 8 ft where 20 ft is require to the north side. The home on the west side would be 51 ft from the shoreline where 56.1 ft is required due to the adjoining home setback. The stormwater devices to be installed would be 48 ft and 88 ft where 100 ft setback is required. Summary Pending ZBA Meeting History: PB: 8/16/2022; ZBA: 8/17/2022 LaBeLLa Powered 10y partnership, August 18, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: Crai B@ciueensbu[y.net Re: Randles Residence Town of Queensbury, Warren County, New York Labella Project # 2220706.34 Queensbury Ref #SP52-2022 Dear Mr. Brown: LaBella Associates has received a submission package from your office for the above referenced project. The Applicant is proposing the addition of a 10' wide paved driveway, 1,734 SF of building addition consisting of a second story, two bay garage, on site stormwater management and shoreline buffer additions. Information submitted to our office for review includes the following: • Architectural plans; • Certification letter of wastewater system, prepared by EDP LLP, dated June 13, 2022; • Cover letter, prepared by EDP LLP, dated June 15, 2022; • Site Plan Application, prepared by EDP LLP, dated June 13, 2022, and; • Site plans, prepared by EDP LLP, dated April 20, 2022. Your office has requested that we limit our review to the design of the stormwater system as it relates to compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the site plan review application, the proposed site improvements will disturb less than one (1) acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). However, this project falls within the Lake George watershed and therefore is subject to the stormwater management requirements set forth in Section 147-11 of the Town Code for projects within the Lake George Park. Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2. According to the site plans, this project proposes land disturbance of 10,000 (+/-) square feet and is classified as a minor project for stormwater management by Town Code Section 147-11.E(1)(a). With the minor project classification, the Applicant has opted to use the alternative stormwater calculation method described in Town code section 147-11.1(2)(a), which allows a flat rate of 1.5 gallons of stormwater to be used for every square foot net increase in impervious area, where net increase is the difference between predevelopment and post development conditions. 20 Elm Street Suite 110 i Glens Falls, NY 12801 p (518) 812-0513 = ,,x,v,,1a beLLa c.corti 3. Town code section 147-111(2)(c) states infiltration devices shall not be installed up gradient within 20 feet of the subsurface treatment system of a wastewater treatment system. It is difficu It to discern where the project site and neighboring absorption fields are located (as applicable). The Applicant to revise or clarify accordingly to support a review of 147-111(2)(c). 4. The callout for stormwater management practice SMA #4 states that it will have a bottom elevation of 332.5 throughout the section. The proposed contours do not match the callout, as the portion of the practice closest to the lake shows an elevation of 332 feet. The Applicant to clarify, and revise the site plans if applicable. 5. Town code section 147-111(2)(a) states that the location of the infiltration devices shall be determined based upon soil test results. Town code section 147-111(2)(e) prescribes the vertical separation distances for infiltration practices. It does not appear that deep soil test pits nor infiltration tests were performed in support of the design. The Applicant to perform the tests and provide the results. 6. As applicable, the Applicant to add downspout locations to the site plans. 7. Sheet 6 of the site plans has a callout stating the limit of work is 29,000 SF and a limit of disturbance of 11,250 SF. The Applicant to clarify what construction activities will take place within each described boundary. 8. It does not appear that the grading plans depict the overflow weir elevation for SMA #3 and the Applicant to revise accordingly. 9. The Applicant to clarify the method of pre-treatment prior to entry to the infiltration practice. Erosion & Sediment Control 10. It appears the erosion and sediment control plan is incorporated into the overall site plan. It does not appearthatthe ESC plan is complete as no temporary ESC controls are depicted to protect the infiltration areas. Section 6.3.6 of the NYS SMDM states "Infiltration practices shall never serve as a sediment control device during site construction phase. In addition, the Erosion and Sediment Control plan for the site shall clearly indicate how sediment will be prevented from entering an infiltration facility." The Applicant shall revise the plans to clearly indicate how sediment will be prevented from entering the infiltration facilities during the site construction phase. 11. Further, it does not appear that a temporary soil stockpile and temporary ESC controls for a temporary soil stockpile are depicted on the site plans. The applicant to clarify if there will be a temporary soil stockpile and revise the plans if applicable. Conclusion & Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Sincerely, ram. Richard Adams, PE Senior Civil Engineer cc: Shauna Baker, Town Planning Office Administrator (via email) Laura Moore, Town Land Use Planner (via e-mail) File Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 51-2022 JEFFREY RANDLES Tax Map ID: 239.12-222-11 / Property Address: 42 Old Assembly Point Road / Zoning: WR The applicant has submitted an application the Planning Board: Applicant proposes alterations to an existing single family home with a second story addition and an attached garage. New floor area to be 6,968 sq ft and the total footprint of the new house to be 3,348 sq ft. The additions include additional basement area. The main floor would alter the north side with a new dining area and a new garage. The south side bedroom areas to be added to the footprint of the structure. The second floor would include additionalliving space and storage. The project includes stormwater management and shoreline plantings. Pursuant to chapter 179-3- 040, 147, site plan review for a new floor area and alterations to the existing home shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 8/16/202; the ZBA approved the variance on 8/17/2022; The Planning Board opened a public hearing on the Site plan application on 8/25/2022 and continued the public hearing to 8/25/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 8/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 51-2022 JEFFREY RANDLES; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Pagel of 2 Phone: S18.761.82201 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 25th day of August 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.763..8220 I Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 58-2022 @ 40 Dark Bay Lane Dark Bay Lane, LLC. Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 58-2022 DARK BAY LANE, LLC. 40 Dark Bay Lane / Waterfront Residential / Ward 1 SEQR Type II Material Review: application, site plans, floor plans, elevations, stormwater Parcel History: SP 28-2021, AV 56-2021, AV 43-2022 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. Requested Action Planning Board review and approval for demolition of an existing home to construct a new home. Resolutions 1. PB decision Proiect Description Applicant proposes to demolish an existing 2,000 sq ft home to construct a new home with a footprint of 2,658 sq ft. The new floor area is to be 4,378 sq ft. The project includes a new septic system, update to parking and shared access arrangement, shoreline planting areas, and stormwater management. Pursuant to chapters 179-3- 040, 179-6-050, 179-4-010, 179-6-065, new floor area in a CEA and hard surfacing within 50 ft of shoreline shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 40 Dark Bay Lane off of State Route 9L. The parcel is 0.44 acres on Lake George. • Arrangement- The applicant had a similar project with additions to an existing home that was approved in 2021. The applicant has had to change the project to demolish the existing home and construct a new home in a similar configuration and location that includes the previous improvements due to the existing structure foundation. • Site Design- The project includes the construction of a new home of 2295 sq foot print with 363 sq ft foor print porch/deck areas. The improvements include the driveway area to be altered to meet the garage with retaining walls to be constructed. The driveway area includes permeable pavers. • Building — There home to be constructed is to be in a similar location as the current home. The existing floor area of 2,650 sq ft and the new floor area to be 4,378 sq ft. The height is to be 27.92 ft • Site conditions -The applicant proposes to the hard surfacing and driveway area of 1,498 sq ft hard surface area with a permeable paver. • Grading and drainage plan, Sediment and erosion control -The applicant has indicated the project is a minor stormwater project. The project includes rain garden, shallow grassed depression and permeable pavers to assist with stormwater management. The materials have been provided to the Town Designated engineering for review and comment. • Landscape plan- Landscape plan -The plans indicate there is vegetation to remain and improvements to the patios near the shoreline would be permeable paver type patio area. Below are the guidelines from the shoreline buffer code section o Shoreline Buffer - Section 179-8-040 -Minimum width 35 ft (Lake George) -For every 700 sgft of shoreline buffer area -one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 - 24 in native shrubs; 14 herbaceous plants Project site -105 ft of shoreline per site drawing existing conditions -Shoreline buffer 105 ft X 35 ft width is 3,675 sq ft -Shoreline buffer area-3675/700 = 5.25 round up to 6 -six large trees at 3 inch diameter -Ground cover-3675/350 = 10.5 round up to 11 (X7) =77 native shrubs and 11 (X14) herbaceous plants=154 o Shoreline Cutting restrictions- Section 179-6-050 - Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 105 ft Shoreline X 30%= 31.5 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan —Three lamp poles are proposed with a notation these lights and building lights will be downward facing and dark sky compliant. • Utility details -a new septic system is proposed to be installed. The plans show a new well location to be drilled. Plans should probably show the 100 ft separation to ensure there is no other wells or septic systems located to the proposed. • Elevations -The plans submitted show the elevations of the existing conditions and the proposed conditions of a new garage, new facade features, raised roof areas and other site improvements. • Floor plans -The plans submitted show the existing and proposed floor plans. • Waivers -Planning staff has reviewed the applicants request for waivers that include items, h. signage, n traffic, r. construction/demolition disposal s. snow removal. • The waivers requested -Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant provided information on the following items -g. site lighting, j. stormwater, k. topography, 1. landscaping, o. commercial alterations/ construction details, p floor plans q. soil logs. Additional information may be requested for the landscaping and lighting. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance The new deck is to be located 22.8 ft from the shoreline and the proposed main house is to be 31.3 ft setback where a 75 ft setback is required. North office/study side is to be 19.4 ft to the side and South main house side proposed 16.5 ft setback where a 20 ft setback is required. Floor area is proposed to be 4,378 sq ft or 22.75% where the maximum allowed is 4,233 sq ft or 22%. Permeability - no variance is required but should be noted the existing is 57.5% and the proposed is 60.1% where a 75% is required - the project improves site permeability and not subject to a variance. Summary Pending ZBA Meeting History: PB: 8/16/2022; ZBA: 8/17/2022 LaBella Powered by p r'Lne-rship. August 18, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@oueensbury.net Re: Dark Bay Lane, LLC Town of Queensbury, Warren County, New York Labella Project # 2220706.36 Queensbury Ref #SP58-2022 Dear Mr. Brown: LaBella Associates has received a submission package from your office for the above referenced project. The Applicant is proposing to demolish the existing single-family home and include a new single-family structure with attached garage and deck, driveway and parking area realignment and grading, and a new septic system. Information submitted to our office for review includes the following: • Site plans, prepared by EDP LLP , dated March 8, 2022; • Building plans, prepared by Balzer -Tuck Architecture, dated; • Narrative, prepared by, dated December 19. 2019, and; • Site plan application, prepared by EDP LLP, dated March 8, 2022. Your office has requested that we limit our review to the design of the stormwater system as it relates to compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the site plan review application, the proposed site improvements will disturb less than one (1) acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). However, this project falls within the Lake George watershed and therefore is subject to the stormwater management requirements set forth in Section 147-11 of the Town Code for projects within the Lake George Park. Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2. According to the site plans, this project proposes land disturbance of 11,100 (+/-) square feet and is classified as a minor project for stormwater management by Town Code Section 147-11.E(1)(a). With the minor project classification, the Applicant has opted to use the alternative stormwater calculation method described in Town code section 147-11.1(2)(a), which allows a flat rate of 1.5 gallons of stormwater to be used for every square foot net increase in impervious area, where net increase is the difference between predevelopment and post development conditions. 20 Elm Street I Suite 110 l Glens Falls, NY 12801 p (518) 812-0513 w vj,.,�Jabe[Lapsc.corrt 3. The narrative states that the Applicant is proposing a water supply from the lake. However, the water supply is not depicted on the site plans. Further, the site plans also depict a note for a proposed well to the north of the house. The applicant to clarify the water supply and revise the site plans to incorporate the water supply. 4. The detail for the proposed drywell does not include the culvert that connects from the drywell to the flared end section. The Applicant to revise the detail accordingly. 5. It appears multiple retaining walls are proposed on the site plans. The NYS Standards and Specifications for Erosion and Sediment Control (SSESC) states, "The design of any retaining wall structure must address the aspects of foundation bearing capacity, sliding, overturning, drainage and loading systems. These are complex systems that should be designed by a licensed professional engineer." The Applicant to provide the design for the wall prior to construction so long as the Town does not take exception to this approach. The design shall be developed in accordance with the NYS SSESC and other regulating documents (for example, the residential building code). 6. As applicable, the Applicant to add downspout locations to the site plans. Conclusion & Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Sincerely, Richard Adams, PE Senior Civil Engineer cc: Shauna Baker, Town Planning Office Administrator (via email) Laura Moore, Town Land Use Planner (via e-mail) File 0wTown of Queensbury Community Development Office o 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 58-2022 DARK BAY LANE, LLC. Tax Map ID: 239.18-1-37 / Property Address: 40 Dark Bay Lane / Zoning: WR The applicant has submitted an application the Planning Board: Applicant proposes to demolish an existing 2,000 sq ft home to construct a new home with a footprint of 2,658 sq ft. The new floor area is to be 4,378 sq ft. The project includes a new septic system, update to parking and shared access arrangement, shoreline planting areas, and stormwater management. Pursuant to chapters 179-3-040, 179-6-050, 179-4-010, 179-6- 065, new floor area in a CEA and hard surfacing within 50 ft of shoreline shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 8/16/2022; the ZBA approved the variance on 8/17/2022; The Planning Board opened a public hearing on the Site plan application on 8/25/2022 and continued the public hearing to 8/25/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 8/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 58-2022 DARK BAY LANE, LLC; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Pagel of 2 Phone: 53.8.761.82201 Fax: 53.8.745.4437 ( 742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 251h day of August 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.82201 Fax: S18.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net Site Plan 35-2022 @ 2930 State Route 9L Morgan Gazetos/Greg Francis Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Qw, Community Development Department Staff Notes August 25, 2022 Site Plan 35-2022 MORGAN GAZETOS/GREG FRANCIS 2930 State Route 9L / Waterfront Residential / Ward 1 SEAR Type II Material Review: application, survey, deck drawings, pictures, updated survey Parcel History: SP 72-2014, AV 85-2014, AV 25-2022 Warren Co Referral Sent: June 2022 / Comments: Concur w/local board. Requested Action Planning Board review and approval for post construction approval of a deck and additional unapproved site work. Resolutions 1. PB decision Project Description (Revised) Applicant requests approval for construction of a deck addition not constructed per approval. Additionally, the applicant has completed additional work without approval including deck area near shoreline, shoreline pathway decking, and a reconstructed shed/changing accessory structure near the shore. The existing house footprint of 1,285 sq ft to remain the same. The existing decking area today is 1,508 sq ft. where a previous approval was for 1,116 sq ft. The site work with the additional wooden walkway has an existing square footage of 2,384 where the proposed is 2,074 sq ft. Updated plans show overlay of existing and previously approved. Pursuant to chapter 179-3-040, 179-13-010, site plan for hard surfacing within 50 ft of the shoreline and expansion of a non -conforming structure shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 2930 State Route 9L on a 0.93 acre parcel • Arrangement- The existing home per survey is 1,306 sq ft footprint with a deck area of 1,508 sq ft. The applicant is attempting to correct errors made during the 2014 proposed deck addition to now. • REVISED for August .... Site Design- The applicant has proposed to remove 310 sq of deck area which primary is the walking path (198 sq ft) deck to the adjoining boathouse, then deck on the boathouse to be removed (64 sq ft), and the shoreline deck at the dock reduced (48 sq ft). The applicant has had the surveyor overlay the approved decking on the existing deck where the primary issues are for the work at the shoreline. The applicant proposes to maintain the 46 sq ft shed in the current configuration, remove the shoreline deck pathway and replace with mulch, stone landscape areas with native plantings. Also to be removed is a portion of the lower deck to dock area, and a portion of the boathouse deck area. • Building — The house will remain the same as no work has been proposed on the house. The existing shed at the shoreline has been converted to a changing room for the applicant's elderly parents so to minimize the walking to and from the house. The shed is now located closer to the deck area. • Grading and drainage plan, Sediment and erosion control -The applicant proposes no changes to the existing conditions on the site in regards to grading, drainage. The applicant will install erosion control as necessary when removing the deck path area. Revised for August Landscape plan- The project site is located on Lake George and is subject to the shoreline buffer review. The applicant has indicated the shoreline deck path is to be removed and replaced with mulch (permeable walkway) and to install rock rimmed landscape areas with native plantings to be planted. All existing shoreline vegetation is to remain no other disturbance is proposed. Below are the guidelines from the shoreline buffer code section o Shoreline Buffer - Section 179-8-040 -Minimum width 35 ft (Lake George) -For every 700 sgft of shoreline buffer area -one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 - 24 in native shrubs; 14 herbaceous plants Project site -195 ft of shoreline per survey -Shoreline buffer 195 ft X 35 ft width is 6825 sq ft -Shoreline buffer area -6825 /700 = 9.75 round up to 10 -ten large trees at 3 inch diameter -Ground cover-6825/350 = 19.5 round up to 20 (X7) =140 native shrubs and 20 (X14) herbaceous plants=280 o Shoreline Cutting restrictions- Section 179-6-050 - Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 195 ft Shoreline X 30%= 58.5 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan -There is no lighting proposed or changes to the lighting on the site. • Site details -The applicant has indicate some of the additional decking was to assist with elderly parents and since the dock is complete some of the decking can be removed. • Utility details -There are no changes to the septic or water source for this site. • Elevations -The applicant has provided photo narrative of before 2014 of deck area and shed. In addition there are photos for the deck area and the shed after 2014. This shows the shed and shoreline decking were altered after the original approvals. • Floor plans- o Upper Deck and Lower Deck - the deck plans for the as -built survey shows the existing conditions as of 2022 of 901sq ft. The 2014 approval the upper and lower indicates 828 sq ft was approved (includes stair areas). o Shoreline Deck -The shoreline wood deck area on the as built survey indicates the size is 409 sq ft where the 2014 shoreline deck was to be 288 sq ft Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested -Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. Pursuant to Section 179-9-050 the Planning Board may grant waivers written request of an applicant. The Board is to review the waivers and granted. on its own initiative or at the to determine if they are to be Nature of Variance 1. Upper Deck — The as -built for the upper deck addition indicates is 24 ft from the shoreline where the 2014 approval was for 24.4 ft from the shoreline. Relief needed 25.6 ft for shoreline. Relief is also required for the side setback where 14.3 ft furthest extent, is proposed and 25 ft is required. The deck addition at the house 11.2 ft to the side setback where 25 ft is required. 2. Lower Deck -The as -built survey shows the Deck addition to the house the closest point is 22 ft where the 2014 approval was for this portion of the deck to be 22 ft (built as approved) 3. Shoreline Deck — The as built indicates 0 ft from the shoreline for the landing connection to the dock and 6 ft from the shoreline dock to the shoreline. The 2014 approval was for the shoreline deck to be 12 ft from the shoreline. Relief needed for the landing of 50 ft and the shoreline dock of 46 ft 4. Shoreline Shed — As built indicates the shed of 46 sq ft is 2 ft from the property line. The 2014 approval indicates an unlabeled square near the shoreline. Relief need for 48 ft. 5. Wooden walkway path from shoreline deck to covered boathouse; length 198 ft and 5 ft to the shoreline where 50 ft is required. Relief need of 45 ft. Note the 2014 approval does not identify a wooden walkway. Not subject to variance but additional hard surfacing review under site plan —permeability is greater than 75% even with the deck additions - 6. Upper and lower deck size 73 sq ft of additional decking — approved was 828 sq ft existing is 901 sq ft 7. Shoreline deck size 121 sq ft of additional decking- approved was 288 sq ft and existing is 409 sq 8. The decking is 392 sq ft in excess of what is approved- specific to the deck elements at the house and shoreline. 9. Total existing for decking and includes boathouse deck areas and wooden walk existing 2384 sf and proposed 2074 sf. The applicant has proposed to removed 310 sq ft of deck area; this includes 64 sq ft of boathouse rear deck, 48 sq ft of the shoreline deck at the dock, and 198 sq ft of the wooden path. (noting the boathouse decking and the wooden walking path were not in the 2014 calcs). 10. The proposed 310 sq ft removal from the existing unapproved 392 sq ft leaves 82 sq ft over built Summary Pending ZBA Meeting History: PB: 6/21/2022, 8/16/2022; ZBA: 6/22/2022, 8/17/2022 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 35-2022 MORGAN GAZETOS/GREG FRANCIS Tax Map ID: 239.20-1-19 / Property Address: 2930 State Route 9L / Zoning: WR The applicant has submitted an application the Planning Board: Applicant requests approval for construction of a deck addition not constructed per approval. Additionally, the applicant has completed additional work without approval including deck area near shoreline, shoreline pathway decking, and a reconstructed shed/changing accessory structure near the shore. The existing house footprint of 1,285 sq ft to remain the same. The decking areas of 2,270 sq ft to be reduced to 1,930 sq ft; original approval was for 1,408 sq ft. Pursuant to chapter 179-3-040, 179-13-010, site plan for hard surfacing within 50 ft of the shoreline and expansion of a non -conforming structure shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 8/16/2022; the ZBA approved the variance on 8/17/2022; The Planning Board opened a public hearing on the Site plan application on 8/25/2022 and continued the public hearing to 8/25/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 8/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 35-2022 MORGAN GAZETOS/GREG FRANCIS; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Page 1 of 2 Phone: S18.76i.8220 I Fax: S18.74S.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 25th day of August 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 53-2022 @ 395 Big Bay Road Adirondack Winery Public hearing scheduled SEAR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 53-2022 ADIRONDACK WINERY 395 Big Bay Road / Commercial Light Industrial / Ward 4 SEQR Type II Material Review: site plan application, site plans, and fence photo Parcel History: SP 24-95, SP 26-2020 Warren Co Referral Sent: August 2022 / Comments: NCI Requested Action Planning Board review and approval for installation of a privacy fence. Resolutions 1. PB decision Project Description Applicant proposes to install 180 ft of privacy fencing with a 6ft height along the entire length. The fence is to be placed on the Southern property line. The site contains an existing 17,750 sq ft wine manufacturing facility with wine tasting. The applicant received site plan approval in 2020 for an addition to the building to assist with manufacturing space. Pursuant to chapter 179-3-040, 179-5-020, site plan for fence installation for an existing business shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 395 Big Bay Road with a parcel of 2.03 acres, • Arrangement- The site has an existing building and associated site work for the most recent construction. • Site Design- The project includes installation of 180 ft of privacy fencing along a portion of the southern property line. • Building — The existing building is 17,750 sq ft footprint and is to remain with no changes. • Traffic- The site has 49 parking spaces noted on the plans • Grading and drainage plan, Sediment and erosion control -There are no changes to the site arrangement • Landscape plan -There no changes proposed to the site landscaping • Site lighting plan -There was an update to the plans in regards to building mounted lighting and six pole lights. • Site details -The project work adjusted some site items — there is a patio installed in front of the new building, updated wall pack lighting fixtures, adjustments to the sidewalk layout. The patio is used for site taste testing of products outside — noting not a restaurant. • Utility details -There are no proposed changes to utility connections. • Signage-There are no changes to the signage for the site. • Elevations, Floor plans -There are no changes to the building elevations and floor plans. Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested —Staff finds it reasonable to request a waiver as these have been addressed in Site Plan 26-2020 and the project is for a fence. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary Applicant has completed a site plan application for the proposed installation of a privacy fence. The board may consider a condition the fence information to be on the as built final plans. Meeting History: 1st Meeting Town of Queensbury t Community Development Office ' 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 53-2022 ADIRONDACK WINERY Tax Map ID: 309.17-1-14 / Property Address: 395 Big Bay Road / Zoning: CLI The applicant has submitted an application the Planning Board: Applicant proposes to install 180 ft of privacy fencing with a 6ft height along the entire length. The fence is to be placed on the Southern property line. The site contains an existing 17,750 sq ft wine manufacturing facility with wine tasting. The applicant received site plan approval in 2020 for an addition to the building to assist with manufacturing space. Pursuant to chapter 179-3-040, 179-5-020, site plan for fence installation for an existing business shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on 8/25/2022 and continued the public hearing to 8/25/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 8/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 53-2022 ADIRONDACK WINERY; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Page 1 of 2 Phone: 518.761.82201 Fax: S18.745.44371742 Bay Road, Queensbury, NY 228041 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 251h day of August 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 228041 www.queensbury.net Site Plan 52-2022 @ 3 Pinello Road Dan Hunt Public hearing scheduled Type I SEAR Draft resolution- Seek Lead Agency Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 52-2022 & DAN HUNT Rezoning 3-2022 3 Pinello Road / Moderate Density Residential / Ward 4 SEQR Type I Material Review: site plan application, mobile home project description, petition of zone change, site drawings, previous approval Parcel History: Town Board permit resolution #181 of 1964 for 7 units; Chapter 113 Manufactured Home Parks Town Code Change 3/7/2022 LLNo3-2022 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. Informal staff comments: Proposed discussion with applicant regarding site layout and access to Pinello Road. Town Board Referral Resolution 282-2022 Adopted 7/25/2022 Requested Action Planning Board review and approval for installation of 4 units and associated site work in order to operate a 6 unit manufactured home park. Resolutions 1. Seeks Lead Agency Project Description Applicant proposes to operate a 6 unit manufactured home park. The project proposes 4 new units to be installed with associated grass, plantings, blacktop roadway and new underground utilities. Two units were approved for the existing site; the park would contain 6 total. The project is part of rezoning where the mobile home overlay zone is proposed for this parcel pursuant to Chapter 179-9-040 referral from the Town Board where the Planning Board is to complete SEQR and provide recommendation to the Town Board. Pursuant to Chapter 113-17, 179-3-040, site plan for manufactured homes shall be subject to Planning Board review and approval upon completion of rezoning. Staff Comments • Location -The site is located at 3 Pinello Road a 0.79 ac parcel. • Site Design- The plans shows a layout of six units. • Building — The site has proposes 6 units total where two existing units are approved. • Site conditions -There is currently work being done on the site for the preparation of the two units approved. • Traffic- The applicant has shown each unit would have a parking area of 24x24 that would accommodate 2 vehicles per unit. • Grading and drainage plan, Sediment and erosion control -There is grading on site for installation of units and utilities. The applicant request a waiver from stormwater due to the site location being relatively flat. • Landscape plan -The plans show a fence line on the east side of the property to be 6 ft in height privacy fence, the remaining property lines will have a split rail fence of vinyl. New grass, perimeter/privacy trees, buses and flowers. 0 Site lighting plan -The plans show there is to be 6 pole lights installed for the site. • Utility details -The site has proposed six septic system that has been reviewed and approved by DOH. Connection water, power, cable and natural gas is proposed. • Signage-There is no sign proposed. • Elevations -The applicant has provided a typical modular unit to be installed on the lots • Floor plans -The applicant has provided a floor plan of the typical unit arrangment. • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested —Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Chanter 113 Manufactured Home Parks review — As submitted in the application where it outlines responses completed by the applicant. The following identifies the request by the applicant for waivers to Chapter 113 Requesting waivers per the Chapter 113 — • Showing lot lines —tenants are provided with park rules that explains utilization of space between each unit • Lot size -where 10 acre is require and 0.8 ac is proposed — there have been as many as 8 units on this site and proposed is 6 per staff this is not a variance but to be addressed by the planning board. • Topography - lot is level • Surface drainage — no issues on site with 8 units proposed is 6 units and the site is to be maintained lawn and landscaping on the borders of the parcel no problems with stormwater will be generated • Density- only proposing 6 units where 4 units would be allowed —again previous was for 8 and proposed is for 6 • Lot size and setbacks — tenants are provided with rules as to how space is used between units Summary The project has been referred by the Town Board to the Planning Board for seeking lead agency, SEQR and recommendation. The Planning Board is requesting to Seek Lead Agency. Attached is a map showing the existing mobile home/ manufactured home overlay areas in the Town. The map provides names of the existing parks within the overlay area. The project would be an overlay and a park. Tentative Schedule • July 2022 Town Board — referral to Planning Board and consent to Lead Agency (completed) • August 2022 Planning Board — seeks Lead Agency Accepts Lead Agency • September 2022 (9/27/2022 for 30 days) Planning Board may conduct SEQR, may provide recommendation to Town Board • September -October Meeting Town Board Public Hearing Change of Zone • October Meeting Planning Board — Site Plan Meeting History: 1 sc Meeting RESOLUTION AUTHORIZING TOWN CLERK TO SUBMIT DAN HUNT' S PETITION FOR CHANGE OF ZONE TO QUEENSBURY PLANNING BOARD RESOLUTION NO.: 282, 2022 INTRODUCED BY: Mr. Timothy McNulty WHO MOVED ITS ADOPTION SECONDED BY: Mr. George Ferone WHEREAS, Dan Hunt submitted a zoning change application to the Queensbury Town Clerk's Office on or about July 5, 2022 requesting designation of a parcel identified as Tax Map No.: 308.15-1-58 as included in the Mobile Home Overlay District, and WHEREAS, by the same submittal, Dan Hunt has also applied for Planning Board site plan approval of proposed changes to the existing mobile home park at this property known as Groom's Trailer Court, and WHEREAS, the applications have been reviewed by the Town's Senior Planner and Land Use Planner and deemed complete for purposes of review, and WHEREAS, applications for zoning changes are subject to Warren County Planning Department review in accordance with New York State General Municipal Law §239-m, and WHEREAS, applications for zoning changes may be forwarded to the Town Planning Board for recommendations in accordance with § 179-15-040 of the Town Zoning Ordinance, and WHEREAS, following such recommendations, the Town Board will review the application and take such other actions as it shall deem necessary and proper, and WHEREAS, prior to making a decision about whether to approve the zoning change, it is necessary to conduct a review under the New York State Environmental Quality Review Act (SEQRA) for potential environmental effects, NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby requests that the Planning Board seek Lead Agency status for SEQRA review of the proposed zoning change requested by Dan Hunt as delineated in the preambles of this Resolution, and BE IT FURTHER, RESOLVED, that the Town Board hereby authorizes and directs the Town Clerk to forward Dan Hunt's application received by the Town Clerk's Office on or about July 5, 2022 to the Queensbury Planning Board for review, report and recommendation on both the proposed zoning change, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Clerk to submit the application to the Warren County Planning Department for NYS GML §239-m review, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to execute any necessary documentation and the Town Supervisor, Town Clerk and/or Department of Community Development to take any other necessary actions to effectuate the terms of this Resolution. Duly adopted this 25"' day of July, 2022 by the following vote: AYES : Mr. Strough, Mr. Ferone, Mr. McNulty NOES : None ABSENT: Mr. Metivier, Mr. Freer I I ftTown of Queensbury Community Development Office —T-ME 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Seek Lead Agency Status in connection with SITE PLAN 52-2022 DAN HUNT Tax Map ID: 308.15-1-58 / Property Address: 3 Pinello Road/ Zoning: MDR WHEREAS, the applicant proposes to operate a 6 unit manufactured home park. The project proposes 4 new units to be installed with associated grass, plantings, blacktop roadway and new underground utilities. Two units were approved for the existing site; the park would contain 6 total. The project is part of rezoning where the mobile home overlay zone is proposed for this parcel pursuant to Chapter 179-9-040 referral from the Town Board where the Planning Board is to complete SEQR and provide recommendation to the Town Board. Pursuant to Chapter 113-17, 179-3-040, site plan for manufactured homes shall be subject to Planning Board review and approval upon completion of rezoning. WHEREAS, the Planning Board of the Town of Queensbury has determined to begin an environmental review process under the State Environmental Quality Review Act (SEQRA). WHEREAS, the Planning Board of the Town of Queensbury has identified the project to be a Type I action for purposes of SEQR review pursuant to 6 NYCRR 617. WHEREAS, the Planning Board is the agency most directly responsible for approving the action because of its responsibility for approving the land uses for the property. NOW, THEREFORE BE IT RESOLVED, the Planning Board of the Town of Queensbury hereby indicates its desire to be lead agency for SEQRA review of this action and authorizes and directs the Zoning Administrator to notify any other potentially involved agencies of such intent. That Part I of the SEQRA form will be sent to the following agencies: NY State Department of Health MOTION TO SEEK LEAD AGENCY STATUS IN CONNECTION WITHSITE PLAN 52-2022 DAN HUNT, Introduced by who moved for its adoption, As per the draft resolution prepared by staff. Duly adopted this 25th day of August 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 50-2022@ 33 Holly Lane Public hearing scheduled Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 50-2022 BRIAN HOGAN 33 Holly Lane / Waterfront Residential / Ward 1 SEQR Type II Material Review: site plan application, stormwater, pavilion plan, site plan Parcel History: AV 68-2021 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. Requested Action Planning Board review and approval for completion of a pavilion project located near the shoreline with no changes to existing home. Resolutions 1. PB decision Proiect Description Applicant proposes to complete a 529 sq ft pavilion at 15ft 2 inches to be constructed near the vicinity of the cottage that has been demolished. The existing home of 1,460 sq ft is to remain with no changes. The project includes a lot line adjustment with the Town in regards to Holly Lane where 916 sq ft of hard surface is added to the applicant's site. Additionally, the project includes a 1,568 sq ft pickle ball court under review for minor stormwater management. Pursuant to chapter 179-3-040, site plan review for a new pavilion in the Waterfront Residential zone shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 33 Holly Lane located in the Waterfront Residential zone on a 0.79 ac parcel. • Arrangement- The site has an existing home, bocce court, garden area, pickle ball court. • Site Design -The site was part of a project where the applicant had demolished the existing house and converted a portion of the garage to living space with a garage. • Building — The existing home is 1,480 sq ft and proposes to complete the pavilion of 361 sq ft. The applicant had started the piers. The pavilion concrete piers were present in photos in 1/25/2022 and the concreted pad had also been installed. • Site conditions -The plans show the lot line adjustment that includes a portion of the road that occurred between the applicant and the town highway. • Grading and drainage plan, Sediment and erosion control -The applicant has provided information on stormwater management with a raingarden to be constructed at this time the information has not been reviewed by the Town Engineer. The Board may consider having the materials reviewed by the engineer. • Landscape plan -The plans show some of the existing landscaping on the site and the installation of the rain garden area for stormwater management. • Site lighting plan -The plans do not indicate lighting and the applicant is reminded any new lighting to be downcast cut off fixture. • Site details- • Utility details -There are no changes to the existing septic and well. • Elevations -The plans provided show the piers and the pavilion to be placed on top of the piers. • Floor plans- The floor plan shows the existing fireplace from the demolished home • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, 1. landscaping, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested —Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant provided J. stormwater, k. topography, p floor plans • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The applicant has completed a site plan application to complete the construction of an open sided pavilion. Meeting History: lst Meeting Town of Queensbury Community Development Office ` 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 50-2022 BRIAN HOGAN Tax Map ID: 239.12-2-37 / Property Address: 33 Holly Lane / Zoning: WR The applicant has submitted an application the Planning Board: Applicant proposes to complete a 529 sq ft pavilion at 15ft 2 inches to be constructed near the vicinity of the cottage that has been demolished. The existing home of 1,460 sq ft is to remain with no changes. The project includes a lot line adjustment with the Town in regards to Holly Lane where 916 sq ft of hard surface is added to the applicant's site. Additionally, the project includes a 1,568 sq ft pickle ball court under review for minor stormwater management. Pursuant to chapter 179-3-040, site plan review for a new pavilion in the Waterfront Residential zone shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on 8/25/2022 and continued the public hearing to 8/25/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 8/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 50-2022 BRIAN HOGAN; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Page 1 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 251h day of August 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.8220 ( Fax: 518.745.44371742 gay Road, Queensbury, NY 128041 www.queensbury.net