Loading...
Staff notes for 8/25/2022 Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 52-2022 & DAN HUNT Rezoning 3-2022 3 Pinello Road / Moderate Density Residential / Ward 4 SEQR Type I Material Review: site plan application, mobile home project description, petition of zone change, site drawings, previous approval Parcel History: Town Board permit resolution #181 of 1964 for 7 units; Chapter 113 Manufactured Home Parks Town Code Change 3/7/2022 LLNo3-2022 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. Informal staff comments: Proposed discussion with applicant regarding site layout and access to Pinello Road. Town Board Referral Resolution 282-2022 Adopted 7/25/2022 __________________________________________________________________________________________ Requested Action Planning Board review and approval for installation of 4 units and associated site work in order to operate a 6 unit manufactured home park. Resolutions 1. Seeks Lead Agency Project Description Applicant proposes to operate a 6 unit manufactured home park. The project proposes 4 new units to be installed with associated grass, plantings, blacktop roadway and new underground utilities. Two units were approved for the existing site; the park would contain 6 total. The project is part of rezoning where the mobile home overlay zone is proposed for this parcel pursuant to Chapter 179-9-040 referral from the Town Board where the Planning Board is to complete SEQR and provide recommendation to the Town Board. Pursuant to Chapter 113-17, 179-3-040, site plan for manufactured homes shall be subject to Planning Board review and approval upon completion of rezoning. Staff Comments • Location-The site is located at 3 Pinello Road a 0.79 ac parcel. • Site Design- The plans shows a layout of six units. • Building – The site has proposes 6 units total where two existing units are approved. • Site conditions-There is currently work being done on the site for the preparation of the two units approved. • Traffic- The applicant has shown each unit would have a parking area of 24x24 that would accommodate 2 vehicles per unit. • Grading and drainage plan, Sediment and erosion control-There is grading on site for installation of units and utilities. The applicant request a waiver from stormwater due to the site location being relatively flat. • Landscape plan-The plans show a fence line on the east side of the property to be 6 ft in height privacy fence, the remaining property lines will have a split rail fence of vinyl. New grass, perimeter/privacy trees, buses and flowers. • Site lighting plan-The plans show there is to be 6 pole lights installed for the site. - 2 - • Utility details-The site has proposed six septic system that has been reviewed and approved by DOH. Connection water, power, cable and natural gas is proposed. • Signage-There is no sign proposed. • Elevations-The applicant has provided a typical modular unit to be installed on the lots • Floor plans-The applicant has provided a floor plan of the typical unit arrangment. • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, l. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested–Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Chapter 113 Manufactured Home Parks review – As submitted in the application where it outlines responses completed by the applicant. The following identifies the request by the applicant for waivers to Chapter 113 Requesting waivers per the Chapter 113 – • Showing lot lines – tenants are provided with park rules that explains utilization of space between each unit • Lot size -where 10 acre is require and 0.8 ac is proposed – there have been as many as 8 units on this site and proposed is 6 per staff this is not a variance but to be addressed by the planning board. • Topography - lot is level • Surface drainage – no issues on site with 8 units proposed is 6 units and the site is to be maintained lawn and landscaping on the borders of the parcel no problems with stormwater will be generated • Density - only proposing 6 units where 4 units would be allowed – again previous was for 8 and proposed is for 6 • Lot size and setbacks – tenants are provided with rules as to how space is used between units Summary The project has been referred by the Town Board to the Planning Board for seeking lead agency, SEQR and recommendation. The Planning Board is requesting to Seek Lead Agency. Attached is a map showing the existing mobile home/ manufactured home overlay areas in the Town. The map provides names of the existing parks within the overlay area. The project would be an overlay and a park. Tentative Schedule • July 2022 Town Board – referral to Planning Board and consent to Lead Agency (completed) • August 2022 Planning Board – seeks Lead Agency Accepts Lead Agency • September 2022 (9/27/2022 for 30 days) Planning Board may conduct SEQR, may provide recommendation to Town Board • September-October Meeting Town Board Public Hearing Change of Zone • October Meeting Planning Board – Site Plan Meeting History: 1st Meeting