Loading...
EDP.05.25.2004May 25, 2004 Craig Brown, Zoning Administrator Department of Community Development Town of Queensbury 742 Bay Road Queensbury, NY 12804 Re: SP 13 — 2004 Lands of Wakita Motel Dear Craig: ail D �llllll��i�'�I ENVIRONMENTAL DESIGN PARTNERSHIP, LLP TO,,nva11 Following our resubmission of application documents for the referenced project on April 15, 2004, C.T. Male has review same and provided a comment letter dated May 21,2004. Our response to each numbered comment of that letter is included herein. Stormwater — General As indicated a NOI has been prepared and the SWPPP will be prepared for the construction phase of the project. Review Comments 2. The Post Development Drainage Divide Map (from the Stormwater Management Narrative) has been revised to be consistent with the Grading and Utility plan. 3. The referenced 12" culvert has been extended to beyond the lower 98' contour. 4. The 'B-B' Section line has been adjusted as noted. The slope beyond the northernmost section of parking has been graded to be less steep as it blends to meet the existing grade to the north. A note has been added to recommend use of erosion control blankets as needed on the steeper slopes. 5. Revisions to the noted plans have been made so they are consistent. The open-end section has been eliminated in favor of a catch basin within the paved area with necessary regrading along the easterly edge of drive completed. 6. The Post Development Drainage Divide Map has been revised to be consistent with the Grading and Utility Plan. 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 - fax (518) 371-9540 A Page 2 Craig Brown, Zoning Administrator May 25, 2004 7. We are pleased to know that C.T. Male, the Town's consulting engineer, is in agreement with the proposed access plan, both onto Rt. 9 and onto Round Pond Road. Note that a copy of this response has been sent directly to C.T. Male for their review. We are hopeful that these issues are now resolved. Thank you for your continued assistance with this approval process. Sincerely, Dennis MacElroy P.E. Associate Cc: T. James Houston, P.E. David Menter Jon Lapper 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 - fax (518) 371-9540