Loading...
EDP.04.15.2004• • �jllllllllllj� FILE�IIIIIIIIIII� ENVIRONMENTAL DESIGN PARTNERSHIP, LLP April 15, 2004 Craig Brown, Zoning Administrator hi� Department of Community Development �,1� Town of Queensbury k 742 Bay Road Queensbury, NY 12804 Re: SP 13 — 2004 Lands of Wakita Motel Dear Craig: On March 23, 2004 I provided a response to the March 19th C.T. Male review comments for the referenced project. In turn, Jim Houston has provided additional comments (C.T. Male letter dated April 9, 2004) based on my response letter. In preparation of the additional information documents requested by the Planning Board (and submitted to the planning office on this date) we have also addressed C.T. Male's follow-up comments. The numbered responses below correspond to the original numbered comments and explain how/where we have addressed each item. Regarding Stormwater and Grading 1. The reduction of the hotel footprint and contraction of the parking lot have provided additional open space at the northeast comer of the property. We have utilized this area to grade a temporary sediment basin. Refer to Sheet 2 — Grading and Utility Plan. 2. Invert elevations have been added to the plans for the end section near Round Pond Road. Supplemental topographic information has also been obtained along the road. Existing drainage along Round Pond Road is in an easterly direction away from the proposed entrance. Refer to Sheet 2 — Grading and Utility Plan. 5. Mapping for the existing and post -development conditions are included. The watershed subcatchments have been further divided so that the contribution to each storm segment can be measured. Refer to the stormwater narrative. 6. The hydraulic model has been updated to match revisions made to the site plan. Refer to the revised stormwater narrative. 7. The referenced hay bale notation has been removed from the plan sheet — Sheet 4. 12. New results for the hydraulic model are included within the revised stormwater narrative submitted to the Planning Board. 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 - fax (518) 371-9540 Page 2 Craig Brown, Zoning Administrator April 15, 2004 Regarding Access Management 14. Please refer to Sheet 1 — Site Layout Plan, which has been revised to show the proposed ingress only scenario at the Rt. 9 curb cut. The Round Pond Road curb cut will be two-way but will handle all exiting traffic from the site. Site signage will provide the necessary guidance to internal site traffic. Regarding the left turn into the site from Rt. 9 southbound, please note that the existing turn lane has over 800' of stacking length back to the traffic light at the main Great Escape entrance. Creighton Manning Engineering has provided a letter commenting on this proposed ingress/egress scenario that has been submitted as part of the Planning Board's package. 15. In response to a drainage question along Round Pond Road, EDP's survey crew has picked up additional topo in the area of the Round Pond Road entry. The base mapping prepared by others was inaccurate in the area of concern related to site distance. Refer to Sheet 2 — Grading and Utility Plan for the revised topo and an indication that the required 305' stopping site distance will be unobstructed. Miscellaneous 18. Due to a change in Queensbury's Rt. 9 Sewer District project, the location of Manhole F2 has moved to the north. As a result, the design of the sewer service for the proposed hotel has been revised. Please refer to Sheet 2 — Grading and Utility Plan, which provides information for the new service. Note that a copy of this response has been sent directly to C.T. Male for their review. We are hopeful that these issues are now resolved. Thank you for your continued assistance with this approval process. Sincerely, � E.K Dennis MacElroy P.E. Associate Cc: T. James Houston, P.E. David Menter Jon Lapper 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 - fax (518) 371-9540