EDP.03.23.2004FV iR t3-2004 TUE 02: 34 PM 0 March 23, 2004 Craig Brown, Zoning Administrator Department of Community Development Town of Queensbury 742 Bay Road Queensbury, NY 12804 Re: SP 13 — 2004 Lands of Wakita Motel Dear Craig: We are in receipt of the review comments prepared by Jim Houston of C.T. Male, dated March 19, 2004, for the referenced project. In an effort to address these issues prior to the planning board meeting scheduled for this evening we offer the following correspondingly numbered responses. Regarding Stormwater and Grading A Notice of Intent form has been completed for the project and submitted to the applicant for signature. A copy of the form is included for your reference. The signed form will be forwarded to NYS DEC and a Storm Water Pollution Prevention Plan will be developed prior to construction. A copy of the SWPPP will be submitted to the town. 2. Additional storm structures have been added to the plan at the Round Pond Road intersection. Further information on existing elevations and drainage will be provided when available. 3. The proposed catch basins have been numbered. 4. The slopes of the storm discharge pipes have been revised to reduce the steep grades. Specifications for the rip -rap stabilization have also been added to the plan. The rip -rap parameters are in accordance with the NYS Guidelines for Urban Erosion and Sediment Control. 900 Route 146. Clifton Park, New York 12065 phone (518) 371-7621 - fax (518) 371-9540 4p MAR--P-2004 TUE 02:35 PM • FAX NO, P. 03 IIIVIINflq Page 2 Illlnllllll Craig Brown, Zoning Administrator March 23, 2004 5. Supplemental hydraulic modeling data is included with this letter that represents the proposed storm sewer pipes. The original subcatchments have been further divided to model the contributing areas to each individual pipe run. Results for the storm sewer indicate that the selected pipe sizes will convey, at a minimum, the runoff generated by a 25-year storm event. 6. Copies of the Hydrocad results for the storm sewer are included with this letter. Full flows are conveyed in each section without reliance on surcharge. 7. The detail for sediment and erosion control in the concentrated Swale will be changed. 8. A temporary siltation basin has been added to the storm management area at the entrance to the site. A note specifies that the berm separating the temporary structure from the main basin is to be removed after the site is stabilized. Sediment accumulated in the temporary section will be cleaned. A note has also been added near the storm management basin at the northeast corner. This basin is also to be cleaned of accumulated sediment after the site is stabilized. The site grades do not readily provide for construction of a separate temporary sediment basin. It is important to realize that there is no outfall from the NE storm management area. The small culvert shown on the north line is an inflow to this natural low area from The Great Escape. The invert of that culvert was observed as being at least two feet above the existing grade and four feet above the proposed bottom of the storm basin. Although access to The Great Escape was not available, it was obvious from the condition of the pipe and inspection of the surrounding areas that inflow from this source is minimal. The pipe most likely was installed to drain a small flat area between amusement rides of only "nuisance" amounts of storm water. The predicted depth in the NE basin is just over two feet for a 100 year storm. Storage depth of approximately six feet is available. Since the available volume in this area far exceeds the watershed contribution, and there is no potential for the outflow of sediment or pollutants to a surface water body, we believe it is appropriate for the permanent management area to act as a sediment basin during construction. 9. Erosion control measures are now shown on the plan in the area of the existing cabins. 10. No changes to the existing drainage patterns in front of the existing motel are planned. Additional topographic information will be added to the plan when available to better illustrate the drainage pattems in that area. 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 - fax (518) 371-9540 ♦ MAR -a 3-2004 TUE 02:35 PM . FAX NO. P. 04 Ilia Page 3 IIIIII� Craig Brown, Toning Administrator March 23, 2004 11. An additional note has been added to the catch basin sediment detail that specifies that fabric is to remain under the catch basin grates after pavement is constructed and the silt fence is no longer practical. This is the typical method of restricting silt entry into catch basins in paved areas. 12. Supplemental data is included with this letter showing the results of the post development watershed without the open space surfaces. Subcatchments 1 and 5 were not altered as these areas model existing portions of the property that are not being altered. Modeling simply a paved surface did yield somewhat higher volumes and peak rates of runoff. The summary chart from the original narrative has been updated with these new figures. This chart shows that postdevelopment rates of runoff remain less than existing conditions for each storm event. 13, The emergency overflow in the front basin is not anticipated to be used during normal conditions. The purpose of the overflow is to provide a backup path of drainage in the event that the pipe inlet becomes plugged. The stone reinforcement of the overflow will be removed in favor of a more aesthetic alternative. ReEardinp- Access Management 14, The revised site plan clarifies the proposed access to the existing motel as coming off the proposed drive up to the new hotel facility. There will be only one curb cut along the Rt. 9 frontage. The revised plan clarifies the pavement limits and areas of sidewalk and vegetation. 15. The minimum sight distance along Round Pond Road (40 MPH) for the passenger vehicle exiting the hotel driveway is 445'. The proposed sight distance will exceed that requirement. Grading and/or vegetation removal at the edge of the hillside will be completed as necessary. 16. Driveway intersection vehicle signage will be added as needed. Refer to the Site Layout Plan. Miscellaneous 17. The proposed hotel building will have a sprinkler system. The water supply to the hydrant adjacent to the building will be a 6" main. The service into the building will be sized by the architect with separation to the domestic and fire systems within the 900 Route 146, Clifton Park, New Yak 12065 phone (518) 371-7621 - Fax (518) 371-9540 T MAR i 3-2004 TUE 02: 35 PM . FAX N0, P. 05 Page 4 Illpl Craig Brown, Zoning Administrator March 23, 2004 mechanical room. The placement of the proposed hydrant conforms to the code requirements for hydrant coverage. 18. Addition of the sanitary sewer pipe size has been made on Sheet No. 2. Note that a copy of this response has been faxed directly to C.T. Male for their review. We are hopeful that these issues can he resolved the to Board's satisfaction for tonight's meeting. Thank you for your continued assistance with this approval process. Sincerely, �t=t�tt�t1'J Dennis MacElroy P.E. Associate Enclosure: Response #1 Attachment Response 45 Attachment Response 412 Attachment Cc: T. James Houston, P.E. David Menter Jon Lapper 900 Route 146, Clifton Park, New York 12066 phone (518) 371-7621 - fax (518) 371.9540 Y MAR -P-2004 TUE 02: 36 PM FAX NO. P, 06 Notice of Intent ("NOI") New York State Department of Environmental Conservation AM Division of Water Iftille 625 Broadway, 4th Floor _ Alb my, New York 12233-3505 NOTICE OF INTENT for Stormwater Discharges Associated with Construction Activity UNDER SPDES GENERAL PERMIT #GP-02-01 NYR-- _-- (G DEC u5c aNy) IMPORTANT: All sections mast be completed unless otherwise noted. Failure to complete all items may result in this form being returned to you, thereby delaying your coverage under this general permit. Applicants most read and understand the conditions of the permit and prepare a Stormwater Pollution Prevention Plan (SWPPP) prior to completing and submitting this NOL Applicants are responsible for identifying and obtaining other DEC permits that may be required. 1.Owner/Operator Name: Wakita Motel 2a. Mailing Address: 1130 Roure 9 2b. City Queensbury 2c. State 2d. Zip 12804 NY 3. Contact Person: 3a. First Name: David 3c. Phone: (51 S)792-03_6 3d, E-mail: 3b. Last Name: Menter 4a. SiM/project Name: Wakita Motel, proposed hotel 4b. Existing use of the site: camping 5a. Street Address: 1130 Route 9 5b, City: Queensbury � • Sc. Zip 12804 6. County: Warren 7. Site Location: 7a. Latitude: 43 21 00 7b. Longitude:73 41 20 - t ,tea 8. Future use of the site: Hotel 9. Duration of disturbance activity: from 9a. 10/ 01 / 2004 to 9b. 10 / 01 / 2005 10. Total site acreage: 5.95 (acres) 11. Total amount of disturbed area of overall plan of development or sale: 3.5 (acres) 12. Soil (Hydrologic Soil Group): SCS A 13. What is the maximum slope of disturbed area: % 251/4 14, What is the percentage of impervious area of the site?l4a. before commencement of the project e/s 15% 14b. after completion of the project % 33% 15. Will there be permanent stormwater management practices? M yes Ono 16. Is this a phased project? Q yes 19 no i�f.4L1IL`Ath'? ..1 SlFi' ... •. rrt 17. Does any part of the project lie within a regulated 100-year flood plain? Oyes ®no 18. Does the site/activity lie within the boundaries of the New York City watershed? ❑ yes ER no 19. Does runoff from site enter a storm sewer or ditch maintained by a local, Federal or State governmental unit (MS4)?M yes❑ no If the answer to 19 is no, skip to question 20. 19a. Provide the name of the government owning the storm sewer system: Town of Queensbury 19b. Is the MS4 a "regulated MS4" as defied under 40 CFR Section 122.32? O yes ❑ no ® don't }stow 19c. Does the MS4 have a SPDES permit for their storm sewer system? ❑ yes ❑ no ® don't know 19d, Is the runoff from the site tributary to a Combined Sewer Overflow (CSO)? ❑ yes El no 20. What is the name of the nearest surface water body into which the runoff will enter?: tributary to Glen Lake 21. Does the runoff discharge to a receiving water identified as 303(d) listed segment ❑, or "TMDL" water ❑, or neither 67? N R 22. What components are required for the SWPPP? (Consult the SWPPP and Stormwater Permit Process flow chart and check all that apply): 22a. M Erosion and Sediment Control Plan 22b. UJ Water Quality and Quantity Controls Page I of 2 MAR s 3-2004 TUE 02:36 PM • FAX N0, . Pr 07 23. Is the Construction Sequence Schedule for the planned management practices prepared? 12 yes ❑ no Will the Stormwater Pollution Prevention Plan be in conformance with: 24a. local government requirements? 0 yes ❑ no 24b. NYSDEC requirements? ® yes ❑ no If the answer to 24b. is yes, skip to Section VI. 25. Before submitting this NOI, you must have your SWPPP certified by a licensed Professional. This certification trust state that the SWPPP has been developed in a manner which will eassure compliance with water quality standards and with the substantive intent of this permit (see general permit for additional information). Is your plan certified by a licensed Professional? O yes 0 no Do not submit your SWPPP to DEC unless requested. • A copy of your SWPPP must be submitted to the local jurisdicdon(s) as required under Part III, subsection B.2 (also see question q29 below). State each deviation from the Department's Technical Standards, reasons supporting each deviation request and an analysis of the water quality impacts in your SWPPP. Use Section VU below to summarize the justification statement in one paragraph. Allow sixty (60) days from the receipt of your completed application for permit coverage to provide DEC an opportunity to review the application and supporting information. ...r;.... p.... '+tT,i`.''�+i'-e'.'�^veir .° ';:r :tart ram'? •:I.ik'i. ,.Nc, e}!'2PI!dppro ; r"t`#':2'srL r...iec'.�&z Has your SWPPP been reviewed by: 26a. 0 local Soil and Water Conservation District 26b. m Professional Engineer 26c. 0 Certified Professional Erosion Control Specialist 26d. 0 Licensed Landscape Architect, 26e. 0 None 27. Are there other DEC permits required or already obtained for this project? 0 yes M no 28. If the answer to 27 is no, skip to question 29. 28a. If this NOI is submitted for the purpose ofcontinuing previous coverage under the general permit for stormwater nmofffrom construction activities (GP-93-06), please indicate the SPDES reference number assigned under GP-93-06: NYRI 28b. If there is another SPDES permit, please indicate the permit number: NY 28c. If there are other DEC permits, please provide one of the permit numbers: 29. Has a copy of your SWPPP been submitted to the goveming jurisdiction as required by the permit? ® yes ❑ no Win, ` .%l`ts�aFi:s eg 3 scK_ MIN ,.....°,"U!:(>tlu;,,,mawmuritlUOwgrt�Boi600,charagtees;;tofi,�r'th_eriaoi Answers to questions 26 and 29 are premised upon anticipated responses once SWPPP is developed. SWPPP will be prepared by professional engineer prior to construction and submitted to the Town of Queensbury. .`.,:w�, I have tend or been advised of the permit conditions and believe that 1 understand them. I also understand that, under the terms of the permit, there may be reporting requirements. I also certify under penalty of law that this document and the corresponding documents were prepared under my direction or supervision in accordance with a system tl aigncd to assure that qualified personrwl properly, gather and evaluate the information subadncd Based oa my inquiry of the person(s) who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and betie4 true, accurate and complete. I are aware that there are significant penalties for submitting false infomution, including the possibility of fine and imprisonment for knowing violations. I (hither understand that coverage under the general permit will be identified in the acknowledgment that I will rcccivo ax a result of submitting this NOI and can be as long as sixty (60) days ns provided for in the general permit. I also understand that, by submitting this NOI, t am acknowledging that the SWPPP has been developed and will be implemented as the first clement of construction. and agreeing to comply with all the terms and conditions of the general permit for which this NO[ is being submitled- 30a. Printed Name: David Tenter 30b. Title/Position:Owner 30c. Phone: 5 18-792-0326 Signature: 30d. E-mail: I 30e. Date: Page 2 of 2 MAR J3-2004 TUE 02:37 PM FAX N0, P, 08 42 PAVEMENT 4R 4, S IZ PAVEMENT �___/ 43 B�DG 3R �I7 ISCHARGE PIPE�R 2P PROP. BASIN SW CORNER Bob4 Reach L PARKING 21 8R O PARKING FAM fURAL BASIN AT NE CORNER MARs23-2004 TUE 02:37 PM • WAKITA MOTEL - PIPE SIZE Prepared by Environmental Design - msm HvdroCAD® 7.00 s/n 000476 ® 1986-2003 Appl FAX NO. 0 P. 09 Type 1124-hr 25 YEAR Rainfall=4.70" Paae 1 Subcatchment 21: BLDG Runoff = 2.24 ofs @ 11.91 hrs, Volume= 0.108 af, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YEAR Rainfall=4.70" Area (sf) CN Description 13,740 98 Paved parking & roofs Tc Length Description 1.9 175 0.0400 1.6 Lag/CN Method, Subcatchment 22: PARKING Runoff = 3,16 of$ @ 11.90 hrs, Volume= 0.146 af,. Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5,00-20.00 hrs, dY 0.05 hrs Type II 24-hr 25 YEAR Rainfall=4.70" Area (sf) CN Description 18,650 98 Paved parking & roofs Tc Length Description 1.1 100 0.0500 1.6 Lag/CN Method, Subcatchment 23: PARKING Runoff = 3.04 cfs @ 11.93 hrs, Volume= 0.146 af, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YEAR Rainfall=4.70" Area (9f) CN Description 18,630 98 Paved parking & roofs Tc Length Slope Velocity tin) (feet) (f ift) (f /sec) 2.9 275 0.0350 1.6 Description Lag/CN Method, Subcatchment 41: PAVEMENT Runoff = 1.33 cfs @ 11.90 hrs, Volume= 0.062 af, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 11 24-hr 25 YEAR Rainfall=4.70" MAR 13-2004 TUE 02:37 PM • WAKITA MOTEL - PIPE SIZE Preoared by Environmental Desiqn - msm Area (sf) CN Description 7,950 98 Paved parking & roofs FAX N0. • P. 10 Type 1124-hr 25 YEAR Ralnfall=4.70" Page 2 To Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.3 125 0.0500 1.6 Lag/CN Method, Subcatchment 42: PAVEMENT Runoff - 2.46 cfs @ 11.90 hrs, Volume= 0.117 af, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 25 YEAR Rainfall=4.70" Area (sf) CN Description 14,885 98 Paved parking & roofs Tc Length Slope tin) (feet) (ft/ft) 1.6 125 0.0300 Description 1.3 Lag/CN Method, Subcatchment 43: BLDG Runoff = 1.26 cfs @ 11.92 hrs. Volume= 0.062 af, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt-- 0.05 hrs Type 1124-hr 25 YEAR Rainfall=4.70" Area (sf) CN Description 7,870 98 Paved parking & roofs Tc Length Slope tin) (feet) (fUft) 2.4 100 0.0100 Description 0.7 Lag/CN Method, Reach 3R: DISCHARGE PIPE Inflow Area = 0.705 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow - 4.88 cfs @ 11.91 hrs, Volume= 0.241 of Outflow - 4.85 cfs @ 11.92 hrs, Volume-- 0.241 af, Atten= 1%, Lag= 0.2 min Routing by Star-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0,05 hrs Max. Velocity-- 12.3 fps, Min. Travel Time= 0.1 min Avg. Velocity = 4.1 fps, Avg. Travel Time= 0,3 min Peak Depth= 0.45' @ 11.92 hrs Capacity at bank full= 17.84 cfs 15.0" Diameter Pipe n= 0.012 Length= 62.0' Slope= 0.0650'P MAR -�3-2004 TUE 02:37 PM • WAKITA MOTEL - PIPE SIZE Prepared by Environmental Design - msm Reach 4R: FAX NO, • P. 11 Type 11 24-hr 25 YEAR Rainfall=4.70" Page 3 Inflow Area = 0,342 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow = 2.46 cis @ 11.90 hrs, Volume= 0.117 of Outflow = 2.38 cfs @ 11.91 hrs, Volume= 0.117 af, Atten= 3%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 7.7 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.6 fps, Avg. Travel Time=1.0 min Peak Depth= 0.42' @ 11.91 hrs Capacity at bank full= 6.57 cfs 12.0" Diameter Pipe n= 0.012 Length= 159.0' Slope= 0.0290 7' Reach 5R: Inflow Area = 0.181 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow - 1.26 cfs @ 11.92 hrs, Volume= 0.062 of Outflow = 1.25 cfs @ 11.93 hrs, Volume= 0.062 af, Atten= 1 %, Lag= 0.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 3.8 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.2 fps, Avg. Travel Time= 1.8 min Peak Depth= 0.46 @ 11.93 hrs Capacity at bank full= 2.99 cfs 12.0" Diameter Pipe n= 0.012 Length= 130.0' Slope= 0.0060'7 Reach 6R: DISCHARGE Inflow Area = 1.171 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow = 8.02 cfs @ 11.92 hrs, Volume= 0.400 of Outflow = 8.00 cfs @ 11.92 hrs, Volume= 0.400 af, Atten= 0%, lag= 0.1 min Routing by Stor-Intl+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 16.5 fps, Min. Travel Time= 0.0 min Avg. Velocity = 5.5 fps, Avg. Travel Time= 0.1 min Peak Depth= 0.52' @ 11,92 hrs Capacity at bank full= 22.13 cfs 15.0" Diameter Pipe n= 0.012 Length= 30.0' Slope= 0.1000 T Reach 7'R: Inflow Area = 0.744 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow = 5.13 cfs @ 11.91 hrs, Volume= 0.254 of Outflow - 5.11 cfs @ 11.91 hrs, Volume= 0.254 af, Atten= 0%, Lag= 0.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity=13.0 fps, Min. Travel Time= 0.0 min Avg. Velocity = 4.4 fps, Avg. Travel Time= 0.1 min MAR-,23-2004 TUE 02:38 PM • WAKITA MOTEL - PIPE SIZE Prepared by Environmental Design - msm HvdroCAM 7.00 sln 000476 ® 1986-2003 ADDI FAX NO. 0 P. 12 Type 1124-hr 25 YEAR Rainfall--4.70" Peak Depth= 0.50' @ 11.91 hrs Capacity at bank full= 10.21 cis 12.0" Diameter Pipe n= 0.012 Length= 35.0' Slope= 0.0700 T Reach 8R: Inflow Area = 0.315 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow = 2.24 cfs @ 11.91 hrs, Volume= 0.108 of Outflow = 2.15 cfs @ 11.94 hrs, Volume= 0.108 af, Atten= 4%, Lag= 1.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 4.0 fps, Min. Travel Time= 0.9 min Avg. Velocity = 1.4 fps, Avg. Travel Time= 2.7 min Peak Depth= 0.66' @ 11.93 hrs Capacity at bank full= 2.87 cfs 12.0" Diameter Pipe n= 0.012 Length= 225.0' Slope= 0.0055 T Pond 1P: NATURAL BASIN AT NE CORNER Inflow Area = 1.171 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow = 8.00 cfs @ 11.92 hrs, Volume= 0,400 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 100.58'@ 20.00 hrs Surf.Area= 8,131 sf Storage= 17,411 of Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) # Invert Avail.Storane Storage Description 1 98.00' 40,573 of Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 98.00 5,016 0 0 100.00 7,365 12,380 12,380 102.00 10,010 17,375 29,755 103.00 11,626 10,818 40,573 Pond 2P: PROP. BASIN SW CORNER Inflow Area = 0.705 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow - 4.85 cfs @ 11.92 hrs, Volume= 0.241 of Outflow - 0.27 cfs @ 12.67 hrs, Volume= 0.084 af, Atten= 94%, Lag= 45.4 min Primary = 0.27 cfs @ 12.67 hrs, Volume= 0,084 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 101.79' @ 12.67 hrs Surf.Area= 0.113 ac Storage= 0.172 of Plug -Flow detention time= 287.1 min calculated for 0.084 of (35% of inflow) Center -of -Mass det. time= 167.6 min ( 896.1 - 728.5 ) MAR,23-2004 TUE 02:38 PM • WAKITA MOTEL - PIPE SIZE Prepared by Environmental Design - msm HvdroCAD® 7.00 s/n 000476 ® 1986-2003 AW FAX NO. 0 P. 13 Type 1124-hr 25 YEAR Rainfall=4, 70" Page 5 # Invert Avail.Storage Storage Description �1 100.00' 0,565 of Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 100.00 0.075 0,000 0.000 102.00 0.118 0.192 0.192 104.00 0.167 0.285 0.477 104.50 0.184 0.088 0.565 # Routing Invert Outlet Devices 1 Primary 101.50' W x 20.0' long Culvert CMP, end -section conforming to fill, Ke= 0.500 Outlet Invert-- 101.00' S= 0.0250'P n= 0.012 Cc= 0.900 2 Primary 103,50' 10.0' long x 10' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 Coef. (English) 2.54 2.61 2,61 2.60 2.66 2.70 2.77 2.89 2.88 2.85 3.07 3.20 3.32 nmary OutFlow, Max=0.27 cfs @ 12.67 hrs HW=101.79' (Free Discharge) `Lllulvert (Inlet Controls 0.27 cfs @ 1.8 fps) road-Crested Rectangular Weir ( Controls 0.00 cfs) , MAR,23-2004 TUE 02:38 PM . FAX N0, P. 14 �EfT�brF�+i E. * 1 0� WAKITA MOTEL - PRELIMINARY (no pervious) Prepared by Environmental Design - msm Type Il 24-hr 2 YEAR Rainfall=2.50" Page 1 :ems 3=2004 Subcatchment 2S: EAST HALF HOTEL Runoff = 2.91 cis @ 11.93 hrs, Volume= 0.137 af, Depth= 2.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2 YEAR Rainfall=2.50" Area sf CN Description 34,040 98 Paved parking & roofs Tc iin) Length (feet) Slope (ft/ft) Velocity (ft/sec) 2.4 240 0,0400 1.7 3.2 340 Total Description Lag/CN Method, SURFACE FLOW PAVT. 11. 19 6i R&M& -J noru csAnc Subcatchment 3S: DRAINS TO "MAGICAL ..." Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.W' Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 2 YEAR Rainfall=2.50" Area (sf) CN Description 4,300 30 Woods, Good, HSG A Tc Length Slope Velocity nin (feet) (ft/ff) (f isec) _ 9.6 150 0.0800 _ 0.3 Description Lag/CN Method, Subcatchment 4S: WEST HALF HOTEL & ENTRANCE RDS Runoff = 2.97 cfs @ 11.92 hrs, Volume= 0.141 af, Depth= 2.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 1124-hr 2 YEAR Rainfall=2.50" 35,030 98 Paved parking & Tc Length Slope u�_ (feet) 2.2 175 0.0300 Velocity Capacity Description 1.4 Lag/CN Method, MAR,23-2004 TUE 02:38 PM 0 FAX NO. 0 P. 15 WAKITA MOTEL - PRELIMINARY (no pervious) Type 1124-hr 2 YEAR Rainfall=2.50- Prepared by Environmental Design - msm Page 2 HydroCADS 7.00 s/n 000476 0 1.986-2003..Applied Microcomputer Systems 3/22/2004 Reach 2R. EX. SWAM GREAT ESCAPE Inflow Area = 2.116 ac, Inflow Depth = 0.04" for 2 YEAR event Inflow = 0.02 cfs @ 12.49 hrs, Volume= 0.007 of Outflow = 0.01 cfs @ 12.65 hrs, Volume= 0.007 at, Atten= 3%, Lag= 9.2 min Routing by Star-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 0.4 fps, Min. Travel Time= 4.1 min Avg. Velocity = 0.4 fps, Avg. Travel Time= 4.1 min Peak Depth= 0.00' @ 12.57 hrs Capacity at bank full= 328.86 cfs 10.00' x 3.00' deep channel, n= 0.035 Length=100.0' Slope= 0.0100'P Side Slope Z-value= 2.0 '1' Pond 1P: NATURAL BASIN AT NE CORNER Inflow Area = 0.781 ac, Inflow Depth = 2.11" for 2 YEAR event Inflow - 2.91 cfs @ 11.93 hrs, Volume= 0.137 of Outflow - 0.00 cfs @ 5.00 hrs, Volume= 0.000 at, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 98.9T @ 20.00 hrs Surf.Area= 6,151 sf Storage= 5,983 cf Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) 98,00' 40,573 cf Custom Stage Data Elevation Surf.Area Inc.Store Cum.Store feet (sq-ft) (cubic -feet) (cubic -feet) 98.00 5,015 0 0 100,00 7,365 12,380 12,380 102.00 10,010 17,375 29,755 103,00 11,626 10,818 40,573 Listed below Pond 2P: PROP. BASIN SW CORNER Inflow Area = 0.804 ac, Inflow Depth = 2A 1" for 2 YEAR event Inflow = 2.97 ofs @ 11.92 hrs, Volume= 0,141 of Outflow = Primary = 0.00 cfs @ 0.00 cfs @ 5.00 hrs, Volume= 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 101.47' @ 20.00 hrs Surf.Area= 0.106 ac Storage= 0.141 of Plug -Flow detention time= (not calculated) Center -of -Mass det_ time= (not calculated) MAR -�3-2004 TUE 02:39 PM 0 WAKITA MOTEL - PREUMINARY (no pervious) Prepared by Environmental Design - msm 1 100.00, 0.565 of Custom Stage Data Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 100.00 0.075 _ 0.000 0.000 102.00 0.118 0.192 0,192 104.00 0.167 0.285 0.477 104.50 0.184 0.088 0.565 FAX N0, • P. 16 Type 1124-hr 2 YEAR Rainfal1=2.50- Page 3 der Systems 'vow-jnne Listed below 1 Primary 101.50' 8.0'" x 20.0' long Culvert CMP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 101.00, S= 0.02507 n= 0.012 Cc_- 0.900 2 Primary 103.50' 10.0' long x 2.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 Coef. (English) 2.54 2.61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 2.85 3.07 3.20 3.32 Primary OutFlow Max=0.00 cis @ 5.00 hm HW=100.00' (Free Discharge) -Culvert ( Controls 0.00 cfs) 2=Broad-Crested Rectangular Weir ( Controls 0.00 cis) MAR-23-2004 TUE 02:39 PM . FAX NO. • P. 17 WAMTA MOTEL - PRELIMINARY (no pervious) Prepared by Environmental Design - msm Type 1124-hr 10 YEAR Rainfall=3.go- Page 4 Subcatchment 2S: EAST HALF HOTEL Runoff = 4.59 cfs @ 11.93 hrs, Volume= 0.220 af, Depth= 3.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type If 24-hr 10 YEAR Rainfall=3.90" Areas CN Description 34,040 98 Paved parking & roofs Tc Length Description 2.4 240 0.0400 1.7 Lag/CN Method, SURFACE FLOW PAVT. 0.8 100 0.0900 2.1 Lara/CN Method OPEN SPACE 3.2 340 Total Subcatchment 3S: DRAINS TO -MAGICAL...- Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 YEAR Rainfall=3.90" Area (sf) CN Description 4,300 30 Woods, Good, HSG A Tc Length Slope Velocity 'in) (feet) (fffi) (ft(sec) 9.6 150 0.0800 0.3 Description Lag1CN Method, Subcatchment 4S: WEST HALF HOTEL & ENTRANCE RDS Runoff = 4.68 cfs @ 11.92 hrs, Volume= 0.226 af, Depth= 3.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20,00 hrs, dt= 0.05 hrs Type II 24-hr 10 YEAR Rainfall=3.90" Area (sf) CN Description _ 35,030 98 Paved parking & roofs Tc iin) Length (feet) Slope (fttft) Velocity (ft/sec) 2.2 175 0.0300 1.4 Description La91CN Method, MAR-,23-2004 TUE 02:39 PM • FAX NO. 0 P. 18 WAKITA MOTEL - PRELIMINARY (no pervious) Type 11 24-hr 10 YEAR Rainfal1=3.90" Prepared by Environmental Design - msm FldroCAD® 7.00 s/n 000476 01986-2003 Page 5 Applied Microcomputer S stems 3 2Pag Reach 2R: EX. SWALE, GREAT ESCAPE Inflow Area = Inflow 2.116 ac, Inflow Depth = 0.66" for 10 YEAR event = Outflow = 0.71 cfs @ 0.66 ds @ 12.05 hrs, Volume= 12.11 hrs, Volume= 0.116 of 0.115 af, Atten= 6%, Lag= 3.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 0.8 fps, Min. Travel Time= 2.1 min Avg. Velocity = 0.5 fps. Avg. Travel Time= 3.5 min Peak Depth= 0.08' @ 12.07 hrs Capacity at bank full= 328.86 cis 10.00' x 3.00' deep channel, n= 0.035 Length= 100.0' Slope= 0.01001/' Side Slope Z-value= 2.0 T Pond 1 P: NATURAL BASIN AT NE CORNER Inflow Area = 0.781 ac, Inflow Depth = 3.38" for 10 YEAR event Inflow = 4.59 cfs @ 11.93 hrs, Volume= 0.220 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%. Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 99.55' @ 20.00 hrs Surf.Area= 6,833 sf Storage= 9,579 of Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) 40,573 of Custom Stage Data Elevation Sutf.Area Inc.Store Cum.Store (feet) (sg-ft) (cubic -feet) (cubic -feet) 98.00 51015 0 0 100.00 7,365 12,380 12,380 102.00 10,010 17,375 29,755 103.00 11,626 10,818 40,573 Listed below Pond 2P: PROP. BASIN SW CORNER Inflow Area = 0.804 ac, Inflow Depth = 3.38" for 10 YEAR event Inflow = 4.68 cfs @ 11.92 hrs, Volume= 0.226 of Outflow = Primary 0.19 cfs @ 13.03 hrs, Volume= 0.070 af, Atten= 96%, Lag= 66.6 min = 0.19 cis @ 13.03 hrs, Volume= 0.070 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 101.74' @ 13.03 hrs Surf.Area= 0.112 ac Storage= 0.168 of Plug -Flow detention time= 315.8 min calculated for 0.070 of (31 % of inflow) Center -of -Mass det. time= 183.8 min ( 912.7 - 728.8 ) 11 MAR,23-2004 TUE 02:39 PM • FAX NO. • P. 19 WAKITA MOTEL - PRELIMINARY (no pervious) Prepared by Environmental Design - msm Type 1124-hr 10 YE4R Ralnfall=ago" Page 6 # Invert Avail.Stora a Stord a Description 1 100.00' 0.565 of Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 100.00 0.075 0.000 0.000 102.00 0.118 0.192 0.192 104.00 0.167 0.285 0.477 104.50 0.184 0.088 0.565 # Routing_ Invert Outlet Devices 1 Primary 101.50 8.0" x 20.0' long Culvert CMP, end -section conforming to fill, Ke= 0.500 Outlet Invert-- 101.00' S= 0.0250 T n= 0.012 Cc= 0.900 2 Primary 103.50' 10.0' long x 2.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 Coef. (English) 2.54 2.61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 2.85 3.07 3.20 3.32 nmary OutFlow Max=0.19 cfs @ 13.03 hrs HW=101.74' (Free Discharge) L-I=Culvert (Inlet Controls 0.19 cfs @ 1.7 fps) 2--Broad-Crested Rectangular Weir ( Controls 0.00 cfs) MAR;23-2004 TUE 02:40 PM • FAX NO. • P. 20 WAKITA MOTEL - PRELIMINARY (no pervious) Prepared by Environmental Design - msm Type li 24-hr 25 YEAR Rainfal1=4.70" Page 7 Subcatchment 2S: EAST HALF HOTEL Runoff = 5.55 cfs @ 11.93 hrs, Volume= 0.267 af, Depth= 4.10" Runoff by SOS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YEAR Rainfall=4.70" Areas ON Description 34,040 98 Paved parking & roofs Tc Length Description 2.4 240 0.0400 1.7 LagICN Method, SURFACE FLOW PAVT. 0.8 100 0.0900 2.1 LaQtCN Method OPEN SPACE 3.2 340 Total Subcatchment 3S: DRAINS TO "MAGICAL... -- Runoff - 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SOS TR-20 method, UH=SCS, Time Span= 5.00-20,00 hrs, dt= 0.05 hrs Type If 24-hr 25 YEAR Rainfall=4.70" 4,300 30 Woods, Good, Tc Length Slope Velocity tin feet ftift ft/sec 9.6 150 0.0800 0.3 A Description LagICN Method, Subcatchment 4S. WEST HALF HOTEL & ENTRANCE RDS Runoff = 5.65 cfs @ 11.92 hrs, Volume= 0.275 af, Depth= 4.10" Runoff by SOS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YEAR Rainfall=41U' Areas ON Description 35,030 98 Paved parking & roofs To yin) Length (feet) Slope (ft/ft) Velocity (ft/sec 2.2 175 0.0300 1.4 Description LagICN Method, NAR.23-2004 TUE 040 PM • FAX NO, P, 21 WAKITA MOTEL - PRELIMINARY (no pervious) Type It 24-hr 25 YEAR Rainfall=4.70" Prepared by Environmental Design - msm HroCAPage 8 O® 7.00 s/n 000476 ®1986 2003 Aoolied M!gM52 Uter Systems 3/22/2004 Reach 2R: EX. SWALE, GREAT ESCAPE Inflow Area = 2.116 ac, Inflow Depth = 1.12" for 25 YEAR event Inflow - 1.81 cfs @ 12.05 hrs, Volume= 0.197 of Outflow = 1.70 cfs @ 12.09 hrs, Volume= 0.196 af, Atten= 6%, Lag= 2.7 min Routing by Star-IndfTrans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity-- 1.2 fps, Min. Travel Time= 1.4 min Avg. Velocity = 0.5 fps, Avg. Travel Time= 3.1 min Peak Depth= 0.15' @ 12.06 hrs Capacity at bank full= 328.86 cfs 10.00' x 3.00' deep channel, n= 0.035 Length= 100.0' Slope= 0.0100 'P Side Slope Z-value= 2.0 'F Pond 1 P: NATURAL BASIN AT NE CORNER Inflow Area = Inflow 0.781 ac, Inflow Depth = 4.10" for 25 YEAR event = Outflow = 5.55 cfs @ 0.00 cfs @ 11.93 hrs, Volume= 5.00 hrs, Volume= 0.267 of 0.000 at, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt-- 0.05 hrs Peak Elev= 99.88' @ 20.00 hrs Surf.Area= 7,222 sf Storage= 11,625 of Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) # Invert Avail.Stora a Storage Description 1 98.00, 40,573 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Stors Cum _ (feet) (sn-ft) -Store (cubic -feet) (cubic -feet) 98.00 5,015 0 0 100.00 7,365 12,380 12,380 102.00 10,010 17,375 29,755 103.00 11,626 10,818 40,573 Pond 2P: PROP. BASIN SW CORNER Inflow Area = 0.804 ac, Inflow Depth = 4.10" for 25 YEAR event Inflow - Outflow = 5.65 cfs @ 0.52 cfs @ 11.92 hrs, Volume= 12.32 hrs, Volume= 0.275 of 0.118 af, Atten= 91 %, Lag= 24.0 min Primary = 0.52 cfs @ 12.32 hrs, Volume= 0.118 of Routing by Stor-Ind method, Time Span= 5,00-20,00 hrs, dt= 0.05 hrs Peak Elev-- 101.92' @ 12.32 hrs Surf.Area= 0.116 ac Storage= 0.185 of Plug -Flow detention time= 243.8 min calculated for 0.118 of (43% of inflow) Center -of -Mass det. time= 141.4 min ( 869.1 - 727.7 ) MAR�23-2004 TUE 02:40 PM is FAX NO. 0 P. 22 WAWTA MOTEL - PRELIMINARY (no pervious) Type ll 24-hr 25 YEAR Rainfall=4.70" Prepared by Environmental Design - msm H roCAD® 7.00 s/n 000476 ®1986 2003 Aonlied Microcom uter S terns Page 9 3/22/2004 # Invert Avail.Stora a -Storage Description 1 100.00' 0.565 of Custom Stage Data (Prisartatic) Listed below Elevation Surf.Area Inc.Store CUm.Store feet acres acre-feet acre-feet 100.00 0.075 0.000 0.000 102.00 0.118 0.192 0.192 104.00 0.167 0.285 0.477 104.50 0.184 0,088 0.565 1 Primary 101.50, 2 Primary 103.50, "' x 20.0' long Culvert CMP, end -section conforming to fill, Outlet Invert= 101.00' S= 0.0250 'P n= 0.012 Cc= 0.900 10.0' long x 2.0' breadth Broad-Cmsted Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 3.00 3.50 Coef. (En fish) 2 54 2 Ke= 0.500 2.00 2.50 9 .61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 2.85 3.07 3.20 3.32 Vrimary OutFlow Max=0.52 cfs @ 12.32 hrs HW=101.92' (Free Discharge) 1=Culvert (Inlet Controls 0.52 ofs @ 2.2 fps) =13r0ad-Crested Rectangular Weir (controls 0.00 cfs) MAR- 23-2004 TUE 02:40 PM • FAX NO. • P. 23 WAKITA MOTEL -PRELIMINARY (no pervious) Prepared by Environmental Design - msm Type 11 24-hr 100 YEAR Rainfall=5.60" Page 10 Subcatchment 2S. EAST HALF HOTEL Runoff — 6.62 cfs @ 11.93 hrs, Volume= 0.320 af, Depth= 4.91" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20,00 hrs, dt= 0.05 hrs Type II 24-hr 100 YEAR Rainfall=5.60" Area (sf) CN Description 34,040 98 Paved parking & roofs — Tc Length Slope Velocity Capacity Description 2.4 240 0.0400 1.7 Lag/CN Method, SURFACE FLOW PAVT. 0.8 100 0.0900 2.1 Lag/CN Method OPEN SPACE 3.2 340 Total Subcatchment 3S: DRAINS TO "MAGICAL ..." Runoff = 0.00 cis @ 18.87 hrs, Volume= 0.000 af, Depth= 0.02" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YEAR Rainfall=5.60" Area 18f) CN Description 4,300 30 Woods, Good, HSG A Tc Length Slope Velocity iin (feet) (Rift) (ftlsec) 9.6 150 0.0800 0.3 Description Lag/CN Methodi Subcatchment 4S: WEST HALF HOTEL & ENTRANCE RDS Runoff — 6.74 cfs @ 11.92 hrs, Volume= 0.329 af, Depth= 4.91" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YEAR Rainfall=5.60" _ Area (sf) CN Description 35,030 98 Paved parking & roofs — Tc Length Slope iin (feet) (ft/ft) 2.2 175 0.0300 Velocity Capacity Description 1.4 Lag/CN Method, r +MAV3-2004 TUE 02:41 PM • FAX N0, • P. 24 WAKITA MOTEL - PRELIMINARY (no pervious) Type 1124-hr f00 YEAR Rainfal1=5.60,, Prepared by Environmental Design - msm HYdrOCADO 7.00 s/n 000476 A 1986-2003 A lied micMMMAIter S stems Page 11 3/2212004 Reach 2R: EX. SWALE, GREAT ESCAPE Inflow Area = 2.116 ac, Inflow Depth = 1.68" for 100 YEAR event Inflow = 3.29 cfs @ 12.03 hrs, Volume= 0.296 of Outflow = 3.20 cfs @ 12.06 hrs, Volume= 0.295 af, Atten= 3%, Lag= 2.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 1.5 fps, Min. Travel Time= 1.1 min Avg. Velocity = 0.6 fps, Avg. Travel Time= 2.7 min Peak Depth= 0.21' @ 12.05 hrs Capacity at bank full= 328.86 cis 10.00' x 3.00' deep channel, no 0.035 Length= 100.0' Slope= 0.0100'p Side Slope Z-value= 2.0 7 Pond 1 P: NATURAL BASIN AT NE CORNER Inflow Area = 0.781 ac, Inflow Depth = 4.91" for 100 YEAR event Inflow = 6.62 cfs @ 11.93 hrs, Volume= 0.320 of Outflow = 0.00 cfs @ 5.00 his, Volume= 0,000 af, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 100.18' @ 20.00 hrs Surf.Area= 7,599 sf Storage= 13,920 cf Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) Invert Avail.S 1 tor a Stora a Description 1 98.00' 40,573 of Custorn Stage Data (Prismatic) Listed below Elevation (feet) Surf.Area Inc.Store Cum.Store (sq-ft) (cubic feeU (cubic feet) 98.00 51015 0 0 100.00 102.00 7,365 10,010 12,380 17,375 12,380 103.00 11,626 10,818 29,755 40,573 Pond 2P: PROP. BASIN SW CORNER Inflow Area = Inflow = 0,804 ac, Inflow Depth = 4.91" for 100 YEAR event Outflow = Primary = 6.74 cfs @ 0.94 cfs @ 0.94 11.92 hrs, Volume-- 12.09 hrs, Volume= 0.329 of 0.171 af, Allen= 86%, Lag= 10.3 min cfs @ 12.09 hrs, Volume= 0.171 of Routing by Stor-Ind method, Time Span- 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 102.14' @ 12.09 hrs Surf.Area= 0.121 ac Storage= 0.213 of Piug-Flow detention time= 207.2 min calculated for 0.170 of (52% of inflow) Center -of -Mass det. time= 120.7 min ( 847.4 - 726.8 ) 0 rMARS 23-2004 TUE 02;41 PM • FAX NO, 0 P. 25 WAMTA MOTEL - PRELIMINARY (no pervious) Type 1124-hr 100 YEAR Rainfall=5.60" Prepared by Environmental Design - msm 11droCAO® 7.00 s/n 000476 ®1986-2003 A lied Microcom ter S tems Page 12 3/22/2004 # Invert Avail .Stora a Stor a 1 Descri tion 100.00' 0.565 of custom Stage Data (Prismatic) Listed below Elevation (feet) Surf.Area (acres) Inc -Store Cum.Store __ {acre feet) (acre-feet) 100.00 102.00 0.075 0.000 0.000 104.00 0,118 0.167 0.192 0.192 0.285 104.50 0,184 0,477 0.088 0.565 # Routin Invert Outlet Devices 1 Primary 101.50, 8.0" x 20.0' long Culvert CMP, end -section conforming to fill, Ke= 2 Primary 103.50' 0.500 Outlet Invert-- 101.00' S= 0.0250 %' n= 0.012 Cc= 0.900 10.0' long 2.0' breadth x Broad- Crested Rectangular Welr Head (feet) 0.20 0.40 0.60 0.80 1.00 3.00 3.50 1.20 1.40 1,60 1.80 2.00 2.50 Coef. (English) 2.54 2,61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 2,85 3.07 3.20 3.32 rimary OutFlow Max=0.94 cfs @ 12.09 hrs HW=102.14' (Free Discharge) =Culvert (Inlet Controls 0.94 efs @ 2.7 fps) 2--Broad-Crested Rectangular Weir ( Controls 0.00 cfs)