Loading...
Environmental Design Partnership.05.13.1988OF QUEENSBb:I l N N_ d ib May 13, 1988 I"' f MAY m[a 91N ° Mr. Richard Roberts, Chairman ?L Ai,W4 i'v", { a Town Of Queensbury Planning Board DEPARTMENT m c m Town Offices N Queensbury, New York 12801 C C Re: Hiland Park - Overlook Site Plan Review Dear Dick, In response to the Town's request that Design Partnership review the Overlook plans for site plan approval, we offer STATEMENTS AND ASSUMPTIONS The Environmental subdivision design the following. It is our understanding that this subdivision within the Hiland Park PUD consists of 34 residential units (duplex and fourplex) on approximately 10 acres. The road servicing the units, Overlook Drive, will be private with connections to two Town roads. Water will be provided by the Town of Queensbury municipal system, wastewater will be discharged on -site and the stormwater will be handled through a storm - water management system. In a conversation detailing our scope of work you suggested that because DEC will be reviewing the on -site wastewater system and issuing a SPDES permit we need not review the wastewater plans. Thus we have completed a cursory review of the sewage plan as it effects other infrastructure. We also understand from a conversation with you that the meeting on Tuesday is for consideration of preliminary site plan approval. With this understanding we have reviewed the plans in consideration of the Town's requirements and standards for layout, streets, storm drainage and water. RECOMMENDATIONS AND REVIEW COMMENTS The plans submitted for the Overlook subdivision are of sufficient detail and completeness for preliminary site plan approval. We recommend that preliminary site plan approval be granted. C ROUTE 146, CLIFTON PARK, NEW YORK 12065 151 8) 371 -7621 28 MAOISON STREET, RUTLANO, VERMONT 05701 [8021 775-31 00 O) C 0) C 0 C a .a .a) L C [ Inca) C 7 N ME Principals James E. Mitchell, P.E. Richard A. Eats, L.A. Gordon P. Nicholson, L.A. RECOMMENDATIONS AND REVIEW COMMENTS - cont'd Prior to issuing final site plan approval it is recommended that the following items be completed and/or obtained by the applicant. 1. A SPDES permit for the on -site discharge of wastewater must be obtained from DEC. 2. The required permit/approval for the water system must be obtained from the N.Y.S. Dept. of Health. 3. A conflict between the sanitary system and the stormwater system exists in the area of Units 6 & 7. Refer to Plan Sheet L-2 and L-5. The seepage pits and the dry well will not function properly if they are so close together. One of theses structures must be relocated. 4. The Stormwater Management Report should more completely discuss the design capabilities of DW-1. Peak inflow is 2.1 CFS but then what? Estimated recharge, storage and overflow should be discussed. 5. Runoff from subareas 1,5,6,7,8 and9 is all directed along Rockwell Road to a "contolled release basin" which is part of the Fairway Court Site plan. Refer to Plan Sheet L-3 of the Fairway Court plans. Does this basin need to be re -designed to accommodate this additional flow? If so, the easement within Lot#1 must be enlarged. 6. Runoff from subareas 10,11,12,13,14 and 15 is dischared to a low lying area north of the project site. As this area is part of the PUD and will some day be developed into private lots some provision for accepting the runoff should be made. This is a non -technical issue but some- thing that should be considered. 7. The plans contain several minor omissions, math errors, labeling errors, etc.. These points will be discussed directly with the LA Group so that the necessary correc- tions can be made. I will be in attendence at Tuesday's meeting should there be any further questions. Sincerely, Dennis MacElroy, P.E. The Environmental Design Partnership C.C. Lee York, Town Planner Joe Sporko, LA Group