Loading...
SOLAR-0466-2022 oocunign Envelope ID:s789FI Office Use Only 74a Bay Road,Queensbuny,NY12OO4 P:51D'751-8Z56 Flood Zone? Y Reviewed By: SOLAR PANEL PERMIT APPLICATIONSITE INFORMATION: Project Location: 188 Chestnut Ridge Rd Tax MapUD#: Subdivision Name: PROJECT INFORMATION: Residential: Commercial '` Other: ` ingle F� U N1ulti-FaO0ily . / . . Are the solar panels? xPUrCh8Sed [e8sed . Estimated cost Ofconstruction: Total System Capacity Rating (sum of all panels): Solar PVSystem: _�10k\NDC Select System Configuration: JUL 25 2022 Supply side connection with micro inverters Supply side connection with DC optimizers TOWN OF QUEENSBURYBUILDING &CODES Supply side connection with string inverter --- Load side connection with DCoptimizers Load side connection with micro inverters _x Load side connection with string inverter ^ ' Solar Panel Application Revised January uoz DocuSign Envelope ID:E789F194-7B4C-4DEF-B4AC-DAE84CAOBBEF DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in,accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 5. A third-party electrical inspection will be completed at which time the,Town of Queensbury's Building and Codes Enforcement department will be contacted to complete an inspection of the final installation of the solar panels. Please sign below to affirm that all answers are correct and that you have met all of the conditions and requirements to submit a unified solar permit. I have read and agree to the above: LDocuSigned 6y: V,bV, 7/19/2022 Homeowner's Signature Date 7/19/22 Solar Co. Representative Signature Date I,5, M„ Solar Panel Application Revised January 2021 S' P DocuSign Envelope ID:E789F194-7B4C-4DEF-B4AC-DAE84CAOB8EF CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Property Owner(s): Name(s): Clinton McCarthy Mailing Address, C/S/Z: 188 Chestnut Ridge Rd, Queensbury NY 12804 Cell Phone:_( 518 ) 338- 6067 Land Line: Email: clintonmccarthy@mac.com • Solar Contractor: Workers' Comp documentation must be submitted with this application Business Name: Plug PV LLC Contact Name: Chanelle Williams Mailing Address, C/S/Z: 875 Broadway Albany NY 12207 Cell Phone:_( ) Land Line:_( 518 ) 948- 5316 Email: projects@plugpv.com • Electrical Contractor: Workers' Comp documentation must be submitted with this application Business Name: Plug PV LLC/Steven Weigel Contact Name: Chanelle Williams Mailing Address, C/S/Z: 875 Broadway Albany NY 12207 Cell Phone:_( ) Land One:._( 518 )948 - 5316 Email: projects@plugpv.com Contact Person for Compliance in regards to this project: Chanelle Williams Cell Phone: ( Land Line: ( 518 )391 - 8636 Email: cwilliams@pluepv.com Solar Panel Application Revised January 2021 DocuSign Envelope ID:F9BDDBD5-6C06-44B7-B47A-7D57E71 C6931 (518)948-S316 HELLOOPLUGPV.COM u p L�44,E r y 1I/ HTTPS://WWW.PLUGPV.COM M fI� 875 BROADWAY ALBANY NY 12207 A LETTER OF AUTHORIZATION FOR ZONING AND PERMIT APPLICATION To Whom It May Concern: Katherine R. McCarthy I, as owner(s)of the property located at 188 chestnut Ridge Rd. Queensbury, NY 12804 Hereby designate P1ugPV,LLC.as my contractor and registered agent for the purposes of the applying for Permits and Zoning Board representation regarding my solar installation project. Katherine R. McCarthy Print Docu5igned by: Sign Date 5/24/2022 C w JUL 2 5 2022 TOWN OF QUEENSBURY BUILDING& CODES o 0 P Ize June 20,2022 PIugPV LLC 875 Broadway Albany,NY,12207 Subject:Structural Certification for Installation of Solar Panels Job Number:22-07551 Client:CLINTON MCCARTHY-6714 Address:188 CHESTNUT RIDGE RD,CIUEENSBURY,NY 12804 Attn.:To Whom It May Concern The scope of work is limited to performing a structural evaluation of loading at the address above.After review,the FOR certifies that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable codes and criteria shown below: Design Criteria: • Applicable Codes=2020 Residential Code of NYS,ASCE 7-16,and NDS-18 • Ground Snow Load=50 psf;Roof Snow Load=30.4 psf ARRAY 1/2 • Basic Wind Speed=110 mph Exposure Category C • Existing Roof Dead Load:ARRAY 1/2=10 psf • Existing Roof Live Load:15.6 psf The existing structure is adequate to support the PV alteration per 2018 IEBC§402.3&402.4. PV System Assembly The PV module assembly including all structural supporting components have been reviewed to be in accordance with the manufacturers specifications and meets or exceeds all requirements set forth by the referenced codes above. Installation Requirements The PV system shall be mounted flush to the existing roof surface.The contractor shall notify the FOR of any signs of damage to the roof framing prior to commencing the installation.The FOR shall then determine if the existing roof is adequate to support the applied loads.The electrical engineering and system waterproofing shall be,addressed by others. If you have any questions on the above,do not hesitate to call. OF NE Sincerely, / �K. z1q 0� Paul Zac er UL Z 5 � � °A,�o9?3s5N Fi 2022 �SS10 TOWN OF OUEENSBURY 06/20/2022 BUILDING& CODES 1 t. t powered by ' DUO q ' TOP BRAND PV-� OWL EUROPE ' Warranty .2021 O CELLS P'ochid B P.,f-- Yield Security BREAKING THE 20%EFFICIENCY BARRIER n/I Ilnll�I� Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 20.9%. THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY Q CELLS is the first solar module manufacturer to pass the most comprehen- sive quality programme in the industry:The new"Quality Controlled PV"of the independent certification institute TOV Rheinland. „ INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields,whatever the weather with excellent low-light and temperature behavior. _ ENDURING HIGH PERFORMANCE Oz Long-term yield security with Anti LID Technology,Anti PID Technology',Hot-Spot Protect and Traceable Quality Tra.QTM'. EXTREME WEATHER RATING High-tech aluminum alloy frame,certified for high snow(5400 Pa)and wind loads(4000 Pa). A RELIABLE INVESTMENT Inclusive 25-year product warranty and 25-year 1� linear performance warranty2. 'APT test conditions according to IEC/TS 62804-1:2015,method A(-1500V,96h) 2 EC.data.sbeston.reartorftirther.information CE9;�] � THE IDEAL SOLUTION FOR: r Rooftop arrays on ��� L. . /'. (I^r0 residential buildings V U __ l TOWN OF QUEENSBURY BUILDING&CODES Engineered in Germany OCELLS ' '1 MECHANICAL SPECIFICATION Format 74.0 in x 41.1in x 1.26 in(including frame) (1879 mm x 1045 mm x 32 mm) 24n'(1999mm) 421,(was-) is-s•r9s s,�) Weight 48.5lbs(22.Okg) Front Cover 0.13in(3.2mm)thermally pre-stressed glass with z4ar(usomm) anti-reflection technology 4,D ~ oun3n9 pa9us°O�a'14bmm Frame Back Cover Composite film 393.1996mm) Frame Black anodized aluminum Cell 6 x 22 monocrystalline Q.ANTUM solar half cells ® 4u u94smm) Junction Box 2.09-3.98in x 1.26-2.361n x 0.59-0.71in (53-101mm x 32-60mm x 15-18mm),IP67,with bypass diodes sa� e4a.zt zsomm) Cable 4mm2 Solarcable;(+)Z49.2in(1250mm),(-)a49.2in(1250mm) 4•Muntrpd (DUAILA) _ Connector Staubli MC4;IP68 j A I-].76'132mm1 DMLA Of3'(18mm) f-� 0.9a'(20.5 mm)I-(_�Ia33'Ia3 mm) ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 395 400 405 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-0 W) Power at MPP' P,,,? [W] 385 390 395 400 405 Short Circuit Current' 1,, [A] 11.04 11.07 11.10 11.14 11.17 Open Circuit Voltage' Vcc IV] 45.19 45.23 45.27 45.30 45.34 Current at MPP I [A] 10.59 i10.65 10.71 10.77 10.83 2 nF Voltage at MPP VM„ IV] 36.36 t'36.62 36.88 37.13 37.39 Efficiency' q [%] t19.6 .:>_19.9 >20.1 2:20.4 >_20.6 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2 ' I Power at MPP Pr;� [W] 288.8 292.6 296.3 300.1 303.8 E Short Circuit Current IS, [A] 8.90 8.92 8.95 8.97 9.00 Open Circuit Voltage VDc IV] 42.62 42.65 42.69 42.72 42.76 Current at MPP IWp [A] 8.35 8.41 8.46 8.51 8.57 Voltage at MPP VM1,,,, IV] 34.59 34.81 36.03 35.25 35.46 'Measurement tolerances P,4„±3%;Isc;VDc±5%at STC:1000W/ml,25±2°C,AM 1.5 according to IEC 60904-3. 800 W/m2,NMOT,spectrum AM 1.5 0 CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98%ofnominal power during :I:f --r--__-r-----r-----r--- u was.... first year.Thereafter max.0.5% z I I I I LLa _____________________________ degradation per year.At least p93.5% w< of nominal power up to 10 years.At a least 86q of nominal power u to ° , a do ,° - - - ------------- 25years. F a"---------r-----I-----ti------ z o 0 All data within measurement toleranc- es.Full warranties in accordance with i the warranty terms of the Q CELLS ' aao 40o soa eoo laoo o o ,4 sales organisation of your respective IRRADIANCE iW/ms] ti m country. °•s, ,«�•�, �4 YEARS Typical module performance under low luadiance conditions in comparison to STC conditions(25°C,1000 W/m2) n I TEMPERATURE COEFFICIENTS o Temperature Coefficient of 1,o a [%/K] +0.04 Temperature Coefficient of VDc a [%/K] -0.27 Temperature Coefficient of Pt,,, y [%/K] -0.34 Nominal M641ule Operating Temperature NMOT [°F] 109±5.4(43±3°C) m Q PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage Vs,s IV] 1000(IEC)/1000(UL) PV module classification Class II o 9 Maximum Series Fuse Rating (A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 W Max.Design Load,Push/Pull' [Ibs/ft2] 75(3600 Pa)/55(2660 Pa) Permitted Module Temperature -40°Fupto+185°F o Max.Test Load,Push/Pui13 [Ibs/ft2] 113(540OPa)/84(400013a) on Continuous Duty (-40°C up to+85'C) o 'See Installation Manual 5 QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION 0 UL 61730.CE-com Ilant, 63' c, Quality Controlled PV-TUV Rheinland, ib 0,­0O-O l4o)NC] an IEC 6atent Na (��® / / O U.S.Patent o.9,893,2:5(solar cells), v (` (`� ie�a�ew,° Horizontal 76.4 in 43.3in 48.Oin 16561bs 24 24 32 QCPV Certification ongoing. Cc,,,,na4 U3 packaging 1940mm 1100mm 1220mm 751 kg pallets pallets modules U-0 ID llltE D Note:Installation Instructions must be followed.See the installation and operating manual or contact our technical sewice department for further Information on approved installation and use of this product. Henwhe 0 CELLS America Inc. 400 Spectrum Center Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiry®us.q-cellscom I WEB www.q-cells.us ti TRANSITIONING TO UL 61730-1 AND UL 61730-2 FROM UL 1703 BACKGROUND ' Solar panel certification for the U.S,market has transitioned from vironment under a single certification program.Since IEC 61730 UL 1703 to UL 61703-1 and UL 61730-2.UL 61730-1 encompass- standards have been developed for the international market,this es the construction evaluation of the solar module,such as the may not necessarily address specific local requirements such as individual component evaluation utilized in construction/assembly, for the U.S.market.However,modifications made to address the and design assessment,such as clearance and creepage dis- U.S.market's safety requirements have been incorporated and are tances.UL 61730-2 entails testing requirements for solar panels called national deviations.When comparing the UL 61730 certi- such as humidity freeze tests and how to conduct such tests.The ficatidn program against the UL 1703 certification program,UL new UL standards(UL 61730-1 and-2)harmonize with existing 61730 ihvofyes more testing requirements such as more fire types international standards(IEC 61730-1 and-2).The harmonization alongside other key differences as tabulated below: helps solar panel manufacturing companies operate in a global an- KEY DIFFERENCES BETWEEN UL 1703 AND UL 61730-1 AND UL 61730-2 STANDARD REQUIREMENTS UL 1703 ''UL 61730-1&UL 61730-2 Construction and Testing One document,UL 1703,refers to construction._,-Two documents-UL 61730-1 refers to evaluation of the product and its testing construction evaluation of the product and 'UL 61730-2 refers to its testing Number of Test Sequences 4 .: 8 Design Load 30 psf or 1436 Pa 50.12 psf or 2400 Pa Fire Type Up to Type 15 Up to Type 33 California Energy Commission Will not accept UL 1703 certification for new Accepted starting January 1,2020 products starting January 1,2020 a . Z NEC 2020 Referenced Referenced o QUESTION AND ANSWER 0 Do I need UL 1703 or UL 61730 certification?Will both or one of Are these new standards adopted or referenced in the 2020 Q the two suffice? National Electric Code? - a Certification to only one standard is required(UL 1703 or UL UL 61730-1/-2 is referenced in Appendix A of the latest NEC 2020 61730)but will depend on the timeframe.Products with UL1703 edition.This is also helpful to point out to building inspectors if 3 obtained before January 2020 can continue to be used in the U.S., they have questions about UL 61730 certification. J U but new products certified after January 2020 need to have UL 61730 for CEC listing.QCELLS solar panels are UL 1703 and UL Whom should'we reach out to in case building officials have any 61730 certified since the standard was adopted by the CEC. questions? - Which standard is better? Please reach out to Q CELLS at pti@us.q-celis.com;an engineer from Q CELLS will assist you with your needs. Overall,UL 61730 is a better standard for modules since the requirements and test cycles are more stringent in UL 61730 com- pared to UL 1703.It is more beneficial for the market and address- �• N es challenges such as new construction types for fire ratings that were not addressed before in UL 1703. OCELLS Power Optirnizer O For North America P320/ P340 / P370 / P400 / P401 / P405/ P485 / P505 m . 70 r251' o 1'1____� _ N m r. PV power optimization at the module=.level / Specifically designed to work with SolarEdge / Fast installation with a single bolt inverters / Next generation maintenance with module- Up to 25% more energy level monitoring / Superior efficiency (99.5%) / Meets NEC requirements for arc fault protection (AFCI) and Photovoltaic Rapid / Mitigates all types of module mismatch losses, Shutdown System (PVRSS) from manufacturing tolerance to partial shading / Module-level voltage shutdown for installer and firefighter safety / Flexible system design for maximum space utilization solaredge.com So I a r / Power Optimizer For North America P320 / P340 / P370 / P400 / P401 / P405 / P485 / P505 •C 1 11 1 1 Optimizer model1 I (for high power(typical module 1 (for 60-cell 60 and 72- ll voltage voltage current .. cell modules) .. .. .. modules INPUT Rated Input DC PoweO 320 350 370 400 405 485 505 W Absolute Maximum Input Voltage 48 60 80 60 125',', 831iI Vdc (Voc at lowest temperature) MPPT Operating Range B-48 8-60 8-80 8-60 12.5-105 12.5-83 Vdc Maximum Short Circuit Current 11 11.02 11 10.1 11.75 11 14 Adc (Isc) Maximum DC Input Current 13.75 12.5 14.65 12.5 17.5 Adc Maximum Efficiency 995 Weighted Efficiency 98.8 98.6 % Overvoltage Category II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current I 15 Adc Maximum Output Voltage 1 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Optimizer 1±0.1' Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B,IEC61000-6-2,IEC61000-6-3 Safety IEC62109-1(class II safety),UL1741 Material UL94 V-0,UV Resistant ROHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Compatible inverters All SolarEdge Single Phase and Three Phase inverters 129x153x33.5 129x153x29.5 129x162x59 mm Dimensions(W x L x H) 129x153x27.5/5.1x6x1.1 /5.1x6x1.3 /�5.1x6x1:16 129x159x49.5/5.1x6.3x1.9 /5.1x6.4x2.3 /in Weight(including cables) 630/1.4 1 750/1.7 1 655/1.5 845/19 1064/2.3 gr/lb Input Connector MC401 Single or dual MC41=1 p MC4sum InputWireLen Length 0.16/0.52 0.16or0.9 0.16/0.52 m/ft g /0.52 or 2.9515 Output Wire Type/Connector Double Insulated/MC4 Output Wire Length 0.9/2.95 1.2/3.9 m/ft Operating Temperature Ranget5j -40 to+E�/-40 to+1K, °C/°F Protection Rating IP68%kMAISP Relative Humidity 0-100 q (1)Rated power of the module at STC will not exceed the optimizer'Rated Input DC Power'.Modules with up to+5%power tolerance are allowed (2)NEC 2017 requires max input voltage be not more than 80V ' (3)For other connector types please contact SolarEdge (4)For dual version for parallel connection of two modules use P485-4NMDMRM.In the case of an odd number of PV modules in one string,installing one P485 dual version power optimizer connected to one PV module.When connecting a single module seal the unused input connectors with the supplied pair of seals (5)Longer inputs wire length are available for use For 0.9m input wire length order P401-xxxLxxx (6)For ambient temperature above-85'C/+185°F power de-rating Is applied.Refer to Power Optimizers Temperature De-Rating Technical Note f6r more details DesignPV Systern • • 1: • :1. Minimum String Length P320,P340,P370,p400,P401 8 10 18 (Power Optimizers) P405,P485,P505 6 8 14 Maximum String Length(Power Optimizers) 25 25 500, 5700(6000 with Maximum Power per String SE7600-US-SE11400- 5250 6000"0) 12750,1" W US) Parallel Strings of Different Lengths or Orientations Yes (7)For detailed string sizing information refer to:http.,//vN isolaredge.coni/sites/default/files/string sizing na pdf (8)It is not allowed to mix P405/P485/P505 with P320/P340/P370/P400/P401 In one string (9)A string with more than 30 optimizers does not meet NEC rapid shutdown requirements',safety voltage will be above the 30V requirement (10)For 208V grid:it is allowed to install up to 6,500W per string when the maximum power difference between each Sling is 1,000W (11)For 277/480V grid:it is allowed to install up to 15.000W per string when the maximum power difference between Xltl ing is 2,000W ®SolarEdge Technologies Ltd.All rights reserved SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc CC I)u9 RoH.S All other trademarks mentioned herein are trademarks of their respective owners.Date:082021 DS-000044-12-NA.Subject to change Qhout fiotice t., Intertek ii Sin 1e ' Phase'-1 '1nvert1e,r . ,- g C with H D-Wave Tech'nolog y M for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US / SE7600H-US / SE1000OH-US / SE11400H-US- m 12-2 ® 0i ® -solar._ solar Z" .,!iD•9. g I ISI Optimized installation with HD-Wave technology / Specifically designed to work with power optimizers / UL1741 SA certified,for CPUC Rule 21 grid compliance / Record-breaking 99%weighted efficiency / Small, lightweight,and easy to install both outdoors or indoors / Quick and easy inverter commissioning directly from a smartphone using the SolarEdge SetApp / Built-in;mod ule-level monitoring / Fixed voltage inverter for longer strings / Optional: Faster installations with built-in consumption metering (1%accuracy) and / Integrated arc fault protection and rapid shutdown production revenue grade metering (0.5%accuracy, for NEC 2014, NEC 2017 and NEC 2020 per article ANSI Ci2.20) 690.11 and 690.12 solared e.com solar=ee / Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/ SE760OH-US / SE1000OH-US / SE11400H-US I Al.. WIN H OUTPUT Rated AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7660 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V 3800 @ 240V 6000 @ 240V 11400 @ 240V Maximum AC Power Output 3000 3300 @ 208V 5000 5000 @ 2d8V 7600 10000 10000 @ 208V VA AC Output Voltage Min.-Nom:Max. ✓ ✓ ✓ I ✓ ✓ ✓ ✓ Vac (211-240-264) AC Output Voltage Min.-Nom.-Max. ✓ ✓ e ✓ I Vac (183-208-229) AC Frequency(Nominal) 59.3-60-60.51`3 Hz Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A Current @240V Maximum Continuous Output - 16 - 24 - 48.5 A Current @208V Power Factor 1,Adjustable-0.85 to 0.85 GFDI Threshold 1 A Utility Monitoring,Islanding Protection, Country Configurable Thresholds Yes INPUT Maximum DC Power @240V 4650 5900 7750 9300' 11800 15500 17650 j W Maximum DC Power @208V - 5100 7750 - 15500 W Transformer-less,Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240V2) 8.5 10.5 13.5 16.5 20 27 30.5 Adc Maximum Input Current @208V(n - 9 13.5. 27 Adc Max.Input Short Circuit Current 45- Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600ka Senstivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V 98.5 @ 208V Nighttime Power Consumption <2.5 W (1)For other regional settings please contact SolarEdge support (2)A higher current source may be used;the inverter will limit its input current to the values stated a 4 / Single Phase Inverter with HID-Wave Technology for North America 1. SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/ SE760OH-US / SE1000OH-US / SE11400H-US MODEL ADDITIONAL FEATURES Supported Communication Interfaces RS485,Ethernet,ZigBee(Optional),Cellular(optional) Revenue Grade Metering,ANSI C12.20 Consumption metering OptionaF' Inverter Commissioning With the SetApp mobile application using Built-in Wi-Fi Access Point for Local Connection Rapid Shutdown-NEC 2014,NEC Automatic Rapid Shutdown upon AC Gr d Disconnect 2017 and NEC 2020,690.12 STANDARD COMPLIANCE Safety (UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to T.I.L.M-071 Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG Range 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG AWG Range Dimensions with Safety Switch(HxWxD) 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/mm Weight with Safety Switch 22/10 1 25.1(11.4 1 26.2/11.9 38.8/17.6 lb/kg Noise <2S I <50 dBA Cooling Natural Convection Operating Temperature Range -40 to+140/-40 to+60"t "F/°C Protection Rating NEMA 4X(Inverter with Safety Switch) (3)Inverter with Revenue Grade Meter P/N:SExxxxH-U5000BNC4;Inverter with Revenue Grade Produdon and Consumption Meter P/N:SExxxxH-lJS000BNI4.For consumption metering,current transformers should be ordered separately:SEACT07SO-20ONA-20 or SEACT0750-400NA-20.20 units per Dox (4)Full pourer up to at least 50°C/122'F;for power de-rating information refer to:https://wnvw.solaredge.com/sites/defau[Vfflcs/se-ttmperature-derating-note-na.pdf How to Enable Consumption Monitoring By simply wiring current transformers through the inverter's-existing AC conduits and connecting them to the service panel, homeowners will gain full insight into their household energy usage helping them to avoid high electricity bills Single ph6se inverter with HD-wave technology and built-in RGM and Service Panel consumption monitoring ® Grid E •---- s 1 CT L1 N L2 -- Shielded CATSe cable --! N lam fa I L2" AC Conduit r ®SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S other trademarks mentioned herein are trademarks of their respective owners.Date.12/2020N01/ENG NAM.subject to change without notice.. Mounting systems for solar technology solar system i t► ;z } EVEREST SOLAR SYSTEMS RESIDENTIAL ROOF SOLUTIONS Everest Solar Systems,LLC !It,:ShceiGa;halS lemlll5I10216 3809 Ocean " a an Ranch Blvd.,Suite 111 r,k.+• is I:/J r:,'I•:u-i n•lu. Oceanside,CA 92056 CROSSRAIL SYSTEM Service-Hotline+1.760.301 5300 info@everest-solarsystems.com www.everest-solarsystenis.com CR®SSRAIL SYSTEM LISTED - -- --- ______------- High quality, German engineered system optimized for residential installation Everest M K2 mounting hardware simplifies module installation— fast,easy, and secure Easily integrates with third party roof attachment products,such as QuickMountPV L-foot provides adjustability and compatibility with common roof interfaces (Comp,Tile&Metal) No shingle cutting,won't void roof manufacturer's warranty 100%code-compliant,structural validation for all solar states ". Three rail sizes available to suit all structural conditions --- -All components also available in dark CrossRail for Pitched Roofs Fast installation, minimal component count result in low total installed cost — — i Simple to design using code compliant Everest Online Design Tool Technical data p ti Applicable Roof Types Composition shingle,tile,flat the Flexibiligq Modular constrmction,suitable for any system size, height „ adjustable-- ' PV modules For alf`conimon mddiule types ` Module orientation Portait and landscape .......... ..... .... . ... ... .. .. . i Material High corrosion resistance,stainless steel and high grade aluminum - ---- -- -- ................_..... ... ......-.. . .. -...: .... .... ... ................._.. . ......... ...........- ................... .......-.-_............ Roof attachment Screw connection into rafter CrossRail with EverFlash _.. ..-....._._._.... .... ...... ............. . _.... Structural validity IBC compliant,stamped engineering letters available for all solar ------- states Warranty 12 years - CrossRail 48,48-5 or 80, L-Foot, Mid and End Clamp ° l i System components Sets,Universal Mid and End Clamps,third-party roof , attachment products such as QuickMountPV i 1 � Bonding Mid and End Clamps r W70"", a 1A01-111iing systems for solar technology solar system �,.;... : �r NI1:W 13It0I3UCAi ► ' Part Number Description Optimized rail profile 4600019 CrossRail 44-X 166", Mill ►'One rail for all markets 4000020 CrossRail 44-X 166",.Dark ► Built-in`wire management 4000021 CrossRail-44-X 180", Mill 4000022 CrossRail 44-X-180", Dark ► Maintains.same structural integrity as 48-X 4000051 _ RailConn Set,-CR 44-X, Mill. , ► Tested up to 200 mph winds _ -_ -_._ __ -RailConn Set, CR 44-X, Dark 4000052 4000067 End Cap, Black, CR 44-X ►-Test'ed.up to 100 PSF snow loads: 42% q , , Y3 i www.evei-est-solarsystems.com CrossRaiI 44-X Product Sheet US0110520 Subject to change Product illustrations are exemplary and may differ from the original. TO1'bJN OF QUEENSEURY - - BUILDING DEPARTMENT R fir. EaseG on out"iimited examination,compliance F� �t9'' L2 1 with our comments shall not be construed as FILE COPY indicatit)g the plans and specifications are in full compliance with the Building Codes of JUL 5 ��2 N �:, PHOTOVOLTAIC SYSTEM lJV ! 'v!11ieL:.�a 71J� l� SYSTEM SIZE: L /' _ /LL'I NAMEPLATE: 10 KW DC/10 KW AC EQUIPMENT: , :�_ r{. �.•, 1. = , (25) HANWHA CIPEAK DUO BLK ML-G10+(400W) VIC. Q. PV MODULES: zq„ � PV OPTIMIZER(S): (25)P401 SOLAREDGE POWER OPTIMIZER - •' gip, a INVERTER(S): (1)SOLAREDGE SE10000H-US INVERTER " •jj j r xj..R -1 188�Choetnut Ridge Rd,4ue(nm ury, AC NY 12804.United States- 7 COMPONENT(S): (1)60A FUSED AC DISCONNECT __ d - } m r = Z r (� w of LU TYPE OF INTERCONNECTION_ LINE SIDE TAP IN THE MSP (! U d j SCOPE OF WORK: w c N INSTALLATION OF A CODE COMPLIANT,UTILITY INTERACTIVE 1 Z PHOTOVOLTAIC ELECTRIC SYSTEM. J,�. r - j 0 M z 2017 NATIONAL ELECTRIC CODE AERIAL VIEW 43-362075,-73.672284 VICINITY MAPLU � m 2020 FIRE CODE OF NYS CLINTON MCCARTHY: 188 CHESTNUT RIDGE RD, QUEENSBURY, NY 12804, USA 2020 RESIDENTIAL CODE OF NYS N 2020 BUILDING CODE OF NYS GENERAL NOTES: ELECTRICAL NOTES: LU � o-. W F- UI 1. DRAWINGS ARE DIAGRAMMATIC ONLY.THE LOCATION AND ROUTING OF RACEWAYS SHALL BE 1. ALL EQUIPMENT IS LISTED FOR USE APPLICABLE CODE PER LOCAL AUTHORITY HAVING N DETER UATIOBY CCOU144TFOR OR WORST CASE ASOTHERWION NOTED OR STANDARDIZED. 2. ANY EQUIPMENT VOLTAGE DOES ELECTRICAL MEED600VDC. } Y 0 JURISDICTION 2. ALLE ADISCRIONSACIN QUANTITY UA FOR OR SIZE OF CONDUIT, 3. ANYE BYARECOR ELECTRICAL ELECTRICAL TESTING USED FOR THIS ORY.INSTALLATION SHALL BE NEW AND U 3. IF A DIS PROTECTION. NCYGROUNDING N DUANTIT SYSTEMS. ETC. .(ALL EQUIPMENT UIIP WIRE,EQUIPMENTAND MAMATERIALS) CES,O R-C R SHALL ANLIS INVERTER RTE RECOGNIZED AN INTERACTIVE SOLARESTING LABORATORY.SHALL DRY. U O PBE REROTECTIONIBLEFO PROVIDING AN INSTALLING ALL MATERIALS RIALSA AND SERVICES CONTRACTOR REQUIREDBY HE 4. OUTPUT TOT HE CONNECTED ELECTRICAL ICAL PRODUCTION DISTRIBUTION NETWORDE-ENERK UP ITS Q Q STRIC EST CONDITIONS INT ESPECDINSTIONS OR NOTED ON ANOSERVICES REQUIRED BVTHE OF VOLTAGE IN THAT ECTED AND REMAIN IN THAT STAISTRIB LTH NETWORK UPON LOSS S'}�) STRICTEST CONDH,61. O THE SPECIFICATIONS OR NOTED IT THE PLANS TO ENSyREDGSRLETE OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL COMPLIANCE WITIH�L CODES AND Te ENSURE THE LONGEVITY SAFETY®FTHE,BP LE PRODUCTION AND SSHAL BEEQ EQUIPPED OI.LTME GROUNDHAS FAULENRESTORED. SYSTEM. 6. ALL PV ARRAYS SHALL BE EQUIPPED WITH E GROUND FAULT PROTECTION. 4. ALL OUTDOOR NDUITA AND ENCLOSURES SHALL NE USE RATED. & TANY ACHAT COMPONENT SHALL MEET OR EXCEED THE AVAILABLE FAULT CURRENT CALCULATED AT �• N S. METALINSIDE BUILDING. ENCLOSURES SHALL BE USED WHERE PV SOURCE OR OUTPUT CIRCUITS ARE THAT COMPONENT. .- RUN INSIDEABUILDING. c 7. ALL MODULES AND ANY RELATEDROOEMOUNTED METALLIC EQUIPMENT SHALL BE PROPERLYAPPLICABLE CODES • 6. MODULES SHALL NOT BE PLACED OVER ANY PLUMBING VENTS AND AT LEAST 6'MOVE FLUSH VENTS.' GROUNDED. U O } 7. THE ELECTRICAL CONTRACTOR SHALL COMPLY WITH ANY AND ALL REQUIREMENTS GIVEN BY UTILITY 8, OC EQUIPMENT SHALL BE 600VUC RATED MINIMUM. Q a Q Z COMPANIES. 9. MARKINGS SHALL BE PROVIDED TO INDICATE THATALL CONTACTS OF THE DISCONNECT EQUIPMENT a/ CD W �- B. FOR ADDITIONAL EQUIPMENT SPECIFICATIONS,SEE PROVIDED CUT-SHEETS. MIGHT BF.E.NF.RGI7FD. 0. ALL LABELS AND MARKINGS SHALL BE ATTACHED ACCORDING TO REQUIREMENTS BY NEC AND THE 10.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OR JUNCTION ~ J M Z PV1 COVERPAGE LOCAL AHJ.THE AHJ MAY HAVE SPECIAL LABEL REQUIREMENTS BEYOND THE SCOPE OF THIS BOXESICOMBINER BOXES PER APPROPRIATE JURISDICTIONAL REQUIREMENTS. Z 0- M) Q DOCUMENT.THIS MAY ENCOMPASS LANGUAGE INCLUDING,BUT NOT LIMITED TO,THAT FOUND IN NEC ED 11.FOR DO CONDUCTORS OF THIS OLTAICEADING AREUNGROUNDED GROU DEDA AND HAZARD. 0 ARTICLESEFERENCES SHALL.14 f BE DIRECTLY 0.INTER.35(F)GEAB EWITH(8)CREF17)REFERENCES. THE DO CONDUCTORS OFFACE ATEACOLTAICION BOX. ARE COMBINER BOX, ISCO NECTAY (.� � Q PV2 SITE PLAN 10.ALL NEC REFERENCES SHALL BE DIRECTLY INTERCHANGEABLE WITH CEC REFERENCES. ENERGI2ED.'SHALL BE PLACED AT EACH JUNCTION BO%,COMBINER BOX,DISCONNECT AND DEVICE WHERE ENERGIZED,UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE. 12.INVERTER(S)SHALL CONTAIN A GROUND FAULT DETECTION AND INTERRUPTION DEVCE. G DATE PV3 MOUNTING PLAN STRUCTURAL NOTES: 13.ALLMETALLICRACEWAYSANDEQUIPMENTSHALLBEBONDEDAN0ELECTRICALLYCONTIN000S. O6I17IZO2Z 14.THEPOINTOF CONNECTION COMPLIES WITH APPLICABLE CECNEC. 1. MOUNTS ARE DIAGRAMMATIC AND EXACT LOCATION MAY CHANGE,BUT SHALL BE ACCURATELY SPACED. 15.BACKFEO SOLAR BREAKER(S)SHALL BE INSTALLED AT THE OPPOSITE ENO OF THE CIRCUIT OR PV4 MOUNTING DETAILS FURTHEST AWAY FROM THE MAIN BREAKER. 2, MOUNTS SHALL BE STAGGERED WHEN NECESSARY TO EVENLY DISTRIBUTE LOAD AMONGST RAFTERS. 16.ALL WIRE,VOLTAGES,AM1IPERAGES AND EQUIPMENT IS SIZED ACCORDING TO TEMPERATURE [ME 3. DO NOT SPLICE RAILS IN MIDDLE 50%OF SPAN BETWEEN TWO MOUNTS. DERATINGANDLOCATION. PV5-5.1 ELECTRICAL DIAGRAMS ,.11}1(p /'y s- OF NEw 17.ONLY COPPER(CU)CONDUCTORS SHALL BE USED.CONDUCTORS SHALL BE STRANDED OR SOLID TOWN I\tl �'- t !UEENSBURY 111 Z O WRHPROPERLYRATED CONNECTORS. '�✓V V V `+uC IJ L tl CO „ACy� 18.9.ALLDISCONNECTMODULES SHALL BEGR D SOOUND D AS PBLADEER ME NU ENERGIZED. PV6 MARKING&LABELS M.ALL MODULES SHALLB BE GRODEDASPER DINUFACNNG JUMPCIFICA ERE BUILDING i•-•7I I p• IN & CODES g EPT. * - P� M.ALLE SPLICE PLATES BEGROUNOED,INCLUCES OF RAIL. "ERE NECESSARY ACROSS 'ATTACHMENTS Id~J('pV1 IL.plJtll IV1U �.,+ B-" _ � I� � RAIL SPLICE PLATES TO BOND INDIVIDUAL PIECES OF RAIL. N MANUFACTURER'S SPECIFICATIONS I�O111 nW XP091 6 Date, �� p 1365• �� dJ�¢le. _ •••'�`�. `_ � ROFESSIO�P INDEX GE ERA NOTES PV1 290.-1-22.121 SOLAR-0466-2022 McCarthy, Clinton 188 Chestnut Ridge Rd Solar Panel (roof) 10 kW DC Y r ..1 ARRAY 1 ARRAY 2 > TILT:35' TILT:35° N AZIMUTH:200° AZIMUTH:110* ^ ,n �ma l pROpER 7 ARRAY SPECIFICATIONS j/ ...................................................................................................................... z a °g L) o IM UTILITY METER Lu o m t7l AC DISCONNECT FUSED F- Z F' ® INVERTER M � b z ' \ \ [;M;l COMBINER PANEL Z MAIN SERVICE PANEL U i 18"VENTILATION SETBACK m 3'WIDE FIRE ACCESS PATHWAY 3k3'GROUND LADDER ACCESS POINT g O N o LEGEND � p i rnoQo / OF NEI yY Oda, O ma MP7 Q. pROFESSIONP� z a m V m i DATE _ DESIGNED BY: OSD i i / PV2 Design Criteria: •Applicable Codes=2020 Residential Code of NYS,ASCE 7-16,and NDS-18 V •Ground Snow Load=50 psf;Roof Snow Load=30.4 psf ARRAY 1/2 •Basic Wind Speed=110 mph Exposure Category C o J •Existing Roof Dead Load:ARRAY 1/2=30 psf ^ •Existing Roof Live Load:15.6 psf SOLAR MODULE LL ° ............... 3' WIDE FIRE ACCESS 18" VENTILATION SETBACK ............. PATHWAY t Z 42' — 13'-10" �I g W as :>�,�"Fr`�'v!'C.:,r; `.�F��.,..rC.\•ry S T �"x;f.,try Ci -: —_ ' T.f^v�ry �:3�.:"r' Q -vl Vr U v -i--j- �-�- mow--,t-�-,1�..�- I -•-��. � � -�-- - tt / Z � �m r - T ... s j _ �• - =z t0 lD — --0—-�- 40— —F ♦——-�— — —�— �-——40,—I -i—=-40— 1 I N LU L Li-.0— ..............._. I- \. .............. �..............._ 13'-10.. ................—I N o a 0 —......_.-...........................---------._-----------------... 3 3'-3" .................... -------------------...._.-------- OF NEby } N MP1 K ZACyyOP MP2 3 ......... V o } f `��'t TILT: 35° a o z TILT: 35° -Ie° AZIMUTH: 110° Z m z ,- AZIMUTH: 200 - O a ca O PO°l33�7�2 pp J 91365• U AR�FESSIONP L/1DATE 7/2022 TYPE DESCRIPTION QUANTITY TYPE DESCRIPTION QUANTITY ROOF SPECIFICATION CMD MODULE HANWHA QPEAK DUO BLK ML-G10+(400W) 25 DISCONNECT 60A FUSED AC DISCONNECT 1 ROOF MATERIAL ASPHALT SHINGLE DC OPTIMIZER P401 SOLAREDGE POWER OPTIMIZER 25 SEAM SAPCING 2"X 6"@ 20'O.C. INVERTER SOLAREDGE SE1000OH-US INVERTER 1 ROOF CONDITION GOOD PV3 r l� n/n 4 Technical Report for Everest Racking System Jun 17,2022 Array Layout Rrna Celumna engm WI4M orivnbdon Taml Weight Weight/ Pamibute4 _ 4a - AtuNmen[ Weiaht LL CrossRail Flush to Roof 6 !'6.S 37-7' u 4scapc !ss 1m vsnn x.e4pr A1ea2 1 2 r ss• u•a• un4s<ape ue It los 1510IDS 2e6 p!.i A-3 1 3 3'S5• It'll• lanOsca{M 1>9.>J the 17.1111x 264 Mf } Name Clinton McCarthy Atea4 1 6 3'ss. 31.1• I-.k 359311Gs 17..1. 4.psf Areas I J 3'S.5• 25'1.5• lantlsrape 24006 ft 17.15IW 2.e4 psf 1n } 10 Address Glens Falls,12804,NV A1eafi 2 2 ITV 7-2• ppreaa 236051hs 29s111u 2.79 psf J = Z Q ~VVV 7 Contact Phone Tout IA95.QN1 U.S 16s 263 psf Q W Q (� N Flush Mounting System for tilted roofs U Contact Email U a mallshrlkant1998@gmall.com Z Z Z 0 irz � Z z Module Information v Name HANWHA QPEAK DUO BLK-1,1LCa10+(400M U ce W Description Length 6'2' Peak Power 400.00 Wp N Width 3'5.1' Weight 48.50Ih5 Estimated Bill of Materials w o w Model Name Cal.City. Extra.City. Total.Qty. J Depth 011.3° y. 4000652 Cros:Rail48•X166',Mill 25 0 25 } Y Y 0 I Fronlc N Q < �• -"� 4000433 Cro"Rall EndCap,Black OR 48-X.48-XL 28 0 'Q 28 End Cap • 4000583 Crossitall 3'Blacksleeve 48.X,48-XL 28 • •0 28 } O N Sleeve _ '. O J 4DD0622 Burmly WEER Lug 10.3 7' 0 7 4V > Q Z Bearital Bpndln8 - LL (7 0 } 4000624 WEER Lug 10.3 Hardware Only,CR,Ra2 7 0 7 z J m Q Bennral bantling 0 d m OF Nc 400D430 CR EC Dark.30-50mm,Shared RL 3045mm 28 0 28 V Q K Z' y0 Em camp �..,.:o,, DATE �* _ FP i 4000367 EverFlash e[omp Kit,Silver 80 28 108 06/17/2022 Rp01—mem 4000382 HeyCllp SunRunner Cable Clip S5,S6404 25 0 25 DESIGNED BV: r..-- (� Wire Managemem ActeasOry xPC9j365m V 4000385 RailConn CR4&X,4&XLStruct Set,Mill 12 0 12 R—FESSIONP na1 epnnrapr ser 4000602 CR MC Dark 3047mm,Shared RL 3042mm 36 0 36 MIddle Mldtlle CMmp Model Name Calc.Cry. Extra.Qty. Total.Qty. PV4 150A MAIN SERVICE PANEL SOLAREDGE 60A AC 120/240V } 1 STRING OF SE1000OH-US DISCONNECT } Z 13 MODULES INVERTER FUSED W DC UNGROUNDED 150A v, a W/OPTIMIZERS g 60A/2P U } O rz Z z 1 STRING OF UM -j 0 lu 12 MODULES G G G N W W/OPTIMIZERS O O N STRUCTURAL ONLY 1 2 3 N W !. Y Y OF NEt1 Y © y U Q 0 K•Zq�y Op ❑ ro ,1 p J � r �p 9136 z 5 R�FESSIONP a oCL CONDUCTORS AND CONDUIT MODULES INVERTER(S) OTHER EQUIPMENT L) (4)#10 PV WIRE (25)HANWHA OPEAK DUO BLK-ML-G10+ SOLAREDGE SE10000H-US 60A FUSED AC DISCONNECT oAlE (1)#6 THHN GND MAX AC OUTPUT:42 A 3/4"EMT 06/17/2022 WATTS STC:400W (3)#6 THHN ISC:11.14A INVERTER OCPD CALC:(42)X 1.25=52.5 DESIGNED BV; O O2 (1)#6 THHN GND IMP:10.77A MIN OCPD:60A OSD 3/4"EMT WIRE AMPACITY:65A @75"C TERMINAL VOC:45.30V TEMPERATURE CORRECTION FACTOR: O (3)#6 THHN VMP:37.13V 31'-35O CORRECTED =0.(1)#6 THHN GND CORRECTEDD WIRE AMPACITY:61.10A 3/4"EMT PV5 n 150A N MAIN SERVICE PANEL (L 120/240V 60A AC SOLAREDGE DISCONNECT } 1 STRING OF SE10000H-US FUSED W 13 MODULES INVERTER 150A ¢ �< W/OPTIMIZERS DC UNGROUNDED 60A/2P C) J Lu g Q p N C1 C) } rz Lu � Z z 1 STRING OF UM 12 MODULES G G G N w W/OPTIMIZERS STRUCTURAL ONLY 2 3 g o o OF z O j J Y y q�y p,P N Y G.. O v otl-A17402 >- 09136b- F- J AROFESSIONP a ¢ z ofz CONDUCTORS AND CONDUIT MODULES INVERTER(S) OTHER EQUIPMENT v n < (4)#10 PV WIRE (25)HANWHA QPEAK DUO BLK-ML-G10+ SOLAREDGE SE1000OH-US O (1)#6 THHN GND MAX AC OUTPUT:42 A 60A FUSED AC DISCONNECT DATE 3/4"EMT WATTS STC:40DW 06/17/2022 O (3)#6 THHN ISC:11.14A INVERTER OCPD CALC:(42)X 1.25=52.5A OESIGNE�BY: O2 (1)#6 THHN GND IMP:10.77A MIN OCPD:60A OSD 3/4"EMT WIRE AMPACITY:65A @75"C TERMINAL VOC:45.30V TEMPERATURE CORRECTION FACTOR: O (3)#6 THHN VMP:37.13V 31°-35'C=0.94 (1)#6 THHN GND CORRECTED WIRE AMPACITY:61.10A 3/4"EMT PV5.1 INVERTER AC DISCONNECT MAIN SERVICE PANEL n a .........................-............. ..... ------ .................................-.................. ----- -------...... _ NEC 690.17(4)GROUNDED SYSTEMS NEC 690.14(C)(2) NEC 705.12(D)(4)),690.56(B) w PHOTOVOLTAIC DISCONNECT WARNING d WARNING POWER IS BEING SUPPLIED TO THIS ELECTRIC SHOCK HAZARD. FOR UTILITY OPERATIONS PANEL FROM THE UTILITY AND A DO NOT TOUCH TERMINALS. NEC 690.54 SOLAR PV SYSTEM. TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN RATED AC OUTPUT CURRENT: 42 A NEC 705.12(D)(7) coco THE OPEN POSITION. NOMINAL AC VOLTAGE: 240 V WARNING = W INVERTER OUTPUT CONNECTION m Q o NEC 690.14(C)(2) NEC 690.56 DO NOT RELOCATE THIS o U) OVERCURRENT DEVICE o6 U WEMERGENCY RESPONDER z o PHOTOVOLTAIC DC DISCONNECT SOLAR SYSTEM LABEL TO BE INSTALLED DIRECTLY NEXT TO PV BACKFEED Z O z BREAKER.IF INSTALLED ANYWHERE ELSE ON DEADFRONT Y z ---- -- - -- -..-.....-- EQUIPPED 0' Z z THEN A PERMANENT ARROW FROM LABEL POINTING TO Q WITH RAPID •• PV BACKFEED BREAKER REQUIRED. U U TURN RAPID SHUTDOWN PHOTOVOLTAIC SWITCH TO THE NEC 690.54 "OFF"POSITION ONLY CONDUCTORS INSIDE SYSTEM EQUIPPED WITH BUILDING OR OFF THE RATED AC OUTPUT CURRENT: 42 A N ROOF WILL SHUT DOWN p RAPID SHUTDOWN ,,,,,,_„',^;,' i NOMINAL AC VOLTAGE: 240 V F CO I_ NEC 690.14(C)(2) U U O NEC 690.53 #.INVERTEIj'$`� CONDUIT, RAC EVIW YS, PHOTOVOLTAIC AC DISCONNECT r- PHOTOVOLTAIC ARRAY p ¢ N DC DISCONNECT ENCLOSURES CABLE _ J o }U OPERATING CURRENT: 27 A "� 0. o Z OPERATING VOLTAGE: 400 V ASSEMBLIES STRUCTURAL ONLY Z �a m z .......... MAX.SYSTEM VOLTAGE: 480.0 V O m NE SHORT-CIRCUIT CURRENT: 45.0 A & JUNCTION BOXES °K.zA y�0 U.................................._...,(... .. ................- .. - .. ................. ..... .. DATE NEC 690.31(E 3) -- .___ --_ ---- CONDUIT " P 06/17/2022 Warning:Photovoltaic Power Source NESICNED BY: P�136- OSD NEC 690.35(F)UNGROUNDED SYSTEMS JUNCTION BOX p�D SSIONP WARNING Q ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED. PV6