Pre-ApplicationTown of Queensbury Site Plan Pre-Submission Conference Form / Section 179-9-040
1. Applicant Name: __________________________________________________
2. Tax Map ID ________________ Location: _______________________
3. Zoning Classification __________
4. Reason for Review: __________________________________________________________
5. Zoning Section #: ________________________
6. Pre-Submission Meeting Notes: Provided Outstanding; Please provide by
Deed ____ _____________
General Information complete ____ _____________
Site Development Data Complete ____ _____________
Setback Requirements Complete ____ _____________
Additional Project Information Complete ____ _____________
FAR addressed ____ _____________
Requirements for Site Plan-Standards ____ _____________
Checklist items addressed ____ _____________
Environmental Form completed ____ _____________
Signature Page completed ____ _____________
Staff Representative: ________________________________
Applicant / Agent: ________________________________ Date: ___________
Northern Gateway Renewables
297.15-1-1/510.06ac 443 Queensbury Avenue /So. Side of Hicks Road
CLI
Project includes 31 ac of fenced area with 8.3 acre of ground mounted 5.MW solar array farm on property of the County Airport
179-5-140 Renewable, 179-10 SUP Solar, 179-3-040 CLI, Chapt 94
X
X
X
X
NA
X
X
X
None
difficult with North and South together
"
Chris Clark & Dallas Manson? titles needed
Laura Moore via email 07/07/2022
Applicant proposes to utilize 31 acres of the 510 sq ft parcel for a 8.3 acre 6.6MW or 5.0MW? solar farm
on land of the Warren County Airport. Project site work is within 100 ft of designated wetland and
disturbance of existing wetland areas for placement of solar panels. Project work includes fencing,
stormwater management, and equipment areas. The increase in hard surfacing is 0.86 ac of hard surfacing
with equipment pads. Site work proposed in the wetland is in three specific areas and other site work is
adjacent. Site disturbance of 34.10ac. Panel height is 16.5 to 19.5 affic Site Plan, Special Use Permit,
Freshwater Wetlands Permit, work on slopes 15% greater.
Items reviewed: site plan application, site plan drawings, SWPPP
1) Clarification needed on MW 6.6 (EAF) or 5.0 (Narrative)
2) Any information from Army Corp in regards to wetlands - reviewed DEC confirming wetland
boundary
3) Separate North and South - Project Narrative, Site Plan Review Requirements, Special Use Permit
general criteria and specific criteria, and EAF
4) will need dimensions on the equipment unit and individual concrete pad
5) confirm with emergency service road width needs and drive length
6) any lighting needs?
7) is there a glare study?
8) Plans with 100 ft buffer area for wetland should be denoted for Army Corp and DEC
9) Wetlands permit should note both Army Corp and NYSDEC
10) signature page - will need names and titles as part of signature page
8