Loading...
Cert. letter for SPR application900 Route 146 Clifton Park, NY 12065 (P) 518.371.7621 (F) 518.371.9540 edpllp.com June 13, 2022 Town of Queensbury Zoning Department 742 Bay Road Queensbury, NY 12804 Attn: Laura Moore Re: Randles – 42 Old Assembly Point Rd. Dear Laura: In response to the Town’s requirements for a certification letter for the wastewater system serving a property which is subject to a Site Plan Review application for proposed improvements to the residence I offer the following. In November of 2016 EDP prepared a design plan for a replacement wastewater system to serve the Randles property based on the existing site conditions. The plans included an existing condition plan as well as the proposed replacement system design and details. At the request of the Owner, the wastewater design was based on a six-bedroom flowrate as they anticipated a future project which would enlarge the size of the residence and thus the necessary capacity of the wastewater system. System components consist of a concrete septic tank (2000 gallons), a 1000-gallon concrete pump tank with a duplex pump/control system and an Eljen GSF absorption field in a trench configuration (3 laterals of 44 lf each – 132 LF total). All components were designed and installed in compliance with the required sizing for a six-bedroom flowrate (660 gpd). Following installation of the system in the Fall of 2017 a compliance letter was prepared and submitted to the Town by EDP. The system was approved for operation at that time of the start-up in November 2017 The Owner is now proceeding with the house expansion and as such requires a statement indicating that the existing system is adequate for the proposed house expansion. As originally designed and installed, the wastewater system in-place is adequately sized for a residence of up to six bedrooms. It is my understanding that the proposed residence will not be increasing the bedroom count above the existing 4-bedroom residence. Thus, the existing bedroom count and proposed bedroom count will remain at 4 bedrooms, and the system as originally designed will be adequately sized to serve the expanded residence. Please advise should further information be required. Sincerely, Dennis MacElroy Dennis MacElroy, PE The Environmental Design Partnership, LLP 518 376-4485