Loading...
Pre-ApplicationTown of Queensbury Site Plan Pre-Submission Conference Form / Section 179-9-040 1. Applicant Name: __________________________________________________ 2. Tax Map ID ________________ Location: _______________________ 3. Zoning Classification __________ 4. Reason for Review: __________________________________________________________ 5. Zoning Section #: ________________________ 6. Pre-Submission Meeting Notes: Provided Outstanding; Please provide by Deed ____ _____________ General Information complete ____ _____________ Site Development Data Complete ____ _____________ Setback Requirements Complete ____ _____________ Additional Project Information Complete ____ _____________ FAR addressed ____ _____________ Requirements for Site Plan-Standards ____ _____________ Checklist items addressed ____ _____________ Environmental Form completed ____ _____________ Signature Page completed ____ _____________ Staff Representative: ________________________________ Applicant / Agent: ________________________________ Date: ___________ Brian Hogan 239.12-2-37 33 Holly Lane WR Applicant proposes a 529 sq ft pavillion and new hard surface is added due to lot line adjustment on Holly Ln with the Town 179-3-040 X X NA X X AV68-2021 X X X survey needed as well X Laura Moore via email 05/31/2022 Applicant proposes a 529 sq ft pavilion at 15ft 2 inches to be constructed in similar location of cottage that has been demolished. The existing home of 1,460 sq ft is to remain with no changes. The project includes a lot line adjustment with the Town in regards to Holly Lane where 916 sq ft of hard surface is added to the applicants site. In addition, the project includes a 1568 sq ft pickle ball court under review for minor stormwater management. Site Plan review for the new pavilion in Waterfront Residential zone. Items reviewed application, site drawings, elevations Items to be updated or provided: 1) page 3 site data and setback information to be confirmed - survey 2) page 4 confirm floor area and include AV68-2021 3) page 5 need responses to A-O 4) page 6 and 7 Checklist - confirm site information 5) signatures 8