Staff notes for 8/25/2022 Town of Queensbury Planning Board Community Development Department Staff Notes August 25, 2022 Site Plan 50-2022 BRIAN HOGAN 33 Holly Lane / Waterfront Residential / Ward 1 SEQR Type II Material Review: site plan application, stormwater, pavilion plan, site plan Parcel History: AV 68-2021 Warren Co Referral Sent: August 2022 / Comments: Concur w/local board. __________________________________________________________________________________________ Requested Action Planning Board review and approval for completion of a pavilion project located near the shoreline with no changes to existing home. Resolutions 1. PB decision Project Description Applicant proposes to complete a 529 sq ft pavilion at 15ft 2 inches to be constructed near the vicinity of the cottage that has been demolished. The existing home of 1,460 sq ft is to remain with no changes. The project includes a lot line adjustment with the Town in regards to Holly Lane where 916 sq ft of hard surface is added to the applicant’s site. Additionally, the project includes a 1,568 sq ft pickle ball court under review for minor stormwater management. Pursuant to chapter 179-3-040, site plan review for a new pavilion in the Waterfront Residential zone shall be subject to Planning Board review and approval. Staff Comments • Location-The project is located at 33 Holly Lane located in the Waterfront Residential zone on a 0.79 ac parcel. • Arrangement- The site has an existing home, bocce court, garden area, pickle ball court. • Site Design-The site was part of a project where the applicant had demolished the existing house and converted a portion of the garage to living space with a garage. • Building – The existing home is 1,480 sq ft and proposes to complete the pavilion of 361 sq ft. The applicant had started the piers. The pavilion concrete piers were present in photos in 1/25/2022 and the concreted pad had also been installed. • Site conditions-The plans show the lot line adjustment that includes a portion of the road that occurred between the applicant and the town highway. • Grading and drainage plan, Sediment and erosion control-The applicant has provided information on stormwater management with a raingarden to be constructed at this time the information has not been reviewed by the Town Engineer. The Board may consider having the materials reviewed by the engineer. • Landscape plan-The plans show some of the existing landscaping on the site and the installation of the rain garden area for stormwater management. • Site lighting plan-The plans do not indicate lighting and the applicant is reminded any new lighting to be downcast cut off fixture. • Site details- • Utility details-There are no changes to the existing septic and well. • Elevations-The plans provided show the piers and the pavilion to be placed on top of the piers. - 2 - • • Floor plans- The floor plan shows the existing fireplace from the demolished home • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, l. landscaping, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested–Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant provided -j. stormwater, k. topography, p floor plans • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Summary The applicant has completed a site plan application to complete the construction of an open sided pavilion. Meeting History: 1st Meeting