Loading...
Nace Engineering.05.14.2001.2• 6FILE 169 Haviland Road, Queensbury, NY 12804 Phone-518-745-4400 Fax - 518-792-8511 May 14, 2001 Job 947319 Mr. Chris Round 1Z Director of Community Development RAC �V 1 Town of Queensbury 742 Bay Road Queensbury, NY 12804 TOWN OF CUEENSBURY PLANMNG OFFICE Re: Site Plan No. 13-01 — North Country Day Care Dear Chris: In response to C. T. Male's review letter of April 27, we have the following responses and have revised the referent site plans as follows: 1. This site should not generate very much silt or sediment from "first flush" storm flows once the ground cover is established. Additionally, the top of the check dam is constructed of NYSDOT "light stone fill" which should remain porous. If, for any reason the check dam does become impervious, then it will have to be replaced. I have shown a silt fence and hay bale dam on the upstream side of the check dam to detain sediment until the site is stabilized. I have also shown hay bale dams on the swale leading into the detention basin. 2. The bottom of the detention basin has been raised so that it will drain to the edge of the wetland buffer. The surrounding grading has been raised accordingly. The elevations shown on the check dam detail on S-4 have been adjusted accordingly. I have also rerun the HydroCAD calculations for the basin using the revised grading to assure that there is adequate storage capacity in the basin. A copy of the results is attached. 3. Only a small portion of pavement at the west entry drive drains back toward the road and practically no pavement at the east drive drains toward the road. Additional spot grades have been added to better define the pavement grades. Also, the catch basins on the main road have been shown. 4. The water main tapping detail shown on Sheet S-4 has been changed to show an eight inch main. 5. Both lots are owned by Schermerhorn Construction and the proposed grading will be performed by Schermerhorn Construction. Therefore a grading easement will not be necessary. 6. The western drive with directional (right in only) flow will help to promote more orderly traffic flow on site and thus help to eliminate queuing problems. This facility will not be like a normal school, with students all arriving at the same time. Rather, children's arrival will be spread out depending on the parents' work schedule and location of workplace. 0 l J 7. A proposed ground mounted sign location is shown on the plans. The sign details are not finalized at this time. 8. The walkway lights are over 150 feet from the travel lanes on Bay Road and are relatively well shielded from oncoming northbound traffic by the building. They are also partially shielded from southbound traffic by the landscaping. We have looked at the individual light distribution in the parking and entry area for placement of the fixtures. We do not feel that it is necessary to produce a complete site illumination plan for such a simple site. 9. Parking has been provided in accordance with requirements of the daycare operator, based on his experience with similar facilities in the capital district. In accordance with his requirements, we have added 6 spaces for a total of 38. Additional spaces could be added in the rear if future requirements or use of the site changed. As you are aware, there is concern regarding the time frame for having sewer service available to the Baybrook Professional Park Subdivision. Therefore we have designed a temporary septic system to serve the proposed development on lots #4 and #5 of this subdivision. The enclosed drawings 946148-TS1 and TS2 provide the plan and details for these systems. They have been designed to DOH, DEC and Town standards. Although the septic system for lot #4 has been designed for only the proposed physical therapy tenant (because the municipal sewer should be available prior to other occupancies in the building), it could easily be expanded if required. Enclosed are 9 copies of revised plans S-1, S-2 and S-4, as well as the plans for the temporary septic system. Please call me if you have any further questions or comments. QS' ly> Thomas W. Nace, P.E. cc w/encl: James Edwards, P.E. — C. T. Male Rich Schermerhorn Data for 47319 NORTH CWTRY ACADEMY DAY CARE DEVELOPED• Page 1 TYPE II 24-HOUR RAINFALL= 4.80 IN Prepared by NACE ENGINEERING, P.C. 15 May 01 w droCAD 5 11 000576 (c) 1986-1999 Applied Microcomputer Systems POND 2 DETENTION POND Qin = 3.66 CFS @ 11.89 HRS, VOLUME= .16 AF Qout= .51 CFS Q 12.10 HRS, VOLUME= .15 AF, ATTEN= 86*, LAG= 12.9 MIN Qpri= .51 CFS ® 12.10 HRS, VOLUME= .15 AF Qsec= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF ELEVATION AREA INC.STOR CUM.STOR (FT) (SF) (CF) (CF) 309.5 0 0 0 310.0 888 222 222 311.0 6732 3810 4032 311.5 10050 4196 8228 STOR-IND METHOD PEAK STORAGE = 2911 CF PEAK ELEVATION= 310.7 FT FLOOD ELEVATION= 311.5 FT START ELEVATION= 309.5 FT SPAN= 10-20 HRS, dt=.1 HRS Tdet= 72.3 MIN (.15 AF) # ROUTE INVERT OUTLET DEVICES 1 P 309.5' 12" CULVERT n=.1 L=50' 5=.0051/' Ke=.5 Cc=.9 Cd=.6 2 S 311.0' 20' BROAD -CRESTED RECTANGULAR WEIR X 1.81 Q=C L H"1.5 C=1.94, 1.92, 1.92, 0, 0, 0, 0, 0 Primary Discharge 11=Culvert Secondary Discharge I2=Hroad-Crested Rectangular Weir