Loading...
Mechanical Testing ^�Z1 MAT"i E1013 Sustainable Solutions for Efficient Environments Ste warts Quaker Road Queensbury Addition FIRM: CUSTOMER: MTI -Mechanical Testing, Inc. Hilltop Construction PROJECT#: 4 Chelsea Place,Suite 102 22-244 Clifton Park NY 12065 PROJECT ADDRESS: PHONE: 777 Quaker Road (518)450-7292, Queensbury NY FAX: DATE: (518)450-7295 2022-05-06 CONTACT: Jeff Paro Cal Testlq OpJP��C W ;/'`:MEN"m O OWNED0 dJ�F � CERTIFIED BY I NAT INSBUSI NSS ENTERPRISE This is to certify that Mechanical Testing, Inc. has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements of the Associated Air Balance Council and the results of these tests are herein recorded. m MANTi Sustainable Solutions for Efficient Environments 4 Chelsea PI,Suite 102 Clifton Park,NY 12065 Phone:518-450-7292 Fax:518-450-7295 Design Review-Commissioning-Fire Life Safety-Test And Balance-ASHRAE 110-Drone Sales/Inspections Terms and Abbreviations In:Inches In.w.g.-Inches of Water Gauge ACH-Air Changes per Hour ISDFT-Insufficient Straight Duct for Traverse AHU-Air Handling Unit Kfactor-Correction factor to the free area AK-Free Area of Duct needed to calculate CFM. AVG-Average LAT-leaving Air Temperature BHP-Brake Horsepower LWT-Leaving Water Temperature BV-Ball Valve(Shut Off Valve) MAU-Make Up Air Handling Unit CB-Circuit Breaker MAX-Maximum set point/flow CBV-Calibrated Balance Valve MIH-Minimum set point/flow CD-Ceiling Diffuser HI-Not Installed CFM-Cubic Feet per Minute HIS-Not in Scope CHWS-Chilled Water System 0/A-Outside Air CRAC-Computer Room Air Conditioner OBD-Opposed Blade Damper CS-Circuit Setter OD-Outside Diameter Measurement of Sheave CUH-Cabinet Unit Heater PH-Phase DAT-Discharge Air Temperature PSI-Pounds per Square Inch DD-Direct Drive(motor) RA-Return Air Des.-Design RAT-Return Air Temperature Disch:Discharge RF-Return Fan DHE-Does Not Exist RHC-Reheat Coil DP-Discharge Pressure of Pump/Pressure Drop RPM-Revolutions per Minute EA-Exhaust Air RTU-Roof Top Unit EAV-Exhaust Air Valve SA-Supply Air EAT-Entering Air Temperature SAV-Supply Air Valve EF-Exhaust Fan SAT-Supply Air Temperature EG-Exhaust Grille S.F.-Service Factor ERU-Energy Recovery Unit SF-Supply Fan E.S.P.-External Static Pressure SP-Suction Pressure of Pump/Static Pressure EWT-Entering Water Temperature Sq.ft.-Square Feet FCU-Fan Coil Unit TAB-Test,Adjust and Balance FD-Fire Damper TOV-Triple Duty Valve FLA-Full Load Amperage TP-Thermally Protected Flow Coeff.—Correction Factor for Flow to VAV TSP-Total Static Pressure Flow Hood-Instrument that measures airflow UH-Unit Heater FPM-Feet per Minute GPM-Gallons Per Minute V-Volts HEPA-High Efficiency Particulate Arrestance VAV-Variable Air Volume Box HP-Horsepower VD-Volume Damper HVAC-Heating Ventilation and Air Conditioning VFD-Variable Frequency Drive HWS-Hot Water System VVT-Variable Volume Terminal HX-Heat Exchanger WC-Water Column Hz-Hertz MT1 0 Lq 13 Sustainable Solutions for Efficient Environments LOCATION: PROJECT NUMBER: CONTACT: Stewarts Quaker Road Queensbury Addition 22-244 Jeff Paro 777 Quaker Road Queensbury NY Table of Contents Instruments Used 3 Instruments Used 3 ...I. ... ............... . .......... . ... ............ Bard Unit O/A* 5 _. . ... . ...... ..... ... . Traverse Summary 5 Exhaust Inlets* 6 Exhaust Inlet summary,.. 6 Blower Door Test 7 3/24/2022-Blower Door Test 7 .... . .......... .......... .I.. .. ......... ............ _....... . ...... ..... .... . Page 2 of 7 2022-05-06 Ti Sustainable Solutions for Efficient Environments LOCATION: PROJECT NUMBER: CONTACT: Stewarts Quaker Road Queensbury Addition 22-244 Jeff Paro 777 Quaker Road Queensbury NY Instruments Used Instruments Used AIR Manufacturer Evergreen Calibration Date 7121 Model No: S-PVF-1 Tech Name Jeff Paro Serial No. 1700220 WATER Manufacturer Not Applicable Calibration Date Not Applicable Model No. Not Applicable Tech Name: Not Applicable Serial No. Not Applicable ALTERNATE METER Meter Type Not Applicable Serial No., Not Applicable Manufacturer Not Applicable Calibration Date, Not Applicable Model No. Nat Applicable Instruments Used Page 3 of 7 2022-05-06 MTi 0 Uq 13 Sustainable Solutions for Efficient Environments LOCATION: PROJECT NUMBER: CONTACT: Stewarts Quaker Road Queensbury Addition 22-244 Jeff Paro 777 Quaker Road Queensbury NY IMAGES: Air N� ,5� �,'°!Lw..2iu'g,R a w:':-G ,�1.`• .: ',i i«.�<y�'„ Vr+Wawnri k1fR4WE8'tltdiEl�ytt.�,y� �„ie'J .,, ,_ s 1L Yt !}176.1•.,,i� �.� '�"' tWrUegf..lvJiNrsLtlB.L%'.'�,��..�• awaeww. r6LNr. .• -,,i� aawyros e�.eM 2miMmcbi.Rt'h091 `;'��y,'�Iv4y�; 1':i'am.r.�Mrr�s;' t ltCsWa Mrv`pvwYe nNw�mwl.wavwgaµwY4+una,•3•"'�''����� yMNWmuHs?ebbaubrWCVyxanue�lLnppAy�w+r�uatl Wow NMWu "� ptlTpRm'.y2II+5>7.wmWtaey,e0K1m:p+�}Nammay�ml>afwaWvtur d IMnmsalMOdppm4� /216MbSt3?2d/10G«»9a zrJ9a.sae E�rrw.11m '. NN � .er(p.aseaa.,rpew,n wn+mmrat+as++wfoa+rswn+r,ne+rdrosmpaw�usR.;c tqa�OM><'u:nbMR�bwrdmjmwO.roNtl#M4+,a1F�igRptimwam n0^'upW I wwm Rli Atm.",,: ., �rawl.h HAtl NrYppk krWiu'eaf .. N RNJk'2' � •'y„rp,�y." M' �,:/�fsiiic M+anM�' nU'Fl- ..:aYR,tmvtcrtlWriFurn+OivYlMiau2.8fCrra,...,., �.9aAAt;'^@�µl�-"_"; .CiaM�'-,�.Mm[.pPi@uvi@'�9sOmbIM,W�MYMi.3-Wf0}R�Fi..t.GbP'A1i!„b>,(,MtM2W�i� .�:Whv�.:,mT4VrtirA Jl,arolAYe. Mp0.pElk'fi.W6vttt.rt �'M.a1AiS uy,i�T!'1wIDG ,. ',n+rxra r±gapwxrir<",'Mx(iatl 4„'.,', j':mwrilt vv:�0uvpq v.Crnlat��, urritx�w6nmteHpv:r•.• ••;.,i"�. • t Yls,f��%p'PDJS ' �.A�xr3@.Mr'9✓>IMViIti[r4R'•,'id"'' . q;,usrma. mw�cw,tlrinwanter ,�„ ',�;'a,".ft�;.t.roam:x» "no.tm2"me Mp+2Ga2 .k6 MI .itswlai 0te �A� ^r'�', Instruments Used Page 4 of 7 2022-05-06 1 MTi 131013 Sustainable Solutions for Efficient Environments LOCATION: PROJECT NUMBER: CONTACT: Stewarts Quaker Road QueensburyAddition 22-244 Jeff Paro 777 Quaker Road Queensbury NY Bard Unit OIA* Traverse Summary TRAVERSE SUMMARY Name System Location Size Area Design FPM Design CFM Average FPM Actual CFM Static Pressure Bard-1 Bard OA 32x7 1.560 Not'Applicable 66 103 Not Applicable Totals 0 103 NOTES: Traverse Summary Bard-1 f Average FPM Per the Stewan's HVAC tech on site,the Outside Air is factory set and not manually adjustable.MTI read and recorded the flow. Traverse Summary Page 5 of 7 2022-05-06 MTi PL-713 Sustainable Solutions for Efficient Environments LOCATION: PROJECT NUMBER: CONTACT: Stewarts Quaker Road Queensbury Addition 22-244 Jeff Paro 777 Quaker Road Queensbury NY Exhaust Inlets* Exhaust Inlet Summary EXHAUST INLET SUMMARY Name Room No: Type Size AK Factor Design FPM Design CFM Reading 1 Reading 2 Final CFM %of Design EI-001 Toilet EG 12x12 1.100 45 50 42 42 46 92 EI-002 Kitchen EG 12x12 1.100 68 75 62 62 68 91 Totals 125 114 NOTES: Exhaust Inlet Summary EI.0011 Room No. Fan unit appears to be existing.Possibly sized for 50 ctm. Exhaust Inlet Summary Page 6 of 7 2022-05-06 M v Ti CIO Sustainable Solutions for Efficient Environments LOCATION: PROJECT NUMBER: CONTACT: Stewarts Quaker Road Queensbury Addition 22-244 Jeff Paro 777 Quaker Road Queensbury NY Blower Door Test 3/24/2022 - Blower Door Test TEST INFO Date of Test 3/24/2022 Leakage Code, 0.40 Technician Name Austin Roggen PasslFail "' Pass TEST DATA Floor Plan Area 297 sq.ft No.of TestsPerformed. - 3 CFM .Enclosed;Volume 2970 Test Average 615 CFM Envelope Surface Area 1602 sq.ft Air Changes Per Hour 12.42' Test Pressure -75.00 kPa Leakage Per SF 0.38 IMAGES: Test Data V iy�fll � d Pti e. 0 u {{ u w d 3/24/2022-Blower Door Test Page 7 of 7 2022-05-06