Loading...
Subdivision ApplicationFinal Stage Subdivision application Town of Queensbury Planning Office-742 Bay Road-Queensbury, NY 12804 518-761-8220 Town of Queensbury Final Stage Subdivision Pre-Submission Conference Form Section 179-9-040 1. Applicant Name: __________________________________________________ Tax Map ID ________________ Location: _______________________ 2. Zoning Classification __________ 3. Reason for Review: __________________________________________________________ 4. Zoning Section #: ________________________ 5. Pre-Submission Meeting Notes: Provided Outstanding Deed ____ _____________ General Information complete ____ _____________ Site Development Data Complete ____ _____________ Setback Requirements Complete ____ _____________ Additional Project Information Complete ____ _____________ FAR addressed ____ _____________ Final Plat ____ _____________ Endorsement of State and County ____ _____________ Other Plans ____ _____________ planting ____ _____________ tree clearing ____ _____________ erosion control ____ _____________ stormwater plan/ SWPPP ____ _____________ Open space/ Homeowners association ____ _____________ Fee ____ _____________ Subdivision Sign Posting ____ _____________ Signature Page ____ ____________ _ Staff Representative: ________________________________ Applicant / Agent: ________________________________ Date: ___________ Rockhurst LLC 239.12-2-35.1 10 Polk Drive (Assembly Point??) WR Modification of SUB 5-1993 subdivision for a setback of 50 ft versus 75 ft. 183 X - - - - x - NA TBD ALD X X ?polk drive/assembly pt x Laura Moore via email via email 10/3/2022 Applicant proposes to modify Subdivision 5-1993 a two lot subdivision for a 50 ft setback versus the 75 ft setback notation that shows on the plat. The applicant has indicated the town code in has been revised where a 50 ft shoreline setback would be required versus a 75 ft setback. The Lot 1 site has previously been approved and is under construction for a single family home. Lot 2 is parcel would be propose to be redeveloped with a single family home and associated septic, stormwater controls, shoreline plantings and only have access to Assembly Point as part of a previous more recent approval. Items review: 1993 subdivision, proposed subdivision Items to be updated or provided 1) deed 2) site developed plans on lot 1 with associated resolutions to show access to assembly point