Loading...
Stormwater Plan V10-24-224'-5" 5' 2 1 ' 20' GUTTER RAIN GARDEN THIS AREA (SEE NOTE) INFILTRATION #1 28'x56' PICKLE BALL COURT 1% PITCH EAST TO WEST 0% NORTH TO SOUTH TO W N S N O W S TO R A G E AR E A AREA OF INFILTRATION STEPSWALE SWALE AREA OF ENCROACHMENT OUTFLOW Test Pit 1 Elev 322 SILT FENCE SLIGHT SWALETest Pit 2 (15' From Property Line) GRADE TO RAIN GARDEN 4" PERFORATED PIPE (EXISTING) RELOCATE AND REPlACE WITH SOLID THIS SECTION SEPTIC FORCE MAIN (FIELD VERIFY LOC.) ADJOINER DRIVEWAY TOWN SNOWPLOW TURNAROUND STONE DRIVE RECONFIGURATION PRFORATED PIPE REBURY IN 2' x 1' STONE TRENCH D-Box 37' 6" Pickleball NW Corner 44' Bocce NE Corner 70' Bocce SE Corner 65' Garden NW Corner EDGE 1' FROM OWNER PROPERTY LINE 33' FROM ADJOINERS SEPTIC AREA MINIMUM 1st Floor STORMWATER PLANSCALE:PROJECT DESCRIPTION:SHEET TITLE:33 HOLLY LANE1" = 20'REVISION:10/24/2022INFILTRATION #1 RAIN GARDEN TURF WITH SLIGHT BERM COURT SURFACE 4"ASPHALT FILTER FABRIC 1" DECORATIVE STONE 1.5-2" CLEAN STONE 40% VOID OR BETTER 12.8' - 14' SQFT CROSS SECTION DRAINAGE FROM PAVILLION STONE LINED OUTFLOW SOIL AREA WITH COBBLES ABOVE 12" CRUSHED CLEAN STONE FILTER FABRIC ABOVE 6"-12" PONDING DEPTH WATER RESIST DOGWOODS PLANTED IN COBBLES S-1NOTE: LOCATE EXSTING FORCE MAIN. SHAPE AND LOCATE TO AVOID DISTURBANCE AS NECESSARY LOCATE AND GRADE AROUND RAIN GARDEN AND PAVILION AREA TO ACCEPT DRAINAGE FROM PAVILION/DRIVEWAY SUB-BASE TAILINGS OVER 4"/2" CRUSHED STONE/ SAND MIX COMPACTED TURF GROUNDWATER SOIL TEST DATA TEST PIT #1 12/4/01 TAKEN AT ELEVATION 98 (HUTCHINS ENGINEERING) 0" - 4" BLACK TOPSOIL 4" - 7"BROWN SAND, LITTLE GRAVEL TRACE OF SILT 7" - 30"RED BROWN SAND, SOME SILT, LITTLE GRAVEL 30" - 40"BROWN TO GRAY SAND, SOME SILT, LITTLE GRAVEL 40" - 64" COMPACT GRAY SAND, SOME SILT, SOME GRAVEL PROBABLE SEASONAL HIGH GROUNDWATER AT 40" 12/4/01 PERCOLATION AT 18" IS 1" IN 12 MIN. 2001 ADDED 2-5' OF GRANULAR MEDIUM SAND w/2" MAXIMUM STONE POST TEST TO BRING OVERALL ELEVATION TO 100+. COMPACTED TO PERCOLATION RATE OF 1"/5MIN TO !"/15MIN MINIMUMSOIL TEST DATA TEST PIT #2 (3/21) TAKEN SAME ELEVATION AS PICKLE COURT (EDP) 0" - 10" FOREST DUFF/ORGANIC MATERIAL/ROOTS 10" - 32"LIGHT BROWN LOAMY SAND 32" - 72"SILTY SAND, FIRMER WITH DEPTH, SOME COBBLES NO EVIDENCE OF GROUNDWATER DETECTED.MAXnnn PROPOSED GRADE AREA OF DISTURBANCE ADJOINER WELL 64' SOUTHADJOINER SEPTIC 25' SOUTHADJOINER WELL 55' SOUTH ADJOINER SEPTIC 50' EAST MAINTENANCE PLAN Owner has agreed to inspect the stormwater controls on an annual basis for proper operation. This includes the operation of the relocated pipe from the driveway to the Rain Garden area as well as the proer functioning of the Rain Garden itself. Also, the proper operation of the existing Infiltration Area #1 near the Pickleball court. Any replacement of piping, stone or other remedial measures will be taken to insure function of these devices as origianlly designed. The owner further agrees that the Town of Queensbury shall have the right to take these restorative measures as necessary, at the owners expense, should the owner fail to do so.