Mann 5 lot Full SubmissionHutchins Engineering PLLC
0+001+002+003+00
4+00
5+00
6+00
7+008+009+0010+0011+000+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+000+001+002+003+004+005+000+001+002+003+004+005+000+001+002+003+004+005+006+000+000+000+001+002+003+004+00Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
0+001+002+003+00
4+00
5+00
6+00
7+008+009+0010+0011+004+005+006+007+008+000+001+002+003+004+005+000+001+002+003+004+005+000+001+002+003+004+005+006+00W
WW0+001+002+003+004+00Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
0+001+002+003+004+005+000+001+002+003+004+005+000+001+002+003+00W
W SFSFS
F
S
F
SFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF
SF SFSFSF
SF
SF
S
F
S
F
SFSF SF SF SF
SF SF
SFS
F
SFSFSFSFSFSFSFSFSFSFSF
SF
SF SF
SFSFSFSFSFSFSFSFSFSFSFSFSF
Hutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
0+000+001+002+003+004+005+006+00SFSFSFSFSFSFSFSFSF
W0+001+002+003+004+00SFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F
SFSFSFSFSFSFSFSFSFSFSFSFSF
SFSFSFSFSFHutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
0+001+002+003+00
4+00
5+00
6+00
7+008+009+0010+0011+00SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFHutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+000+000+00SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SFSFSFSFSFSFSFSFSFSFSFSFS
F
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF0+001+002+003+00
4+00
5+00
6+00
7+008+009+0010+0011+000+001+002+003+004+005+000+001+002+003+004+005+000+001+002+003+004+005+006+000+001+002+003+004+00Hutchins Engineering PLLC
0+000+501+001+502+002+503+003+504+004+505+005+506+006+507+007+508+008+509+009+5010+0010+5011+0011+50540
545
550
555
560
565
570
575
580
585
590
595
600
605
610
615
620
625
630
635
640
645
650
655
660
665
670
540
545
550
555
560
565
570
575
580
585
590
595
600
605
610
615
620
625
630
635
640
645
650
655
660
665
670
5.00%PVC STA.0+25.00PVC ELEV.550.25PVI STA.0+50.00PVI ELEV.551.50PVT STA.0+75.00PVT ELEV.554.0050.00VC
100.00SD5.00%10.00%
10.00K-Val
12.00
%PVC STA.0+75.00PVC ELEV.554.00PVI STA.1+00.00PVI ELEV.556.50PVT STA.1+25.00PVT ELEV.559.5050.00VC
1000.00SD10.00%12.00%
25.00K-Val
12.00
%
5.00%PVC STA.4+75.00PVC ELEV.601.50PVI STA.5+00.00PVI ELEV.604.50PVT STA.5+25.00PVT ELEV.605.7550.00VC
119.94SD12.00%5.00%
7.14K-Val PVC STA.5+75.00PVC ELEV.608.25PVI STA.6+00.00PVI ELEV.609.50PVT STA.6+25.00PVT ELEV.612.5050.00VC
71.43SD5.00%12.00%
7.14K-Val
12.00
%
12.00
%
6.00%PVC STA.10+25.00PVC ELEV.660.50PVI STA.10+40.00PVI ELEV.662.30PVT STA.10+55.00PVT ELEV.663.2030.00VC
125.76SD12.00%6.00%
5.00K-Val
4.00%PVC STA.10+75.00PVC ELEV.664.40PVI STA.10+80.00PVI ELEV.664.70PVT STA.10+85.00PVT ELEV.664.9010.00VC
337.29SD6.00%4.00%
5.00K-Val
Hutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Drawing Not To Scale
1.Prepare soil before installing rolled
erosion control products (RECPs),
including any necessary
application of lime, fertilizer, and
seed.
2.Begin at the top of the slope by
anchoring the RECPs in a
6"(15cm) deep X 6"(15cm) wide
trench with approximately 12"
(30cm) of RECPs extended beyond
the up-slope portion of the trench.
Anchor the RECPs with a row of
staples/stakes approximately 12"
(30cm) apart in the bottom of the
trench. Backfill and compact the
trench after stapling. Apply seed to
the compacted soil and fold the
remaining 12"(30cm) portion of
RECPs back over the seed and
compacted soil. Secure RECPs
over compacted soil with a row
of staples/stakes spaced
approximately 12"(30cm) apart
across the width of the RECPs.
3.Roll the RECPs (A) down or (B)
horizontally across the slope.
RECPs will unroll with appropriate
side against the soil surface. All
RECPs must be securely fastened
to soil surface by placing
staples/stakes in appropriate
locations as shown in the staple
pattern guide.
4.The edges of parallel RECPs must
be stapled with approximately 2" -
5" (5-12.5cm) overlap depending
on the RECPs type.
5.Consecutive RECPs spliced down
the slope must be end over end
(Shingle style) with an approximate
3"(7.5cm) overlap. Staple through
overlapped area, approximately
12"(30cm) apart across entire
RECPs width.
Drawn on: 3-16-11
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
2"-5"
(5-12.5cm)
3B
4
2
5
1
3A
6"
(15cm)
6"
(15cm)
*NOTE:
In loose soil conditions, the use of
staple or stake lengths greater than
6"(15cm) may be necessary to
properly secure the RECP's.
3"(7.5cm)
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-772-2040
www.tensarnagreen.com
Hutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York