Loading...
Staff Notes for 11/29/2022 Town of Queensbury Planning Board Community Development Department Staff Notes November 29, 2022 Site Plan 73-2022 & SCHERMERHORN RESIDENTIAL HOLDINGS Freshwater Wetlands 18-2022 67 Haviland Road/ Planned Unit Development / Ward 1 SEQR Type II Material Review: site plan application, DEC & Army Corp permit information, wetland site plan, Parcel History: SUB 7-2005 Warren Co Referral Sent: November 2022 / Comments: Concur w/local board. Informal staff comments: Identify excavation time frame of driveway and decreasing runoff for wetland protection measures. __________________________________________________________________________________________ Requested Action Planning Board review and approval for construction of an 18 ft long, 1,065 linear feet driveway. Resolutions 1. PB decision Project Description Applicant proposes a 1,065 linear feet driveway at 18 ft width to be constructed on a 15.2 acre parcel. The project includes disturbance and work within 100 ft of a designated wetland and work in the wetland for driveway crossing. Stormwater management is also proposed for the project. Pursuant to chapter 179-3-060, 179-6-050, 94, site plan for development of a driveway and work within 100 ft of wetlands shall be subject to Planning Board review and approval. Staff Comments • Location-The project is located at 67 Haviland Road on a parcel of 15.2 ac. • Arrangement- The parcel is currently vacant, contains wetlands and stream designated area. • Site Design- The project involves constructing a driveway that is to be 1065 ft in length connecting to an existing driveway spur • Building – There are no buildings at this time. The applicant has indicated a single family house may be constructed in the future. • Grading and drainage plan, Sediment and erosion control-The application has indicate grassed depressions are to be installed along the driveway. The materials have been provided to the engineer for review and comment. • Landscape plan- The plans indicate clearing areas for the driveway installation and stormwater management areas. • Site lighting plan-no lighting details were not indicated • Utility details-There are no proposed utilities at this time • Elevations- The plans do include a road profile indicating the proposed driveway does not have steep slope • Floor plans-There are no plans at this time. - 2 - • • Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, l. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, , r. construction/demolition disposal s. snow removal. • The waivers requested–Staff finds it reasonable to request a waiver for these items specific to the development of the driveway additional review may be required for the house development (note the house as proposed would not trigger any additional review at this time). The applicant has provided information for j. stormwater, k. topography, q. soil logs • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Freshwater Wetland The driveway construction includes work within 100 ft. The plans show two specific areas of the driveway within 100 ft. The project breaks down the amount of disturbance of these areas where Area 1 would disturb 3,040 sq ft and Area 2 would disturb 4,482 sq ft. In addition the applicant has received the permit from DEC and received a letter from Army Corp indicating no permit is needed. Summary The applicant has completed a site plan application for the development of a driveway that involves work within 100 ft of the wetland areas, limited clearing for the driveway only Meeting History: 1st Meeting