Loading...
Staff Notes for 12/13/2022 Town of Queensbury Planning Board Community Development Department Staff Notes December 13, 2022 Site Plan 52-2022 & DAN HUNT Petition of Zone Change 3-2022 3 Pinello Road / Moderate Density Residential / Ward 4 SEQR Type I Completed Material Review: site plan application, mobile home project description, petition of zone change, site drawings, previous approval, revised plans with existing septic’s, and project rendition of 6 units Parcel History: Town Board permit resolution #181 of 1964 for 7 units; Chapter 113 Manufactured Home Parks Town Code Change 3/7/2022 LLNo3-2022 Warren Co Referral Sent: July 2022 / Comments: Concur w/local board. Informal staff comments: Discuss site layout and road access. __________________________________________________________________________________________ Requested Action Planning Board review and approval for a six unit manufactured home park. Resolutions 1. PB decision Project Description Applicant proposes to operate a 6 unit manufactured home park. The project proposes 4 new units to be installed with associated grass, plantings, blacktop roadway and new underground utilities. Two units were approved for the existing site; the park would contain 6 total. The project is part of rezoning where the mobile home overlay zone is proposed for this parcel pursuant to Chapter 179-9-040 referral from the Town Board where the Planning Board is to complete SEQR and provide recommendation to the Town Board. Pursuant to Chapter 113, 179-3-040, site plan for manufactured homes shall be subject to Planning Board review and approval upon completion of rezoning. Staff Comments • Location-The site is located at 3 Pinello Road a 0.79 ac parcel. • Site Design- The plans shows a layout of six units. The applicant has also provided a rendition of the 6 units in place with driveway, fencing, and landscaping. • Building – The site has proposes 6 units total where two existing units are approved. • Site conditions-There is currently work being done on the site for the preparation of the two units approved. • Traffic- The applicant has shown each unit would have a parking area that would accommodate 2 vehicles per unit. The parking areas are now shown at the end of each unit to be 441 sq ft. • Grading and drainage plan, Sediment and erosion control-There is grading on site for installation of units and utilities. The applicant request a waiver from stormwater due to the site location being relatively flat. • Landscape plan-The plans show a fence line on the east side of the property to be 6 ft in height privacy fence, the remaining property lines will have a split rail fence. Also, shown on the rendition is new landscaping with grass, perimeter/privacy trees, bushes and flowers. • Site lighting plan-The plans show there is to be 6 pole lights installed for the site. • Utility details-The site has proposed six septic system that has been reviewed and approved by DOH. Connection water, power, cable and natural gas is proposed. The applicant has provided a plan showing the existing septic systems on the site to be evaluated versus installing new systems. - 2 - • Signage-There is no sign proposed. • Elevations-The applicant has provided a typical modular unit to be installed on the lots. The rendition shows the 6 units on the parcel with fencing, landscaping, driveway areas and access road. • Floor plans-The applicant has provided a floor plan of the typical unit arrangement. The units have been reduced to 13 ft X 56 ft each unit to have two bedrooms. • Waivers-Planning staff has reviewed the applicants request for waivers that include items h. signage, j. stormwater, k. topography, n traffic, o. commercial alterations/ construction details, q. soil logs, r. construction/demolition disposal. • The waivers requested–Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information for: g. site lighting, l. landscaping, p floor plans, and s. snow removal • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Chapter 113 Manufactured Home Parks review – As submitted in the application where it outlines responses completed by the applicant. The following identifies the request by the applicant for waivers to Chapter 113 Requesting waivers per the Chapter 113 – • Showing lot lines – tenants are provided with park rules that explains utilization of space between each unit • Lot size -where 10 acre is require and 0.8 ac is proposed – there have been as many as 8 units on this site and proposed is 6 per staff this is not a variance but to be addressed by the planning board. • Topography - lot is level • Surface drainage – no issues on site with 8 units proposed is 6 units and the site is to be maintained lawn and landscaping on the borders of the parcel no problems with stormwater will be generated • Density - only proposing 6 units where 4 units would be allowed – again previous was for 8 and proposed is for 6 • Lot size and setbacks – tenants are provided with rules as to how space is used between units Summary The applicant has completed a site plan application and has identified waivers from Chapter 113 Manufactured Home Park review. 1. Showing lot lines – tenants are provided with park rules that explains utilization of space between each unit 2. Lot size -where 10 acre is require and 0.8 ac is proposed – there have been as many as 8 units on this site and proposed is 6 per staff this is not a variance but to be addressed by the planning board. 3. Topography - lot is level 4. Surface drainage – applicant has indicated no issues on site with 8 units proposed is 6 units and the site is to be maintained lawn and landscaping on the borders of the parcel no problems with stormwater will be generated 5. Density - only proposing 6 units where 4 units would be allowed – again previous was for 8 and proposed is for 6 6. Lot size and setbacks – tenants are provided with rules as to how space is used between units Tentative Schedule • July 2022 Town Board – referral to Planning Board and consent to Lead Agency (completed) • August 2022 Planning Board – seeks Lead Agency • September 2022 (9/27/2022 for 30 days) Accepts Lead Agency, Planning Board may conduct SEQR, may provide recommendation to Town Board • October 2022 Meeting Town Board Public Hearing Change of Zone – Completed 10/17/2022 • December 2022 Meeting Planning Board – Site Plan Meeting History: PB: 8/25/2022, 9/27/2022, 10/18/2022