Staff Notes for 12/15/2022STAFF NOTES
DECEMBER 15, 2022
Queensbury Planning Board Agenda
Second Regular Meeting: Thursday, December 15, 2022 / Time 7 — 11 pm
-- �_ Queensbury Activities Center @ 742 Bay Road
Administrative Items
5:00 PM - 6:30 PM Planning Board and Zoning Board of Appeals Training
Planning Board Elections
SP 68-2022 Faden Enterprises table until January 24, 2023
Old Business
Applicant(s)
3 SONS AND HOLLY LLC.
Application Type
Site Plan 76-2022
Owner (s) (
Same as applicant (
SEQR Type
v
Type II
Agent(s)
Studio A
_Lot size �
.38 acre
Location '
28 Holly Lane _ __�
TABL
Ward: 1
Zoning Classification: WR
Tax ID No.
239.12-2-57 i
Ordinance Reference
179-3-040, 179-6-065, 147, 179-4-080
Cross Reference AV 63-2022 Warren Co. Referral November 2022
Public Hearing November 29, 2022, December 15, 2022 Site Information CEA
Project Description: (Revised) Applicant proposes alterations to an existing home and site. The project includes a 416 sq ft addition to an existing home
with a 1,275 sq ft footprint. There is to be a new 72 sq ft porch and a new 200 sq ft porch with a new floor area of 3,225 sq ft. Site work includes
installation of an on -grade paver patio area with stone slab path enlarging the fire pit area and reduction of hard surface is also proposed. Additionally,
there is to be a rain garden and shoreline plantings added to the site. There is no change to the existing 1,152 sq ft floor area of the garage and living
space. Pursuant to chapter 179-3-040, 179-6-065, 147, and 179-4-080, site plan for new floor area in a CEA, expansion of a non -conforming structure,
and hard surfacing within 50 ft of the shoreline shall be subiect to Plannine Board review and approval.
Applicant(s) I _LOREEN HARVEY/KASSELMAN SOLAR_ Site Plan 75-2022
Owner (s) R
Agent(s) L
Location ! 1
Tax ID No. 2
Cross Reference ( A
SEQR Type1 Type II
Lot size 6.1 acres
Ward: 1 j Zoning Classification: MDR
Ordinance Reference 179-5-140 _
j Warren Co. Referral November 2022_-
Public Hearing November 29, 2022, December 15, 2022 Site Information I APA, LGPC
Project Description: Applicant proposes a South facing ground mounted solar project for 25.92 kW (54 panels), approximately 1,348 sq ft. The existing
5,035 sq ft home is to remain unchanged. The project will be located on the North property line where no vegetation will be removed. Pursuant to
chapter 179-5-140, site plan for a residential ground mounted solar project shall be subject to Planning Board review and approval.
reen Harvey
_Y
It iii
6. 17
I IL
60-2022
Applicant(s)
PAUL NASRANI
Application Type
Subdivision Preliminary 12-2022
Freshwater Wetlands 17-2022 —
Owner (s) (
Paul Nasrani, Envar Mir
SEQR Type
Unlisted
Agent(s)
Jarrett Engineers
Lot size
6.29 acres 4�
Location
790 Bay Road
Ward: 1
Zoning Classification: MDR j
Tax ID No. f 289.15-1-47 Ordinance Reference j 183, 179-3-040, 94, 179-4-010_
Cross Reference SUB (S) 14-2021, AV 54-2022 j _Warren Co. Referral ( n/a for subdivision
Public Hearing_) December 15, 2022 Site Information ( Travel corridor, Wetlands
Project Description: Applicant proposes a 3 lot subdivision of a 6.29 acre parcel. Lot I will be 2.13 acres with house, lot 2 will be 2.08 acres and lot 3
would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project includes a new shared driveway for the second and third lots.
The new sites will have onsite septic and connect to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and
site work within 100 ft of freshwater wetlands shall be subiect to Plannin Board review and approval.
Applicants) _ADIRONDACK RETIREMENT SPECIALISTS Application Tyke, Site Plan 77-2022
Owner (s) ARS RE Holdings Inc. _f SEQR Type ___IType II _
Agents) Rucinski Hall Architecture Lot size 0.93 acre, 0.15 acre _
Location ( 310 Bay Road Ward: 2 j Zoning Classification: CI
Tax ID No. ( 302.8-1-16, 302.8-1-17 Ordinance Reference 179-3-040
Cross Reference SP 62-99, SP 57-92, AV 136-1992, SP 31-94, SP 4- Warren Co. Referral December 2022
96, AV 64-2022 l
Public Hearin December 15, 2022 Site Information Travel Corridor
Project Description: Applicant proposes to complete access renovations and other alterations to an existing two story building. The plans indicate that
there are two South side entry porches to be renovated, a new entryway to be created on the North side and a renovation of the West side first story area.
The building will maintain a 3,215 sq ft footprint. The existing porch areas to be improved with 360 sq ft of new porch areas. Pursuant to chapter 179-3-
040, site plan for alterations and new construction to a building in the Cl zone shall be subject to Planning Board review and approval
New Business
Applicant(s) JEFFREY & JOANNE MANN Q LOT) ( Application Type Subdivision Preliminary 4-2022
Subdivision Final Stage 15-2022
Freshwater Wetlands 6-2022 _
Owner (s) Same as applicant — _ SEQR Type J Unlisted (APA)
Agent(s) Hutchins Engineering j Lot size 17.49 acres
Location 76 Pickle Hill Road Ward: 1 Zoning Classification: RR-3A
Tax ID No. 265.-1-23.2 Ordinance Reference_) 183, Chapter 94
Cross Reference AV 19-2022 Warren Co. Referral n/a for subdivision
------
Public Hearing December 15, 2022 i Site Information APA
Project Description: Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are: Lot 6 to be
3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill Road including easements for shared access to Pickle Hill
Road for lots 6 and 7. The project site contains APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision
for 3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval.
Applicant(s)
JEFFREY & JOANNE MANN (5 LOT)
Application Type
Subdivision Preliminary 5-2022
Subdivision Final Stage 14-2022
Freshwater Wetlands 7-2022
Owner (s)
Same as applicant
SEQR Type
Unlisted (APA)
Agent(s)
Hutchins Engineering
Lot size
34.5 acres
Location j
Bay Road & Pickle Hill Road
Ward: 1 _�
Zoning Classification: RR-3A
Tax ID No.
265.-1-23.1 _ `
Ordinance Reference j
183, Chapter 94
Cross Reference SUB (S) 14-2020, AV 18-2022 Warren Co. Referral ; n/a for subdivision
Public Hearing December 15, 2022 Site Information APA
Project Description: Applicant proposes a 5 lot residential subdivision of a 35.23 acre parcel for preliminary and final stage. The lots would be divided
as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres with access through lot 3, and lot 5 at 11.57 acres. Lot
4 contains an existing barn and shed that will remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94,
subdivision of 5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and approval. _
- Any further business which may be properly brought before the Board -
Administrative Items:
Site Plan 68-2022,
Special
Use
Permit 6-2022
&
Freshwater
Wetlands
13-2022
@ 1471 State
Rt 9
Faden Enterprises
Draft resolution- grant/deny further tabling
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION — TABLE SITE PLAN 68-2022, FRESHWATER WETLANDS 13-2022 &
SPECIAL USE PERMIT 6-2022 FADEN ENTERPRISES
Tax Map ID: 288.4-58 / Property Address: 1471 State Route 9 / Zoning: CI
Applicant proposes removal of an existing building on the site to construct 3 new buildings and associated
site work. The project includes one building of 8,355 sq ft that is designated as 3 tenant spaces: 2,000 sq ft
for a drive-thru, 2,500 sq ft for a restaurant, and 3,855 sq ft for retail space. The second and third buildings
will contain a total of 24 units of self -storage in 3,480 sq ft. Each building will be 1,740 sq ft and have 12
units. Pursuant to chapter 179-3-040, 179-10-040, & 94, site plan for new commercial development and self -
storage facility, hard surfacing within 50 ft of a shoreline/wetlands, freshwater wetlands permit, and special
use permit for self -storage facility shall be subject to Planning Board review and approval.
MOTION TO TABLE SITE PLAN 68-2022, FRESHWATER WETLANDS 13-2022 & SPECIAL USE
PERMIT 6-2022 FADEN ENTERPRISES. Introduced by who moved for its adoption,
Tabled until the January 24, 2023 Planning Board meeting with information due by December 15, 2022.
Duly adopted this 15t1i day of December 2022 by the following vote:
I� IMI
NOES:
Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Site Plan 76-2022@ 28 Holly Lane
3 Sons and Holly LLC
Public hearing scheduled
SEAR Type II
Draft resolution- grant/deny site plan approval
Town of Queensbury Planning Board
Community Development Department Staff Notes
December 15, 2022
Site Plan 76-2022 3 SONS AND HOLLY, LLC.
28 Holly Lane / Waterfront Residential / Ward 1
SEQR Type II
Material Review: site plan application, survey, photos, stormwater, elevations and floor plans, revised plans
Parcel History: AV 63-2022
Warren Co Referral Sent: November 2022 / Comments: Concur w/local board. Informal staff comments:
Encourage discussion about protecting shoreline, stormwater measures, and fertilizer
seepage into lake.
Requested Action
Application to be tabled to January 24, 2023 with information due by December 19, 2022
Resolutions
1. PB decision
Project Description
(Revised) Applicant proposes alterations to an existing home and site. The project includes a 416 sq ft addition
to an existing home with a 1,275 sq ft footprint. There is to be a new 72 sq ft porch and a new 200 sq ft porch
with a new floor area of 3,225 sq ft. Site work includes installation of an on -grade paver patio area with stone
slab path enlarging the fire pit area and reduction of hard surface is also proposed. Additionally, there is to be a
rain garden and shoreline plantings added to the site. There is no change to the existing 1,152 sq ft floor area of
the garage and living space. Pursuant to chapter 179-3-040, 179-6-065, 147, and 179-4-080, site plan for new
floor area in a CEA, expansion of a non -conforming structure, and hard surfacing within 50 ft of the shoreline
shall be subject to Planning Board review and approval.
Staff Comments
• Location -The project site is located at 28 Holly Lane on a 0.34 ac parcel in the Waterfront Residential zone
• Arrangement- The site has an existing home, detached garage, storage shed and other residential related
items ie steps to the lake.
• Site Design- The plans indicate there is to be a new residential addition to the front of the existing home and
new patio area on the shoreline of the home. The revised plans indicate the site work for the road side of
the project is reduce hard -surface areas.
• Building — The existing home is 1,275 sq ft footprint with a porch of 72 sq ft and a deck of 365 sgft. The
existing floor area is 2,809 sq ft. The addition is to be 416 sq ft and new floor area is to be 3,225 sq ft
• Grading and drainage plan, Sediment and erosion control -The plan indicates rain gardens to be installed and
a planted depression area to manage stormwater. The materials have been referred to the Town Engineer for
review and comment.
• Landscape plan- The project site is located on Lake George and is subject to the shoreline buffer review.
The plans indicate existing plantings and trees to remain. The plans also show an area of proposed buffer
plantings, shrubbery and perennials. The plans also show plantings along the north property line. Below
are the guidelines from the shoreline buffer code section.
o Shoreline Buffer - Section 179-8-040
-Minimum width 35 ft (Lake George)
-For every 700 sgft of shoreline buffer area -one large tree minimum 3 inches in diameter
-For every 350 sq ft of ground cover -7 - 24 in native shrubs; 14 herbaceous plants
Project site
-129 ft of shoreline per site plan
-Shoreline buffer 129 ft X 35 ft width is 4515 sq ft
-Shoreline buffer area -4515 /700 = 6.5 round up to 7 -seven large trees at 3 inch diameter
-Ground cover-4515/350 = 12.9 round up to 13 (X7) =91 native shrubs and 13 (X14) herbaceous
plants=182
o Shoreline Cutting restrictions and Cutting Plan- Section 179-6-050 -
- within 35 ft lakes or ponds & 75 ft streams, wetlands and rivers no vegetation within the first 6 ft
and no woody vegetation greater than one inch dbh removed from 6 ft to 35ft/75 ft area to be
maintained as natural buffer - A cutting plan allowing greater may be permitted by the Planning
Board
- Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75
ft whichever is less
- 129 ft Shoreline X 30%= 38.7 feet of the shoreline buffer cut to allow a view, access and to reduce
runoff (such as angled across the lot). A cutting plan allowing greater may be permitted by the
Planning Board
- Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable
within the 30%/75 ft cut area.
• Site lighting plan -The plans include the recessed lighting to be installed for the new addition.
• Site details -The project include a patio area to be installed that is hard surfacing within 50 ft of the
shoreline.
• Utility details -The plans show the septic system on the site.
• Elevations -The plans show the elevation of the new addition area
• Floor plans -The floor plans include the existing garage with residential use above - noting the garage with
residential use has been there since 1958 pre existing structure and use. The floor plans for the main home
show the addition, the arrangement of the living space and the deck addition.
• Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h.
signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction
details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal.
• The waivers requested -Staff finds it reasonable to request a waiver as these items are typically
associated with commercial projects.
• Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the
written request of an applicant. The Board is to review the waivers and to determine if they are to be
granted.
Nature of Variance
Relief is requested for permeability where 71.6% is proposed and 75% is required. The revised information
provided indicates the site was at 75% permeable when an additional paved area was completed prior to the
proposed project. The proposed project verified the existing is 71.6% and prior was at 75%. The deck to be
setback 39 ft where a 50 ft setback is required. Relief is requested for stormwater device where 35 ft is proposed
and 100 ft setback is required.
Summary
Application to be tabled to January 24, 2023 with information due by December 19, 2022. Pending ZBA
Meeting History: PB: 11/15/2022, 11/29/2022; ZBA: 11/16/2022
Town of Queensbury
i" Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION — TABLE SITE PLAN 76-2022 3 SONS AND HOLLY, LLC.
Tax Map ID: 239.12-2-57 / Property Address: 28 Holly Lane / Zoning: WR
(Revised) Applicant proposes alterations to an existing home and site. The project includes a 416 sq ft
addition to an existing home with a 1,275 sq ft footprint. There is to be a new 72 sq ft porch and a new 200
sq ft porch with a new floor area of 3,225 sq ft. Site work includes installation of an on -grade paver patio
area with stone slab path enlarging the fire pit area and reduction of hard surface is also proposed.
Additionally, there is to be a rain garden and shoreline plantings added to the site. There is no change to the
existing 1,152 sq ft floor area of the garage and living space. Pursuant to chapter 179-3-040, 179-6-065, 147,
and 179-4-080, site plan for new floor area in a CEA, expansion of a non -conforming structure, and hard
surfacing within 50 ft of the shoreline shall be subject to Planning Board review and approval.
MOTION TO TABLE SITE PLAN 76-2022 3 SONS AND HOLLY, LLC.. Introduced by
who moved for its adoption, seconded by
Tabled until the January 24, 2023 Planning Board meeting with information due by December 19, 2022.
Duly adopted this 151h day of December 2022 by the following vote:
AYES:
NOES:
Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Site Plan 75-2022@ 1516 Ridge Road
Loreen Harvey/Kasselman Solar
Project has been withdrawn by agent & applicant.
Shauna Baker
From: Loreen Harvey <Iharvey@kasselmansolar.com>
Sent: Friday, December 2, 2022 3:09 PM
To: Laura Moore; Karen Dwyre; Shauna Baker
Subject: Kasselman Update: 1516 Ridge road - Russell
Hello Laura, Karen and Shauna,
Regarding our proposed project for:
Rory Russell
1516 Ridge Road
Queensbury, New York 12804
We would like to withdraw our project from consideration by the Planning and Zoning
Boards as we are no longer pursuing this project in any capacity.
Please let me know if anything more is needed from us at this time.
Thank you for all of your assistance in this matter!
Be,SweU,
279 13rov d way 3 2
Mew NY 12204
(518) 478 -3 906
I
Subdivision Preliminary 12-2022 & Freshwater
Wetlands 17-2022 @ 790 Bay Road
Paul Nasrani
Public Hearing scheduled
Unlisted SEAR
Draft resolution- grant/deny Preliminary
Subdivision approval, SEAR
Town of Queensbury Planning Board
OL Community Development Department Staff Notes
December 15, 2022
Subdivision Preliminary 12-2022 & PAUL NASRANI
Freshwater Wetlands 17-2022 790 Bay Road / Moderate Density Residential / Ward 1
SEQR Unlisted
Material Review: Subdivision application, area variance application, freshwater
wetland, subdivision drawings
Parcel History: SUB (S) 14-2021, AV 54-2022
Requested Action
Planning Board review and approval for subdividing a 6.48 acre parcel into 3 lots.
Resolutions
1. PB decision
Project Description
Applicant proposes a 3 lot subdivision of a 6.48 acre parcel. Lot 1 will be 2.13 acres with house, lot 2 will be
2.08 acres and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project
includes a new shared driveway for the second and third lots. The new sites will have onsite septic and connect
to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and site work
within 100 ft of freshwater wetlands shall be subject to Planning Board review and approval.
Sketch Plan Stage
Applicant completed a sketch plan stage SUB 14-2021 12/14/2021. The project was proposed for 3 residential
lots.
Preliminary Stage
• Preliminary Plat
o The plans show a three lot subdivision. Lot 1 will be 2.13 acres with the existing house, lot 2 will be
2.08 acres and lot 3 would be 2.27 acres.
• Layout plans —
o The plans shows the arrangement of the lots with the existing home and two proposed homes. The
project includes a shared driveway for lots 2 and 3.
• Construction details —
o The plans identify the septic system locations. The plans show a water line connection and a new
hydrant. The project requires the Water Department approval for the type of line and proposed
hydrant.
• Landscape plans —
o Not required for subdivision of less than 10 lots
• Clearing plan
o The plan shows the proposed clearing limits for the subdivision and lots.
0
• Grading and erosion plans —
o A waiver for grading has been requested due to the minimal slopes on the site.
• The Environmental report —
o A long EAF was provided.
• Statement of Intent-
o A deed was provided
• Stormwater management —
o A Stormwater management has been provided. The information has been provided to the Town
designated engineer for review and comment.
• Fees —
o per application $50 for preliminary
• Waivers —
o The waivers requested:
• Open Space —
o No open space is proposed.
• Streets —
o No new roads are provided. The applicant may
Final Stage Review —
• Final Plat -subdivision for 3 lots for residents
• State/County agency —Planning and Zoning Board
• Other plans reports —Stormwater management for a 25 year storm
• Protected open space —none proposed.
• Fees —
o per application $100 for final and $50 per lot
Freshwater Wetlands
The project identifies wetland areas of 0.26 ac. The site work for the new homes and driveway are within 100 ft
of the wetland. The wetlands have been delineated by the applicant and are to be confirmed by Army Corp.
Nature of Variance
Granted 12/14/2022. Lot 1 to be 2.13 acres with existing residential use and buildings to remain. Lot 2 will be
2.08 acres and lot 3 will be 2.27 acres, both for future residential house. Relief is being requested for lot
frontage for Lot 1 where 132 ft is proposed and 200 ft is required. Relief is requested for creation of two flag
lots. Relief is also requested for Lots 2 lot frontage of 78 ft proposed and Lot 3 frontage proposed of 26 ft
where 100 ft is required.
Summary
The applicant has completed a subdivision plan for Preliminary and Final stage of a 3- lot subdivision and a
Freshwater Wetland permit.
Meeting History: PB: 12/13/2022; ZBA: 12/14/2022
IVi
LaBella
Powered by oartnershiq.
December 13, 2022
Mr. Craig Brown
Zoning Administrator and Code Compliance Officer
Town of Queensbury
742 Bay Road
Queensbury, New York 12804
Delivered via email only: CraigB@queensbury.net
Re: Nasrani Subdivision
Town of Queensbury, Warren County, New York
Labella Project # 2220706.53
Queensbury Ref #SD12-2022
Dear Mr. Brown:
LaBella Associates has received a submission package from your office for the above referenced project.
The Applicant is proposing a 3-lot residential subdivision with 2 new residential building lots. Information
submitted to our office for review includes the following:
• Project narrative letter dated September 15, 2022;
• Site plans titled "Nasrani Subdivision", prepared by Jarrett Engineers, PLLC, dated September 15,
2022;
• Survey of Lands N/F Paul N. Nasrani & Envar Mir, prepared by Darrah Land Surveying, PLCC, dated
February 25, 2022.
• Site plan review application and Full Environmental Assessment Form, and;
• Town of Queensbury Freshwater Wetlands Permit Application.
Your office has requested that we limit our review to the design of stormwater system as it relates to
compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the
following comments for the Town's consideration:
Stormwater Management and Erosion and Sediment Control Comments
1. According to the environmental assessment form and site plans, the proposed site improvements will
disturb less than one (1) acre and thus the project is not required to obtain coverage under the NYSDEC
SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). Comments
related to the stormwater management and erosion and sediment control features proposed for the site
are offered below:
2. It is unclear if the disturbance area includes the proposed grading and grading runout as it does not
appear that proposed grading is provided on the site plans. Also, it does not appear that the disturbance
limits extend to the proposed work at the intersection with Bay Road. The Applicant to revise accordingly
and provide the proposed grading.
3. Section 179-6-080.A, B, and C of the Town Code state the following:
20 Elm Street ! Suite 110 ( Glens Falls, NY 128o1 1 p (518) 812-0513
www.tabeltapc.com
❑ § 179-6-080 Stormwater runoff.
A. A stormwater pollution prevention plan consistent with the requirements of Town Code Chapter 147, Stormwater
Management, shall be required as part of the site plan approval process-
B. The stormwater drainage plan shall analyze the impacts of the project using at least a t"venty-five-year return interval storm for
residential projects and a fifty-year return interval storm for commercial or industrial projects, and using the analysis
procedures in the Town of Queensbury Subdivision Regulations E'3
i ] Editors Note: See Ch. A 783, Subdivision of Land
C. All stormwater management plans shall be designed so that post -development run-off rates and volumes are equal to or less
than pre -development run-off- Post -development direction of flow and type of discharge shall be the same as pre -development
conditions.
The application is for a residential project. As such, a stormwater drainage plan shall be provided that
shows, at all design points, the 25-year return interval storm runoff rates and volumes do not exceed
the pre -development condition. A stormwater drainage plan was not provided with this submission. The
Applicant to provide a stormwater drainage plan in subsequent submissions.
4. The existing topography and proposed grading do not appear to be provided. The Applicant to provide in
subsequent submissions to support review of the stormwater drainage plan.
5. There does not appear to be soil tests nor infiltration test results in support of the proposed stormwater
facilities. Our office assumes that the proposed rain gardens will be designed with infiltration in order to
meet the 25-year storm requirements and completely dewater such that the full capacity will be available
for the next storm. The Applicant to perform soil tests and infiltration tests in support of the design. The
Applicant should ensure that soil testing for the proposed infiltration practices meets the requirements
specified in Appendix D of the SMDM.
6. The Applicant to revise the site plans to depict existing neighboring wells (as applicable) and septic
systems to understand horizontal separation distances. It appears that the plan depicts stormwater
practices that may be used as an infiltration practice. It is noted that the NYS SMDM 6.3.1 states:
"Infiltration facilities shall be located at least 100 feet horizontally from any watersupp/y well. Infiltration
trenches and basins shall be setback 25 feet downgradient from structures and septic systems."
7. The Applicant should clarify the method of pre-treatment prior to entry to the stormwater practice.
8. It does not appear that the site plans depict the erosion and sediment controls, only details are provided.
The Applicant to revise the site plans accordingly.
9. The standards and specifications for winter stabilization of the NYS SSESC requires "A temporary site
specific, enhanced erosion and sediment control plan to manage runoff and sediment at the site during
construction activities in the winter months to protect off -site water resources. This standard applies to
all construction activities involved with ongoing land disturbance and exposure between November 15th
to the following April 1st." The Applicant to clarify if construction will occur during the winter months. If
so, the Applicant should provide a separate, temporary site -specific enhanced erosion and sediment
control plan if construction activities with ongoing land disturbance and exposure is planned between
November 15th to the following April 1st. This erosion and sediment control plan shall conform to all
requirements of the winter stabilization specification referenced above.
Conclusion & Recommendation
It is our opinion that the applicant should provide clarification for the above items and incorporate changes
in subsequent plan submissions.
In the event the Planning Board or Town staff have any questions or require additional information, please
do not hesitate to contact me at (518) 824-1932.
Sincerely,
Richard Adams, PE
Senior Civil Engineer
cc: Shauna Baker, Town Planning Office Administrator (via email)
Laura Moore, Town Land Use Planner (via e-mail)
File
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
SEQR RESOLUTION — Grant Positive or Negative Declaration
SUBDIVISION PRELIMINARY 12-2022 & FRESHWATER WETLANDS 17-2022 PAUL NASRANI
Tax Map ID: 289.15-1-47 / Property Address: 790 Bay Road / Zoning: MDR
The applicant proposes a 3 lot subdivision of a 6.48 acre parcel. Lot 1 will be 2.13 acres with house, lot 2 will
be 2.08 acres and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The
project includes a new shared driveway for the second and third lots. The new sites will have onsite septic and
connect to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and
site work within 100 ft of freshwater wetlands shall be subject to Planning Board review and approval.
The Planning Board has determined that the proposed project and Planning Board action is subject to review
under the State Environmental Quality Review Act;
The proposed action considered by this Board is Unlisted in the Department of Environmental Conservation
Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of
Queensbury;
No Federal or other agencies are involved;
Part 1 of the Long EAF has been completed by the applicant;
Part 2 of the Long EAF has been reviewed by the Planning Board;
Upon review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning
Board as lead agency that this project will result in no significant adverse impacts on the environment, and,
therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is
issued.
MOTION TO GRANT A POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR
SUBDIVISION PRELIMINARY 12-2022 & FRESHWATER WETLANDS 17-2022 PAUL NASRANI,
Introduced by who moved for its adoption,
As per the resolution prepared by staff.
1. Part II of the Long EAF has been reviewed and completed by the Planning Board.
2. Part III of the Long EAF has been reviewed and completed by the Planning Board.
Or
Part III of the Long EAF is not necessary because the Planning Board did not identify potentially
moderate to large impacts.
Motion seconded by . Duly adopted this 15t' day of December 2022 by the following vote:
AYES:
NOES:
Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION —Approve / Deny
SUBDIVISION PRELIMINARY STAGE 12-2022 & FRESHWATER WETLANDS 17-2022
PAUL NASRANI
Subdivision Tax Map ID: 289.15-1-47 / Property Address: 790 Bay Road / Zoning: MDR
A subdivision application has been made to the Queensbury Planning Board for the following: Applicant
proposes a 3 lot subdivision of a 6.48 acre parcel. Lot 1 will be 2.13 acres with house, lot 2 will be 2.08 acres
and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project includes
a new shared driveway for the second and third lots. The new sites will have onsite septic and connect to the
existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and site work
within 100 ft of freshwater wetlands shall be subject to Planning Board review and approval.
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board
has determined that this proposal satisfies the requirements as stated in the Zoning Code;
The requirements of the State Environmental Quality Review Act have been considered and the Planning
Board has adopted a SEQRA Negative / Positive Declaration
A public hearing was scheduled and held on December 15, 2022;
This application is supported with all documentation, public comment, and application material in the file of
record;
MOTION TO APPROVE / DISAPPROVE SUBDIVISION PRELIMINARY STAGE 12-2022 &
FRESHWATER WETLANDS 17-2022 PAUL NASRANI, Introduced by who moved for
its adoption.
Motion seconded by
AYES:
NOES:
Duly adopted this 15t' day of December 2022 by the following vote:
Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Site Plan 77-2022 @ 310 Bay Road
Adirondack Retirement Specialists
Public hearing scheduled
SEQR II
Draft resolution- grant/deny site plan approval
Town of Queensbury Planning Board
Community Development Department Staff Notes
December 15, 2022
Site Plan 77-2022 ADIRONDACK RETIREMENT SPECIALISTS
310 Bay Road / Commercial Intensive / Ward 2
SEQR Type II
Material Review: site plan application, site plan drawing, deed, elevation and floor plans
Parcel History: SP 62-99, SP 57-92, AV 136-1992, SP 31-94, SP 4-96, AV 64-2022
Warren Co Referral Sent: December 2022 / Comments: NCI
Requested Action
Planning Board review and approval to complete access renovations and alterations to a two story building.
Resolutions
1. PB decision
Project Description
Applicant proposes to complete access renovations and other alterations to an existing two story building. The
plans indicate that there are two South side entry porches to be renovated, a new entryway to be created on the
North side and a renovation of the West side first story area. The building will maintain a 3,215 sq ft footprint.
The existing porch areas to be improved with 360 sq ft of new porch areas. Pursuant to chapter 179-3-040, site
plan for alterations and new construction to a building in the Cl zone shall be subject to Planning Board review
and approval.
Staff Comments
• Location -The project is located at 310 Bay Road in the Commercial Intensive Zone
• Arrangement- The project includes merging two parcels 302.8-1-16 and 302.8-1-17 for a total of 1.08 acres.
The site has an existing office building with associated parking. The improvement is to the porch access
areas and update to the front of the building. There is an existing gazebo and shed that are to remain on the
site. A new employee walkway of 668 sq ft is being added to the north side with the proposed porch.
• Building — The existing building is 3,215 sq ft that is to remain where the improvements are on the access
porch areas. The existing ramp on the south side is to be removed. The new covered porch areas include 169
sq ft (south) and includes a lift access, 145 sq ft (south), and 46 sq ft (north). The building area facing Bay
Road will remove the walkway and exterior door access
• Traffic- The site has 39 parking spaces there are no changes to parking.
• Grading and drainage plan, Sediment and erosion control -The applicant has indicated there are on site
stormwater practices that handle the roof fun -off and parking lot drainage with eave drip lines.
• Landscape plan -The applicant intends to remove the existing landscaping and to install new landscaping
beds around the foundation of the building.
• Site lighting plan -The plans indicate there is to be canopy lights under the new covered porch areas. The
existing lighting is shown on the plans — applicant is reminded existing lighting is also to conform to code
for down cast lighting.
• Utility details -No changes to connections are proposed.
• Signage-The existing sign is shown on the plan and there are no changes.
• Elevations -The elevation plans show location of the existing and new porches on both sides of the building.
In addition, the existing and proposed doors and windows are shown for each floor — primary improvements
are doors on the first floor.
• Floor plans -The plans show the existing condition of the first and second floor then the reconfiguration of
the first floor office areas. The plans include the interior alteration of the second floor bathroom area.
• Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h.
signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction
details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal.
• The waivers requested —Staff finds it reasonable to request a waiver as these items are typically
associated with commercial projects.
• Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the
written request of an applicant. The Board is to review the waivers and to determine if they are to be
granted.
Nature of Variance
Granted 12/14/2022. The 46 sq ft porch is located 59 ft 3 inches from the road, the 169 sq ft porch is located 33
ft 9 inches from the road where a 75 ft setback is required. The 46 sq ft porch is located 17 ft 5 inches from the
north property line where a 20 ft setback is required. The front area fagade area building improvements is 11 ft
10 inches where a 75 ft setback is required.
Summary
The applicant has completed a site plan application for the alterations to the existing building entry areas, Bay
Road side of building, and interior alterations.
Meeting History: PB: 12/13/2022; ZBA: 12/14/2022
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION — Grant / Deny Site Plan Approval
SITE PLAN 77-2022 ADIRONDACK RETIREMENT SPECIALISTS
Tax Map ID: 302.8-1-16, 302.8-1-17 / Property Address: 310 Bay Road / Zoning: Cl
The applicant has submitted an application to the Planning Board: Applicant proposes to complete access
renovations and other alterations to an existing two story building. The plans indicate that there are two
South side entry porches to be renovated, a new entryway to be created on the North side and a renovation of
the West side first story area. The building will maintain a 3,215 sq ft footprint. The existing porch areas to
be improved with 360 sq ft of new porch areas. Pursuant to chapter 179-3-040, site plan for alterations and
new construction to a building in the CI zone shall be subject to Planning Board review and approval.
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning
Board has determined that this proposal satisfies the requirements as stated in the Zoning Code;
As required by General Municipal Law Section 239-m the site plan application was referred to the Warren
County Planning Department for its recommendation;
The Planning Board made a recommendation to the Zoning Board of Appeals on 12/13/2022; the ZBA
approved the variance requests on 12/14/2022;
The Planning Board opened a public hearing on the Site plan application on 12/15/2022 and continued the
public hearing to 12/15/2022, when it was closed,
The Planning Board has reviewed the application materials submitted by the applicant and all comments
made at the public hearing and submitted in writing through and including 12/15/2022;
The Planning Board determines that the application complies with the review considerations and standards
set forth in Article 9 of the Zoning Ordinance for Site Plan approval,
MOTION TO APPROVE / DISAPPROVE SITE PLAN 77-2022 ADIRONDACK RETIREMENT
SPECIALISTS; Introduced by who moved for its adoption.
According to the draft resolution prepared by Staff with the following:
1) Waivers requested granted/denied;
2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting
an extension of approval before the one (1) year time frame has expired.
Page 1 of 2
Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
3) Adherence to the items outlined in the follow-up letter sent with this resolution.
a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall
be installed around these areas and field verified by Community Development staff,
b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater
Department for its review, approval, permitting and inspection;
c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be
issued until the approved driveway permit has been provided to the Planning Office;
d) If application was referred to engineering then Engineering sign -off required prior to signature of
Zoning Administrator of the approved plans;
e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans
and elevation for the existing rooms and proposed rooms in the building and site improvements;-
f) If required, the applicant must submit a copy of the following to the Town:
a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General
Permit from Construction Activity" prior to the start of any site work.
b. The project NOT (Notice of Termination) upon completion of the project;
c. The applicant must maintain on their project site, for review by staff:
i. The approved final plans that have been stamped by the Town Zoning Administrator.
These plans must include the project SWPPP (Storm Water Pollution Prevention Plan)
when such a plan was prepared and approved;
ii. The project NOI and proof of coverage under the current NYSDEC SPDES General
Permit, or an individual SPDES permit issued for the project if required.
g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community
Development Department before any further review by the Zoning Administrator or Building and
Codes personnel;
h) The applicant must meet with Staff after approval and prior to issuance of Building Permit
and/or the beginning of any site work;
i) Subsequent issuance of further permits, including building permits is dependent on compliance with
this and all other conditions of this resolution;
j) As -built plans to certify that the site plan is developed according to the approved plans to be provided
prior to issuance of the certificate of occupancy.
k) This resolution is to be placed in its entirety on the final plans
Duly adopted this 15th day of December 2022 by the following vote:
AYES:
NOES:
Page 2 of 2
Phone: 518.761.8220 I Fax: 518.745.44371742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Subdivision Preliminary 4-2022, Subdivision Final
15-2022 & Freshwater Wetlands 6-2022
@ 76 Pickle Hill Road
Jeffrey &Joanne Mann (3 Lot)
Public Hearing scheduled
Unlisted (APA)
Draft resolution- grant/deny Preliminary and Final
Stage Subdivision approval
Town of Queensbury Planning Board
_ Community Development Department Staff Notes
December 15, 2022
Subdivision Preliminary 4-2022, JEFFREY & JOANNE MANN (3 LOT)
Subdivision Final 15-2022 & 76 Pickle Hill Road / Rural Residential 3A / Ward 1
Freshwater Wetlands 6-2022
SEQR Unlisted- Subject to APA Environmental Review
Material Review: application, subdivision plans, freshwater wetlands permit, stormwater
management plans.
Parcel History: AV 19-2022
Requested Action
Planning Board review and approval to subdivide a 17.1 acre parcel into 3 lots.
Resolutions
1. PB decision
Project Description
Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot
sizes are: Lot 6 to be 3.8 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle
Hill Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains
APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for 3
lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval.
Staff Comments
Sketch Plan Stage — sketch plan was not applied for this parcel
Preliminar Stage
• Preliminary Plat
o The overall plans shows the property to be subdivided along Pickle Hill Road
• Layout plans —
o The plans indicated 3 residential lots ranging from 3.8 ac, 4.1 ac and 9.2 ac.
• Construction details —
o The plans identify the house locations, septic system locations, and wells.
• Landscape plans —
o The number of lots does not trigger a landscape plan
• Clearing plan
o The plans shows the proposed area for the home, septic, driveway access but not necessarily for the
lot clearing for each lot in total.
O
• Grading and erosion plans —
o Grading Plans were not included but topography is shown on the plans.
• The Environmental report —
o The project is within the APA and is subject to the APA environmental review process. The
applicant is working with APA in regards to jurisdictional requirements.
• Statement of Intent- A statement of intent shall be submitted by the applicant
o A deed was provided
• Stormwater management —
o A Stormwater Pollution Prevention Plan has not been provided — the application is requesting a
waiver.
• Fees —
o per application $50 for preliminary, $100 for wetlands and $50 for Area Variance
• Waivers —
o The applicant requests waivers from the Clearing plan, grading and stormwater plan.
Freshwater Wetland,
The project work proposed on lots adjacent to the designated wetland are within 100 ft of the wetland and
trigger FWW permit.
Nature of Variance
Granted 7/27/2022. The applicant proposes a 3 residential lots. Relief is requested for distance to stormwater
device being less than 100 ft where 50 ft is proposed. Relief is requested for the 3 ft vertical separation distance
for a device where 2 ft is proposed. Relief is requested for lot 6 of 3.8 ac and Lot 7 of 4.1 ac physical access to
use a proposed drive for Lot 8 of 9.2 ac. In addition Road frontage relief is request for Lot 8 where 57.86 is
proposed, Lot 6 and Lot 7 where 0 ft is proposed and required is 400 ft.
Summary
The applicant has completed Preliminary and Final Stage subdivision applications and a Freshwater wetlands
permit for proposed three lots.
Meeting History: PB: 5/19/2022; ZBA: 7/27/2022
LaBeRa
Powered by partnership.
December 15, 2022
Mr. Craig Brown
Zoning Administrator and Code Compliance Officer
Town of Queensbury
742 Bay Road
Queensbury, New York 12804
Delivered via email only: CraigB@queensbury.net
Re: Mann - 3 Lot Subdivision
Town of Queensbury, Warren County, New York
Labella Project # 2220706.51
Queensbury Ref #SUB 15-2022
Dear Mr. Brown:
LaBella Associates has received a submission package from your office for the above referenced project.
The Applicant proposes a 3-lot residential subdivision. Information submitted to our office for review includes
the following:
• Lot Width Calculation Plan, prepared by Hutchins Engineering PLLC, dated September 25, 2022;
• Cover letter, prepared by Hutchins Engineering PLLC, dated November 10, 2022;
• Stormwater Management Plan, prepared by Hutchins Engineering PLLC, dated November 9, 2022;
• Site Plans, prepared by Hutchins Engineering PLLC, dated November 11, 2022; and,
• Subdivision Application, prepared by Hutchins Engineering PLLC, dated November 2, 2022.
Your office has requested that we limit our review to the design of the stormwater system as it relates to
compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the
following comments for the Town's consideration:
Stormwater Management and Erosion and Sediment Control Comments
1. There are two applications for Jeff and Joanne Mann, Subdivision 14-2022 and Subdivision 15-2022.
The stormwater management narrative and draft NOI combine the two subdivisions as it relates to
stormwater permitting. According to the draft NOI (both projects combined), the proposed site
improvements appear to disturb greater 1 acre (20.5 acres per the draft NOI), which typically requires
the preparation of a Stormwater Pollution Prevention Plan (SWPPP) in accordance with GP-0-20-001
that includes erosion and sediment controls, as well as post construction stormwater management
practices.
Lot 5 is tributary to waters of the state classified as AA/AA-s and Lot 5 appears to include greater than
1 acre of land disturbance on virgin land with a slope phase of E or F. Per I.F.6 of the General Permit,
Lot 5 would be ineligible for coverage under the General Permit.
Lots 1, 2, 3, 4, 6, 7, and 8 would require the preparation of a SWPPP in accordance with the General
Permit, however the inclusion of Lot 5 in the NOI would require the project to seek individual SPDES
permit coverage. The Applicant acknowledges this situation in Section 4.10 of the SWPPP and states
20 Elm Street ; Suite 110 ! Glens Falls, NY 128011 p (518) 812-0513
wwww.Labellapc.com
"Therefore, an individual SPDES permit will be required from NYSDEC for this lot prior to beginning
construction as designed for the subdivision."
Our office understands the Applicant's approach that a General Permit is prepared for all lots except Lot
5, where an individual SPDES permit is required if it is built per the plans submitted with this application.
Since the SWPPP states each lot SPDES permit coverage is transferred to each respective purchaser
and Lot 5 may be developed per the plans provided in this submission (requiring individual permit
coverage for Lot 5), the Applicant shall submit the SWPPP to NYS DEC for individual permit coverage for
Lot 5. When submitting to NYS DEC for Lot 5 individual coverage the Applicant should seek concurrence
from DEC on this approach. It is noted that our office does not take exception to this approach so long
as Lot 5 is submitted to NYS DEC for individual permit coverage.
2. Additionally, this project falls within the Lake George watershed and therefore is subject to the
stormwater management requirements set forth in Section 147-11 of the Town Code for projects within
the Lake George Park. Comments related to the stormwater management and erosion and sediment
control features proposed for the site are offered below:
3. Projects that disturb greater than 15,000 SF are considered Major Projects per Town code section 147-
11.E.(2). In accordance with Town code section 147-11.1.(3)(c)[2], Major Projects stormwater control
measures shall be designed so that there will be no increase in runoff volume from a ten-year-
frequency/twenty-four-hour-duration storm event following development over the predevelopment
volume; and for storm events exceeding the ten-year design storm, the stormwater controls measures
shall function to attenuate peak runoff flow rates for a twenty -five-year frequency storm to be equal to
or less than predevelopment flow rates. For development greater than five acres, consistent with New
York State guidelines, stormwater control measures shall function to attenuate peak runoff flow rates
for a one -hundred -year storm to be equal to or less than predevelopment flow rates. The Applicant has
provided a 10-year, 25-year and 100-year storm analysis.
4. Section 147-111(3)(c)(4) of the Town Code states, "Stormwater recharge areas shall be located a
minimum of 100 feet from the subsurface treatment system of a wastewater treatment system unless
it is demonstrated that a lesser separation will not adversely affect the functioning of such /each fields."
It appears that IBL6 and IBL8D infiltration basins are within 100 feet of the proposed wastewater
systems. Further IBL8D appears to be uphill and in the direct path of the absorption field. The Applicant
to revise accordingly or demonstrate that a lesser separation will no adversely affect the functioning of
the absorption fields.
5. Section 147-111(3)(c)[4] of the town code states, "Infiltration devices for major projects shall be located
a minimum of 100 feet from Lake George and any down -gradient drinking water supply, lake, river,
protected stream, water well, pond, wetland; a separation of more than 100 feet may be required in
cases where contamination of the water supply is possible due to highly permeable soils, shallow
groundwater and similar situations." The SWPPP states "Stormwater management practices setback
relief was granted by the Town of Queensbury's Zoning Board of Appeals in July 2022 to allow infiltration
practices to be situated 50-ft horizontally from water features (wetlands, stream)." The Applicant to
clarify that this applies to all infiltration practices for all lots.
6. Section 147-111(3)(c)[3] of the town code requires infiltration devices to be a minimum of two feet above
the seasonal high groundwater level realized following development and 147-111(3)(c)[6] states the
infiltration devices shall be designed based on the infiltration capacity of the soils preset at the project
site. Further, Section 6.3.1. of the 2015 NYS Stormwater Management Design Manual (SMDM) states
that, "To be suitable for infiltration, underlying soils shall have an infiltration rate (fc) of 0.5 inches per
hour, as initially determined from NRCS soil textural classification, and subsequently confirmed by
geotechnical tests (see Appendix D). The minimum geotechnical testing is one test hole per 5000 sf,
with a minimum of two borings per facility (taken within the proposed limits of the facility)." (Please note
that the DEC's FAQ allows minimum of one test pit/boring and one infiltration test for every 5000 square
feet of basin area, with no fewer than four test pit/boring and infiltration tests per facility.). It does not
appear that testing was performed within the bounds of each infiltration practice. The Applicant to
perform the testing per the NYS SMDM and provide the results.
7. Site data, as it relates to horizontal separation distances, shall be provided (or described) west of the
proposed access road and north of Pickle Hill Road to confirm required separation distances.
8. The Applicant shall model all stormwater conveyances and diversion trenches to support the design.
9. The NYS SMDM states that "Infiltration practices cannot be located on areas with natural slopes greater
than 15%" and "Infiltration practices cannot be located in fill soils". It appears the site has slopes
throughout the site that exceed 15%, including in the locations of the infiltration practices. Previous
correspondence received from the NYS DEC regarding projects with similar concerns of locating
stormwater features in fill slopes has resulted in the following recommendations:
"At a minimum, the designer must meet the following guidance and provide
justification/demonstration of equivalence in the SWPPP:
• Insitu/natural soil layer below the infiltration system has an infiltration rate greater than or equal
to the 0.5 in/hr
• Ground water and bedrock levels in insitu/natural soil should be at least 2 - 3 feet below grade
• Fill material is an engineered fill that is tested after placement (by geotechnical firm) and
demonstrated to be equivalent to a soil material acceptable for the installation of an infiltration
system (i.e. infiltration rate greater than or equal to .5 in/hr, etc.). Infiltration rate of fill material
should be similar infiltration rate as insitu/existing soil.
• If there is a difference in the infiltration rates between the fill and insitu/native soil, the designer
should use the more conservative (i.e. slower infiltration rate) when determining whether the
infiltration system will dewater (exfiltrate) with the required 48 hours (see Section 6.3.2
"Conveyance' of the Design Manual)
• Required vertical separation distances to groundwater/bedrock are maintained
• Required horizontal separation distances to surface waters, wells, etc. are maintained
• There is adequate fill along the edges of the infiltration system to prevent seeps/breakouts"
DEC has indicated that with regards to the 15% limit, they have allowed designers to use the cut/fill
approach provided the criteria above is met. As such, the Applicant should demonstrate compliance with
the provisions outlined by the DEC.
10. The Applicant indicates within Section 5.0 of the SWPPP that an inquiry has been made to the NYS DEC
regarding impacts to endangered and threatened species as it relates to the development of the site.
The Applicant shall provide correspondence once received and include it into the SWPPP per I.F.4 of the
General Permit.
11. The Applicant indicates within Section 6.0 of the SWPPP that an inquiry has been made to NYS OPRHP
regarding Archeological Resources and Historic Places as it relates to the development of the site. The
Applicant shall provide correspondence once received and include it into the SWPPP per I.F.8 of the
General Permit.
12. It appears that there are inconsistencies between the HydroCAD model and the site plans. For example,
the site plans depict infiltration practice IBL8E, which is not included in the HydroCAD model and the
HydroCAD model includes practice IBD8 but is not depicted on the site plans. The Applicant to revise
accordingly.
13. It is difficult to discern rooftop runoff directions as it does not appear that roof conveyances area
depicted on the plans. The Applicant shall depict roof conveyances, as applicable, on the site plans in
subsequent submission.
14. Section 6.3.6 of the NYS SMDM states "Infiltration practices shall never serve as a sediment control
device during site construction phase. In addition, the Erosion and Sediment Control plan for the site
shall clearly indicate how sediment will be prevented from entering an infiltration facility." The Applicant
shall revise the plans to clearly indicate how sediment will be prevented from entering the infiltration
facilities during the site construction phase.
15. It does not appear that the Applicant has depicted the location nor provided design details fortemporary
soil stockpiles on the site plans. The Applicant to revise accordingly.
16. The Applicant to depict, within reason, the locations of water wells and wastewater absorption fields on
all neighboring parcels to confirm adequate horizontal separation distances.
17. The Applicant to confirm if the stone walls depicted are on the site plans are existing or proposed.
18. The Applicant has provided a draft NOI for the old permit GP-0-15-001 and shall provide an updated NOI
that conforms to the new General Permit (GP-0-20-001).
Conclusion & Recommendation
It is our opinion that the applicant should provide clarification for the above items and incorporate changes
in subsequent plan submissions.
In the event the Planning Board or Town staff have any questions or require additional information, please
do not hesitate to contact me at (518) 824-1932.
Sincerely,
Richard Adams, PE
Senior Civil Engineer
Arl Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION —Approve / Deny
SUBDIVISION PRELIMINARY STAGE 4-2022 & FRESHWATER WETLANDS 6-2022
JEFFREY & JOANNE MANN (3 LOT)
Subdivision Tax Map ID: 265.-1-23.2 / Property Address: 76 Pickle Hill Road / Zoning: RR-3A
A subdivision application has been made to the Queensbury Planning Board for the following: Applicant
proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are:
Lot 6 to be 3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill
Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains
APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for
3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and
approval.
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board
has determined that this proposal satisfies the requirements as stated in the Zoning Code;
The requirements of the State Environmental Quality Review Act have been considered and the Planning
Board has adopted a SEQRA Negative / Positive Declaration
A public hearing was scheduled and held on December 15, 2022;
This application is supported with all documentation, public comment, and application material in the file of
record;
MOTION TO APPROVE / DISAPPROVE SUBDIVISION PRELIMINARY STAGE 4-2022 &
FRESHWATER WETLANDS 6-2022 JEFFREY & JOANNE MANN, Introduced by who
moved for its adoption.
Duly adopted this 151h day of December 2022 by the following vote:
AYES:
IWOII.3
Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION —Approve / Disapprove
SUBDIVISION FINAL STAGE 15-2022 JEFFREY & JOANNE MANN (3 LOT)
Tax Map ID: 2653-1-23.2 / Property address: 76 Pickle Hill Road / Zoning: RR-3A
A subdivision application has been made to the Queensbury Planning Board for the following: Applicant
proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are:
Lot 6 to be 3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill
Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains
APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for
3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and
approval.
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board
has determined that this proposal satisfies the requirements as stated in the Zoning Code;
This application is supported with all documentation, public comment, and application material in the file of
record;
MOTION TO APPROVE / DISAPPROVE SUBDIVISION FINAL STAGE 15-2022 JEFFREY &
JOANNE MANN (3 LOT), Introduced by who moved for its adoption.
1. The requirements of the State Environmental Quality Review Act have been considered and the Planning
Board has adopted a SEQRA Negative / Positive Declaration; and if the application is a modification, the
requirements of the State Environmental Quality Review Act have been considered, and the proposed
modification[s] do not result in any new or significantly different environmental impacts, and, therefore,
no further SEQRA review is necessary;
2. Waiver requests granted / denied:
3. The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting
an extension of approval before the one (1) year time frame has expired if you have not yet applied for a
building permit or commenced significant site work.
4. The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed
around these areas and field verified by Community Development staff
5. Engineering sign -off required prior to signature of Planning Board Chairman.
6. The applicant must submit a copy of the following to the Town:
a) The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit
or for coverage under an individual SPDES prior to the start of M site work.
b) The project NOT (Notice of Termination) upon completion of the project; and
Page 1 of 2
Phone: 518.761..82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net
7. The applicant must maintain on their project site, for review by staff:
a) The approved final that have been stamped by the Town Zoning Administrator. These plans must
include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared
and approved; and
b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an
individual SPDES permit issued for the project.
8. Final approved plans, in compliance with the Subdivision, must be submitted to the Community
Development Department before any further review by the Zoning Administrator or Building and Codes
personnel.
9. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the
beginning of any site work.
10. Subsequent issuance of further permits, including building permits is dependent on compliance with this
and all other conditions of this resolution;
11. As -built plans to certify that the subdivision is developed according to the approved plans to be provided
prior to issuance of the certificate of occupancy;
12. Resolutions must be included on Final Subdivision mylar;
Duly adopted this 15th day of December 2022 by the following vote:
AYES:
NOES:
Page 2 of 2
Phone: 518.761.82201 Fax: S18.745.44371742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Subdivision Preliminary 5-2022, Subdivision Final
14-2022 & Freshwater Wetlands 7-2022
Jeffrey & Joanne Mann (5 Lot)
Public Hearing scheduled
Unlisted (APA)
Draft resolution- grant/deny Preliminary and Final
Stage Subdivision approval
Town of Queensbury Planning Board
ot Community Development Department Staff Notes
December 15, 2022
Subdivision Preliminary 5-2022, JEFFREY & JOANNE MANN (5 LOT)
Subdivision Final 14-2022 & Bay Rd & Pickle Hill Rd / Rural Residential 3A / Ward 1
Freshwater Wetlands 7-2022
SEQR Unlisted- Subject to APA Environmental Review
Material Review: application, narrative, subdivision plans, freshwater wetlands permit,
stormwater management.
Parcel History: SUB (S) 14-2020, AV 18-2022
Requested Action
Planning Board review and approval to subdivide a 34.74 acre parcel into 5 lots.
Resolutions
1. PB decision
Project Description
Applicant proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots
would be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63
acres with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will
remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of
5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review
and approval.
Staff Comments
Sketch Plan Stage
Applicant completed a sketch plan stage SUB 14-2020 11/2020. The project was for 6 residential lots.
Preliminar Serge
• Preliminary
o The overall plans shows the property to be subdivided along Bay Road and Pickle Hill Road
• Layout plans —
o The plans indicated 5 residential lots ranging from 3.63 ac to 11.57 ac.
• Construction details —
o The plans identify the house locations, septic system locations, and wells.
• Landscape plans —
o The number of lots does not trigger a landscape plan.
• Clearing plan
o The plans shows the proposed area for the home, septic, driveway access but not necessarily for the
lot clearing for each lot in total.
0
• Grading and erosion plans —
o Grading Plans were not included but topography is shown on the plans.
• The Environmental report —
o The project is within the APA and is subject to the APA environmental review process. The
applicant is working with APA in regards to jurisdictional requirements.
• Statement of Intent- A statement of intent shall be submitted by the applicant
o A deed was provided
• Stormwater management —
o A Stormwater Pollution Prevention Plan has not been provided — the application is requesting a
waiver.
• Fees —
o per application $50 for preliminary, $100 for wetlands and $50 for Area Variance
• Waivers —
o The applicant requests waivers from the Clearing plan, grading and stormwater plan.
Final Stage Review —
• Final Plat -subdivision for 5 lots for residents
• State/County agency —Planning Board and Adirondack Park Agency
• Other plans reports —Stormwater management—SWPPP, Major Stormwater Permit, Maintenance agreement
• Protected open space —none proposed.
• Fee - $100 and $50 per each lot
Freshwater Wetland,
The project work proposed on lots adjacent to the designated wetland are within 100 ft of the wetland and
trigger FWW permit.
Nature of Variance
Granted 7/27/2022. The applicant proposes a 5 residential lots. Lot 2 requires relief for lot width where 362 is
proposed and 400 ft is required; road frontage where 400 ft is required and 325 ft is proposed. Relief is
requested for distance to stormwater device being less than 100 ft where 50 ft is proposed. Relief is also
requested for the 3 ft vertical separation distance for a device where 2 ft is proposed. Lot Four will have access
to Pickle Hill Road through Lot Three.
Summary
The applicant has completed Preliminary and Final Stage subdivision applications and a Freshwater wetlands
permit for proposed five lots.
Meeting History: PB: 5/19/2022; ZBA: 7/27/2022
WIM
LaBeRa
Powered by partnership.
December 15, 2022
Mr. Craig Brown
Zoning Administrator and Code Compliance Officer
Town of Queensbury
742 Bay Road
Queensbury, New York 12804
Delivered via email only: CraigB@aueensbury.net
Re: Mann - 5 Lot Subdivision
Town of Queensbury, Warren County, New York
LaBella Project # 2220706.52
Queensbury Ref #SUB 14-2022
Dear Mr. Brown:
LaBella Associates has received a submission package from your office for the above referenced project.
The Applicant proposes a 5-lot residential subdivision. Information submitted to our office for review includes
the following:
• Lot Width Calculation Plan, prepared by Hutchins Engineering PLLC, dated September 25, 2022;
• Cover letter, prepared by Hutchins Engineering PLLC, dated November 10, 2022;
• Stormwater Management Plan, prepared by Hutchins Engineering PLLC, dated November 9, 2022;
• Site Plans, prepared by Hutchins Engineering PLLC, dated November 11, 2022; and,
• Subdivision Application, prepared by Hutchins Engineering PLLC, dated November 2, 2022.
Your office has requested that we limit our review to the design of the stormwater system as it relates to
compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the
following comments for the Town's consideration:
Stormwater Management and Erosion and Sediment Control Comments
1. There are two applications for Jeff and Joanne Mann, Subdivision 14-2022 and Subdivision 15-2022.
The stormwater management narrative and draft N01 combine the two subdivisions as it relates to
stormwater permitting. According to the draft N01 (both projects combined), the proposed site
improvements appear to disturb greater 1 acre (20.5 acres per the draft N01), which typically requires
the preparation of a Stormwater Pollution Prevention Plan (SWPPP) in accordance with GP-0-20-001
that includes erosion and sediment controls, as well as post construction stormwater management
practices.
Lot 5 is tributary to waters of the state classified as AA/AA-s and Lot 5 appears to include greater than
1 acre of land disturbance on virgin land with a slope phase of E or F. Per I.F.6 of the General Permit,
Lot 5 would be ineligible for coverage under the General Permit.
Lots 1, 2, 3, 4, 6, 7, and 8 would require the preparation of a SWPPP in accordance with the General
Permit, however the inclusion of Lot 5 in the N01 would require the project to seek individual SPDES
permit coverage. The Applicant acknowledges this situation in Section 4.10 of the SWPPP and states
20 Elm Street Suite 110 1 Glens Falls. NY 128o1 I p (518) 812-0513
www1abetlapc.corn
"Therefore, an individual SPDES permit will be required from NYSDEC for this lot prior to beginning
construction as designed for the subdivision."
Our office understands the Applicant's approach that a General Permit is prepared for all lots except Lot
5, where an individual SPDES permit is required if it is built perthe plans submitted with this application.
Since the SWPPP states each lot SPDES permit coverage is transferred to each respective purchaser
and Lot 5 may be developed per the plans provided in this submission (requiring individual permit
coverage for Lot 5), the Applicant shall submit the SWPPP to NYS DEC for individual permit coverage for
Lot 5. When submitting to NYS DEC for Lot 5 individual coverage the Applicant should seek concurrence
from DEC on this approach. It is noted that our office does not take exception to this approach so long
as Lot 5 is submitted to NYS DEC for individual permit coverage.
2. Additionally, this project falls within the Lake George watershed and therefore is subject to the
stormwater management requirements set forth in Section 147-11 of the Town Code for projects within
the Lake George Park. Comments related to the stormwater management and erosion and sediment
control features proposed for the site are offered below:
3. Projects that disturb greater than 15,000 SF are considered Major Projects per Town code section 147-
11.E.(2). In accordance with Town code section 147-11.1.(3)(c)[2], Major Projects stormwater control
measures shall be designed so that there will be no increase in runoff volume from a ten-year-
frequency/twenty-four-hour-duration storm event following development over the predevelopment
volume; and for storm events exceeding the ten-year design storm, the stormwater controls measures
shall function to attenuate peak runoff flow rates for a twenty -five-year frequency storm to be equal to
or less than predevelopment flow rates. For development greater than five acres, consistent with New
York State guidelines, stormwater control measures shall function to attenuate peak runoff flow rates
for a one -hundred -year storm to be equal to or less than predevelopment flow rates. The Applicant has
provided a 10-year, 25-year and 100-year storm analysis.
4. Section 147-111(3)(c)(4) of the Town Code states, "Stormwater recharge areas shall be located a
minimum of 100 feet from the subsurface treatment system of a wastewater treatment system unless
it is demonstrated that a lesser separation will not adversely affect the functioning of such leach fields."
It appears that I131-113, I131-213, I131-313, IBL3C, IBL4A, I131-413, and IBL5D infiltration basins are within 100
feet of the proposed wastewater systems. The Applicant to revise accordingly or demonstrate that a
lesser separation will no adversely affect the functioning of the absorption fields.
5. Section 147-111(3)(c)[4] of the town code states, "Infiltration devices for major projects shall be located
a minimum of 100 feet from Lake George and any down -gradient drinking water supply, lake, river,
protected stream, water well, pond, wetland; a separation of more than 100 feet may be required in
cases where contamination of the water supply is possible due to highly permeable soils, shallow
groundwater and similar situations." The SWPPP states "Stormwater management practices setback
relief was granted by the Town of Queensbury's Zoning Board of Appeals in July 2022 to allow infiltration
practices to be situated 50-ft horizontally from water features (wetlands, stream)." The Applicant to
clarify that this applies to all infiltration practices for all lots.
6. Section 147-111(3)(c)[3] of the town code requires infiltration devices to be a minimum of two feet above
the seasonal high groundwater level realized following development and 147-111(3)(c)[6] states the
infiltration devices shall be designed based on the infiltration capacity of the soils preset at the project
site. Further, Section 6.3.1. of the 2015 NYS Stormwater Management Design Manual (SMDM) states
that, "To be suitable for infiltration, underlying soils shall have an infiltration rate (fc) of 0.5 inches per
hour, as initially determined from NRCS soil textural classification, and subsequently confirmed by
geotechnical tests (see Appendix D). The minimum geotechnical testing is one test hole per 5000 sf,
with a minimum of two borings per facility (taken within the proposed limits of the facility)." (Please note
that the DEC's FAQ allows minimum of one test pit/boring and one infiltration test for every 5000 square
feet of basin area, with no fewer than four test pit/boring and infiltration tests per facility.). It does not
appear that testing was performed within the bounds of each infiltration practice. The Applicant to
perform the testing per the NYS SMDM and provide the results.
7. Site data, as it relates to horizontal separation distances, shall be provided (or described) north of Pickle
Hill Road to confirm required separation distances.
8. The Applicant shall model all stormwater conveyances and diversion trenches to support the design.
9. The NYS SMDM states that "Infiltration practices cannot be located on areas with natural slopes greater
than 15%" and "Infiltration practices cannot be located in fill soils". It appears the site has slopes
throughout the site that exceed 15%, including in the locations of the infiltration practices. Previous
correspondence received from the NYS DEC regarding projects with similar concerns of locating
stormwater features in fill slopes has resulted in the following recommendations:
"At a minimum, the designer must meet the following guidance and provide
justification/demonstration of equivalence in the SWPPP:
• Insitu/natural soil layer below the infiltration system has an infiltration rate greater than or equal
to the 0.5 in/hr
• Ground water and bedrock levels in insitu/natural soil should be at least 2 - 3 feet below grade
• Fill material is an engineered fill that is tested after placement (by geotechnical firm) and
demonstrated to be equivalent to a soil material acceptable for the installation of an infiltration
system (i.e. infiltration rate greater than or equal to .5 in/hr, etc.). Infiltration rate of fill material
should be similar infiltration rate as insitu/existing soil.
• If there is a difference in the infiltration rates between the fill and insitu/native soil, the designer
should use the more conservative (i.e. slower infiltration rate) when determining whether the
infiltration system will dewater (exfiltrate) with the required 48 hours (see Section 6.3.2
"Conveyance' of the Design Manual)
• Required vertical separation distances to groundwater/bedrock are maintained
• Required horizontal separation distances to surface waters, wells, etc. are maintained
• There is adequate fill along the edges of the infiltration system to prevent seeps/breakouts"
DEC has indicated that with regards to the 15% limit, they have allowed designers to use the cut/fill
approach provided the criteria above is met. As such, the Applicant should demonstrate compliance with
the provisions outlined by the DEC.
10. The Applicant indicates within Section 5.0 of the SWPPP that an inquiry has been made to the NYS DEC
regarding impacts to endangered and threatened species as it relates to the development of the site.
The Applicant shall provide correspondence once received and include it into the SWPPP per I.F.4 of the
General Permit.
11. The Applicant indicates within Section 6.0 of the SWPPP that an inquiry has been made to NYS OPRHP
regarding Archeological Resources and Historic Places as it relates to the development of the site. The
Applicant shall provide correspondence once received and include it into the SWPPP per I.F.8 of the
General Permit.
12. It appears that there are inconsistencies between the HydroCAD model and the site plans. For example,
IBL2D and IBL4C are modeled but not depicted on the site plans and IBL2C is depicted twice on the site
plans. The Applicant to revise accordingly.
13. The site plans include an arch culvert stream crossing for Lot 3. The Applicant to clarify who the AHJ of
the stream is and clarify if the design has been sent to them for review.
14. It is difficult to discern rooftop runoff directions as it does not appear that roof conveyances area
depicted on the plans. The Applicant shall depict roof conveyances, as applicable, on the site plans in
subsequent submission.
15. Section 6.3.6 of the NYS SMDM states "Infiltration practices shall never serve as a sediment control
device during site construction phase. In addition, the Erosion and Sediment Control plan for the site
shall clearly indicate how sediment will be prevented from entering an infiltration facility." The Applicant
shall revise the plans to clearly indicate how sediment will be prevented from entering the infiltration
facilities during the site construction phase.
16. Town code section 147-9 stipulates the NYS SSESC as the performance and design criteria. The
Landgrading section of the NYS SSESC states that "When slopes exceed 2[H]:1[V], special design and
stabilization consideration are required and shall be adequatelyshown on the plans."The Applicant has
provided a detail for an armored slope stabilization. The armored slope stabilization shall be designed
in accordance with the NYS SSESC standard specifications for armored slope and channel stabilization.
The NYS SSESC states "Slopes approaching 1.5[H]:1[V] may require special stability analysis. The
inherent stability of the soil must be satisfactory before riprap is used for surface stabilization."
The site plans and detail depict the rock armored slope on slopes approaching 1H:1V. The Applicant to
clarify if a special stability analysis was performed or will be performed prior to construction.
The NYS SSESC states that the gradient of the slope to be stabilized shall be less than the natural angle
of repose of the stone selected. The Applicant to clarify if the slope gradient will be less than the natural
angle of repose for the rock selected.
17. The road and embankment grading from station approximately 9+00 to 7+00 create proposed slopes
of approximately 1.5H:1V. At the base of the embankment appears to be a conceptual diversion trench
(not completely graded in) that extends up the driveway to approximately 10+50. The Applicant to clarify
if a special stability analysis has been performed on the embankment. The Applicant to clarify if the rock
armored slope detail considers this embankment situation where flow is concentrated at the toe of the
slope. The grading runout and diversion trench appear to outside the existing topographic information.
The Applicant shall provide additional topographic information to support final design. The proximity to
parcel 265: 1-24 should also be considered in the design.
Further, the diversion trench referenced above appears to convey runoff from subcatchment 1S, which
according to the HydroCAD model is approximately 36 acres. The diversion trench is not included in the
HydroCAD model. Has the Applicant considered the size of the tributary watershed when designing the
road embankment and diversion trench?
18. The rock cut slope west of the proposed home on Lot 5 appears to be 1H:2V. The Applicant to clarify if
a special stability analysis has been performed on this cut slope. Further, the Applicant should clarify
the method of rock removal. The NYS SSESC section on Landgrading prescribes specifications for cut
slopes occurring on ripable rock.
19. It does not appear that the Applicant has depicted the location nor provided design details for temporary
soil stockpiles on the site plans. The Applicant to revise accordingly.
20. The Applicant to depict, within reason, the locations of water wells and wastewater absorption fields on
all neighboring parcels to confirm adequate horizontal separation distances.
21. The Applicant has provided a draft N01 for the old permit GP-0-15-001 and shall provide an updated NO1
that conforms to the new General Permit (GP-0-20-001).
Conclusion & Recommendation
It is our opinion that the applicant should provide clarification for the above items and incorporate changes
in subsequent plan submissions.
In the event the Planning Board or Town staff have any questions or require additional information, please
do not hesitate to contact me at (518) 824-1932.
Sincerely,
Richard Adams, PE
Senior Civil Engineer
cc: Shauna Baker, Town Planning Office Administrator (via email)
Laura Moore, Town Land Use Planner (via e-mail)
File
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION —Approve / Deny
SUBDIVISION PRELIMINARY STAGE 5-2022 & FRESHWATER WETLANDS 7-2022
JEFFREY & JOANNE MANN (5 LOT)
Subdivision Tax Map ID: 265.4-23.1 / Property Address: Bay Road & Pickle Hill Road / Zoning: RR-3A
A subdivision application has been made to the Queensbury Planning Board for the following: Applicant
proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots would
be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres
with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will remain.
Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of 5 lots,
and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and
approval.
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board
has determined that this proposal satisfies the requirements as stated in the Zoning Code;
A public hearing was scheduled and held on December 15, 2022;
This application is supported with all documentation, public comment, and application material in the file of
record;
MOTION TO APPROVE / DISAPPROVE SUBDIVISION PRELIMINARY STAGE 5-2022 &
FRESHWATER WETLANDS 7-2022 JEFFREY & JOANNE MANN (5 LOT), Introduced by
who moved for its adoption.
Motion seconded by
AYES:
NOES:
Duly adopted this 15'' day of December 2022 by the following vote:
Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net
Town of Queensbury
Community Development Office
742 Bay Road, Queensbury, NY 12804
Town of Queensbury Planning Board
RESOLUTION —Approve / Disapprove
SUBDIVISION FINAL STAGE 14-2022 & FRESHWATER WETLANDS 7-2022
JEFFREY & JOANNE MANN (5 LOT)
Tax Map ID: 265.4-23.1 / Property Address: Bay Road & Pickle Hill Road / Zoning: RR-3A
A subdivision application has been made to the Queensbury Planning Board for the following: Applicant
proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots would
be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres
with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will remain.
Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of 5 lots,
and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and
approval.
Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board
has determined that this proposal satisfies the requirements as stated in the Zoning Code;
This application is supported with all documentation, public comment, and application material in the file of
record;
MOTION TO APPROVE / DISAPPROVE SUBDIVISION FINAL STAGE 14-2022 &
FRESHWATER WETLANDS 7-2022 JEFFREY & JOANNE MANN (5 LOT), Introduced by
who moved for its adoption.
1. The requirements of the State Environmental Quality Review Act have been considered and the Planning
Board has adopted a SEQRA Negative / Positive Declaration; and if the application is a modification, the
requirements of the State Environmental Quality Review Act have been considered, and the proposed
modification[s] do not result in any new or significantly different environmental impacts, and, therefore,
no further SEQRA review is necessary;
2. Waiver requests granted / denied:
3. The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting
an extension of approval before the one (1) year time frame has expired if you have not yet applied for a
building permit or commenced significant site work.
4. The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed
around these areas and field verified by Community Development staff
5. Engineering sign -off required prior to signature of Planning Board Chairman.
6. The applicant must submit a copy of the following to the Town:
a) The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit
or for coverage under an individual SPDES prior to the start of Any site work.
b) The project NOT (Notice of Termination) upon completion of the project; and
Page 1 of 2
Phone: 518.761.82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net
7. The applicant must maintain on their project site, for review by staff:
a) The approved final that have been stamped by the Town Zoning Administrator. These plans must
include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared
and approved; and
b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an
individual SPDES permit issued for the project.
8. Final approved plans, in compliance with the Subdivision, must be submitted to the Community
Development Department before any further review by the Zoning Administrator or Building and Codes
personnel.
9. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the
beginning of any site work.
10. Subsequent issuance of further permits, including building permits is dependent on compliance with this
and all other conditions of this resolution;
11. As -built plans to certify that the subdivision is developed according to the approved plans to be provided
r�ior to issuance of the certificate of occupancy;
12. Resolutions must be included on Final Subdivision mylar;
Motion seconded by Duly adopted this 15th day of December 2022 by the following
vote:
EVA
NOES:
Page 2 of 2
Phone: 53.8.761..82201 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net