Loading...
Staff Notes for 12/15/2022STAFF NOTES DECEMBER 15, 2022 Queensbury Planning Board Agenda Second Regular Meeting: Thursday, December 15, 2022 / Time 7 — 11 pm -- �_ Queensbury Activities Center @ 742 Bay Road Administrative Items 5:00 PM - 6:30 PM Planning Board and Zoning Board of Appeals Training Planning Board Elections SP 68-2022 Faden Enterprises table until January 24, 2023 Old Business Applicant(s) 3 SONS AND HOLLY LLC. Application Type Site Plan 76-2022 Owner (s) ( Same as applicant ( SEQR Type v Type II Agent(s) Studio A _Lot size � .38 acre Location ' 28 Holly Lane _ __� TABL Ward: 1 Zoning Classification: WR Tax ID No. 239.12-2-57 i Ordinance Reference 179-3-040, 179-6-065, 147, 179-4-080 Cross Reference AV 63-2022 Warren Co. Referral November 2022 Public Hearing November 29, 2022, December 15, 2022 Site Information CEA Project Description: (Revised) Applicant proposes alterations to an existing home and site. The project includes a 416 sq ft addition to an existing home with a 1,275 sq ft footprint. There is to be a new 72 sq ft porch and a new 200 sq ft porch with a new floor area of 3,225 sq ft. Site work includes installation of an on -grade paver patio area with stone slab path enlarging the fire pit area and reduction of hard surface is also proposed. Additionally, there is to be a rain garden and shoreline plantings added to the site. There is no change to the existing 1,152 sq ft floor area of the garage and living space. Pursuant to chapter 179-3-040, 179-6-065, 147, and 179-4-080, site plan for new floor area in a CEA, expansion of a non -conforming structure, and hard surfacing within 50 ft of the shoreline shall be subiect to Plannine Board review and approval. Applicant(s) I _LOREEN HARVEY/KASSELMAN SOLAR_ Site Plan 75-2022 Owner (s) R Agent(s) L Location ! 1 Tax ID No. 2 Cross Reference ( A SEQR Type1 Type II Lot size 6.1 acres Ward: 1 j Zoning Classification: MDR Ordinance Reference 179-5-140 _ j Warren Co. Referral November 2022_- Public Hearing November 29, 2022, December 15, 2022 Site Information I APA, LGPC Project Description: Applicant proposes a South facing ground mounted solar project for 25.92 kW (54 panels), approximately 1,348 sq ft. The existing 5,035 sq ft home is to remain unchanged. The project will be located on the North property line where no vegetation will be removed. Pursuant to chapter 179-5-140, site plan for a residential ground mounted solar project shall be subject to Planning Board review and approval. reen Harvey _Y It iii 6. 17 I IL 60-2022 Applicant(s) PAUL NASRANI Application Type Subdivision Preliminary 12-2022 Freshwater Wetlands 17-2022 — Owner (s) ( Paul Nasrani, Envar Mir SEQR Type Unlisted Agent(s) Jarrett Engineers Lot size 6.29 acres 4� Location 790 Bay Road Ward: 1 Zoning Classification: MDR j Tax ID No. f 289.15-1-47 Ordinance Reference j 183, 179-3-040, 94, 179-4-010_ Cross Reference SUB (S) 14-2021, AV 54-2022 j _Warren Co. Referral ( n/a for subdivision Public Hearing_) December 15, 2022 Site Information ( Travel corridor, Wetlands Project Description: Applicant proposes a 3 lot subdivision of a 6.29 acre parcel. Lot I will be 2.13 acres with house, lot 2 will be 2.08 acres and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project includes a new shared driveway for the second and third lots. The new sites will have onsite septic and connect to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and site work within 100 ft of freshwater wetlands shall be subiect to Plannin Board review and approval. Applicants) _ADIRONDACK RETIREMENT SPECIALISTS Application Tyke, Site Plan 77-2022 Owner (s) ARS RE Holdings Inc. _f SEQR Type ___IType II _ Agents) Rucinski Hall Architecture Lot size 0.93 acre, 0.15 acre _ Location ( 310 Bay Road Ward: 2 j Zoning Classification: CI Tax ID No. ( 302.8-1-16, 302.8-1-17 Ordinance Reference 179-3-040 Cross Reference SP 62-99, SP 57-92, AV 136-1992, SP 31-94, SP 4- Warren Co. Referral December 2022 96, AV 64-2022 l Public Hearin December 15, 2022 Site Information Travel Corridor Project Description: Applicant proposes to complete access renovations and other alterations to an existing two story building. The plans indicate that there are two South side entry porches to be renovated, a new entryway to be created on the North side and a renovation of the West side first story area. The building will maintain a 3,215 sq ft footprint. The existing porch areas to be improved with 360 sq ft of new porch areas. Pursuant to chapter 179-3- 040, site plan for alterations and new construction to a building in the Cl zone shall be subject to Planning Board review and approval New Business Applicant(s) JEFFREY & JOANNE MANN Q LOT) ( Application Type Subdivision Preliminary 4-2022 Subdivision Final Stage 15-2022 Freshwater Wetlands 6-2022 _ Owner (s) Same as applicant — _ SEQR Type J Unlisted (APA) Agent(s) Hutchins Engineering j Lot size 17.49 acres Location 76 Pickle Hill Road Ward: 1 Zoning Classification: RR-3A Tax ID No. 265.-1-23.2 Ordinance Reference_) 183, Chapter 94 Cross Reference AV 19-2022 Warren Co. Referral n/a for subdivision ------ Public Hearing December 15, 2022 i Site Information APA Project Description: Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are: Lot 6 to be 3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for 3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval. Applicant(s) JEFFREY & JOANNE MANN (5 LOT) Application Type Subdivision Preliminary 5-2022 Subdivision Final Stage 14-2022 Freshwater Wetlands 7-2022 Owner (s) Same as applicant SEQR Type Unlisted (APA) Agent(s) Hutchins Engineering Lot size 34.5 acres Location j Bay Road & Pickle Hill Road Ward: 1 _� Zoning Classification: RR-3A Tax ID No. 265.-1-23.1 _ ` Ordinance Reference j 183, Chapter 94 Cross Reference SUB (S) 14-2020, AV 18-2022 Warren Co. Referral ; n/a for subdivision Public Hearing December 15, 2022 Site Information APA Project Description: Applicant proposes a 5 lot residential subdivision of a 35.23 acre parcel for preliminary and final stage. The lots would be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of 5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and approval. _ - Any further business which may be properly brought before the Board - Administrative Items: Site Plan 68-2022, Special Use Permit 6-2022 & Freshwater Wetlands 13-2022 @ 1471 State Rt 9 Faden Enterprises Draft resolution- grant/deny further tabling Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — TABLE SITE PLAN 68-2022, FRESHWATER WETLANDS 13-2022 & SPECIAL USE PERMIT 6-2022 FADEN ENTERPRISES Tax Map ID: 288.4-58 / Property Address: 1471 State Route 9 / Zoning: CI Applicant proposes removal of an existing building on the site to construct 3 new buildings and associated site work. The project includes one building of 8,355 sq ft that is designated as 3 tenant spaces: 2,000 sq ft for a drive-thru, 2,500 sq ft for a restaurant, and 3,855 sq ft for retail space. The second and third buildings will contain a total of 24 units of self -storage in 3,480 sq ft. Each building will be 1,740 sq ft and have 12 units. Pursuant to chapter 179-3-040, 179-10-040, & 94, site plan for new commercial development and self - storage facility, hard surfacing within 50 ft of a shoreline/wetlands, freshwater wetlands permit, and special use permit for self -storage facility shall be subject to Planning Board review and approval. MOTION TO TABLE SITE PLAN 68-2022, FRESHWATER WETLANDS 13-2022 & SPECIAL USE PERMIT 6-2022 FADEN ENTERPRISES. Introduced by who moved for its adoption, Tabled until the January 24, 2023 Planning Board meeting with information due by December 15, 2022. Duly adopted this 15t1i day of December 2022 by the following vote: I� IMI NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 76-2022@ 28 Holly Lane 3 Sons and Holly LLC Public hearing scheduled SEAR Type II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes December 15, 2022 Site Plan 76-2022 3 SONS AND HOLLY, LLC. 28 Holly Lane / Waterfront Residential / Ward 1 SEQR Type II Material Review: site plan application, survey, photos, stormwater, elevations and floor plans, revised plans Parcel History: AV 63-2022 Warren Co Referral Sent: November 2022 / Comments: Concur w/local board. Informal staff comments: Encourage discussion about protecting shoreline, stormwater measures, and fertilizer seepage into lake. Requested Action Application to be tabled to January 24, 2023 with information due by December 19, 2022 Resolutions 1. PB decision Project Description (Revised) Applicant proposes alterations to an existing home and site. The project includes a 416 sq ft addition to an existing home with a 1,275 sq ft footprint. There is to be a new 72 sq ft porch and a new 200 sq ft porch with a new floor area of 3,225 sq ft. Site work includes installation of an on -grade paver patio area with stone slab path enlarging the fire pit area and reduction of hard surface is also proposed. Additionally, there is to be a rain garden and shoreline plantings added to the site. There is no change to the existing 1,152 sq ft floor area of the garage and living space. Pursuant to chapter 179-3-040, 179-6-065, 147, and 179-4-080, site plan for new floor area in a CEA, expansion of a non -conforming structure, and hard surfacing within 50 ft of the shoreline shall be subject to Planning Board review and approval. Staff Comments • Location -The project site is located at 28 Holly Lane on a 0.34 ac parcel in the Waterfront Residential zone • Arrangement- The site has an existing home, detached garage, storage shed and other residential related items ie steps to the lake. • Site Design- The plans indicate there is to be a new residential addition to the front of the existing home and new patio area on the shoreline of the home. The revised plans indicate the site work for the road side of the project is reduce hard -surface areas. • Building — The existing home is 1,275 sq ft footprint with a porch of 72 sq ft and a deck of 365 sgft. The existing floor area is 2,809 sq ft. The addition is to be 416 sq ft and new floor area is to be 3,225 sq ft • Grading and drainage plan, Sediment and erosion control -The plan indicates rain gardens to be installed and a planted depression area to manage stormwater. The materials have been referred to the Town Engineer for review and comment. • Landscape plan- The project site is located on Lake George and is subject to the shoreline buffer review. The plans indicate existing plantings and trees to remain. The plans also show an area of proposed buffer plantings, shrubbery and perennials. The plans also show plantings along the north property line. Below are the guidelines from the shoreline buffer code section. o Shoreline Buffer - Section 179-8-040 -Minimum width 35 ft (Lake George) -For every 700 sgft of shoreline buffer area -one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 - 24 in native shrubs; 14 herbaceous plants Project site -129 ft of shoreline per site plan -Shoreline buffer 129 ft X 35 ft width is 4515 sq ft -Shoreline buffer area -4515 /700 = 6.5 round up to 7 -seven large trees at 3 inch diameter -Ground cover-4515/350 = 12.9 round up to 13 (X7) =91 native shrubs and 13 (X14) herbaceous plants=182 o Shoreline Cutting restrictions and Cutting Plan- Section 179-6-050 - - within 35 ft lakes or ponds & 75 ft streams, wetlands and rivers no vegetation within the first 6 ft and no woody vegetation greater than one inch dbh removed from 6 ft to 35ft/75 ft area to be maintained as natural buffer - A cutting plan allowing greater may be permitted by the Planning Board - Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ft whichever is less - 129 ft Shoreline X 30%= 38.7 feet of the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot). A cutting plan allowing greater may be permitted by the Planning Board - Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable within the 30%/75 ft cut area. • Site lighting plan -The plans include the recessed lighting to be installed for the new addition. • Site details -The project include a patio area to be installed that is hard surfacing within 50 ft of the shoreline. • Utility details -The plans show the septic system on the site. • Elevations -The plans show the elevation of the new addition area • Floor plans -The floor plans include the existing garage with residential use above - noting the garage with residential use has been there since 1958 pre existing structure and use. The floor plans for the main home show the addition, the arrangement of the living space and the deck addition. • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested -Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance Relief is requested for permeability where 71.6% is proposed and 75% is required. The revised information provided indicates the site was at 75% permeable when an additional paved area was completed prior to the proposed project. The proposed project verified the existing is 71.6% and prior was at 75%. The deck to be setback 39 ft where a 50 ft setback is required. Relief is requested for stormwater device where 35 ft is proposed and 100 ft setback is required. Summary Application to be tabled to January 24, 2023 with information due by December 19, 2022. Pending ZBA Meeting History: PB: 11/15/2022, 11/29/2022; ZBA: 11/16/2022 Town of Queensbury i" Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — TABLE SITE PLAN 76-2022 3 SONS AND HOLLY, LLC. Tax Map ID: 239.12-2-57 / Property Address: 28 Holly Lane / Zoning: WR (Revised) Applicant proposes alterations to an existing home and site. The project includes a 416 sq ft addition to an existing home with a 1,275 sq ft footprint. There is to be a new 72 sq ft porch and a new 200 sq ft porch with a new floor area of 3,225 sq ft. Site work includes installation of an on -grade paver patio area with stone slab path enlarging the fire pit area and reduction of hard surface is also proposed. Additionally, there is to be a rain garden and shoreline plantings added to the site. There is no change to the existing 1,152 sq ft floor area of the garage and living space. Pursuant to chapter 179-3-040, 179-6-065, 147, and 179-4-080, site plan for new floor area in a CEA, expansion of a non -conforming structure, and hard surfacing within 50 ft of the shoreline shall be subject to Planning Board review and approval. MOTION TO TABLE SITE PLAN 76-2022 3 SONS AND HOLLY, LLC.. Introduced by who moved for its adoption, seconded by Tabled until the January 24, 2023 Planning Board meeting with information due by December 19, 2022. Duly adopted this 151h day of December 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 75-2022@ 1516 Ridge Road Loreen Harvey/Kasselman Solar Project has been withdrawn by agent & applicant. Shauna Baker From: Loreen Harvey <Iharvey@kasselmansolar.com> Sent: Friday, December 2, 2022 3:09 PM To: Laura Moore; Karen Dwyre; Shauna Baker Subject: Kasselman Update: 1516 Ridge road - Russell Hello Laura, Karen and Shauna, Regarding our proposed project for: Rory Russell 1516 Ridge Road Queensbury, New York 12804 We would like to withdraw our project from consideration by the Planning and Zoning Boards as we are no longer pursuing this project in any capacity. Please let me know if anything more is needed from us at this time. Thank you for all of your assistance in this matter! Be,SweU, 279 13rov d way 3 2 Mew NY 12204 (518) 478 -3 906 I Subdivision Preliminary 12-2022 & Freshwater Wetlands 17-2022 @ 790 Bay Road Paul Nasrani Public Hearing scheduled Unlisted SEAR Draft resolution- grant/deny Preliminary Subdivision approval, SEAR Town of Queensbury Planning Board OL Community Development Department Staff Notes December 15, 2022 Subdivision Preliminary 12-2022 & PAUL NASRANI Freshwater Wetlands 17-2022 790 Bay Road / Moderate Density Residential / Ward 1 SEQR Unlisted Material Review: Subdivision application, area variance application, freshwater wetland, subdivision drawings Parcel History: SUB (S) 14-2021, AV 54-2022 Requested Action Planning Board review and approval for subdividing a 6.48 acre parcel into 3 lots. Resolutions 1. PB decision Project Description Applicant proposes a 3 lot subdivision of a 6.48 acre parcel. Lot 1 will be 2.13 acres with house, lot 2 will be 2.08 acres and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project includes a new shared driveway for the second and third lots. The new sites will have onsite septic and connect to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and site work within 100 ft of freshwater wetlands shall be subject to Planning Board review and approval. Sketch Plan Stage Applicant completed a sketch plan stage SUB 14-2021 12/14/2021. The project was proposed for 3 residential lots. Preliminary Stage • Preliminary Plat o The plans show a three lot subdivision. Lot 1 will be 2.13 acres with the existing house, lot 2 will be 2.08 acres and lot 3 would be 2.27 acres. • Layout plans — o The plans shows the arrangement of the lots with the existing home and two proposed homes. The project includes a shared driveway for lots 2 and 3. • Construction details — o The plans identify the septic system locations. The plans show a water line connection and a new hydrant. The project requires the Water Department approval for the type of line and proposed hydrant. • Landscape plans — o Not required for subdivision of less than 10 lots • Clearing plan o The plan shows the proposed clearing limits for the subdivision and lots. 0 • Grading and erosion plans — o A waiver for grading has been requested due to the minimal slopes on the site. • The Environmental report — o A long EAF was provided. • Statement of Intent- o A deed was provided • Stormwater management — o A Stormwater management has been provided. The information has been provided to the Town designated engineer for review and comment. • Fees — o per application $50 for preliminary • Waivers — o The waivers requested: • Open Space — o No open space is proposed. • Streets — o No new roads are provided. The applicant may Final Stage Review — • Final Plat -subdivision for 3 lots for residents • State/County agency —Planning and Zoning Board • Other plans reports —Stormwater management for a 25 year storm • Protected open space —none proposed. • Fees — o per application $100 for final and $50 per lot Freshwater Wetlands The project identifies wetland areas of 0.26 ac. The site work for the new homes and driveway are within 100 ft of the wetland. The wetlands have been delineated by the applicant and are to be confirmed by Army Corp. Nature of Variance Granted 12/14/2022. Lot 1 to be 2.13 acres with existing residential use and buildings to remain. Lot 2 will be 2.08 acres and lot 3 will be 2.27 acres, both for future residential house. Relief is being requested for lot frontage for Lot 1 where 132 ft is proposed and 200 ft is required. Relief is requested for creation of two flag lots. Relief is also requested for Lots 2 lot frontage of 78 ft proposed and Lot 3 frontage proposed of 26 ft where 100 ft is required. Summary The applicant has completed a subdivision plan for Preliminary and Final stage of a 3- lot subdivision and a Freshwater Wetland permit. Meeting History: PB: 12/13/2022; ZBA: 12/14/2022 IVi LaBella Powered by oartnershiq. December 13, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: Nasrani Subdivision Town of Queensbury, Warren County, New York Labella Project # 2220706.53 Queensbury Ref #SD12-2022 Dear Mr. Brown: LaBella Associates has received a submission package from your office for the above referenced project. The Applicant is proposing a 3-lot residential subdivision with 2 new residential building lots. Information submitted to our office for review includes the following: • Project narrative letter dated September 15, 2022; • Site plans titled "Nasrani Subdivision", prepared by Jarrett Engineers, PLLC, dated September 15, 2022; • Survey of Lands N/F Paul N. Nasrani & Envar Mir, prepared by Darrah Land Surveying, PLCC, dated February 25, 2022. • Site plan review application and Full Environmental Assessment Form, and; • Town of Queensbury Freshwater Wetlands Permit Application. Your office has requested that we limit our review to the design of stormwater system as it relates to compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. According to the environmental assessment form and site plans, the proposed site improvements will disturb less than one (1) acre and thus the project is not required to obtain coverage under the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-20-001). Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 2. It is unclear if the disturbance area includes the proposed grading and grading runout as it does not appear that proposed grading is provided on the site plans. Also, it does not appear that the disturbance limits extend to the proposed work at the intersection with Bay Road. The Applicant to revise accordingly and provide the proposed grading. 3. Section 179-6-080.A, B, and C of the Town Code state the following: 20 Elm Street ! Suite 110 ( Glens Falls, NY 128o1 1 p (518) 812-0513 www.tabeltapc.com ❑ § 179-6-080 Stormwater runoff. A. A stormwater pollution prevention plan consistent with the requirements of Town Code Chapter 147, Stormwater Management, shall be required as part of the site plan approval process- B. The stormwater drainage plan shall analyze the impacts of the project using at least a t"venty-five-year return interval storm for residential projects and a fifty-year return interval storm for commercial or industrial projects, and using the analysis procedures in the Town of Queensbury Subdivision Regulations E'3 i ] Editors Note: See Ch. A 783, Subdivision of Land C. All stormwater management plans shall be designed so that post -development run-off rates and volumes are equal to or less than pre -development run-off- Post -development direction of flow and type of discharge shall be the same as pre -development conditions. The application is for a residential project. As such, a stormwater drainage plan shall be provided that shows, at all design points, the 25-year return interval storm runoff rates and volumes do not exceed the pre -development condition. A stormwater drainage plan was not provided with this submission. The Applicant to provide a stormwater drainage plan in subsequent submissions. 4. The existing topography and proposed grading do not appear to be provided. The Applicant to provide in subsequent submissions to support review of the stormwater drainage plan. 5. There does not appear to be soil tests nor infiltration test results in support of the proposed stormwater facilities. Our office assumes that the proposed rain gardens will be designed with infiltration in order to meet the 25-year storm requirements and completely dewater such that the full capacity will be available for the next storm. The Applicant to perform soil tests and infiltration tests in support of the design. The Applicant should ensure that soil testing for the proposed infiltration practices meets the requirements specified in Appendix D of the SMDM. 6. The Applicant to revise the site plans to depict existing neighboring wells (as applicable) and septic systems to understand horizontal separation distances. It appears that the plan depicts stormwater practices that may be used as an infiltration practice. It is noted that the NYS SMDM 6.3.1 states: "Infiltration facilities shall be located at least 100 feet horizontally from any watersupp/y well. Infiltration trenches and basins shall be setback 25 feet downgradient from structures and septic systems." 7. The Applicant should clarify the method of pre-treatment prior to entry to the stormwater practice. 8. It does not appear that the site plans depict the erosion and sediment controls, only details are provided. The Applicant to revise the site plans accordingly. 9. The standards and specifications for winter stabilization of the NYS SSESC requires "A temporary site specific, enhanced erosion and sediment control plan to manage runoff and sediment at the site during construction activities in the winter months to protect off -site water resources. This standard applies to all construction activities involved with ongoing land disturbance and exposure between November 15th to the following April 1st." The Applicant to clarify if construction will occur during the winter months. If so, the Applicant should provide a separate, temporary site -specific enhanced erosion and sediment control plan if construction activities with ongoing land disturbance and exposure is planned between November 15th to the following April 1st. This erosion and sediment control plan shall conform to all requirements of the winter stabilization specification referenced above. Conclusion & Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Sincerely, Richard Adams, PE Senior Civil Engineer cc: Shauna Baker, Town Planning Office Administrator (via email) Laura Moore, Town Land Use Planner (via e-mail) File Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board SEQR RESOLUTION — Grant Positive or Negative Declaration SUBDIVISION PRELIMINARY 12-2022 & FRESHWATER WETLANDS 17-2022 PAUL NASRANI Tax Map ID: 289.15-1-47 / Property Address: 790 Bay Road / Zoning: MDR The applicant proposes a 3 lot subdivision of a 6.48 acre parcel. Lot 1 will be 2.13 acres with house, lot 2 will be 2.08 acres and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project includes a new shared driveway for the second and third lots. The new sites will have onsite septic and connect to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and site work within 100 ft of freshwater wetlands shall be subject to Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; The proposed action considered by this Board is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury; No Federal or other agencies are involved; Part 1 of the Long EAF has been completed by the applicant; Part 2 of the Long EAF has been reviewed by the Planning Board; Upon review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency that this project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. MOTION TO GRANT A POSITIVE DECLARATION OR NEGATIVE DECLARATION FOR SUBDIVISION PRELIMINARY 12-2022 & FRESHWATER WETLANDS 17-2022 PAUL NASRANI, Introduced by who moved for its adoption, As per the resolution prepared by staff. 1. Part II of the Long EAF has been reviewed and completed by the Planning Board. 2. Part III of the Long EAF has been reviewed and completed by the Planning Board. Or Part III of the Long EAF is not necessary because the Planning Board did not identify potentially moderate to large impacts. Motion seconded by . Duly adopted this 15t' day of December 2022 by the following vote: AYES: NOES: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION —Approve / Deny SUBDIVISION PRELIMINARY STAGE 12-2022 & FRESHWATER WETLANDS 17-2022 PAUL NASRANI Subdivision Tax Map ID: 289.15-1-47 / Property Address: 790 Bay Road / Zoning: MDR A subdivision application has been made to the Queensbury Planning Board for the following: Applicant proposes a 3 lot subdivision of a 6.48 acre parcel. Lot 1 will be 2.13 acres with house, lot 2 will be 2.08 acres and lot 3 would be 2.27 acres. Two new houses to be constructed on the remaining lots. The project includes a new shared driveway for the second and third lots. The new sites will have onsite septic and connect to the existing municipal water. Pursuant to chapter 183, 179-3-040 and 94, subdivision of 3 lots and site work within 100 ft of freshwater wetlands shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative / Positive Declaration A public hearing was scheduled and held on December 15, 2022; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SUBDIVISION PRELIMINARY STAGE 12-2022 & FRESHWATER WETLANDS 17-2022 PAUL NASRANI, Introduced by who moved for its adoption. Motion seconded by AYES: NOES: Duly adopted this 15t' day of December 2022 by the following vote: Phone: 518.761.8220 1 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Site Plan 77-2022 @ 310 Bay Road Adirondack Retirement Specialists Public hearing scheduled SEQR II Draft resolution- grant/deny site plan approval Town of Queensbury Planning Board Community Development Department Staff Notes December 15, 2022 Site Plan 77-2022 ADIRONDACK RETIREMENT SPECIALISTS 310 Bay Road / Commercial Intensive / Ward 2 SEQR Type II Material Review: site plan application, site plan drawing, deed, elevation and floor plans Parcel History: SP 62-99, SP 57-92, AV 136-1992, SP 31-94, SP 4-96, AV 64-2022 Warren Co Referral Sent: December 2022 / Comments: NCI Requested Action Planning Board review and approval to complete access renovations and alterations to a two story building. Resolutions 1. PB decision Project Description Applicant proposes to complete access renovations and other alterations to an existing two story building. The plans indicate that there are two South side entry porches to be renovated, a new entryway to be created on the North side and a renovation of the West side first story area. The building will maintain a 3,215 sq ft footprint. The existing porch areas to be improved with 360 sq ft of new porch areas. Pursuant to chapter 179-3-040, site plan for alterations and new construction to a building in the Cl zone shall be subject to Planning Board review and approval. Staff Comments • Location -The project is located at 310 Bay Road in the Commercial Intensive Zone • Arrangement- The project includes merging two parcels 302.8-1-16 and 302.8-1-17 for a total of 1.08 acres. The site has an existing office building with associated parking. The improvement is to the porch access areas and update to the front of the building. There is an existing gazebo and shed that are to remain on the site. A new employee walkway of 668 sq ft is being added to the north side with the proposed porch. • Building — The existing building is 3,215 sq ft that is to remain where the improvements are on the access porch areas. The existing ramp on the south side is to be removed. The new covered porch areas include 169 sq ft (south) and includes a lift access, 145 sq ft (south), and 46 sq ft (north). The building area facing Bay Road will remove the walkway and exterior door access • Traffic- The site has 39 parking spaces there are no changes to parking. • Grading and drainage plan, Sediment and erosion control -The applicant has indicated there are on site stormwater practices that handle the roof fun -off and parking lot drainage with eave drip lines. • Landscape plan -The applicant intends to remove the existing landscaping and to install new landscaping beds around the foundation of the building. • Site lighting plan -The plans indicate there is to be canopy lights under the new covered porch areas. The existing lighting is shown on the plans — applicant is reminded existing lighting is also to conform to code for down cast lighting. • Utility details -No changes to connections are proposed. • Signage-The existing sign is shown on the plan and there are no changes. • Elevations -The elevation plans show location of the existing and new porches on both sides of the building. In addition, the existing and proposed doors and windows are shown for each floor — primary improvements are doors on the first floor. • Floor plans -The plans show the existing condition of the first and second floor then the reconfiguration of the first floor office areas. The plans include the interior alteration of the second floor bathroom area. • Waivers -Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, j. stormwater, k. topography, 1. landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal. • The waivers requested —Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. • Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance Granted 12/14/2022. The 46 sq ft porch is located 59 ft 3 inches from the road, the 169 sq ft porch is located 33 ft 9 inches from the road where a 75 ft setback is required. The 46 sq ft porch is located 17 ft 5 inches from the north property line where a 20 ft setback is required. The front area fagade area building improvements is 11 ft 10 inches where a 75 ft setback is required. Summary The applicant has completed a site plan application for the alterations to the existing building entry areas, Bay Road side of building, and interior alterations. Meeting History: PB: 12/13/2022; ZBA: 12/14/2022 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION — Grant / Deny Site Plan Approval SITE PLAN 77-2022 ADIRONDACK RETIREMENT SPECIALISTS Tax Map ID: 302.8-1-16, 302.8-1-17 / Property Address: 310 Bay Road / Zoning: Cl The applicant has submitted an application to the Planning Board: Applicant proposes to complete access renovations and other alterations to an existing two story building. The plans indicate that there are two South side entry porches to be renovated, a new entryway to be created on the North side and a renovation of the West side first story area. The building will maintain a 3,215 sq ft footprint. The existing porch areas to be improved with 360 sq ft of new porch areas. Pursuant to chapter 179-3-040, site plan for alterations and new construction to a building in the CI zone shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on 12/13/2022; the ZBA approved the variance requests on 12/14/2022; The Planning Board opened a public hearing on the Site plan application on 12/15/2022 and continued the public hearing to 12/15/2022, when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including 12/15/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE / DISAPPROVE SITE PLAN 77-2022 ADIRONDACK RETIREMENT SPECIALISTS; Introduced by who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted/denied; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired. Page 1 of 2 Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval, permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign -off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required, the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b. The project NOT (Notice of Termination) upon completion of the project; c. The applicant must maintain on their project site, for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As -built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Duly adopted this 15th day of December 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.8220 I Fax: 518.745.44371742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Subdivision Preliminary 4-2022, Subdivision Final 15-2022 & Freshwater Wetlands 6-2022 @ 76 Pickle Hill Road Jeffrey &Joanne Mann (3 Lot) Public Hearing scheduled Unlisted (APA) Draft resolution- grant/deny Preliminary and Final Stage Subdivision approval Town of Queensbury Planning Board _ Community Development Department Staff Notes December 15, 2022 Subdivision Preliminary 4-2022, JEFFREY & JOANNE MANN (3 LOT) Subdivision Final 15-2022 & 76 Pickle Hill Road / Rural Residential 3A / Ward 1 Freshwater Wetlands 6-2022 SEQR Unlisted- Subject to APA Environmental Review Material Review: application, subdivision plans, freshwater wetlands permit, stormwater management plans. Parcel History: AV 19-2022 Requested Action Planning Board review and approval to subdivide a 17.1 acre parcel into 3 lots. Resolutions 1. PB decision Project Description Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are: Lot 6 to be 3.8 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for 3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval. Staff Comments Sketch Plan Stage — sketch plan was not applied for this parcel Preliminar Stage • Preliminary Plat o The overall plans shows the property to be subdivided along Pickle Hill Road • Layout plans — o The plans indicated 3 residential lots ranging from 3.8 ac, 4.1 ac and 9.2 ac. • Construction details — o The plans identify the house locations, septic system locations, and wells. • Landscape plans — o The number of lots does not trigger a landscape plan • Clearing plan o The plans shows the proposed area for the home, septic, driveway access but not necessarily for the lot clearing for each lot in total. O • Grading and erosion plans — o Grading Plans were not included but topography is shown on the plans. • The Environmental report — o The project is within the APA and is subject to the APA environmental review process. The applicant is working with APA in regards to jurisdictional requirements. • Statement of Intent- A statement of intent shall be submitted by the applicant o A deed was provided • Stormwater management — o A Stormwater Pollution Prevention Plan has not been provided — the application is requesting a waiver. • Fees — o per application $50 for preliminary, $100 for wetlands and $50 for Area Variance • Waivers — o The applicant requests waivers from the Clearing plan, grading and stormwater plan. Freshwater Wetland, The project work proposed on lots adjacent to the designated wetland are within 100 ft of the wetland and trigger FWW permit. Nature of Variance Granted 7/27/2022. The applicant proposes a 3 residential lots. Relief is requested for distance to stormwater device being less than 100 ft where 50 ft is proposed. Relief is requested for the 3 ft vertical separation distance for a device where 2 ft is proposed. Relief is requested for lot 6 of 3.8 ac and Lot 7 of 4.1 ac physical access to use a proposed drive for Lot 8 of 9.2 ac. In addition Road frontage relief is request for Lot 8 where 57.86 is proposed, Lot 6 and Lot 7 where 0 ft is proposed and required is 400 ft. Summary The applicant has completed Preliminary and Final Stage subdivision applications and a Freshwater wetlands permit for proposed three lots. Meeting History: PB: 5/19/2022; ZBA: 7/27/2022 LaBeRa Powered by partnership. December 15, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: Mann - 3 Lot Subdivision Town of Queensbury, Warren County, New York Labella Project # 2220706.51 Queensbury Ref #SUB 15-2022 Dear Mr. Brown: LaBella Associates has received a submission package from your office for the above referenced project. The Applicant proposes a 3-lot residential subdivision. Information submitted to our office for review includes the following: • Lot Width Calculation Plan, prepared by Hutchins Engineering PLLC, dated September 25, 2022; • Cover letter, prepared by Hutchins Engineering PLLC, dated November 10, 2022; • Stormwater Management Plan, prepared by Hutchins Engineering PLLC, dated November 9, 2022; • Site Plans, prepared by Hutchins Engineering PLLC, dated November 11, 2022; and, • Subdivision Application, prepared by Hutchins Engineering PLLC, dated November 2, 2022. Your office has requested that we limit our review to the design of the stormwater system as it relates to compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. There are two applications for Jeff and Joanne Mann, Subdivision 14-2022 and Subdivision 15-2022. The stormwater management narrative and draft NOI combine the two subdivisions as it relates to stormwater permitting. According to the draft NOI (both projects combined), the proposed site improvements appear to disturb greater 1 acre (20.5 acres per the draft NOI), which typically requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP) in accordance with GP-0-20-001 that includes erosion and sediment controls, as well as post construction stormwater management practices. Lot 5 is tributary to waters of the state classified as AA/AA-s and Lot 5 appears to include greater than 1 acre of land disturbance on virgin land with a slope phase of E or F. Per I.F.6 of the General Permit, Lot 5 would be ineligible for coverage under the General Permit. Lots 1, 2, 3, 4, 6, 7, and 8 would require the preparation of a SWPPP in accordance with the General Permit, however the inclusion of Lot 5 in the NOI would require the project to seek individual SPDES permit coverage. The Applicant acknowledges this situation in Section 4.10 of the SWPPP and states 20 Elm Street ; Suite 110 ! Glens Falls, NY 128011 p (518) 812-0513 wwww.Labellapc.com "Therefore, an individual SPDES permit will be required from NYSDEC for this lot prior to beginning construction as designed for the subdivision." Our office understands the Applicant's approach that a General Permit is prepared for all lots except Lot 5, where an individual SPDES permit is required if it is built per the plans submitted with this application. Since the SWPPP states each lot SPDES permit coverage is transferred to each respective purchaser and Lot 5 may be developed per the plans provided in this submission (requiring individual permit coverage for Lot 5), the Applicant shall submit the SWPPP to NYS DEC for individual permit coverage for Lot 5. When submitting to NYS DEC for Lot 5 individual coverage the Applicant should seek concurrence from DEC on this approach. It is noted that our office does not take exception to this approach so long as Lot 5 is submitted to NYS DEC for individual permit coverage. 2. Additionally, this project falls within the Lake George watershed and therefore is subject to the stormwater management requirements set forth in Section 147-11 of the Town Code for projects within the Lake George Park. Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 3. Projects that disturb greater than 15,000 SF are considered Major Projects per Town code section 147- 11.E.(2). In accordance with Town code section 147-11.1.(3)(c)[2], Major Projects stormwater control measures shall be designed so that there will be no increase in runoff volume from a ten-year- frequency/twenty-four-hour-duration storm event following development over the predevelopment volume; and for storm events exceeding the ten-year design storm, the stormwater controls measures shall function to attenuate peak runoff flow rates for a twenty -five-year frequency storm to be equal to or less than predevelopment flow rates. For development greater than five acres, consistent with New York State guidelines, stormwater control measures shall function to attenuate peak runoff flow rates for a one -hundred -year storm to be equal to or less than predevelopment flow rates. The Applicant has provided a 10-year, 25-year and 100-year storm analysis. 4. Section 147-111(3)(c)(4) of the Town Code states, "Stormwater recharge areas shall be located a minimum of 100 feet from the subsurface treatment system of a wastewater treatment system unless it is demonstrated that a lesser separation will not adversely affect the functioning of such /each fields." It appears that IBL6 and IBL8D infiltration basins are within 100 feet of the proposed wastewater systems. Further IBL8D appears to be uphill and in the direct path of the absorption field. The Applicant to revise accordingly or demonstrate that a lesser separation will no adversely affect the functioning of the absorption fields. 5. Section 147-111(3)(c)[4] of the town code states, "Infiltration devices for major projects shall be located a minimum of 100 feet from Lake George and any down -gradient drinking water supply, lake, river, protected stream, water well, pond, wetland; a separation of more than 100 feet may be required in cases where contamination of the water supply is possible due to highly permeable soils, shallow groundwater and similar situations." The SWPPP states "Stormwater management practices setback relief was granted by the Town of Queensbury's Zoning Board of Appeals in July 2022 to allow infiltration practices to be situated 50-ft horizontally from water features (wetlands, stream)." The Applicant to clarify that this applies to all infiltration practices for all lots. 6. Section 147-111(3)(c)[3] of the town code requires infiltration devices to be a minimum of two feet above the seasonal high groundwater level realized following development and 147-111(3)(c)[6] states the infiltration devices shall be designed based on the infiltration capacity of the soils preset at the project site. Further, Section 6.3.1. of the 2015 NYS Stormwater Management Design Manual (SMDM) states that, "To be suitable for infiltration, underlying soils shall have an infiltration rate (fc) of 0.5 inches per hour, as initially determined from NRCS soil textural classification, and subsequently confirmed by geotechnical tests (see Appendix D). The minimum geotechnical testing is one test hole per 5000 sf, with a minimum of two borings per facility (taken within the proposed limits of the facility)." (Please note that the DEC's FAQ allows minimum of one test pit/boring and one infiltration test for every 5000 square feet of basin area, with no fewer than four test pit/boring and infiltration tests per facility.). It does not appear that testing was performed within the bounds of each infiltration practice. The Applicant to perform the testing per the NYS SMDM and provide the results. 7. Site data, as it relates to horizontal separation distances, shall be provided (or described) west of the proposed access road and north of Pickle Hill Road to confirm required separation distances. 8. The Applicant shall model all stormwater conveyances and diversion trenches to support the design. 9. The NYS SMDM states that "Infiltration practices cannot be located on areas with natural slopes greater than 15%" and "Infiltration practices cannot be located in fill soils". It appears the site has slopes throughout the site that exceed 15%, including in the locations of the infiltration practices. Previous correspondence received from the NYS DEC regarding projects with similar concerns of locating stormwater features in fill slopes has resulted in the following recommendations: "At a minimum, the designer must meet the following guidance and provide justification/demonstration of equivalence in the SWPPP: • Insitu/natural soil layer below the infiltration system has an infiltration rate greater than or equal to the 0.5 in/hr • Ground water and bedrock levels in insitu/natural soil should be at least 2 - 3 feet below grade • Fill material is an engineered fill that is tested after placement (by geotechnical firm) and demonstrated to be equivalent to a soil material acceptable for the installation of an infiltration system (i.e. infiltration rate greater than or equal to .5 in/hr, etc.). Infiltration rate of fill material should be similar infiltration rate as insitu/existing soil. • If there is a difference in the infiltration rates between the fill and insitu/native soil, the designer should use the more conservative (i.e. slower infiltration rate) when determining whether the infiltration system will dewater (exfiltrate) with the required 48 hours (see Section 6.3.2 "Conveyance' of the Design Manual) • Required vertical separation distances to groundwater/bedrock are maintained • Required horizontal separation distances to surface waters, wells, etc. are maintained • There is adequate fill along the edges of the infiltration system to prevent seeps/breakouts" DEC has indicated that with regards to the 15% limit, they have allowed designers to use the cut/fill approach provided the criteria above is met. As such, the Applicant should demonstrate compliance with the provisions outlined by the DEC. 10. The Applicant indicates within Section 5.0 of the SWPPP that an inquiry has been made to the NYS DEC regarding impacts to endangered and threatened species as it relates to the development of the site. The Applicant shall provide correspondence once received and include it into the SWPPP per I.F.4 of the General Permit. 11. The Applicant indicates within Section 6.0 of the SWPPP that an inquiry has been made to NYS OPRHP regarding Archeological Resources and Historic Places as it relates to the development of the site. The Applicant shall provide correspondence once received and include it into the SWPPP per I.F.8 of the General Permit. 12. It appears that there are inconsistencies between the HydroCAD model and the site plans. For example, the site plans depict infiltration practice IBL8E, which is not included in the HydroCAD model and the HydroCAD model includes practice IBD8 but is not depicted on the site plans. The Applicant to revise accordingly. 13. It is difficult to discern rooftop runoff directions as it does not appear that roof conveyances area depicted on the plans. The Applicant shall depict roof conveyances, as applicable, on the site plans in subsequent submission. 14. Section 6.3.6 of the NYS SMDM states "Infiltration practices shall never serve as a sediment control device during site construction phase. In addition, the Erosion and Sediment Control plan for the site shall clearly indicate how sediment will be prevented from entering an infiltration facility." The Applicant shall revise the plans to clearly indicate how sediment will be prevented from entering the infiltration facilities during the site construction phase. 15. It does not appear that the Applicant has depicted the location nor provided design details fortemporary soil stockpiles on the site plans. The Applicant to revise accordingly. 16. The Applicant to depict, within reason, the locations of water wells and wastewater absorption fields on all neighboring parcels to confirm adequate horizontal separation distances. 17. The Applicant to confirm if the stone walls depicted are on the site plans are existing or proposed. 18. The Applicant has provided a draft NOI for the old permit GP-0-15-001 and shall provide an updated NOI that conforms to the new General Permit (GP-0-20-001). Conclusion & Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Sincerely, Richard Adams, PE Senior Civil Engineer Arl Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION —Approve / Deny SUBDIVISION PRELIMINARY STAGE 4-2022 & FRESHWATER WETLANDS 6-2022 JEFFREY & JOANNE MANN (3 LOT) Subdivision Tax Map ID: 265.-1-23.2 / Property Address: 76 Pickle Hill Road / Zoning: RR-3A A subdivision application has been made to the Queensbury Planning Board for the following: Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are: Lot 6 to be 3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for 3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative / Positive Declaration A public hearing was scheduled and held on December 15, 2022; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SUBDIVISION PRELIMINARY STAGE 4-2022 & FRESHWATER WETLANDS 6-2022 JEFFREY & JOANNE MANN, Introduced by who moved for its adoption. Duly adopted this 151h day of December 2022 by the following vote: AYES: IWOII.3 Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION —Approve / Disapprove SUBDIVISION FINAL STAGE 15-2022 JEFFREY & JOANNE MANN (3 LOT) Tax Map ID: 2653-1-23.2 / Property address: 76 Pickle Hill Road / Zoning: RR-3A A subdivision application has been made to the Queensbury Planning Board for the following: Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are: Lot 6 to be 3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill Road including easements for shared access to Pickle Hill Road for lots 6 and 7. The project site contains APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision for 3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SUBDIVISION FINAL STAGE 15-2022 JEFFREY & JOANNE MANN (3 LOT), Introduced by who moved for its adoption. 1. The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative / Positive Declaration; and if the application is a modification, the requirements of the State Environmental Quality Review Act have been considered, and the proposed modification[s] do not result in any new or significantly different environmental impacts, and, therefore, no further SEQRA review is necessary; 2. Waiver requests granted / denied: 3. The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. 4. The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff 5. Engineering sign -off required prior to signature of Planning Board Chairman. 6. The applicant must submit a copy of the following to the Town: a) The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit or for coverage under an individual SPDES prior to the start of M site work. b) The project NOT (Notice of Termination) upon completion of the project; and Page 1 of 2 Phone: 518.761..82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net 7. The applicant must maintain on their project site, for review by staff: a) The approved final that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; and b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. 8. Final approved plans, in compliance with the Subdivision, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. 9. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. 10. Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; 11. As -built plans to certify that the subdivision is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy; 12. Resolutions must be included on Final Subdivision mylar; Duly adopted this 15th day of December 2022 by the following vote: AYES: NOES: Page 2 of 2 Phone: 518.761.82201 Fax: S18.745.44371742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Subdivision Preliminary 5-2022, Subdivision Final 14-2022 & Freshwater Wetlands 7-2022 Jeffrey & Joanne Mann (5 Lot) Public Hearing scheduled Unlisted (APA) Draft resolution- grant/deny Preliminary and Final Stage Subdivision approval Town of Queensbury Planning Board ot Community Development Department Staff Notes December 15, 2022 Subdivision Preliminary 5-2022, JEFFREY & JOANNE MANN (5 LOT) Subdivision Final 14-2022 & Bay Rd & Pickle Hill Rd / Rural Residential 3A / Ward 1 Freshwater Wetlands 7-2022 SEQR Unlisted- Subject to APA Environmental Review Material Review: application, narrative, subdivision plans, freshwater wetlands permit, stormwater management. Parcel History: SUB (S) 14-2020, AV 18-2022 Requested Action Planning Board review and approval to subdivide a 34.74 acre parcel into 5 lots. Resolutions 1. PB decision Project Description Applicant proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots would be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of 5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and approval. Staff Comments Sketch Plan Stage Applicant completed a sketch plan stage SUB 14-2020 11/2020. The project was for 6 residential lots. Preliminar Serge • Preliminary o The overall plans shows the property to be subdivided along Bay Road and Pickle Hill Road • Layout plans — o The plans indicated 5 residential lots ranging from 3.63 ac to 11.57 ac. • Construction details — o The plans identify the house locations, septic system locations, and wells. • Landscape plans — o The number of lots does not trigger a landscape plan. • Clearing plan o The plans shows the proposed area for the home, septic, driveway access but not necessarily for the lot clearing for each lot in total. 0 • Grading and erosion plans — o Grading Plans were not included but topography is shown on the plans. • The Environmental report — o The project is within the APA and is subject to the APA environmental review process. The applicant is working with APA in regards to jurisdictional requirements. • Statement of Intent- A statement of intent shall be submitted by the applicant o A deed was provided • Stormwater management — o A Stormwater Pollution Prevention Plan has not been provided — the application is requesting a waiver. • Fees — o per application $50 for preliminary, $100 for wetlands and $50 for Area Variance • Waivers — o The applicant requests waivers from the Clearing plan, grading and stormwater plan. Final Stage Review — • Final Plat -subdivision for 5 lots for residents • State/County agency —Planning Board and Adirondack Park Agency • Other plans reports —Stormwater management—SWPPP, Major Stormwater Permit, Maintenance agreement • Protected open space —none proposed. • Fee - $100 and $50 per each lot Freshwater Wetland, The project work proposed on lots adjacent to the designated wetland are within 100 ft of the wetland and trigger FWW permit. Nature of Variance Granted 7/27/2022. The applicant proposes a 5 residential lots. Lot 2 requires relief for lot width where 362 is proposed and 400 ft is required; road frontage where 400 ft is required and 325 ft is proposed. Relief is requested for distance to stormwater device being less than 100 ft where 50 ft is proposed. Relief is also requested for the 3 ft vertical separation distance for a device where 2 ft is proposed. Lot Four will have access to Pickle Hill Road through Lot Three. Summary The applicant has completed Preliminary and Final Stage subdivision applications and a Freshwater wetlands permit for proposed five lots. Meeting History: PB: 5/19/2022; ZBA: 7/27/2022 WIM LaBeRa Powered by partnership. December 15, 2022 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@aueensbury.net Re: Mann - 5 Lot Subdivision Town of Queensbury, Warren County, New York LaBella Project # 2220706.52 Queensbury Ref #SUB 14-2022 Dear Mr. Brown: LaBella Associates has received a submission package from your office for the above referenced project. The Applicant proposes a 5-lot residential subdivision. Information submitted to our office for review includes the following: • Lot Width Calculation Plan, prepared by Hutchins Engineering PLLC, dated September 25, 2022; • Cover letter, prepared by Hutchins Engineering PLLC, dated November 10, 2022; • Stormwater Management Plan, prepared by Hutchins Engineering PLLC, dated November 9, 2022; • Site Plans, prepared by Hutchins Engineering PLLC, dated November 11, 2022; and, • Subdivision Application, prepared by Hutchins Engineering PLLC, dated November 2, 2022. Your office has requested that we limit our review to the design of the stormwater system as it relates to compliance of local, state, or relevant codes and regulations. Based upon our review, LaBella offers the following comments for the Town's consideration: Stormwater Management and Erosion and Sediment Control Comments 1. There are two applications for Jeff and Joanne Mann, Subdivision 14-2022 and Subdivision 15-2022. The stormwater management narrative and draft N01 combine the two subdivisions as it relates to stormwater permitting. According to the draft N01 (both projects combined), the proposed site improvements appear to disturb greater 1 acre (20.5 acres per the draft N01), which typically requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP) in accordance with GP-0-20-001 that includes erosion and sediment controls, as well as post construction stormwater management practices. Lot 5 is tributary to waters of the state classified as AA/AA-s and Lot 5 appears to include greater than 1 acre of land disturbance on virgin land with a slope phase of E or F. Per I.F.6 of the General Permit, Lot 5 would be ineligible for coverage under the General Permit. Lots 1, 2, 3, 4, 6, 7, and 8 would require the preparation of a SWPPP in accordance with the General Permit, however the inclusion of Lot 5 in the N01 would require the project to seek individual SPDES permit coverage. The Applicant acknowledges this situation in Section 4.10 of the SWPPP and states 20 Elm Street Suite 110 1 Glens Falls. NY 128o1 I p (518) 812-0513 www1abetlapc.corn "Therefore, an individual SPDES permit will be required from NYSDEC for this lot prior to beginning construction as designed for the subdivision." Our office understands the Applicant's approach that a General Permit is prepared for all lots except Lot 5, where an individual SPDES permit is required if it is built perthe plans submitted with this application. Since the SWPPP states each lot SPDES permit coverage is transferred to each respective purchaser and Lot 5 may be developed per the plans provided in this submission (requiring individual permit coverage for Lot 5), the Applicant shall submit the SWPPP to NYS DEC for individual permit coverage for Lot 5. When submitting to NYS DEC for Lot 5 individual coverage the Applicant should seek concurrence from DEC on this approach. It is noted that our office does not take exception to this approach so long as Lot 5 is submitted to NYS DEC for individual permit coverage. 2. Additionally, this project falls within the Lake George watershed and therefore is subject to the stormwater management requirements set forth in Section 147-11 of the Town Code for projects within the Lake George Park. Comments related to the stormwater management and erosion and sediment control features proposed for the site are offered below: 3. Projects that disturb greater than 15,000 SF are considered Major Projects per Town code section 147- 11.E.(2). In accordance with Town code section 147-11.1.(3)(c)[2], Major Projects stormwater control measures shall be designed so that there will be no increase in runoff volume from a ten-year- frequency/twenty-four-hour-duration storm event following development over the predevelopment volume; and for storm events exceeding the ten-year design storm, the stormwater controls measures shall function to attenuate peak runoff flow rates for a twenty -five-year frequency storm to be equal to or less than predevelopment flow rates. For development greater than five acres, consistent with New York State guidelines, stormwater control measures shall function to attenuate peak runoff flow rates for a one -hundred -year storm to be equal to or less than predevelopment flow rates. The Applicant has provided a 10-year, 25-year and 100-year storm analysis. 4. Section 147-111(3)(c)(4) of the Town Code states, "Stormwater recharge areas shall be located a minimum of 100 feet from the subsurface treatment system of a wastewater treatment system unless it is demonstrated that a lesser separation will not adversely affect the functioning of such leach fields." It appears that I131-113, I131-213, I131-313, IBL3C, IBL4A, I131-413, and IBL5D infiltration basins are within 100 feet of the proposed wastewater systems. The Applicant to revise accordingly or demonstrate that a lesser separation will no adversely affect the functioning of the absorption fields. 5. Section 147-111(3)(c)[4] of the town code states, "Infiltration devices for major projects shall be located a minimum of 100 feet from Lake George and any down -gradient drinking water supply, lake, river, protected stream, water well, pond, wetland; a separation of more than 100 feet may be required in cases where contamination of the water supply is possible due to highly permeable soils, shallow groundwater and similar situations." The SWPPP states "Stormwater management practices setback relief was granted by the Town of Queensbury's Zoning Board of Appeals in July 2022 to allow infiltration practices to be situated 50-ft horizontally from water features (wetlands, stream)." The Applicant to clarify that this applies to all infiltration practices for all lots. 6. Section 147-111(3)(c)[3] of the town code requires infiltration devices to be a minimum of two feet above the seasonal high groundwater level realized following development and 147-111(3)(c)[6] states the infiltration devices shall be designed based on the infiltration capacity of the soils preset at the project site. Further, Section 6.3.1. of the 2015 NYS Stormwater Management Design Manual (SMDM) states that, "To be suitable for infiltration, underlying soils shall have an infiltration rate (fc) of 0.5 inches per hour, as initially determined from NRCS soil textural classification, and subsequently confirmed by geotechnical tests (see Appendix D). The minimum geotechnical testing is one test hole per 5000 sf, with a minimum of two borings per facility (taken within the proposed limits of the facility)." (Please note that the DEC's FAQ allows minimum of one test pit/boring and one infiltration test for every 5000 square feet of basin area, with no fewer than four test pit/boring and infiltration tests per facility.). It does not appear that testing was performed within the bounds of each infiltration practice. The Applicant to perform the testing per the NYS SMDM and provide the results. 7. Site data, as it relates to horizontal separation distances, shall be provided (or described) north of Pickle Hill Road to confirm required separation distances. 8. The Applicant shall model all stormwater conveyances and diversion trenches to support the design. 9. The NYS SMDM states that "Infiltration practices cannot be located on areas with natural slopes greater than 15%" and "Infiltration practices cannot be located in fill soils". It appears the site has slopes throughout the site that exceed 15%, including in the locations of the infiltration practices. Previous correspondence received from the NYS DEC regarding projects with similar concerns of locating stormwater features in fill slopes has resulted in the following recommendations: "At a minimum, the designer must meet the following guidance and provide justification/demonstration of equivalence in the SWPPP: • Insitu/natural soil layer below the infiltration system has an infiltration rate greater than or equal to the 0.5 in/hr • Ground water and bedrock levels in insitu/natural soil should be at least 2 - 3 feet below grade • Fill material is an engineered fill that is tested after placement (by geotechnical firm) and demonstrated to be equivalent to a soil material acceptable for the installation of an infiltration system (i.e. infiltration rate greater than or equal to .5 in/hr, etc.). Infiltration rate of fill material should be similar infiltration rate as insitu/existing soil. • If there is a difference in the infiltration rates between the fill and insitu/native soil, the designer should use the more conservative (i.e. slower infiltration rate) when determining whether the infiltration system will dewater (exfiltrate) with the required 48 hours (see Section 6.3.2 "Conveyance' of the Design Manual) • Required vertical separation distances to groundwater/bedrock are maintained • Required horizontal separation distances to surface waters, wells, etc. are maintained • There is adequate fill along the edges of the infiltration system to prevent seeps/breakouts" DEC has indicated that with regards to the 15% limit, they have allowed designers to use the cut/fill approach provided the criteria above is met. As such, the Applicant should demonstrate compliance with the provisions outlined by the DEC. 10. The Applicant indicates within Section 5.0 of the SWPPP that an inquiry has been made to the NYS DEC regarding impacts to endangered and threatened species as it relates to the development of the site. The Applicant shall provide correspondence once received and include it into the SWPPP per I.F.4 of the General Permit. 11. The Applicant indicates within Section 6.0 of the SWPPP that an inquiry has been made to NYS OPRHP regarding Archeological Resources and Historic Places as it relates to the development of the site. The Applicant shall provide correspondence once received and include it into the SWPPP per I.F.8 of the General Permit. 12. It appears that there are inconsistencies between the HydroCAD model and the site plans. For example, IBL2D and IBL4C are modeled but not depicted on the site plans and IBL2C is depicted twice on the site plans. The Applicant to revise accordingly. 13. The site plans include an arch culvert stream crossing for Lot 3. The Applicant to clarify who the AHJ of the stream is and clarify if the design has been sent to them for review. 14. It is difficult to discern rooftop runoff directions as it does not appear that roof conveyances area depicted on the plans. The Applicant shall depict roof conveyances, as applicable, on the site plans in subsequent submission. 15. Section 6.3.6 of the NYS SMDM states "Infiltration practices shall never serve as a sediment control device during site construction phase. In addition, the Erosion and Sediment Control plan for the site shall clearly indicate how sediment will be prevented from entering an infiltration facility." The Applicant shall revise the plans to clearly indicate how sediment will be prevented from entering the infiltration facilities during the site construction phase. 16. Town code section 147-9 stipulates the NYS SSESC as the performance and design criteria. The Landgrading section of the NYS SSESC states that "When slopes exceed 2[H]:1[V], special design and stabilization consideration are required and shall be adequatelyshown on the plans."The Applicant has provided a detail for an armored slope stabilization. The armored slope stabilization shall be designed in accordance with the NYS SSESC standard specifications for armored slope and channel stabilization. The NYS SSESC states "Slopes approaching 1.5[H]:1[V] may require special stability analysis. The inherent stability of the soil must be satisfactory before riprap is used for surface stabilization." The site plans and detail depict the rock armored slope on slopes approaching 1H:1V. The Applicant to clarify if a special stability analysis was performed or will be performed prior to construction. The NYS SSESC states that the gradient of the slope to be stabilized shall be less than the natural angle of repose of the stone selected. The Applicant to clarify if the slope gradient will be less than the natural angle of repose for the rock selected. 17. The road and embankment grading from station approximately 9+00 to 7+00 create proposed slopes of approximately 1.5H:1V. At the base of the embankment appears to be a conceptual diversion trench (not completely graded in) that extends up the driveway to approximately 10+50. The Applicant to clarify if a special stability analysis has been performed on the embankment. The Applicant to clarify if the rock armored slope detail considers this embankment situation where flow is concentrated at the toe of the slope. The grading runout and diversion trench appear to outside the existing topographic information. The Applicant shall provide additional topographic information to support final design. The proximity to parcel 265: 1-24 should also be considered in the design. Further, the diversion trench referenced above appears to convey runoff from subcatchment 1S, which according to the HydroCAD model is approximately 36 acres. The diversion trench is not included in the HydroCAD model. Has the Applicant considered the size of the tributary watershed when designing the road embankment and diversion trench? 18. The rock cut slope west of the proposed home on Lot 5 appears to be 1H:2V. The Applicant to clarify if a special stability analysis has been performed on this cut slope. Further, the Applicant should clarify the method of rock removal. The NYS SSESC section on Landgrading prescribes specifications for cut slopes occurring on ripable rock. 19. It does not appear that the Applicant has depicted the location nor provided design details for temporary soil stockpiles on the site plans. The Applicant to revise accordingly. 20. The Applicant to depict, within reason, the locations of water wells and wastewater absorption fields on all neighboring parcels to confirm adequate horizontal separation distances. 21. The Applicant has provided a draft N01 for the old permit GP-0-15-001 and shall provide an updated NO1 that conforms to the new General Permit (GP-0-20-001). Conclusion & Recommendation It is our opinion that the applicant should provide clarification for the above items and incorporate changes in subsequent plan submissions. In the event the Planning Board or Town staff have any questions or require additional information, please do not hesitate to contact me at (518) 824-1932. Sincerely, Richard Adams, PE Senior Civil Engineer cc: Shauna Baker, Town Planning Office Administrator (via email) Laura Moore, Town Land Use Planner (via e-mail) File Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION —Approve / Deny SUBDIVISION PRELIMINARY STAGE 5-2022 & FRESHWATER WETLANDS 7-2022 JEFFREY & JOANNE MANN (5 LOT) Subdivision Tax Map ID: 265.4-23.1 / Property Address: Bay Road & Pickle Hill Road / Zoning: RR-3A A subdivision application has been made to the Queensbury Planning Board for the following: Applicant proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots would be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of 5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; A public hearing was scheduled and held on December 15, 2022; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SUBDIVISION PRELIMINARY STAGE 5-2022 & FRESHWATER WETLANDS 7-2022 JEFFREY & JOANNE MANN (5 LOT), Introduced by who moved for its adoption. Motion seconded by AYES: NOES: Duly adopted this 15'' day of December 2022 by the following vote: Phone: 518.761.8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION —Approve / Disapprove SUBDIVISION FINAL STAGE 14-2022 & FRESHWATER WETLANDS 7-2022 JEFFREY & JOANNE MANN (5 LOT) Tax Map ID: 265.4-23.1 / Property Address: Bay Road & Pickle Hill Road / Zoning: RR-3A A subdivision application has been made to the Queensbury Planning Board for the following: Applicant proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots would be divided as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres with access through lot 3, and lot 5 at 11.57 acres. Lot 4 contains an existing barn and shed that will remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94, subdivision of 5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code -Chapter A-183, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SUBDIVISION FINAL STAGE 14-2022 & FRESHWATER WETLANDS 7-2022 JEFFREY & JOANNE MANN (5 LOT), Introduced by who moved for its adoption. 1. The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative / Positive Declaration; and if the application is a modification, the requirements of the State Environmental Quality Review Act have been considered, and the proposed modification[s] do not result in any new or significantly different environmental impacts, and, therefore, no further SEQRA review is necessary; 2. Waiver requests granted / denied: 3. The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1) year time frame has expired if you have not yet applied for a building permit or commenced significant site work. 4. The limits of clearing will constitute a no -cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff 5. Engineering sign -off required prior to signature of Planning Board Chairman. 6. The applicant must submit a copy of the following to the Town: a) The project NOI (Notice of Intent) for coverage under the current NYSDEC SPDES General Permit or for coverage under an individual SPDES prior to the start of Any site work. b) The project NOT (Notice of Termination) upon completion of the project; and Page 1 of 2 Phone: 518.761.82201 Fax: 518.745.44371742 Bay Road, Queensbury, NY 128041 www.queensbury.net 7. The applicant must maintain on their project site, for review by staff: a) The approved final that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan) when such a plan was prepared and approved; and b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. 8. Final approved plans, in compliance with the Subdivision, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. 9. The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. 10. Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; 11. As -built plans to certify that the subdivision is developed according to the approved plans to be provided r�ior to issuance of the certificate of occupancy; 12. Resolutions must be included on Final Subdivision mylar; Motion seconded by Duly adopted this 15th day of December 2022 by the following vote: EVA NOES: Page 2 of 2 Phone: 53.8.761..82201 Fax: 518.745.4437 1742 Bay Road, Queensbury, NY 128041 www.queensbury.net