Loading...
CC-0280-2021 - - PRINCIPLE STRUCTURE Office Use Only I PERMIT APPLICATION Permit#: eC.' 026D -2.9 21 Permit Fee:$ 2$ Town of Qucensbury *Rec Fee: $ N P,-,e_ 742 Bay Road, Queensbury, NY 12804 `1 U P: 518-761-8256 www.queensbury.net Invoice#: \ Flood Zone? Y' N Reviewed By: QJ1 $ i UY�Yv¢�v Z Project Location: 6 Duke%dustrial Park Rd Tax Map #: 302.8-2-24 Subdivision Name: *RECREATION FEE $1000.00 for new dwelling units: single family, duplex t o-fc>rnil"y,-ri�uiipl it , apartments,condominiums, townhouses,cr NYS Building Standards & C Xa proved manuf� t r d home. This is in addition to the permit fee(s). 'PR ? 'Gi21 TOw�Or OUEEJgS3URY PROJECT INFORMATION: E3Cllf®cN�� -----...._.0 ODES ❑ Residential ® Commercial, Proposed Use: Self Storage ❑ Single-Family: ❑Two-Family ❑ Multi-Family (#of units: ) 1. ❑ Custom 2. ❑ Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) ❑Townhouse ❑ Garage (#of cars ) ❑ Business Office ❑ Retail ❑ Hotel/Motel ❑ Industrial ❑ Heated Warehouse/Storage Building ® Unheated Warehouse/Storage Building ❑Amusement Ride ❑ Other(describe: ) MAIN STRUCTURE SQUARE.FOOTAGE: GARAGE SQUARE FOOTAGE: lsrfloor: 2"d floor: 2"d floor: 3rd floor: Total square feet: Basement(habitable space): Total square feet: Principle Structure Packet Revised March 2021 i ti ADDITIONAL PROJECT INFORMATION: !,1.; Estimated"Cost:of Constru.ctiQ,n: $? 2. Proposed use of the building: Self storage building 3. If Commercial or Industrial, indicate the name of the business: Bay Road Self Storage LLC i,4.',Source of�Heat: ❑ Gas ❑ Oil —1 Propane ❑ Solar ❑ Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application,one per appliance) 15.,. Are there any-,structures.,not shown'on the plot plan,? ❑ YES ❑ NO Explain, if yes: 16:. Are.there an',,easements on the property? ❑ YES ❑ NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? b. Is this a corner lot? ❑ YES ® NO c. Will the grade be changed as a result of the construction? ❑ YES ❑ NO d. What is the water source? ❑ PUBLIC ❑ PRIVATE ❑ WELL e. What type of wastewater system is on the parcel? ❑ SEWER ❑ PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans, additional reviews and re-approval. 2. If,.for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and inconformance with localzoning regulations. '4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of -occupancy. 5. 1 also understand that I/we are required to provide an as-built survey bya NYSlicensed land surveyor of all newly constructed facilities priorto issuance ofacertificateofoccupancy. I have read and agree to the above: PRINT NAME: GiaZ" i ne SIGNAURE: 'DATE: Gf � Z Principle Structure Packet Revised March 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): Gianni Simone Mailing Address, C/S/Z: Cell Phone: 518-729-7477 Land Line: Email: gianniCc cerronebuilders.com • Primary Owner(s): Name(s): Bay Road Self Storage,LLC Mailing Address, C/S/Z: 269 Ballard Rd Wilton NY 12831 Cell Phone: Land Line: Email: ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): Cerrone Builders Contractor Trade: Mailing Address,,C/S/Z: 1589 State Rte 9 Ft Edward NY 12828 Cell Phone: 518-729-7477 Land Line: Email: **Workers' Comp documentation must be submitted with this application** • Arch itect(sUEngineer(s): Business Name: Trachte Building Systems Contact Name(s): Mailing Address, C/S/Z: 314 Wilburn Rd Sun Praire Wl Cell Phone: 800-356-5824 Land Line: Email: Contact Person for Compliance in regards to this project: Gianni Simone Cell Phone: 518-729-7477 Land Line: Email: ganni a cerronebuilders.com Principle Structure Packet Revised March 2021 • Contractor(s): Workers' Comp documentation must be submitted with this application 6ntact Name(s)OConnor Construction Contractor Trade: excavation/grading Mailing Address, C/S/Z: PO Box 877 Glens Falls NY 12801 Cell Phone: 518-361-0787 Land Line: 518-792-4090 Email: o'connorincCE hotmail.com • Contractor(s): Workers' Comp documentation must be submitted with this application Contact Name(s): Barlow Electric Contractor Trade: electrician Mailing Address, C/S/Z: 46 Gillespie Rd Granville NY 12846 Cell Phone: 518-361-0531 Land Line: 518-361-0531 Email: wesbarlow349yahoo.com ✓ • Contractor(s): Workers' Comp documentation must be submitted with this application Contact Name(s): Vision Engineering/Dan Ryan Contractor Trade: steel erection inspection Mailing Address, C/S/Z: PO Box 596 Glens Falls NY 12801 Cell Phone: 518-742-9569 Land Line: 518-742-9569 Email: dryan@dwrpe.com • Contractor(s): Workers' Comp documentation must be submitted with this application Contact Name(s): Construction Technology Inspecting & Testing Contractor Trade: concrete testing Mailing Address, C/S/Z: 4 Williams St Ballston Lake NY 12019 Cell Phone: Land Line: 518-399-1848 Email: constructiontech@live.com V • Contractor(s): Workers' Comp documentation must be submitted with this application Contact Name(s): Reno Storage & Repairs LLC Contractor Trade: Steel erector Mailing Address, C/S/Z: 54 Cardinal Dr East Hartford CT 06118 Cell Phone: 860-559-3528 Land Line: Email: renostor8938@yahoo.com ,-/• Contractor(s): Workers' Comp documentation must be submitted with this application Contact Name(s): Patrick Tirado Contractor Trade: Concrete Mailing Address, C/S/Z: 5 Old Bend Rd Fort Edward NY 12828 Cell Phone: 518-480-9141 Land Line: Email: patricktirado@gmail.com Principle Structure Packet Revised March 2021 i TRACHTE BUILDING SYSTEMS, INC. � OF NE�,r PROJECT CALCULATIONS C��'o�`1i° q� CUSTOMER :_ "Al Cerrone" PREPARED—BY = 'Claire Z.Robinson" LOCATION := "Queensbury,NY" REVIEWED—BY n y1 4 �I, w PLAN NUMBER :_ "P, 9,Phase C" oward �() .02.10 BUILDING.-, "#b#8P d#9" FILE COPY R F�S�IO�P :25:55-06'00 BODY = ® Building Code of New York State" COUILDINGDESCRIPTION BAYWIDTH bay:= 10ft PURLIN BRIDGING PBddging:= "no" in ROOF PITCH Rpitch 0.25— BUILDING HEIGHT height:= 8ft+4in ROOF MATERIAL Roof:= "SSR" ft BUILDING WIDTH width:= 30ft PURLIN SPACING Pspace 5ft ROOF ANGLE 9 = 1.19deg BUILDING LENGTH length:= 170ft INT.PARTITION PANEL Ptpanel "Yes" ROOF PE Type:= "Gable" FLOOR TO FLOOR lower:= Oft INT.LATERAL BRIDGING Bridge:= "no" K CATEGORY UseGroup:= "I" Use® I"or"II" FOUNDATION SLOPE Fndslope 0% SNOW LOAD SEISMIC LOAD GROUND SNOW LOAD P9 'X6% sf ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE SNOW EXPOSURE CATEGORY Esnow:= C. BUILD G FRAME SYSTEM BFS = "Light Frame Wall w/Shear Panels" SNOW IMPORTANCE FACTOR is= 0.8 a6EISMIC SITE CLASS Sited,,:= "D" THERMAL FACTOR Ct ' 1.2 SHORT PERIOD SPECTIAL ACC. SS:= 0.236 SNOW EXPOSURE Exp := "Partial" 1 SECOND PERIOD SPECTRAL ACC. S1 :_ 0.068 ROOF LIVE LOAD Lr := 20psf FLAT ROOF SNOW LOAD Pf =40-psf SPECTRAL RESPONSE ACC. SDg = 0.25 UNBALANCE SNOW LOAD Punbalanced =40•psf SPECTRAL RESPONCE ACC. SDI = 0.11 SNO LOAD USED IN DESIGN PS=40 psf RE ON SE FACTOR Response L= 6.5 IN SURCHARGE RainSurcharge= Gpsf EISMIC DESIGN CATEGORY SeismicD O WIND VELo IND LOCITY V 105m h SEISMIC RESPONSE COFFICIENT Cs = 0.04 00 Vasd = 81•mph d;;� ('` I /DGE SURE CATEGORY E C € —�� wmd = 0 M b�ti d 10Z TRIP WIDTH a= 3ft DEAD LOAD ®M - COMPONENTS AND CLADDING (Method 2) ROOF DEAD LOAD DR= 3psf ENDWALL GIRT FED= 25psf PARTITION DEAD LOAD Dp= 3psf SIDEWALL GIRT FSG= 24psf ADDITIONAL LONG.DEAD LOAD DL = 0psf PURLIN Fpurlin =— P 23 sf ADDITIONAL TRANS,DEAD LOAD DT= 0psf MAIN WIND FORCE(Method 2) BASE SHEAR LONGITUDINAL TRANSVERSE WALL (SuctionandPressure) Fw = 17.54psf SEISMIC Vas = 17371b VT, = 1021b ROOF FR = 8psf WIND VFW = 13031b VTw= 5631b ANCHOR INFORMATION $02.8-2-24 - CC-0280-2021 EDGE DISTANCE EdgeDistance:=3 Bay Road Self Storage LLC P50359C #7,#8,#9.xmcd 1 6 Duke Industrial Park Rd, Bldg 8 021 New Commercial Bldg 11,400 s.f. CONCRETE STRENGTH Concrete:=2500 (�N:=0.65 Table 3-ESR-3889 TVs:=0.60 Table 4-ESR-3889 Oc:=0.70 Table 4-ESR-3889 do .375:= 0.375in do .5:= 0.5in nominal anchor diameter(table 1 ES 3889) hef.375 1.33in hef.375 3 1.75in hef.5 2.5 1.75in hef .5 3.5 2.17in effective embedment(table 1 ESR 3889) cac .375 5.Oin cac .375 3 6.3in cac .5 2.5 Min cac .5 3.5 5.9in critical edge distance(table 1 ES 3889) 1�, 1.0 modification factor for cracked and uncraked concrete(tabel 4 ESR388' kc:= 17 effectiveness factor for cracked concrete(table 4 ESR 3889) Np:=Okip characteristic puloutstrength,cracked concrete(table 4 ESR 3889) le .375 1.33in le .375 3 1.75in le .5 2.5 1.75in le .5 3.5 2.17in load bearing length of anchor(table 4 ESR 3889) Nsa .375 8.730kip Nsa .5 20.475kip steel strength in tendon(table 3 ESR 3889) Vsa .375 3.465kip Vsa .5 8.860kip steel strength in shear(table 4 ES 3889) Corner Anchor nc:= 1 number of bolts at column cap c:=2.75in distance between bolts from edge 2 sl c:=Oin distance between bolts along edge 1 ca2 c:=2.75in distance of bolts from edge 1 s2 c:=Oin distance between bolts along edge 2 eN c:= Oin distance from resultant tendon load to centroid of anchors in tension e„ c:=Oin distance from sultant shear load to centroid of anchors in shear 'Exterioir Anchor ne:=2 number of bolts at column cal e:=2.75in distance between bolts from edge 2 si a:=Oin distance between bolts along edge 1 ca2 a:= 100in distance of bolts from edge 1 s2 a:=5in distance between bolts along edge 2 eN a:= Oin distance from resultant tendon load to centroid of anchors in tension e, a:=Oin distance from sultant shear load to centroid of anchors in shear Interior Anchor n;:= 1 numberof bolts at column cap ;:= 100in distance between bolts from edge 2 sl i:=Oin distance between bolts along edge 1 ca2 ;:= 100in distance of bolts from edge 1 s2 I:= Oin distance between bolts along edge 2 eN ;:=Oin distance from resultant tendon load to centroid of anchors in tension ev ;:=Oin distance from sultant shear load to centroid of anchors in shear P50359C_#7,#8,#9.xmcd 2 1/27/2021 % ) ANCHORFORCE SUMMARY SHEAR UPLIFT WIND/LONGITUDINAL/INTERIOR Vwii= 18lb Nwii= 261 lb WIND/LONGITUDINAL/EXTERIOR V1Nei= 62lb N,Nei= 196lb WIND/TRANSVERSE/INTERIOR Vwit= 38lb Nwit= 130lb WIND/TRANSVERSE/EXTERIOR Vw,t= 188lb Nw,t= 221 lb SEISM IC/LONGITUDINAL/INTERIOR Vsil= 138Ib Nsil= 34lb SEISMIC/LONGITUDINAL/EXTERIOR Vsel= 138lb Nsel= 1831b SEISM IC/TRANSVERSE/INTERIOR Vsit= 13lb Nsit=—299lb SEISMIC/TRANSVERSE/EXTERIOR Vset= 65lb Nset=—95lb ULTIMATE LOADS FOR ANCHORS Tension (Interior) Tension(Exterior) Shear(Interior) Shear(Exterior) Tension,=847.441b Tensionx= 1316.03lb Shear,= 912.63lb Shearx= 1247.4lb Bolt Interatcdon Check Applied Uplift/Tension+Applied Shear/Shear<1.2 Longitudinal Transverse InteriorAnchors Wind Anchor;.wl= 0.33 Wind Anchor;,t= 0.19 Siesmic Anchori sl= 0.19 Siesmic Anchori st= 0.01 BderiorAnchors Wind Anchor, w,= 0.199 Wind Anchore wt= 0.32 Siesmic Anchore sl= 0.25 Siesmic Anchor, st= 0.05 ConnnerAnchors Wind Anchorc wl= 0.21 Wind Anchorc wt= 0.21 Siesmic Anchorc sl= 0 Siesmic Anchorc st= 0 ANCHOR Interior Anchori= 1/8"x 2.5- Exterior Anchore= "3l8"x 2.5"" P50359C_#7,#8,#9.xmcd 3 1/27/2021 e_ i PANEL CHECK PANEL CAPACITY Va11= 53•plf LONGITUDINAL SHEAR PANEL REQUIRED PanelLengthL= 32.78ft LONGITUDINALSHEAR PAN EL PanelL= 80ft TRANSVERSE SHEAR PANEL REQUIRED PanelLengthT= 10.63ft TRANSVERSE SHEAR PANEL PanelT= 30 ft LONGITUDINAL SHEAR WALL PanelCheckL= "ok" (IF PANEL CHECK IS"OK"NO STRAP BRACES REQUIRED TRANSVERSE SHEAR WALL PanelCheckT= "ok" FOR LATERAL FORCE RESISTING SYSTEM BUT STRAPS MAY BE REQUIRED FOR ANCHORING) STRAP BRACES(IF REQUIRED) LONGITUDINAL StrapsL= 0 TRANSVERSE StrapsT= 0 Allowable Tension in Strap Ta= 2470.061b GAUGE OF STRAP Gage= 16 STRAP WIDTH ws= 2•in Longitudinal Strap Angle BraceangleL= 39.81•deg Transverse Strap Angle BraceangleT= 39.81•deg 1 Longitudinal Tension on Strap TL:=i PanelCheckL ="ok",0, max(VLs,VLw) co BraceangleL J TL= 0lb Transverse Tension on Strap TT:=i PanelCheckT="ok",O, max(VTs�VTw) co BraceangleT TT= Olb GUNNKE UN b1CNDC: V R VT. 0� OR V_w f VTw reignt Uplift i pp ` �/ BrQLC'angld\\\ �Pr c,"g\I� . ,r /� y} \\� Y _ 1z 1 Brccemgie (Note:Compression member to be designed seperately,see additional calculations. Compression memeber needed only when StrapsT>0) P50359C #7,#8,#9.xmcd 4 1/27/2021 INPUTVALUES PURLIN BRIDGING SPACING PudinBridgeSpace= 60 DEPTH OF PURLIN webp:=7 7,9, 11 or 12 HEIGHT OF HORIZONTAL BRACING BridgeHeight=4.32 ft JAMB SUPPORT StubPostJ:_"no" WIDTH OF INTERIOR COLUMN web,:=3.5 CORNERCOLUMN UNBRACED LENGTH(y&t) Cb,ce= 2.78ft SIDE WALL COLUMN webs:=3.5 ColumnNumbersW:=2 SIDEWALL GIRT webs:=webs GirtNumber:= 1 END WALL COLUMN webE:=3.5 ColumnNumberEW:=2 ENDWALL GIRT webGE:=webE EGirtNumber:= 1 END CLOSET COLUMN(JAMB) webEWc:= 3.5 ColumnNumberEWc:= 1 (Use either 3.5 or 5.5 for the width of Side Wall, END CLOSET COLUMN(HDR) webEC:=3.5 ColumnNumberEC:= 1 End Wall or End Closet Columns) STUB POST HEADER(L) webH:= 9 5.5",9",10"or 12" MembersHL:= 1 STUB POST HEADER(S) webHS:=5.5 5.5",9",10"or 12" MembersHS:= 1 LOAD COMBINATIONS LC1=D+MAX(S,Lr) EQUATION 16-10 LC2=D+MAX(.75S,.75Lr) EQUATION 16-11 LC3=D+MAX(.6W,.7E) EQUATION 16-12 LC4=D+..45W+MAX(.75S,.75Lr) EQUATION 16.13 LC5=D+..525E+,75S EQUATION 16.14 LC6=.6D+MAX(.6W,.7E) EQUATION 16-15 EQUATION 16-16 PURLIN INFORMATION PURLIN LOADS UNIFORM LOAD END REACTION MOMENT LC 1 wPudinl = 217•plf Rpudin1 = 1083 lb Mpudinl = 2707 ft Ib LC4 wPudin4= 185 plf Rpudin4= 9231b Mpudin4= 2308 ft Ib LC6 wPudin6=—59•plf Rpudin6=—2961b Mpudin6=—740f-lb LC6 wPudin6e=—82-plf Rpudin6ea=—3541b Rpudin6eb=—3061b Mpudin6,_—1026ft Ib PURLIN MemberpR= 7 x 16ga,50ksi Cee Purlin" IntpR= 0.900 LXPR= 118.5in LyPR= 118.5in LtPR= 118.5in LyPR_neg= 118.5in LtPR_neg= 118.5in STUB POST HEADERS STUB POST HEADER LOADS REACTION MOMENT LC1 RH1= 1083lb MHl= 5415ft1b LC4 RH4= 9231b MH4=4616 ft lb LC5 RH6=—2961b MH6=—1480 ft Ib MEMBER SIZES INTERACTION LENGTH STUB POST HEADERS MemberH= "9 x 3.2 x 14ga 50 ksi Stub Header" IntH= 0.937 HeaderLength= 10 ft STUB POST HEADER BRACING LxH= 120in LyH= 120in LtH= 12Gin SMALL STUB POST HEADERS MemberHS= "5.5 x 3.2 x 18ga 33 ksi Stub Header" IntHS= 0.923 SHLength= 5ft SMALL STUB POST HEADER BRACING LxHS= 60•in LyHS= 60•in Ltjs= 60•in P50359C #7,#8,#9.xmcd 5 1/27/2021 INTERIOR COLUMNS INTERIOR COLUMN LOADS AXIAL LOAD MOMENT LC1 P11 = 2166lb M11 = 0 LC3 P13=4691b M13= 0 LC4 P14= 1901 lb M14= 175.2f-lb (Moment due to 5 psf horizontal load) LC5 P15= 1817lb M15= 175.2ftlb MEMBER SIZES INTERACTION INTERIOR COLUMN Member,_ '163 x 2 x 16ga,50 ksi Interior Column" Intl= 0.759 INTERIOR COLUMN BRACING Lxl= 97•in Lyl= 12•in Lt,= 97•in JAMBS JAMB LOADS AXIAL LOAD MOMENT LC 1 PJamb1 = 1083 lb NA LC3 PJamb3a= 2891b MJamb3a= 103 ft Ib LC3 PJamb3b= 266lb NA LC4 PJamb4= 991 Ib MJamb4= 78 ft Ib LC5 PJamb5= 9741b NA JAMB UNIFORM LOAD swjamb= 134plf WEWJamb= 76•plf JAMB APPLIED MOMENT JambMoment= 103 ft Ib EWJambMoment= 73 ft.lb JAMB AXIAL LOAD PJamb1 = 1083 Ib JAMB MOMENT CAPACITY Mjambcap= 971 ft Ib JAMB AXIAL CAPACITY Pjamb,p= 5691 lb JAMB CHECK JambCheck= "ok" EWJambCheck= "ok" MEMBER SIZES END WALL HEADER MOMENT CAPACTIY EWheadermomenallt= 2922 ft lb END WALL HEADER APPLIED MOMENT EWhedermomentapp= 2707.5 ft lb LARGE END WALL HEADER CHECK EWheader checkl6= "16in EW Header O.K." EWheader check22= "22in EW Header O.K." SIDE WALL COLUMNS SIDE WALL LOADS AXIAL SIDE WALL MOMENT LC 1 PSW1 = 1083 lb MSW= Oft-lb LC3 PSVV3= 2891b LC4 PSW4= 991 lb MEMBER SIZES INTERACTION SIDE WALL COLUMN MemberSW= "3.63 x 1.5 x 18ga 33 ksi Column" IntsW= 0.360 SIDE WALL COLUMN BRACING LxS= 100in Lys= 33•in LtS= 33•in P50359C #7,#8,#9.xmcd 6 1/27/2021 END WALL COLUMNS END WALL LOADS AXIAL LOAD UNIFORM LOAD MOMENT LC1 PEW1 = 1083lb NA NA LC3 PEWS= 2891b WEVY3= 53-plf MEWS=492ft Ib LC4 PEW4= 991 lb WEW4= 39-plf MEW4= 369ft Ib MEMBER SIZES INTERACTION END WALL COLUMN MemberEW= "3.63 x 1.5 x 18ga 33 ksi Column" IntEW= 0.784 END WALL COLUMN BRACING LxE= 97-in LyE= 37-in LtE= 37-in GIRTS GIRT LOADS UNIFORM LOAD END REACTION MOMENT SIDE WALL GIRT IN MID ZONE WGS=41-plf RGS= 2041b MGS= 510f1:1b SIDE WALL GIRT IN END ZONE WGSe=49-plf RGSe= 2431b MGSe= 609ft lb GIRT IN MID ZONE WGE=47-plf RGE= 2361b MGE= 148ft Ib GIRT IN END ZONE WGSe= 58-pIf RGSe= 2881b MGSe= 180ft lb MEMBER SIZES INTERACTION SIDE WALL GIRT(MID) MemberGS= '15 x 1.75 x 18ga 33 ksi Girt" IntGS= 0.901 END WALL GIRT(END) MemberGS= '15 x 1.75 x 18ga 33 ksi Girt" IntGE= 0.266 SIDE WALL GIRT BRACING LxG= 119-in LyG= 12-in LtG= 119-in END WALL GIRT BRACING LXGE= 59-in LyGE= 12-in LtGE= 59•in STUDS STUD SPACING StudSpacing= 16-in STUD LOADS UNIFORM LOAD MOMENT SIDE WALL STUD IN MID ZONE WSW= 21-pIf MStud= 181 ft.lb SIDE WALL STUD IN END ZONE WStude= 26-pIf MStude= 223ft Ib MEMBER SIZES INTERACTION SIDE WALL STUD MemberStud= '1625 x 2 x 20ga 33 ksi Stud" Intstud= 0.387 SIDE WALL STUB BRACING Lxstud= 100 in Lystud= 33.in Ltstud= 33.in FOUNDATION INFORMATION INTERIOR COLUMN REACTIONS GRAVITY Pdown_intedor= 2166lb UPLIFT Pup_int= 139lb EXTERIOR COLUMN REACTIONS GRAVITY Pdown_exterior= 1083lb UPLIFT Pup ext= 1241b ALLOWABLE BEARING PRESSURE BearingPressure= 1500-psf SLAB THICKNESS Slab= 5.5-in PAD WIDTH PadW= "na"-in PAD DEPTH PadD= "na"-in P50359C #7,#8,#9.xmcd 7 1/27/2021 DAN I E L W. RYAN P.E. Strucc vil Licensed Professional Engineer Municipal September 9, 2021 Town of Queensbury Building and Codes Department 742 Bay Road FILE COPY Queensbury, NY 12804 RE: Bay Road Self-Storage Construction of Buildings4ea This letter,shall serve to verify that DWRPE will provide construction observation/structural.inspection services required by code for the above buildings to be constructed at the Bay Road Self Storage project site. In addition, Construction Technology's services will be utilized_to provide construction material testing services for the project relating to compaction/soil testing and concrete sampling/testing. Sincerely, Daniel W. Ryan P.E. ® ® 206 Glen Street Suite 30 Glens Falls,NY 12801 (518)792-9264 www.dwrpe.com