Loading...
CC-0023-2023 R Office Use Only ADDITION ALTERATION PERMIT _ � Permit#: CG-002'v-2023 Town of�b ry APPLICATION Permit Fee:$ 'ZOO 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.aueensbury.net Invoice#: Flood Zone? Y Reviewed By: Project Location: 27 Carey Rd Tax Map ID#: 308.1 6-2-2.2 Subdivision Name: PROJECT INFORMATION: TYPE: ❑ Residential © Commercial, Proposed Use: Office Space ❑ Single-Family ❑ Two-Family ❑ Multi-Family(#of units_) ❑ Townhouse ® Business Office ❑ Retail ❑ Industrial/Warehouse ❑ Garage (#of cars ) ❑ Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 307 2nd floor: 2nd floor: 31d floor: 3rd floor: Basement(habitable space): Basement (habitable space): Total sq ft: Total sq ft: 307 Scope of work to be done: Interior fit up of single use office within existing warehouse space Addition/Alteration Application Revised June 2022 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(sI. Hudson Headwaters Health Network- Dal Valentini Mailing Address, C/S/Z: 9 Carey Road Queensbury NY 12084 Cell Phone: ( _)518-857-3408 Land Line: _)518-761-0300 x31624 Email:dvalentini@hhhn.org • Primary Owner(s): Name(s): Hudson Headwaters Health Network Mailing Address, C/S/Z: 9 Carey Road Queensbury NY 12084 Cell Phone: ( )518-857-3408 Land Line: )518-761-0300 Email:dvalentini@hhhn.org ❑ Check if all work will be performed by property owner only Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): Contractor Trade: Mailing Address, C/S/Z: Cell Phone:�_) Land Line: � ) Email: "Workers' Comp documentation must be submitted with this application" • Architect(s)/Eneineer(s): Business Name: SMRT Contact Name(s): Adrianne Morganstein Mailing Address, C/S/Z: 433 State Street,5th Floor Schenectady NY 12305 Cell Phone: ( ) Land Line: �_)877700-7678 Email:AMorganstein@smrtinc.com Contact Person for Compliance in regards to this project: Dal Valentin! Cell Phone:�_)518 857-3408 Land Line: �_)518 761-0300x31624 Email:dvalentini@hhhn.org Addition/Alteration Application Revised June 2022 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 50,000 2. Source of Heat(circle one): 9 Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other: Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? ❑ YES ® NO Explain: 4. Are there any easements on the property? ❑ YES ® NO SITE INFORMATION: • Is this a corner lot? ❑ YES B NO • Will the grade be changed as a result of the construction? ❑ YES ® NO • What is the water source? ® PUBLIC ❑ PRIVATE WELL • What type of wastewater system is on the parcel? © SEWER ❑ PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certifythat the application, plans and supporting materials are atrue and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: SIGNATURE: DATE: Addition/Alteration Application Revised June 2022 i Cc. d o Z-j-- {�'= CO:-NINIONWIF-ALTH MECTRICAL INSPECTION SERVICE,INC_ h;,•• I!'idln.Ofrce 176 Doe nun Road-Manlaohn,PA 17545 L •:v?n �6...: M•uNmca0m,crwrivicx'E - ELECTRICAL APPROV?& lrN>r�' Permit No........................................Ccrt.N 2 5® 1 2 O Cat-in Card No..................................... `n ................................. ........................ .'. Owner..................... , c �............Location........... .......C ttZ. ......t .Q:...........,.......................,..,..........._..................................... I�rkii`• Imo, L t'�8 /:yM � 13/ C � '1}�!'" tYe . Inst:t)falitm f_'ntuiyfing vs. .%.����r�'..,H...,�E,?r,...r.......►�.....,..,.�.......�.�•:�+'.y,.�...�.......,f.?...i� •¢r .,+: a•• .............. .... ..i.,tiR.......... ............................................,.-..,.....,,.......................,,.................................. i �y A '' Installed C3y;,.,..,,......Sl►.rr�.. .........................................................Lie.'No................................................. �•'ir;.•:, 1`he couditious ii,uuwini,grlvcrnad the issuance of this certificate,tmd any cer[ilicatc previously issued is � �,. •`..;;•��•"�,�'•, Cancelled:- -fit°. , fS(F��. This ea,rtifietitc OI\11' Cb'Cr4 the L'ICCtrlCai V'(1lIIPR1Cnt and installation cundidons as a�date. Upon the AS•. .../!••� f . introduction of addia;nnal equipment or,alterations,applieution shall he promptly made for inspection, f W. ;, . hospeclors of this ('Ill pony 0;111 have tbo privilege of rmakiq inspgwions at auy time, and if itg „ ',i �, ;�•..• rules Ari: violntcii,rho.Cbmp,lny shall have the right w revoke this ccrtitle;�ta.. .......T••.• . . !11:�`� :. Dale..............::. °.:3- .......:.....INSP�,CTa�.., :_ .. .. ,...... ............,.............. ;��:�•• Memllcr t'i-F.I.A.,I.A.1�,.1- i '�� ,•���: at 6t szei;lLti/be TO 30dd O awm NO�l COMcheck Software Version 4.1.5.5 Mechanical Compliance Certificate Project Information Energy Code: 2020 NYStretch Energy Code-2018 IECC Project Title: Hudson Headwaters Health Network Location: Glens Falls, New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 27 Carey Road Hudson Headwaters Health GPI Queensbury, NY 12804 Network 80 Wolf Road 27 Carey Road Albany, NY 12205 Mechanical Systems List REVIEWED F Quantity System Type&Description ®R 1 HVAC System 1 (Single Zone): ENERGY CODE COMPLIANCE_ Packaged Terminal Heat Pump Heating Mode:Capacity=12 kBtu/h, Proposed Efficiency=3.90 COP,Required Efficiency=3.23 COP Cooling Mode:Capacity=9 kBtu/h, Proposed Efficiency=13.40 EER,Required Efficiency: 11.30 EER Fan System: None Mechanical Compliance Statement Compliance Statement. The proposed mechanical alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2020 NYStretch Energy Code-2018 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checklist, Dan LaBreck Sr. Mech Designer 0cm Ba53w& 01/04/2023 Name-Title Signature Date N � o � E 2 3 2023 QUEEI'�SSRURYG& CODES 308.16-2-2.2 CC-0023-2023 HHHN/Jim McCormack 27 Carey Rd Business Office Alteration 307 s.f. Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 1 of 9 COMCHECK.cck COMcheck Software Version 4.1.5.5 Inspection Checklist Energy Code: 2020 NYStretch Energy Code - 2018 IECC Requirements: 61.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions &Re .ID C103.2 Plans,specifications, and/or f❑Complies ;Requirement will be met. [PR2]1 calculations provide all information !❑Does Not with which compliance can be determined for the mechanical 1❑Not Observable systems and equipment and ,❑Not Applicable document where exceptions to the ; standard are claimed. Load I I calculations per acceptable engineering standards and ; handbooks. I I C405.11 !New parking garages and new parking 1❑Complies ; [PR38]3 (lots powered by the energy services :❑Does Not ,for a building, and with 10 or greater parking spaces, provide either: 1. l;❑Not Observable I Panel capacity and conduit for the 1❑Not Applicable future installation of minimum ' 208/240V 40-amp outlets for 5 I I percent of the total parking spaces land not less than two parking spaces; ; or 2. Minimum 208/240V 40-amp I I outlets for 5 percent of the total I parking spaces and not less than two ; parking spaces. I l Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 2 of 9 COMCHECK.cck j Section # Footing/Foundation Inspection Complies? Comments/Assumptions &Re .ID C403.12.2(Snow/ice melting system and freeze ;❑Complies !Exception: Requirement does not apply. protection systems have sensors and T❑Does Not C403.12.3'controls configured to limit service for ;❑Not Observable [FO913 i pavement temperature and outdoor I (temperature.future connection to 1❑Not Applicable controls. ' Additional Comments/Assumptions: 1 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 3 of 9 COMCHECK.cck Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions &Re .ID C404.5, I Heated water supply piping conforms 10Complies :Exception: Requirement does not apply. C404.5.1, Ito pipe length and volume ;❑Does Not C404.5.2 !requirements. Refer to section details. 1i❑Not Observable 1 [PL6]3 ! ;❑Not Applicable I I I C404.6.3 ,Pumps that circulate water between a 1❑Complies (Exception: Requirement does not apply. [PL7]3 ;heater and storage tank have controls ❑Does Not that limit operation from startup to 1 1 <<= 5 minutes after end of heating 1❑Not Observable 1 cycle. 1❑Not Applicable 1 C404.7 Demand recirculation water systems 1❑Complies :Exception: Requirement does not apply. [PL8]3 have controls that start the pump ;❑Does Not upon receiving a signal from the ❑Not Observable I I action of a user of a fixture or appliance and limits the temperature f❑Not Applicable 1 of the water entering the cold-water 1 1 piping to 1047. 1 1 Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 4 of 9 COMCHECK.cck Section # Mechanical Rough-ln Inspection, Complies? Comments/Assumptions Re .ID C402.2.6 Thermally ineffective panel surfaces of;❑Complies !Exception: Requirement does not apply. [ME41]3 sensible heating panels have UDoes Not E insulation >= R-3.5. :[--]Not Observable; I ;❑Not Applicable C403.8.1 HVAC fan systems at design 1❑Complies ;Requirement will be met. [ME65]3 conditions do not exceed allowable 1❑Does Not I fan system motor nameplate hp or fan 1 !See the Mechanical systems list for values. system bhp. T:]Not Observable, I ;❑Not Applicable C403.8.3 iFans have efficiency grade(FEG) >_ ;,[]Complies ;Requirement will be met. [ME117]2 167.The total efficiency of the fan at :❑Does Not the design point of operation <= 15%u I ; {of maximum total efficiency of the 1❑Not Observable 1 ;fan. 1❑Not Applicable ; C403.12.1 Systems that heat outside the building;❑Complies !Exception: Requirement does not apply. [ME71]2 envelope are radiant heat systems ;❑Does Not controlled by an occupancy sensing I ; device or timer switch. 1ONot Observable, ❑Not Applicable C403.2.3 HVAC equipment efficiency verified. 1❑Complies ;see the Mechanical Systems list for values. [ME55]? f ;❑Does Not I UNot Observable; j ;❑Not Applicable C403.2.3 PTAC and PTHP with sleeves 16 in. by 1❑Complies [ME73]3 142 in, labeled for replacement only as :❑Does Not I per Footnote b to Table C403.2.3(3). :❑Not Observable j ;❑Not Applicable C405.8.1. E New traction elevators with a rise of ;❑Complies ;Exception: Requirement does not apply. 1 75 feet or more have a power U❑Does Not [ME36]3 ;conversion system that complies as 1 I {follows: C405.8.1.1.1 Induction motors;❑Not Observable I with a Class IE2 efficiency ratings are ❑Not Applicable be used. C405.8.1.1.2 Transmissions I ; 'does not reduce the efficiency of the 1 ; combined motor/transmission below ;that shown for the Class IE2 motor for I ; elevators with capacities below 4,000 1 ; lbs. C405.8.1.1.3 Potential energy i !released during motion recovered with!, ; a regenerative drive that supplies Eelectrical energy to the building I 1 electrical system. C405.10 !Commercial kitchen equipment shall ;❑Complies ;Exception: Requirement does not apply. [ME37]3 !comply with the minimum efficiency �❑Does Not. !requirements of Tables C405.9(1) 1❑Not Observable; !through table C405.9(5). ' I ;❑Not Applicable C403.2.2 Natural or mechanical ventilation is ;❑Complies ;Requirement will be met. [ME59]1 provided in accordance with ;❑Does Not International Mechanical Code I Chapter 4. Mechanical ventilation has ;❑Not Observable t capability to reduce outdoor air supply:❑Not Applicable i to minimum per IMC Chapter 4. , C403.7.1 ;Demand control ventilation provided ;❑Complies ;Exception: Requirement does not apply. [ME59]1 for spaces>500 ft2 and >25 1❑Does Not people/1000 ft2 occupant density and !served by systems with air side 1❑Not Observable 1 !economizer, auto modulating outside ;❑Not Applicable ; air damper control, or design airflow >3,000 cfm. 1 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 5 of 9 COMCHECK.cck Section .. # Mechanical Rough-In Inspection- Complies? Comments/Assumptions &Re .IID ' C403.7.2 ,Enclosed parking garage ventilation 1❑Complies ;Exception: Requirement does not apply. [ME115]3 !has automatic contaminant detection !❑Does Not I and capacity to stage or modulate i ; (fans to 50%or less of design capacity.;❑Not Observable 1 ;❑Not Applicable 1, C403.7.6 HVAC systems serving guestrooms in ;❑Complies ;Exception: Requirement does not apply. [ME141]3 'Group R-1 buildings with > 50 ;❑Does Not 'guestrooms: Each guestroom is provided with controls that UNot Observable automatically manage temperature ;❑Not Applicable ; setpoint and ventilation(see sections C403.7.6.1 and C403.7.6.2). C403.7.4 Exhaust air energy recovery on I❑Complies :Exception: Requirement does not apply. [ME57]1 systems meeting Table C403.7.4(1) UlDoes Not and C403.7.4(2). ;❑Not Observable 1 ❑Not Applicable C403.7.5 ,Kitchen exhaust systems comply with 1❑Complies ;Exception: Requirement does not apply. [ME116]3 replacement air and conditioned ;❑Does Not 1 supply air limitations,and satisfy hood 1 ;rating requirements and maximum ;❑Not Observable 1 !exhaust rate criteria. See section 1❑Not Applicable f details. C403.11.1 HVAC ducts and plenums insulated in ;❑Complies ;Requirement will be met. accordance with C403.11.1 and ;❑Does Not C403.11.2 constructed in accordance with [ME60]z C403.11.2,verification may need to ;❑Not Observable occur during Foundation Inspection. '❑Not Applicable C403.4.1. 1 Heating for vestibules and air curtains ;❑Complies ;Exception: Requirement does not apply. 4 !with integral heating include ;❑Does Not [ME63]2 !automatic controls that shut off the fheating system when outdoor air :[]Not Observable !temperatures>45F.Vestibule ;❑Not Applicable heating and cooling systems 'controlled by a thermostat in the vestibule with heating setpoint<_ ; E60F and cooling setpoint>=85F. 1 ; C403.10, Refrigerated display cases,walk-in ;❑Complies ;Exception: Requirement does not apply. C403.10.1`coolers or walk-in freezers served by :❑Does Not II remote compressors and remote C403.10.2 condensers not located in a ❑Not Observable [ME123]3 icondensing unit, have fan-powered ;❑Not Applicable ; jcondensers that comply with Sections C403.5.1 and refrigeration compressor; ; systems that comply with C403.5.2.. ; Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 JLow Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 6 of 9 COMCHECK.cck Section # Rough-in Electrical Inspection Complies? Comments/Assumptions &Re .ID C405.6 I Low-voltage dry-type distribution I❑Complies [EL26]2 :electric transformers meet the ElDoes Not :minimum efficiency requirements of iTable C405.6. i❑Not Observable } ;❑Not Applicable ; C405.7 Electric motors meet the minimum I❑Complies [EL27]2 efficiency requirements of Tables ;❑Does Not C405.7(1)through C405.7(4). ❑Not Observable; Efficiency verified through certification under an approved certification ,,❑Not Applicable program or the equipment efficiency ; ratings shall be provided by motor ; manufacturer(where certification ' programs do not exist). C405.8.2 Escalators and moving walks comply ;❑Complies ; [EL28]2 with ASME A17.1/CSA B44 and have :❑Does Not automatic controls configured to ; ; reduce speed to the minimum ❑Not Observable permitted speed in accordance with 1❑Not Applicable ASME A17.1/CSA B44 or applicable local code when not conveying ; passengers. ' C405.9 Total voltage drop across the 111Complies ; [EL29]2 combination of feeders and branch UDoes Not circuits<= 5%. UNot Observable; !,[]Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 7 of 9 COMCHECK.cck Section # Final Inspection Complies? I Comments/Assumptions &Re .ID C303.3, IFurnished O&M manuals for HVAC ;❑Complies ;Requirement will be met. C408.2.5. systems within 90 days of system ;❑Does Not 3 acceptance. [F18]3 :[-]Not Observable; ❑Not Applicable I C403.3.1 C systems and equipment ❑Complies ;Requirement will be met. [FI27]3 capacity does not exceed calculated T❑Does Not 1HVA loads.See section details. ' ❑Not Observable; ❑Not Applicable C403.2.4. Heating and cooling to each zone is I❑Complies ;Requirement will be met. 1 controlled by a thermostat control. ;❑Does Not [FI47]3 I Minimum one humidity control device :1❑Not Observable; ,per installed , l humidification/dehumidification :❑Not Applicable system. i ; C403.4.1. Heat pump controls prevent I❑Complies :Exception: Requirement does not apply. 1 supplemental electric resistance heat 1❑Does Not [F142]3 from coming on when not needed. i ; ❑Not Observable, ❑Not Applicable C403.4.1. iThermostatic controls have a 5 IF ;❑Complies ;Requirement will be met. 2 . ideadband. :[]Does Not [FI38]3 f QNot Observable; ;❑Not Applicable C403.4.1. ,Temperature controls have setpoint ![]Complies ;Exception: Requirement does not apply. 3 !overlap restrictions. ;❑Does Not [F120]3 I ' ' ❑Not Observable 1 ❑Not Applicable C403.4.2 Each zone equipped with setback ;❑Complies ;Exception: Requirement does not apply. [F139]3 `controls using automatic time clock or T❑Does Not programmable control system. ❑Not Observable; ❑Not Applicable C403.2.4. 'Automatic Controls: Setback to 55°F I❑Complies ;Exception: Requirement does not apply. 2.1, 1(heat)and 850F (cool); 7-day clock, 2- !❑Does Not C403.2.4. ;hour occupant override, 10-hour ; 2.2 Ibackup I❑Not Observable I [F140]3 ( 1❑Not Applicable ; I I I C408.1.1 Building operations and maintenance I❑Complies [F157]1 documents will be provided to the 1,❑Does Not owner. Documents will cover ' 'manufacturers' information, UNot Observable Especifications, programming �❑Not Applicable procedures and means of illustrating ; (to owner how building,equipment and 1 I isystems are intended to be installed, Emaintained, and operated. ' Additional Comments/Assumptions: ' 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network. Report date:.O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 8 of 9 COMCHECK.cck Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 9 of 9 COMCHECK.cck COMcheck Software Version 4.1.5.5 Interior Lighting Compliance Certificate N/ - Project Information Energy Code: 2020 NYStretch Energy Code-2018 IECC Project Title: Hudson Headwaters Health Network Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 27 Carey Road Hudson Headwaters Health GPI Queensbury, NY 12804 Network 80 Wolf Road 27 Carey Road Albany, NY 12205 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Wafts/ft2 (B X C) 1-Office 300 0.69 207 Total Allowed Wafts= 207 Proposed Interior Lighting Power A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Waft. Office(300 sg.ft.l LED 1:L3:2X2 LED RECESSED TROFFER:Other: 1 6 28 168 Total Proposed Wafts= 168 Interior • • PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2020 NYStretch Energy Code-2018 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Franklin Rapp Elec. Designer gyaritF&u Rapp 01/04/2023 Name-Title Signature Date DE E CC-0023-2023 308.16-2-2.2 JAN 2 3 2023 HHHN/aim McCormack 27 Carey Rd TOWN OF QUEENS-BURY Business Office Alteration 307 s.f. BUILDING CODES Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 1 of 7 COMCHECK.cck COMcheck Software Version 4.1.5.5 Inspection Checklist Energy Code: 2020 NYStretch Energy Code - 2018 IECC Requirements: 87.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions &Re .ID C103.2 Plans,specifications,and/or 10Complies :Requirement will be met. [PR4]1 calculations provide all information !❑Does Not with which compliance can be determined for the interior lighting ;❑Not Observable and electrical systems and equipment !❑Not Applicable and document where exceptions to ; the standard are claimed. Information 1 1 provided should include interior lighting power calculations,wattage oft 1 bulbs and ballasts,transformers and control devices. C405.11 ,New parking garages and new parking 1❑Complies 1 [PR38]3 lots powered by the energy services :❑Does Not 'for a building, and with 10 or greater : : parking spaces, provide either: 1. :❑Not Observable 1 Panel capacity and conduit for the 1❑Not Applicable future installation of minimum 208/240V 40-amp outlets for 5 percent of the total parking spaces and not less than two parking spaces; 1 : or 2. Minimum 208/240V 40-amp i !outlets for 5 percent of the total i parking spaces and not less than two parking spaces. 1 1 Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 2 of 7 COMCHECK.cck Section # Rough-In Electrical Inspection Complies? Comments/Assumptions &Re .ID C405.2.2. Spaces required to have light- ;❑Complies ;Requirement will be met. 2 reduction controls have a manual QDoes Not [EL22]1 control that allows the occupant to reduce the connected lighting load in ;❑Not Observable; a reasonably uniform illumination 1❑Not Applicable pattern >= 50 percent. ; ; C405.2.1, Occupancy sensors installed in ;❑Complies ;Requirement will be met. C405.2.1. classrooms/lecture/training rooms, :❑Does Not 1 conference/meeting/multipurpose[EL18]1 rooms,copy/print rooms, ;❑Not Observable, corridor/transition areas, 1❑Not Applicable lounges/breakrooms,enclosed offices, open plan office areas, restrooms, storage rooms, locker rooms, warehouse storage areas,and other spaces<= 300 sgft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in I warehouses and section C405.2.1.3 for open plan office spaces. C405.2.1. Occupancy sensors control function in ;❑Complies ;Exception: Requirement does not apply. 2 warehouses: In warehouses,the 1❑Does Not [EL19]1 lighting in aisleways and open areas is; ; controlled with occupant sensors that ;❑Not Observable automatically reduce lighting power :❑Not Applicable {by 50%or more when the areas are unoccupied.The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being i controlled by the sensor. C405.2.1. Occupant sensor control function in ;❑Complies :Requirement will be met. 3 open plan office areas: Occupant !❑Does Not [EL20]1 sensor controls in open office spaces ❑Not Observable >= 300 sq.ft. have controls 1) ;❑Not Applicable erva configured so that general lighting can be controlled separately in control zones with floor areas <= 600 sq.ft. 1 !within the space, 2) automatically turn; ; toff general lighting in all control zones within 20 minutes after all occupants ; have left the space, 3)are configured ; so that general lighting power in each control zone is reduced by >= 80%of the full zone general lighting power ; within 20 minutes of all occupants leaving that control zone, and 4) are configured such that any daylight ; ,responsive control will activate space ; !general lighting or control zone i general lighting only when occupancy for the same area is detected. ' C405.2.2, Each area not served by occupancy ;❑Complies ;Exception: Lighting controlled by occupancy sensors. C405.2.2. sensors(per C405.2.1) have time- ;❑Does Not 1, switch controls and functions detailed ❑Not Observable; C405.2.2. in sections C405.2.2.1 and C405.2.2.2.; 2 ;❑Not Applicable [EL21]2 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 3 of 7 COMCHECK.cck Section # Rough-in Electrical Inspection Complies? Comments/Assumptions &Re .ID C405.2.3, !Daylight zones provided with :❑Complies :Exception: Requirement does not apply. C405.2.3. j individual controls that control the j❑Does Not 1, !,lights independent of general area ❑Not Observable C405.2.3. !lighting within daylight zones in the 2 !following spaces: 1. Spaces with a j❑Not Applicable [EL23]2 `total of more than 100 watts of !general lighting within sidelit zones I : Icomplying with Section C405.2.3.2. jGeneral lighting does not include plighting that is required to have !specific application control in j accordance with Section C405.2.4. 2. Spaces with a total of more than 100 I : !watts of general lighting within toplit j ;zones complying with Section ; jC405.2.3.3.See code section j :C405.2.3.1 Daylight responsive !control function and section ! C405.2.4 Separate lighting control devices for :❑Complies ;Requirement will be met. [EL26]1 specific uses installed per approved !❑Does Not lighting plans. j❑Not Observable j ❑Not Applicable C405.2.4 Additional interior lighting power :❑Complies ;Requirement will be met. [EL27]1 allowed for special functions per the C]Does Not approved lighting plans and is automatically controlled and !❑Not Observable; separated from general lighting. :,[--]Not Applicable C405.3 Exit signs do not exceed 5 watts per :❑Complies :Exception: Requirement does not apply. [EL6]1 face. j❑Does Not j❑Not Observable j j❑Not Applicable C405.6 Low-voltage dry-type distribution :❑Complies ; [EL26]2 electric transformers meet the j❑Does Not minimum efficiency requirements of Table C405.6. :[-]Not Observable: ❑Not Applicable C405.7 I Electric motors meet the minimum :❑Complies : [EL27]2 jefficiency requirements of Tables j❑Does Not jC405.7(1)through C405.7(4). j❑Not Observable Efficiency verified through certification under an approved certification ,j❑Not Applicable program or the equipment efficiency ratings shall be provided by motor !manufacturer(where certification !programs do not exist). C405.8.2 "Escalators and moving walks comply :❑Complies ; [EL28]2 f with ASME A17.1/CSA B44 and have j❑Does Not !automatic controls configured to ; !reduce speed to the minimum ❑Not Observable !permitted speed in accordance with j❑Not Applicable ; :ASME A17.1/CSA B44 or applicable j !local code when not conveying : ! passengers. : ! C405.9 ;Total voltage drop across the :❑Complies : [EL29]2 lcombination of feeders and branch j❑Does Not !circuits <= 5%. :[-]Not Observable: j❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 4 of 7 COMCHECK.cck I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: 01/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 5 of 7 COMCHECK.cck „ Section # Final Inspection Complies? Comments/Assumptions &Re .ID C303.3, i Furnished O&M instructions for ;❑Complies !Requirement will be met. C408.2.5. systems and equipment to the ;❑Does Not 2 ;building owner or designated [FI17]3 I representative. T❑Not Observable ; ;❑Not Applicable ; 1 I I C405.4.1 Interior installed lamp and fixture I❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what :❑Does Not is shown on the approved lighting i ; plans,demonstrating proposed watts ;❑Not Observable are less than or equal to allowed 1❑Not Applicable watts. ; C408.1.1 !Building operations and maintenance I❑Complies [FI57]1 Iocuments will be provided to the ;❑Does Not owner. Documents will cover ;❑Not Observable manufacturers'information, specifications,programming :❑Not Applicable ; `procedures and means of illustrating ito owner how building, equipment and: I systems are intended to be installed, maintained, and operated. C408.3 `Lighting systems have been tested to I❑Complies ;Requirement will be met. [FI33]1 ensure proper calibration,adjustment, :❑Does Not programming, and operation. I❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 6 of 7 COMCHECK.cck Project Title: Hudson Headwaters Health Network Report date: O1/04/23 Data filename: E:\2022\2200176.00 HHHN 9 Carey Road\ComCheck\20230104 HHHN 27 CAREY RD Page 7 of 7 COMCHECK.cck FIRE MARSHAL'S OFFICE Tozon of Queensbunj 742 Bay Road, Queensbuny, IVY 12804 "Home of Natural Beauty ... A Good Place to Live " J PLAN REVIEW HHHN 27 Carey Rd CC-0023-2023 307 S.F. Business Office Alteration 1/24/23 I have reviewed the submitted drawings for the above project; and offer the following comments: 1) Verify Storage 2) Verify operation of existing exit/ emergency lights. 3) Verify paths of egress 4) Verify Knox Box Key 5) Truss ID required for storage of Office Space 6) Load rating for platform 7) CO Detection required 8) Protection of the Fire Alarm system during construction According to the 2020 NYSFC Chapter 33 9) NFPA 72 letter of compliance required for any alterations to the Fire Alarm System. Deputy t Fire Marshal Tyson Converse 742 Bay Road Queensbury NY 12804 518 761 8205 tysonc@queensbury.net Fire Marshal's Office P li o rl e: 518-761-8206 Fax: 518-745-4437 firetnarshal®gueensbuty.net www.g'yeensbury.net