Loading...
23 05 93-01 HVAC TAB ReportNortheastern Air Quality, Inc. P.O. Box 3271 Albany, New York 12203 (518) 857-3641 HVAC SYSTEMS TESTING: Project:655 Addiction Care Center Location:Queensbury, New York Architect:Lomonaco & Pits, Architect P.C. Troy, New York Engineer:MH Proffesional Engineering, PPLC Clifton Park, New York Piping:Eckert Mechanical, Inc. Albany, New York Sheet Metal:Eckert Mechanical, Inc. Albany, New York Date:April 10, 2023 Prepared by:N. Mailly RKelley@NortheasternAirQuality.com Air Balance Report CERTIFICATION PROJECT: ADDRESS: TESTING AND BALANCING FIRM: CERTIFIED BY:DATE:4/10/2023 SIGNATURE: Robert V. Kelley 655 Addiction Care Center Queensbury, New York THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGNED QUANTITIES WHICH EXCEEDS NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT. THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB ''PROCEDURAL STANDARDS FOR TESTING AND BALANCING OF ENVIRONMENTAL SYSTEM'' AND THE PROJECT SPECIFICATIONS. Northeastern Air Quality, Inc. #3159 Page 2 Northeastern Air Quality, Inc. P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 PROJECT: THE FOLLOWING IS A LIST OF STANDARD ABBREVIATIONS WHICH MAY APPEAR IN THIS REPORT: MEANING MEANING A AMPS or AMPERAGE NL NOT LISTED ACH AIR CHANGES PER HOUR NOM NOMINAL AD ACCESS DOOR NOM EFFY NOMINAL EFFICIENCY ADJ ADJUSTABLE NR NOT REQUIRED Ak KINETIC (EFFECTIVE FREE) AREA NS NOT SPECIFIED BG BLAST GATE OBD OPPOSED BLADE DAMPER BHP BRAKE HORSEPOWER OED OPEN END DUCT CALC CALCULATED PF POWER FACTOR CALIBR CALIBRATION or CALIBRATED PH PHASE CD CEILING DIFFUSER Ps STATIC PRESSURE CF CUBIC FEET Pt TOTAL PRESSURE CFM CUBIC FEET PER MINUTE Pv VELOCITY PRESSURE cL CENTERLINE RG RETURN GRILLE CLG CEILING RPM REVOLUTIONS PER MINUTE CR CEILING REGISTER RR RETURN REGISTER CS CIRCUIT SETTER SBD SINGLE BLADE DAMPER CSD CEILING SUPPLY DIFFUSER SD SMOKE CONTROL DAMPER DD DIRECT DRIVE SF SERVICE FACTOR DDC DIRECT DIGITAL CONTROL SMC SHEET METAL CONTRACTOR DISC DISCONNECT SWITCH SPS STATIC PRESSURE SENSOR DISCH DISCHARGE SR SUPPLY REGISTER DPR DAMPER TC TEMPERATURE CONTROL DR PRESSURE DIFFERENTIAL TCC TEMPERATURE CONTROL CONTRACTOR EC END CAP TCD TEMPERATURE CONTROL DAMPER ER EXHAUST REGISTER TP THERMALLY PROTECTED FL BHP BRAKE HORSEPOWER @ FULL LOAD AMPS TRAV DUCT TRAVERSE FLA FULL LOAD AMPS V VOLTS or VOLTAGE FTR FINNED TUBE RADIATION VAR VARIABLE GPM GALLONS PER MINUTE VBD V-BELT DRIVE HP HORSEPOWER VD VOLUME DAMPER LD LINEAR DIFFUSER VEL VELOCITY LF LINEAR FEET (NOMINAL)W WATTS or WATTAGE NA NOT ACCESSIBLE WG WALL GRILLE ND NO DAMPER WMS WIRE MESH SCREEN NDRG NON-DUCTED RETURN GRILLE WR WALL REGISTER NG NO GAUGE ZD ZONE DAMPER NI NOT INSTALLED NIC NOT IN CONTRACT ABBREVIATIONS 655 Addiction Care Center ABBREVIATION ABBREVIATION Page 3 Northeastern Air Quality, Inc.ENERGY RECOVERY VENTILATOR TEST SHEET P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 4/10/2023 MOTOR NAME-RPM PLATE VOLTS HERTZ 208 60 208 60 DATA EXT. STATIC PRESSURE VOLTS AMPS BHP (calc.) - LOCATION:204A Mechanical MANUFACTURER: REMARKS: Direct Drive Direct Drive No access to motor tag Direct Drive Direct Drive No access to motor tag 0.68 PROJECT:655 Addiction Care Center TESTED BY:N. Mailly DATE: SYSTEM:ERU-1 SERVICE:Building Ventilation MODEL:TR800-240-1-CAV Systemair SERIAL NUMBER:1007178401-222H-001 DATE TESTED:4/10/2023 FAN DATA OUTSIDE AIR EXHAUST MANUFACTURER -- STYLE FRAME ---- HP 1 -1 - PHASE 1 1 FL AMPS S.F.-- P.F.NOM EFFY ---- calculated (P.F. x NOM EFFY) *0.72 0.72 STARTER HEATER ELEMENTS -- MOTOR SHEAVE Direct Drive Direct Drive BELTS FAN SHEAVE Direct Drive Direct Drive TEST DATA DESIGN SHEAVE cL DISTANCE 822 730 762 ACTUAL DESIGN ACTUAL TOTAL CFM - FANS 790 TOTAL CFM - OUTLETS 790 822 740 726 OUTSIDE AIR CFM 790 822 730 - EXHAUST AIR CFM --726 DISCHARGE NL 0.30 NL 0.19 INLET NL -0.22 NL -0.61 TOTAL 0.52 0.80 FAN RPM ---- T1 - T2 208 207 208 207 T2 - T3 (3 Ph only) T1 3.4 3.4 T1 - T3 (3 Ph only) T2 (3 Ph only) F.L.A.ACTUAL 0.68 T3 (3 Ph only) * NOTE: If P.F. or NOM EFFY are NL, (P.F. x NOM EFFY) = 746Hp/(VAX), where X = 1 if 1 Ph, and 1.73 if 3 Ph Page 4 Northeastern Air Quality, Inc. FAN TEST REPORT P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 PROJECT: TESTED BY:DATE: MAKE: MOTOR STYLE/FRAME:-- NAME-HP/RPM:0.17 1725 PLATE VOLTS: DATA PHASE/HERTZ:1 60 FL AMPS/SF:-1.15 P.F./NOM EFFY NL NL DES ACT DES ACT DES ACT DES ACT 320 310 320 295 1,597 - EXT.DISCHARGE NL 0.4 NL NL NL STATIC INLET NL -0.2 NL NL NL PRESS.TOTAL 0.50 0.6 VOLTS T1-T2 115 115 T2-T3 (3 Ph only) T3-T1 (3 Ph only) AMPS T1 -1.1 T2 (3 Ph only) T3 (3 Ph only) BHP(calc)F.L./ACTUAL 0.12 HC Bath 118 SF-1FAN NUMBER: LOCATION: SERVICE: calc (P.F. x NOM EFFY) * DATE TESTED: SERIAL NUMBER: MODEL: 655 Addiction Care Center 3/17/23N. Mailly Laundry 116 Cook 90 SQNHEV 90SQN17DEC 261SJ95275-00/0000701 Cook 3/17/2023 Direct Drive 115 Direct Drive Direct Drive 0.72 Direct Drive MANUFACTURER: TOTAL CFM-FAN TOTAL CFM-OUTLETS FAN RPM TEST DATA SHEAVE cL DISTANCE: BELTS: REMARKS: * NOTE: If P.F. or NOM EFFY are NL, (P.F. x NOM EFFY) = 746Hp/(VAX), where X = 1 if 1 Ph, and 1.73 if 3 Ph FAN SHEAVE: MOTOR SHEAVE: Page 5 Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 TESTED BY:DATE: REMARKS:1. No access to duct.2. Damper closed 100% DESIGN INITIAL INTERMEDIATE FINAL % OF NO.LOCATION SIZE MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS ERU-1 Outside Air 1 AC-140A 6" x 6"0.25 240 60 Est.44 74%4/10/23 1 2 AC-131 4" Rnd 0.09 287 25 Est.44 177%4/10/23 1 3 AC-140B 6" x 6"0.25 240 60 Est.44 74%4/10/23 1 Sub Total (T-5)6" x 8"0.33 435 145 321 107 398 133 91%4/10/23 4 AC-122 4" Rnd 0.09 229 20 Est.23 116%4/10/23 5 AC-125 6" x 6"0.25 240 60 178 45 201 50 84%4/10/23 See T-6 6 AC-121 4" Rnd 0.09 172 15 Est.23 155%4/10/23 1 7 AC-120 4" Rnd 0.09 172 15 Est.23 155%4/10/23 1 Sub Total (T-7)6" x 6"0.25 440 110 330 83 480 120 109%4/10/23 8 AC-119 4" Rnd 0.09 344 30 180 16 221 19 64%4/10/23 1 9 AC-126 6" x 6"0.44 135 60 Est.77 129%4/10/23 1 10 AC-116 4" Rnd 0.09 115 10 Est.19 190%4/10/23 1 11 AC-104 4" Rnd 0.09 516 45 Est.77 171%4/10/23 1 12 Mechanical 204A 10" x 10"0.79 497 390 493 387 480 377 97%4/10/23 Total 790 822 104%4/10/23 Exhaust 13 Bath 135 6" x 6"RG-2 50 Hood 15 Hood 26 Hood 45 90%4/10/23 14 Bath 133 6" x 6"RG-2 50 Hood 13 Hood 32 Hood 46 92%4/10/23 15 MH Counselor 131 6" x 6"RG-1 25 Hood 21 Hood 22 Hood 23 92%4/10/23 15.5 Server Room 6" x 6"RG-1 0.19 52 10 213 41 67 13 67 13 128%4/10/23 2 16 RN Office 122 6" x 6"RG-1 20 Hood 19 Hood 18 90%4/10/23 17 Janitor 124 6" x 6"RG-1 0.19 52 10 102 20 51 10 98%4/10/23 18 HC Bath 117 6" x 6"RG-2 50 Hood 26 Hood 36 Hood 46 92%4/10/23 19 Med Room 121 6" x 6"RG-1 15 Hood 14 Hood 25 Hood 14 93%4/10/23 20 LPN Office 120 6" x 6"RG-1 15 Hood 14 Hood 24 Hood 14 93%4/10/23 21 HC Bath 118 6" x 6"RG-2 50 Hood 40 Hood 47 Hood 46 92%4/10/23 N. Mailly 4/10/2023 655 Addiction Care Center Page 6 Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 TESTED BY:DATE: REMARKS:1. No access to duct.2. Damper closed 100% DESIGN INITIAL INTERMEDIATE FINAL % OF NO.LOCATION SIZE MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS N. Mailly 4/10/2023 655 Addiction Care Center 22 Toilet 102 6" x 6"RG-2 50 Hood 57 Hood 62 Hood 45 90%4/10/23 23 Kitchen 104 6" x 6"RG-1 45 Hood 48 Hood 57 Hood 41 91%4/10/23 24 Mechanical 204A 12" x 12'0.79 446 350 483 379 465 365 104%4/10/23 Total 740 726 98%4/10/23 AC-125 25 Corridor 125 24" x 24"SD-1 280 Hood 150 Hood 302 108%3/17/23 Return 26 Corridor 125 24" x 24"RG-3 220 Hood 78 Hood 241 110%3/17/23 AC-126 27 Corridor 126 24" x 24"SD-1 280 Hood 97 Hood 309 110%3/17/23 Return 28 Corridor 126 24" x 24"RG-3 220 Hood 143 Hood 212 96%3/17/23 AC-140A 29 Corridor 140 24" x 24"SD-1 280 Hood 156 Hood 298 106%3/17/23 Return 30 Corridor 140 24" x 24"RG-3 220 Hood 89 Hood 232 105%3/17/23 AC-140B 31 Corridor 140 24" x 24"SD-1 280 Hood 145 Hood 308 110%3/17/23 Return 32 Corridor 140 24" x 24"RG-3 220 Hood 101 Hood 226 103%3/17/23 Page 7 Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 TESTED BY:DATE: REMARKS:1. No access to duct.2. Damper closed 100% DESIGN INITIAL INTERMEDIATE FINAL % OF NO.LOCATION SIZE MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS N. Mailly 4/10/2023 655 Addiction Care Center SF-1 33 Laundry 116 24" x 24"SD-2 320 Hood 250 Hood 295 92%3/17/23 EF-1 34 Toilet 202 12" x 12"50 Hood 50 Hood 50 100%3/17/23 KH-1 35 Kitchen 104 -0.30 501 150 460 138 460 138 92%3/17/23 AC-204A 36 Toilet 202 8" Rnd -Hood 0 -4/7/23 Not Installed 37 Kitchen / Break 201 8" Rnd 170 Hood 119 Hood 125 Hood 125 74%4/7/23 38 Library 203 8" Rnd 110 Hood 121 Hood 75 Hood 75 68%4/7/23 39 Library 203 8" Rnd 110 Hood 78 Hood 78 Hood 78 71%4/7/23 40 Office 207 8" Rnd 105 Hood 85 Hood 80 Hood 80 76%4/7/23 41 Office 209 8" Rnd 110 Hood 108 Hood 80 Hood 80 73%4/7/23 42 Office 208 8" Rnd 105 Hood 89 Hood 75 Hood 75 71%4/7/23 43 Office 206 8" Rnd 90 Hood 67 Hood 70 Hood 70 78%4/7/23 44 Conference 204 8" Rnd 210 Hood 114 Hood 157 Hood 157 75%4/7/23 Total 1,010 740 73%4/7/23 Return 45 Kitchen / Break 201 24" x 24"790 Hood 90 Hood 90 11%4/7/23 46 Conference 204 24" x 24"210 Hood 234 Hood 234 111%4/7/23 47 Corridor 200 24" x 24"NL Hood 172 Hood 172 -4/7/23 Total 1,000 496 50%4/7/23 Page 8 Northeastern Air Quality, Inc.Duct Traverse Totals P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 DATE: System Area % OF NO.Zone or Branch Sq. Ft.VEL CFM VEL CFM SP VEL CFM SP DES DATE SF-1 T-1 Attic 10''x 10''0.69 461 320 447 310 -447 310 -97%3/17/23 AC-204A T-2 Total Supply 8''x 24''1.33 788 1,050 855 1,140 0.26 855 1,140 0.26 109%3/17/23 ERU-1 T-3 Outside Air Intake 12''x 12''1.00 790 790 581 581 -0.06 822 822 -0.12 104%4/10/23 T-4 Exhaust Discharge 12''x 12''1.00 740 740 685 685 0.20 762 762 0.25 103%4/10/23 T-5 Electrical 127 6''x 8''0.33 435 145 398 133 -91%4/10/23 T-6 Corridor 125 6''x 6''0.25 240 60 201 50 -84%4/10/23 T-7 Corridor 126 6''x 6''0.25 440 110 480 120 -109%4/10/23 Duct Size 655 Addiction Care Center 4/10/2023 DESIGN REQUIRMENT INITIAL FINAL SYSTEM DIAGRAM 655 Addiction Care Center Page 10 Page 11