Loading...
PM_Building_Permit_11-07-2023_09-32-02_794b8218-bd9d-4b95-ac99-a63fd268b801.pdf a i Manual S Compliance Report Job: 1829 Date: Jun 19,2023 Entire House By: Plan: 1829 Project Information For: HASKINS 11 PERSHING RD, QUEENSBURY, NY 12804 Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 30303 Btuh Entering coil DB: 75.3°F Outdoor design WB: 71.0°F Latent gain: 4300 Btuh Entering coil WB: 62.6°F Indoor design DB: 75.0°F Total gain: 34603 Btuh Indoor RH: 50% Estimated airflow: 1621 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: York Model: YCJD42S43S4+CH480B6+T*9(C,V)*D20 Actual airflow: 1317 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% . Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss: 86443 Btuh Entering coil DB: 66.1°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9X100C16MP11 Actual airflow: 1317 cfm Output capacity: 95000 Btuh 110% of load Temp. rise: 50 °F DI c EOMC JUN 21 2023 Meets are all requirements of ACCA Manual S. TOWN OF QUEENSBURY BUILDING &CODES 2023-Jun-19 15:16:26 ti wrightsoft' Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCA ...rthy\Documents\York\Template111 PERSHING RD.rup Calc=MJ7 Front Door faces: N r ? t Residential Plans Examiner Review Form Form AC. for HVAC System Design (Loads, Equipment, Ducts) 15 Mar09 At Cendfcr*9CatrxbsdA reka QUEENSBURY NY Header Information Contractor: REQUIRED ATTACHMENTS ATTACHED ManualJ1 Form(and supporting worksheets): Yes ❑ No ❑ Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes ❑ No ❑ OEM performance data(heating,cooling,blower): Yes ❑ No ❑ Building plan#: 1829 Manual D Friction Rate Worksheet: Yes ❑ No ❑ Duct distribution sketch: Yes ❑ No ❑ Home address(Street or Lot#,Block,Subdivision): 11 PERSHING RD, Entire House HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Building Construction Information Winter Design Conditions Building Outdoor temperature: -4 °F Orientation: Front Door faces North Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 86443 Btuh Number of bedrooms: 3 Conditioned floor area: 4393 ft2 Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75 °F Windows Roof Grains difference: 27 glib©50% RH Eave overhang depth: 0 ft Sensible heat gain: 33670 Btuh Internal shade: none Eaaa Latent heat gain: 4778 Btuh Blinds,drapes,etc. Depth Window Total heat gain: 38448 Btuh Number of skylights: 0 HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data Cooling Equipment Data Blower Data Equipment tye: Gas furnace Equipment type: Split AC Heating cfm: 1317 umace,Heatpump,Boller,etc. it ondltloner,Heat pump,etc. Cooling cfm: 1317 Model: York Model: York Static pressure: 0 in H2O TM9X100C16MP11 YCJD42S43S4 Fan's rated extemal static pressure for design airflow Heating output capacity: 95000 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity at winter design ou door conditions Sensible cooling capacity: 0 Btuh Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: 1317 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft Available static pressure(ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Sheet metal Friction Rate=ASP+(TEL x 10 ) I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County,Town Municipality orAuthority having jurisdiction use. *Home qualifies for MJ 1AE Form based on Abridged Edition Checklist 41- wrightsoft Right-Suite®Universal 2017 17.0.16 RSU25116 , 1 - i Project Summary Job: 1829 • 7 Date: Jun 19,2023 Entire House By: Plan: 1829 Pro'ect Information For: HASKINS 11 PERSHING RD, QUEENSBURY, NY 12804 Notes: Desi. n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 68 °F Inside db 75 °F Design TD 72 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 81550 Btuh Structure 28860 Btuh Ducts 4893 Btuh Ducts 1443 Btuh Central vent(0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 86443 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 27273 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 4300 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 4393 4393 Equipment latent load 4300 Btuh Volume(ft') 35144 35144 Air changes/hour 0.70 0.40 Equipment total load 31573 Btuh Equiv.AVF(cfm) 410 234 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make York Make York Trade YORK Trade ADP Model TM9X100C16MP11 Cond YCJD42S43S4 AHRI ref 2008692 Coil CH480B6+T*9(C,V)*D20 AHRI ref 6496431 Efficiency 95.5 AFUE Efficiency 11.0 EER, 14 SEER Heating input 100000 Btuh Sensible cooling 27650 Btuh Heating output 95000 Btuh Latent cooling 11850 Btuh Temperature rise 66 °F Total cooling 39500 Btuh Actual air flow 1317 cfm Actual air flow 1317 cfm Air flow factor 0.015 cfm/Btuh Air flow factor 0.043 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. Wr- htsoft• 202&Jun-1915:16:26 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCN ...rthy\Documents\York\Template\11 PERSHING RD.rup Calc=MJ7 Front Door faces: N i Right-JO Worksheet Job: 1829 Entire House Date: Jun 19,2023 By: Plan: 1829 MANUAL J:7th Ed. 1 Name of room Entire House Room1 Room2 Room3 2 Length of exposed wall 578.0 ft 176.0 ft 26.0 ft 26.0 ft 3 Room dimensions 1.0 x 1472 ft 120 x 14.0 ft 10.0 x 16.0 ft 4 Ceilings Condit.Option 8.0 ft d 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.4 1.0 4624 **** **** 1408 **** **** 208 **** **.. 206 ••** *•** Exposed b 0 0 !!11l1 .*•* *"• 1111!! .... **** II!!!! ..*• *•*• 111!!! •••* **** walls and c 0 0 111111 .*`* **** Ill!!! **•* •**• I!!!!! **•* •'•• runt! '*.. ***• partitions d 0 0 !III!! •`** **** ill!!! *••• *••• alit! **** •**• !!!l!! ***• •**• e 0 0 111111 .*** **** 11111! **** **** !tilt! .*** *•*• !IIi!! ***• .**• f 0 0 Ill!!! **** **** Ili!!! **•* ***• Ilrr!! .*** ***• !lulu! **•• •••' 6 Windows and a 3A0 39.7 ** 424 16821 **** 96 3809 ***• 0 0 *`** 0 0 ***` glass doors b 0 ** 0 0 **** 0 0 **** 0 0 •`** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 .... d 0 ** 0 0 *•** 0 0 **** 0 0 •*** 0 0 **** e 0 ** 0 0 **•* 0 0 **** 0 0 •*** 0 0 `*** f 0 ** 0 0 *•*• 0 0 **** 0 0 •*** 0 0 **•* 7 Windows and North 19.0 136 .*•• 2584 0 **** 0 0 ••** 0 0 *••• 0 glass doors NE/NW 0 0 *.*• 0 0 ••** 0 0 ..** 0 0 •••• 0 Cooling E/W 68.0 208 .*•• 14144 96 **** 6528 0 **** 0 0 •*** 0 SE/SW 0 0 **** 0 0 **** 0 0 •••• 0 0 **•• 0 South 34.0 80 .**` 2720 0 **** 0 0 **•• 0 0 **`* 0 Horz 0 0 **`* 0 0 *•** 0 0 •*•• 0 0 •••* 0 8 Other doors a 11 F0 12.2 2.3 84 1028 194 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 4116 22226 4198 1312 7085 1338 208 1123 212 208 1123 212 exposed b 0 0 11!1!! 0 0 111111 0 0 HIM 0 0 IIIIII 0 0 walls and c 0 0 I!u!1! 0 0 111!!I 0 0 hull! 0 0 !I1111 0 0 partitions d 0 0 1111!! 0 0 111111 0 0 11111! 0 0 IIIIII 0 0 • •e 0 0 11111! - 0 0 111111 0 0 Illlll 0 0 Ill!!! 0 . 0 f 0 0 Ill!!! 0 0 1111!1 0 0 MI!! 0 0 Will 0 0 10 Ceilings a 16G0 2.4 1.1 2177 5173 2443 0 0 0 0 0 0 0 0 0 b 0 0 111111 0 0 !!!!!! 0 0 !!!111 0 0 11111! 0 0 c 0 0 Illlll 0 0 !!1!I! 0 0 111111 0 0 Illu!! 0 0 d 0 0 11111! 0 0 MI 0 0 Ill!!! 0 0 111111 0 0 e 0 0 !lull! 0 0 Illlll 0 0 11!!!! 0 0 111111 0 0 f 0 0 IIIIII 0 0 11111! 0 0 rural 0 0 Ill!!! 0 0 11 Floors a 1910 1.7 0 2216 3829 0 1472 2544 0 168 290 0 160 276 0 (Note:room b 0 0 111I!! 0 0 111111 0 0 Illlll 0 0 11111! 0 0 perimeter c 0 0 Illlll 0 0 1111!! 0 0 !!I!!! 0 0 !lull! 0 0 is dispi. d 0 0 !tart 0 0 111111 0 0 HIM 0 0 IllIll 0 0 for slab e 0 0 !I!!!! 0 0 11111! 0 0 111!!! 0 0 !1111! 0 0 floors) f 0 0 1!!!!I 0 0 Illlll 0 0 111111 0 0 II!!!! 0 0 12 Infiltration a 63.9 5.1 508 32473 2577 96 6137 487 0 0 0 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 •*** 81550 **** **** 19574 *•** •*•• 1414 **** **** 1400 **** Less external heating *•** 0 ••*• **•* 0 **•• ••** 0 **** **** 0 **** Less transfer •*** 0 *`** •••• 0 •*** •••• 0 **** ..** 0 **•* Heating redistribution *••• 0 *`*` *•** 0 •*•* •*** 0 •*** •••• 0 .*** 14 Duct loss 6% 4893 *"` 6% 1174 **** 6% 85 **** 6% 84 •••* 15 Total loss=13+14 **** 86443 •`** **** 20748 *••• •... 1498 ***` **** 1484 *•** 16 Int.gains: People @ 300 0 •*** 0 0 •*•• 0 0 *•** 0 0 •*** 0 Appl. @ 1200 0 *.*• 0 0 ..*` 0 0 **** 0 0 ..** 0 17 Subtot RSH gain=7+8..+12+16 *`*• `*** 28860 •••• •'*' 8353 .*** .*** 212 •••* ..** 212 Less external cooling **** .*`* 0 .... •*.. 0 **** ***• 0 **** *•** 0 Less transfer •'•• .... 0 •••• *•** 0 **** .... 0 `*** **•* 0 Cooling redistribution ***• •••* 0 *••* **.. 0 `**• ..** 0 .*** ***• 0 18 Duct gain 5% **** 1443 5% `*`* 418 5% **** 11 5% *••* 11 19 Total RSH gain=(17+18)*PLF 1.00 **** 30303 1.00 "`* 8771 1.00 **** 223 1.00 ••** 223 20 Air required(cfm) 1317 1317 316 381 23 10 23 10 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wri F�tsoft' 2023-Jun-1915:16:26 �- 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 AWN ...rthy\Documents\York\Template\11 PERSHING RD.rup Calc=MJ7 Front Door faces: N i, i Right-J®Worksheet Job: 1829 Entire House Date: Jun 19,2023 By: Plan: 1829 i MANUAL J:7th Ed. 1 Name of room Room4 Room5 Room6 Room7 i 2 Length of exposed wall 17.0 ft 33.0 ft 176.0 ft 32.0 ft 3 Room dimensions 11.0 x 6.0 ft 25.0 x 14.0 ft 1.0 x 1472 ft 12.0 x 10.0 ft 4 Ceilings Condit.Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.4 1.0 136 •*** *•** 264 •••• •••• 1408 **** *'** 256 •••• •••• Exposed b 0 0 Illlll ."* •••* 111111 **** **** !!1!I! •**' •'*• Hull . ••• **•• walls and c 0 0 l!!!!! '**• **** !1l!!! '••• *•'• l!I!11 •••• '•** 11111! .*'* ***' partitions d 0 0 III!!! "•* *••* Illlll •••• it., 1l Ill l Illlll •••• e 0 0 Ill!!! ***' *•** huh •••• hull!! •••• * ****!!!!!I •*** f 0 0 !!!1!! *'** •*•* 11I!!1 **** **** 111111 .**' *... hull •••* '**• 6 Windows and a 3A0 39.7 ** 0 0 •••• 0 0 '••• 96 3809 •••* 80 3174 •*'* glass doors b 0 •* 0 0 •••• 0 0 '*•• 0 0 0 0 •••* • Heating c 0 *• 0 0 •••• 0 0 ••*• 0 0 **** * 0 0 d 0 ** 0 0 •••• 0 0 •*•• 0 0 **'* 0 0 **** e 0 ** 0 0 •••• 0 0 *••* 0 0 •••• 0 0 •••• f 0 ** 0 0 •••• 0 0 •••• 0 0 •••• 0 0 •••• 7 Windows and North 19.0 0 •••• 0 0 '*'• 0 56 '••• 1064 0 •••• 0 glass doors NE/NW 0 0 •••• 0 0 •... 0 0 •••• 0 0 **** 0 Cooling E/W 68.0 0 •••• 0 0 • 0 0 0 40 2720 SE/SW 0 0 **** 0 0 •••• 0 0 •••• 0 0 •••• 0 South 34.0 0 •`•• 0 0 •••• 0 40 .*** 1360 40 •••• 1360 Holz 0 0 •••• 0 0 •*•* 0 0 ***• 0 0 •••• 0 8 Other doors a 11F0 12.2 2.3 0 0 0 0 0 0 63 771 146 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 136 734 139 264 1426 269 1249 6745 1274 176 950 180 exposed b 0 0 I!!!!! 0 0 111111 0 0 !!l111 0 0 Ill!!! 0 0 walls and c 0 0 III!!! 0 0 11111! 0 0 !!!!!! 0 0 !!!!I! 0 0 partitions d 0 0 lull! 0 0 111111 0 0 !!h!lh 0 0 !!!!!! 0 0 e 0 .0 III!!! 0 0 HIM 0 0 uhiui! 0 0 !II!!! 0 0 f 0 0 I!!!!! 0 0 lull! 0 0 !lull 0 0 !!fill 0 0 10 Ceilings a 16G0 2.4 1.1 0 0 0 0 0 0 1472 3497 1652 120 285 135 b 0 0 lull! 0 0 HI!!! 0 0 !!!!11 0 0 lil!!! 0 0 c 0 0 lull! 0 0 1111!! 0 0 111111 0 0 1!I!!! 0 0 e 0 0 !!!I1! 0 0 !1!!!I 0 0 11111! 0 0 11111l 0 0 e 0 0 hill! 0 0 11111I 0 0 !!!!!! 0 0 !!!l!! 0 0 f 0 0 111111 0 0 111111 0 0 Hill! 0 0 !!hill 0 0 11 Floors a 1910 1.7 0 66 114 0 350 605 0 0 0 0 0 0 0 (Note:room b 0 0 111111 0 0 I!!!1! 0 0 !!!!!! 0 0 1!!!!! 0 0 perimeter c 0 0 II!!!! 0 0 !!M1!! 0 0 !!!!I! 0 0 IIIIII 0 0 is dispi. d 0 0 !WI! 0 0 !!!I!! 0 0 !!!!!I 0 0 liirii 0 0 for slab e 0 0 !Hill 0 0 111111 0 0 lull! 0 0 !!!1!1 0 0 floors) f 0 0 Illlll 0 0 11111! 0 0 111111 0 0 Ill!!! 0 0 12 Infiltration a 63.9 5.1 0 0 0 0 0 0 159 10164 807 80 5114 406 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 •••• 848 •••• •*** 2030 **•* **** 24986 *•'* **** 9523 •••• Less external heating ••*• 0 •'•• •••• 0 ••.. •••• 0 ••*' **** 0 **** Less transfer .••• 0 •••• **** 0 *••• .••• 0 '••• •''• 0 *••• Heating redistribution •••• 0 •••' *••* 0 •••• •••* 0 •••• •*** 0 •••• 14 Duct loss 6% 51 **** 6% 122 **** 6% 1499 **** 6% 571 **** 15 Total loss=13+14 •••• 899 ••'• .*•• 2152 **•' •*•* 26485 •••• •••* 10095 ***• 16 IM.gains: People @ 300 0 •••' 0 0 •••• 0 0 •••• 0 0 *•** 0 Appl. @ 1200 0 •••• 0 0 •••• 0 0 •••• 0 0 •••• 0 17 Subtot RSH gain=7+8..+12+16 •••• •••• 139 •••• •••• 269 *•'* .... 6302 ***• *•'• 4800 Less external cooling •••• •••• 0 •*•• ••'• 0 •••• •••• 0 •••• •••• 0 Less transfer •••• ••.. 0 ••'• •.•• 0 •••• .••• 0 ••** '•*• 0 Cooling redistribution •••• •••• 0 •••• •••• 0 "•• •••• 0 •*•' '••• 0 18 Duct gain 5% ••*' 7 5% •••• 13 5% *•'• 315 5% **** 240 19 Total RSH gain=(17+18)*PLF 1.00 **** 146 1.00 '*** 283 1.00 •*•* 6617 1.00 **** 5040 20 Air required(cfm) 14 6 33 12 403 288 154 219 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wri htsotft- 2023-Jun-1915:16:26 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 2 AC ...rthylDocuments\Yorl6Template\11 PERSHING RD.rup Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: 1829 Entire House Date: Jun 19,2023 By: Plan: 1829 • MANUAL J:7th Ed. 1 Name of room Room8 Room9 Room10 Room11 2 Length of exposed wall 23.0 ft 10.0 ft 0 ft 28.0 ft 3 Room dimensions 11.0 x 12.0 ft 1.0 x 56.0 ft 6.0 x 2.0 ft 13.0 x 15.0 ft 4 Ceilings Condit.Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg Ma) Htg Clg (ftz) Htg Clg (ftz) Htg Clg (ftz) Htg Clg 5 Gross a 12E3 5.4 1.0 184 ***• **** 80 **•* .**• 0 **** **** 224 **•* **** Exposed b 0 0 II1!11 ***• **** 111111 •'*• *••• llllll **** **** l!!!!I **** **** walls and c 0 0 1111!1 *•** **** llllll •••* **** !ill!! *•** ***• 11111! **** **** partitions d 0 0 Ill!!! **** **** 11111! **** **** llllll **** *•** Ill!!! *•** **** e 0 0 Ill!!! *••* ••** III11! *•** .*** 111u11 **** •*•• I11111 **** **** f 0 0 !II!!! **** ••** llllll **** •*** Hi!!! **** .... llllllt3 *.** *.** 6 Windows and a 3A0 39.7 ** 80 3174 **** 16 635 *••* 0 0 •*** 40 1587 **•• glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **•• Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 ***• d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **•* 0 0 ***• 0 0 ***• f 0 ** 0 0 *•** 0 0 **** 0 0 *•** 0 0 **•* 7 Windows and North 19.0 40 .*•* 760 0 **** 0 0 *•*• 0 40 **** 760 glass doors NE/NW 0 0 ***• 0 0 **** 0 0 **** 0 0 *•** 0 Cooling E/W 68.0 40 .**• 2720 16 .*** 1088 0 **** 0 0 **** 0 SE/SW 0 0 .**• 0 0 .*** 0 0 **•* 0 0 **** 0 South 34.0 0 .*** 0 0 **** 0 0 *••• 0 0 **** 0 Horz 0 0 **** 0 0 *•** 0 0 •*** 0 0 **** 0 8 Other doors a 11 F0 12.2 2.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 104 562 106 64 346 65 0 0 0 184 994 188 exposed b 0 0 !I!!!! 0 0 MI 0 0 111111 0 0 In! 0 0 walls and c 0 0 Ill!!! 0 0 111111 0 0 !!!III 0 0 llllll 0 0 partitions d 0 0 Ill!!! 0 0 llllll 0 0 I!I!II 0 0 111!l! 0 0 e 0 0 I1111! .0 0 IIII!! 0 . 0 111111 0 .0 111111 0 0 f 0 0 Intl! 0 0 I!!!!! 0 0 111111 0 0 !In 0 0 10 Ceilings a 16G0 2.4 1.1 132 314 148 56 133 63 12 29 13 195 463 219 b 0 0 llllll 0 0 MI!! 0 0 llllll 0 0 111111 0 0 c 0 0 I!111! 0 0 llllll 0 0 Mill 0 0 IIII!! 0 0 d 0 0 III!!! 0 0 HIM 0 0 !Ill!! 0 0 llllll 0 0 e 0 0 !!I!!1 0 0 111111 0 0 !IIII! 0 0 111111 0 0 f 0 0 !!!ill 0 0 Mill 0 0 !!!III 0 0 llllll 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 0 0 !1!!1! 0 0 11111! 0 0 111111 0 0 llllll 0 0 perimeter c 0 0 !Ill!! 0 0 III!!! 0 0 111111 0 0 !IIII! 0 0 is displ. d 0 0 IIII!! 0 0 llllll 0 0 MI 0 0 !!!!!1 0 0 for slab e 0 0 !III!! 0 0 11111! 0 0 llllll 0 0 111111 0 0 floors) f 0 0 llllll 0 0 111111 0 0 !!IIII 0 0 !!!!!! 0 0 12 Infiltration a 63.9 5.1 80 5114 406 16 1023 81 0 0 0 40 2557 203 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 ••** 9163 **** **** 2136 **** **** 29 **** **•* 5601 *••• Less external heating •**• 0 *•** .*** 0 **** **** 0 **** **** 0 **•* Less transfer **•• 0 *••• **** 0 **•* •••• 0 *••• *•** 0 **** Heating redistribution ***• 0 •*** **** 0 **•• **** 0 .*•• **** 0 **** 14 Duct loss 6% 550 .*** 6% 128 **** 6% 2 ..*• 6% 336 **** 15 Total loss=13+14 **** 9713 ***• ***• 2264 •*** **•• 30 **** •••• 5937 ••** 16 Int.gains: People @ 300 0 **** 0 0 *•** 0 0 •••• 0 0 **** 0 Appl. © 1200 0 .*** 0 0 **•* 0 0 **** 0 0 •*** 0 17 Subtot RSH gain=7+8..+12+16 **** *•** 4140 **** *••• 1297 •'*• **** 13 **** **** 1369 Less external cooling **•* •*** 0 .... *•** 0 •*•• **•• 0 **** *•** 0 Less transfer *•** •*** 0 **** •*** 0 •*•• **** 0 *•** **** 0 Cooling redistribution •*** *•** 0 •••• **** 0 **** **** 0 **** •*** 0 18 Duct gain 5% **** 207 5% **** 65 5% **** 1 5% **** 68 19 Total RSH gain=(17+18)*PLF 1.00 *•** 4347 1.00 **.. 1362 1.00 **** 14 1.00 **** 1438 20 Air required(cfm) 148 189 34 59 0 1 90 62 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wr- htsoft� 2023-Jun-19 15:16:26 +� g Right-Suite®Universal 2017 17.0.16 RSU25116 Page 3 ACCK ...rthy\Documents\York\Template111 PERSHING RD.rup Cale=MJ7 Front Door faces: N i ,r Rig ht-J®Worksheet Job: 1829 Entire House Date: Jun 19,2023 By: Plan: 1829 MANUAL J:7th Ed. 1 Name of room Room12 Room13 Room14 2 Length of exposed wall 9.0 ft 15.0 ft 7.0 ft 3 Room dimensions 6.0 x 9.0 ft 9.0 x 6.0 ft 1.0 x 82.0 ft 4 Ceilings Condit.Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg Htg Clg 5 Gross a 12E3 5.4 1.0 72 **•* **** 120 **** •*** 56 *•** '*** **** **** Exposed b 0 0 111111 **'* **** i!!!1! *'** ••** 1I II!I ..** **** **** **** walls and c 0 0 I111!! **•* '•** Ili!!! •.** **•* 1111!! `*** ***' **** **'* partitions d 0 0 11!!!! ***' '*** !!!!II **** **** !I1!!! ***• •••• **** •*•• e 0 0 11111! •*'* **** Ili!!! **•* **** 1!!!!1 f 0 0 111111 *`** **** 11111! **** '*** !!!11! **** **** **** '*** 6 Windows and a 3A0 39.7 ** 0 0 **** 16 635 '*** 0 0 **** •*•• glass doors b 0 ** 0 0 **** 0 0 •*** 0 0 **•* ..*• Heating c 0 ** 0 0 **" 0 0 **** 0 0 •••• **** d 0 ** 0 0 ••*• 0 0 **** 0 0 e 0 ** 0 0 "** 0 0 *'** 0 0 •*** •'** f 0 ** 0 0 *•** 0 0 •`*' 0 0 **** **** 7 Windows and North 19.0 0 •*** 0 0 *•'• 0 0 **** 0 "'• glass doors NE/NW 0 0 **** 0 0 0 0 0 **** Cooling E/W 68.0 0 **** 0 16 1088 0 ' 0 **** SE/SW 0 0 **'* 0 0 **** 0 0 **•• 0 South 34.0 0 "** 0 0 ***• 0 0 **'* 0 **** Horz 0 0 •*'* 0 0 **** 0 0 **'* 0 **** 8 Other doors a 11F0 122 2.3 0 0 0 0 0 0 21 257 49 b 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 72 389 73 104 562 106 35 189 36 exposed b 0 0 111111 0 0 111111 0 0 11111! 0 0 walls and c 0 0 11111! 0 0 111111 0 0 111111 0 0 partitions d 0 0 111111 0 0 111111 0 0 llilll 0 0 e 0 0 !III!! 0 0 111111 0 0 111111 0 0 f 0 0 . l!!!I! 0 0 111111 0 0 l!l!ll • 0 0 • 10 Ceilings a 16G0 24 1.1 54 128 61 54 128 61 82 195 92 b 0 0 !!!!!! 0 0 111111 0 0 11111! 0 0 c 0 0 11111! 0 0 111111 0 0 Ill!!! 0 0 d 0 0 111111 0 0 111111 0 0 !!1!!! 0 0 e 0 0 !!!!!! 0 0 11!!!! 0 0 1!1!!! 0 0 f 0 0 111111 0 0 !1111! 0 0 !!llll 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 (Note:room b 0 0 hilhil 0 0 !!l111 0 0 !hill! 0 0 perimeter c 0 0 llllll 0 0 !!1!!! 0 0 111111 0 0 is displ. d 0 0 I1!!!! 0 0 111111 0 0 111111 0 0 for slab e 0 0 !Ill!! 0 0 111111 0 0 11111! 0 0 floors) f 0 0 111111 0 0 111111 0 0 111111 0 0 12 Infiltration a 63.9 5.1 0 0 0 16 1023 81 21 1342 107 Ventilation 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 •'•* 517 **** •*** 2347 **** •*** 1983 .*** **** '*** Less external heating •*** 0 **** '*** 0 **** **** 0 •*** •*** *•** Less transfer ***' 0 *'** •*** 0 "•* .*** 0 **** **** **" Heating redistribution ***• 0 **** **** 0 **** **** 0 **** **** •*** 14 Duct loss 6% 31 **** 6% 141 **** 6% 119 **** **** 15 Total loss=13+14 •*** 548 **** **** 2488 **** "** 2102 **** '*** '*** 16 Int.gains: People @ 300 0 **** 0 0 0 0 0 •*.• Appl. @ 1200 0 *'** 0 0 *••. ••••0 0 0 17 Subtot RSH gain=7+8..+12+16 **" **** 134 **•* **** 1336 **** **** 283 "** •••* Less external cooling **** **** 0 **** **** 0 **** **'* 0 **** **** Less transfer ..** •*** 0 **** *••• 0 •*** **•* 0 **** **** Cooling redistribution •*** •*** 0 '*** *"* 0 *•*' **** 0 **** •*** 18 Duct gain 5% *'** 7 5% •*** 67 5% **** 14 *"* 19 Total RSH gain=(17+18)*PLF 1.00 *"* 141 1.00 **** 1403 1.00 **** 297 "" 20 Air required(cfm) 8 6 38 61 32 13 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wr- FtttsOft' 2023-Jun-1915:16:26 -d_,_ 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 4 /vCCt ...rthy\Documents\York\Template\11 PERSHING RD.rup Calc=MJ7 Front Door faces: N + • l S 1.i,: Deievartonury Your Ventilation Needs f 8-Ooyel 111106 Pro* Nn'"itp y U t1t)tt i7 ;i Good air quality is based d In part on the capacity of the home's ventilation system.LI unity,the(EMat's capacity is }>: measured In CFtul(Cubic Feet per Minute) or Us(Liters par second)of fresh air be lig distributed in the living space,Use the ASt1RAE 62;2 Ventilation Standard,the Room Count Calculation M thod!,or the Air Change Per s,�1 Hour(ACH)Method to determine your ventilatton needs. .i13°i • A. 4111• E �2.2�s'Vonitht.ditil I a',5;ti otz.h.it't j a A'SHiAE 62.2 CFM Sizing Chart • Number of Bedrooms 1 CFM -_. Floor Area 4ft� 04 ;2-3 ;4-5 16 7 l >7 :.15O0 30 • I 46 160 75 .' 90 l',i":,. .. 1501 -3000 45 i 60 75 90 1 105 o' 4503 60 175 I.110 105 i 120 • 6000 90 HK16 . 120 ] 135 6001 6 0► 190 '. 106r 120 ' 135 ? 150 . ; :.:..,: :0 7500 1105 120 i 135 150 105 ., ANSItASHRAE STANDARD 02.2.2010-Ventilation Air Requirements:values inn F •I 'The above chart outlines the minimum requirements fofrcintinct�lis ventilation. ]t. : • • 1 6 S.ff z 0 cf i Lv/f 6 ei /tuM s x 933, • . i . • • I' i, . E aalkzs ate- -® LIFE _n- _= 155MAX --— -gal— — - - -- — — =W W W.L I F E.B R E A T H.0 O M HEAT RECOVERY VENTILATOR ENGINEERING DATA Performance (HVI certified) • THERMALLY CONDUCTIVE,PATENTED ALUMINUM CORE Netsuppty airflow in cfm(L/s)against external static pressure The counter-flow heat recovery core transfers heat between the two airstreams.It is easily External Static Pressure Airflow removed for cleaning or service. -c MOTORS AND BLOWERS @ 0.1in(25 Pa) 184 cfm (87 L/s) Each airstream has one centrifugal blower driven by a common PSC motor,with multiple @ 0.2 in(50 Pa) 163 cfm (77 L/s) fanspeed operations. @ 0.3 in(75 Pa) 146 cfm (69 L/s) FILTERS @ 0.4in(100 Pa) 132 cfm (62 Ifs) Washable air filters in exhaust and supply airstreams. MOUNTING THE HRV • @ 0.5 in(125 Pa) 115 cfm (54 Ifs) Threaded inserts at corners of the cabinet designed to accept the"5"hooks and hanging @ 0.6 in(150 Pa) 92 cfm (43 L/s) straps supplied with the unit @ 0.7 in(175 Pa) 60 cfm (28 L/s) DEFROST Recirculating damper defrost system. Max.Temperature Recovery 86% CASE 20 gauge prepainted galvanized steel for superior corrosion resistance,insulated to prevent Sensible Effectiveness(ASE) exterior condensation.Drain connections:Two 1/2 in(12 mm)OD.Balancing ports are @ 59 cfm(28 L/s) 32°F(0°C) 84% located on unit. Sensible Efficiency (SRE) ELECTRONICS @ 64 cfm(30 L/s) 32°F(0°C) 75% Control included with the unit can be wall mounted in a central location of the home.3 wire 5 ensible Efficiency(SRE) 20 gauge(min.)100 ft length(max.). @ 64 cfm(30 L/s) -13°F(-25°C) 71% CONTROL VAC @ 60Hz 115 99-DXPLO2 Lifebreath Digital Control • 5 speed operation on each mode Watt/Low speed 66 • 5 user selectable operational modes:Continuous Ve-•f • Continuous Watt /High speed 118 Recirculation,20 ON/40 OFF,10 ON/50 OFF,20 ON/ 0 Recirculati_ • Compatible with 99-DET02 Wireless Timers Amp rating 1.4 • Humidity control through adjustable Dehumidistat • 20/40/60 ;�High speed override button �� py Sensible Efficiency:Thermal Based on temperature differential b tween • 3 wire connection '____- the 2 airstreams TIMER OPTIONS - Efficiency:Takes into account all power inputs ' 99-DET01 Lifebreath 20/40/60 Minute Timer-Initiates High speed Ventilation for 20,40 or • 60 minutes.3 wire connection. 200 ' 99-DET02 WIRELESS Lifebreath 20/40/60 Minute Timer-Initiates High speed Ventilation for 20, 180 5 40 or 60 minutes.Wirelessly connects to main control for ease of installation. 40' 160 - 4 approximate range. 3 . 140 99-RX02 WIRELESS Repeater-Used to extend range of 99-DET02 Wireless Timers. Plugs into 2 120V power outlet. Wirelessly connects to main control and 99-DET02.Install at 'G120 1 halfway point between timer and main wall control if timer is out of range. 3100 0 ACCESSORY OPTIONS E 80 99-163 Duct Heater w/Electronic SCR Thermostat-1 kW,6 in(152 mm). 60 99-186 Weatherhoods-Two 6 in(152 mm). 40 20 WEIGHT 71 lbs(32 kg)SHIPPING WEIGHT 73 lbs(33 kg) % 0.1 0.2 03 0.4 0.5 0.6 0.7 0.8 Static Pressure(in w.g.) DIMENSIONS 155MAX �r _ c�V��s V, ISO Q Fresh Air Stale Air .�. CERTIFIED 9001 ® "".7;giareavi From Outside From Inside 14 3/4 in(375 mm Redrculating •4 Filter -0 Defrost Damper • !� j �� a I I • Note:Front WARRANTY clearance of 25 in Removable Blower m (635 mm)is Heat 14 ��) recommended for Units carry a lifetime warranty on the HRV core Recovery r Jl♦ Motor - servidng unit.All and a 5 year replacement parts warranty. • Core - ;,- a duds use 6 in(152 mm)connections. Stale i Fresh Air To<3II I'C>Air To 3 O NOTE:All specifications are subject to change without notice. Outside Inside • ,0 All units conform to CSA and UL standards rIlimillig V 33 5/8 in(854 mm) 1.1 Condensate Drain Front View Ride View v °Q ENERGY STAR Date: Contractor: Tag: Qty: Supplier: Project: • Quote#: Engineer: Submi ed By: , eGenerates! by REScheck-Web Software T d c toi.4 Compliance Certificate * LR vi 1 . -4 (.0 g 2, Project Cerrone Builders �z N �a �O 0 o z o 1(1D Energy Code: 2018 IECC GZ7pal � LI CD Location: Glens Falls, New York m v' i = 70 Construction Type: Single-family nm o 2. A Project Type: New Construction 0 m G; pi 81 p Conditioned Floor Area: 2,230 ft2 rfl° fi - -1 w 10 Glazing Area 20% N ® (D N Climate Zone: 6 (7635 HDD) 0 N Permit Date: 0 0 Permit Number: cn Nj Construction Site: Owner/Agent: Designer/Contractor: 11 Pershing Rd Daniel W. Ryan P.E. Queensbury, NY 12804 PO Box 1386 Nokomis, FL 34274 518-742-9569 dryan@dwrpe.com Compliance: Passes using UA trade-off ( , Compliance: 0.7%Better Than Code Maximum UA: 277 Your UA: 275 The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies_ Gross Area Cavity Cont. Prop. Req. Prop. Req. Assembly or R-Value R-Value, U-Factor U-Factor UA UA Perimeter Ceiling: Raised or Energy Truss 1,470 49.0 0.0 0.020 0.026 29 38 FF Walls:Wood Frame, 16" o.c, 1,584 21.0 0.0 0..057 0.045 73 58 Door 2: Solid Door(under 50%glazing) 18 0.140 0.300 3 5 Door 3: Solid Door(under 50%glazing) 20 0.240 0.300 5 6 Door 1: Glass Door(over 50%glazing) 40 0.290 0.300 12 12 Window:Vinyl Frame 226 0.290 0.300 66 68 Basement Wall Unfin: Solid Concrete or Masonry Wall height: 7.8' 546 0.0 13.0 0.052 0.050 28 27 Depth below grade: 6.5' Insulation depth: 7.8' . Window:Vinyl Frame 16 0.290 0.300 5 5 Stair Wall: Solid Concrete or Masonry Wall height: 8.8' 84 7.5 0.0 0.076 0.050 6 4 Depth below grade: 7.8' Insulation depth: 8.8' Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 1 of10 y .. T 1 _,i "1 f • • • • • • a > _r • Gross Area Cavity Cont. Prop. Req: Prop. Req. Assembly or R-Value R-Value U-Factor U-Factor UA UA Perimeter Finished Basement Wall: Solid Concrete or Masonry Walt height: 8.8' 920 19.0 0.0 0.044 0.050 39 44 Depth below grade: 7.8' Insulation depth: 8.8' Egress:Vinyl Frame 32 0.290 0.300 9 10 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the ma ry r u' ements listed in the REScheck Inspection Checklist. Daniel W. Ryan P.E. 6/5/23 Name-Title Signature Date ENGINEERS STAMP: ��of NEN/ (1/44,..:.� Pc l 1', il, r=r 71 i`sv;;i Ohl ,e Id'lc? N. 5,.i, 0 .Pit0:{1, ' 406111,,i. 4:LL'1.-, 0-1'3 l flit'.� tOLIi1 1: illdi .'. I I) fit S '4141)f h; :H6Q'[:..�". �' Y i I'll. ''C. A c V 9°rEssl ,, Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 2 of10 REScheck Software Versionli: REScheck-Web Checkst Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans.Verified „Field Verified # Pre-Inspection/Plan Review Complies? Comments/Assumptions & Req.ID l Value. Value: , • 103.1, ;Construction drawings and - ;❑Complies 103.2 I documentation demonstrate I :❑Does Not [PR1]1 ;energy code compliance for the - ; `5 ;building envelope.Thermal I❑Not Observable i envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and I❑Complies 103.2, documentation demonstrate • ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable l Systems serving multiple ❑Not Applicable !dwelling units must demonstrate ' ;compliance with the IECC I Commercial Provisions. 302.1, ;Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 ;sized per ACCA Manual S based I Btu/hr Btu/hr ❑Does Not (PR2]z ion loads calculated per ACCA J I Manual.; or other methods Cooling: Cooling: ONot Observable approved by the code official. Btu/hr Btu/hr ❑Not Applicable Additional Comments/Assumptions: • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 3 of10 , Section Plans Verified Field Verified #. Foundation Inspection Complies? Comments/Assumptions & Req.l® Value �ialue 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies (F04)1 insulation R-value.Where interior R_ R- ❑Does Not table for values. insulation is used, verification DNot Observable may need to occur during Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303:2 Conditioned basement wall , ❑Complies (F05]1 insulation installed per • `❑Does Not U manufacturer's instructions. ❑Not Observable ❑Not Applicable - 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies (F06]1 insulation depth of burial or ❑Does Not table for values. ( distance from top of wall. :Not Observable ❑Not Applicable 303.2.1 {A protective covering is installed ❑Complies [F011]z ito protect exposed exterior ❑Does Not i insulation and extends a ;❑Not Observable `minimum of 6 in. below grade. ❑Not Applicable 403.9 'Snow-and ice-melting system j t❑Complies (F012]2 i controls installed. ❑Does Not I ;❑Not Observable 1 ❑Not Applicable • Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 4 of10 Section Plans Verified Field Verified # Framing I.Rough-In.Inspection Compiles? "Comments/Assumptions & Req.ID Value" Value , 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 Oboes Not table for values. [FR1]1 ` :Not Observable ONot Applicable 402.1.1, ;Glazing U-factor(area-weighted U- U- ;❑Complies See the Envelope Assemblies 402.3,1, average). i❑Does Not table for values. 402..3.3, 402.5 :Not Observable [FR2]1 :Not Applicable U 303.1.3 ;U-factors of fenestration products ;❑Complies [FR4]1 !are determined in accordance f f E❑Does Not ;with the NFRC test procedure or !ONot Observable taken from the default table. ❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier ;❑Complies [FR23]1 ;installed per manufacturer's ❑Does Not instructions. _ ONot Observable j ONot Applicable 402.4.3 ;Fenestration that is not site built ;❑Complies [FR20]1 ;is listed and labeled as meeting i❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 'or has infiltration rates per NFRC :Not Observable 400 that do not exceed code ; ONot Applicable limits. ; 402.4.5 IC-rated recessed lighting fixtures ;❑Complies [FR16]2 sealed at housing/interior finish 4❑Does Not and labeled to indicate s2,0"cfm leakage at 75 Pa. ;❑Not Observable ' i❑Not Applicable 403.3.1 ;Supply and return ducts in attics ; ❑Complies [FR12]1 ;insulated >= R-8 where duct is ❑Does Not !>= 3 inches in diameter and >= f I R-6 where < 3 inches. Supply and ❑Not Observable return ducts in other portions of ( ONot Applicable Ithe building insulated >= R-6 for 1 diameter>=3 inches and R-4.2 ; , ' Ifor< 3 inches in diameter. 403.3.2 ;Ducts, air handlers and filter ❑Complies [FR13]1 !boxes are sealed with ODoes Not Lq tloints/seams compliant with International Mechanical Code or :Not Observable International Residential Code, as ONot Applicable applicable. 403.3.5 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. f DDoes Not Ai' [Not Observable ONot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 5 of10 Section Plans Verified Field Verified # Framing /Rough-In Inspection Complies? Comments/Assumptions Value Value & Req.ID ,. 403.3,7 !Ducts declared to be within the I ;❑Complies [FR28)3 conditioned space are either 1) ' ;❑Does Not i completely within the continuous y !air barrier and within the building ;:Not Observable • ;thermal envelope, 2) buried DNot Applicable !within ceiling insulation in accordance with Section ' • R403.3.6 and the air handler is , located completely within the continuous air barrier and within s, ` . the building thermal envelope and the duct leakage is <= 1.5 cfm/100 square feet of conditioned floor area served by ;the duct system, or 3)the ceiling insulation R-value installed !against and above the insulated duct >=to the proposed ceiling !insulation R-value, less the R- ;value of the insulation on the 403,4 ;HVAC piping conveying fluids R- R- ❑Complies [FR17]2 i above 105°F or chilled fluids ❑Does Not ,01 I below 55°F are insulated to zR- 3 :Not Observable ❑Not Applicable 403,4.1 'Protection of insulation on HVAC ❑Complies [FR24]1 i piping, [ ❑Does Not 'U� I Not Observable ❑Not Applicable 403.5.3 i Hot water pipes are insulated to R- R- ❑Complies [FR18]2 i zR-3. ❑Does Not 4J i - ❑Not Observable ❑Not Applicable 403.6 ;Automatic or gravity dampers are ;❑Complies [FR1912 i installed on all outdoor air 1 ❑Does Not 'intakes and exhausts. ;. ;❑Not Observable i t❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 6 of10 • Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ;All installed insulation is labeled ;❑Complies [IN13]2 !or the installed R-values 10Does Not ,�, ;provided. Not Observable Not Applicable 402.1.1, i Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, !mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 40272.6 ;wall insulation on the wall ❑ Mass ❑ Mass DNot Observable [IN3]1 'exterior,the exterior insulation ,�J requirement applies(FR10), ❑ Steel El Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN4]1 !manufacturer's instructions. ❑Does Not ONot Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions I Complies? Comments/Assumptions & Req.ID Value' Value 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2,1, ❑ Wood ❑ Wood ❑Does Not table for values, 402.2.2, ❑ Steel ❑ Steel :Not Observable 402.2,E ❑Not Applicable . 303.1.1.1, Ceiling insulation installed per OComplies 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ft2. ONot Observable ❑Not Applicable 402.2,3 ;Vented attics with air permeable ;❑Complies [FI22]2 !insulation include baffle adjacent !❑Does Not Ito soffit and eave vents that extends over insulation. ❑Not Observable l ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies [FI3]1 insulation R-value of the ODoes Not ' ;adjacent assembly. 1 ONot Observable ONot Applicable 402.4.1.2 'Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [FI17]1 lach in Climate Zones 1-2, and DDoes Not <=3 ach in Climate Zones 3-8. 1 ONot Observable I ❑Not Applicable 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies ` [FI27]1 !determine air leakage with ft2 ft2 ❑Does Not ;either: Rough-in test:Total DNot Observable !leakage measured with a ;pressure differential of 0.1 inch ONot Applicable w.g. across the system including !the manufacturer's air handler :enclosure if installed at time of !test, Postconstruction test:Total leakage measured with a ;pressure differential of 0,1 inch w.g. across the entire system ;including the manufacturer's air ;handler enclosure. 403.14 !Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [FI4]1 ;cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ['Not Observable ;tests,verification may need to ONot Applicable occur during Framing Inspection. 403.3.2,1 Air handler leakage designated IDComplies [FI24]1 by manufacturer at<=2%of 1❑Does Not design air flow. , 1 ONot Observable 1 ONot Applicable 403.1.1 ;Programmable thermostats 10Complies [F19]2 ;installed for control of primary `' ;❑Does Not heating and cooling systems and initially set by manufacturer to i '❑Not Observable code specifications. !❑Not Applicable 403.1,2 ;Heat pump thermostat installed '❑Complies [FI10]2 on heat pumps. ; Does Not I i • is ;❑Not Observable j❑Not Applicable 403.5.1 `Circulating service hot water ;❑Complies [FI11]2 }systems have automatic or i 10Does Not accessible manual controls. 1❑Not Observable ' ;❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system f ;❑Complies (F125]2 'fans not part of tested and listed ' El Does Not HVAC equipment meet efficacy ;and air flow limits per Table 1❑Not Observable !R403.6.1. ❑Not Applicable 403.2 Hot water boilers supplying heat ;❑Complies [FI26]2 through one-or two-pipe heating ' I❑Does Not systems have outdoor setback • control to lower boiler water Not Observable temperature based on outdoor !❑Not Applicable temperature. 403.5.1.1 ;Heated water circulation systems; ;❑Complies (FI28]2 i have a circulation pump.The I !❑Does Not system return pipe is a dedicated; ; I return pipe or a cold water supply`; ❑Not Observable pipe. Gravity and thermos- [ j❑Not Applicable ;syphon circulation systems are not present. Controls for circulating hot water system ;pumps start the pump with signal ;for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 ;Electric heat trace systems EComplies [FI29]2 comply with IEEE 515.1 or UL ❑Does Not 1515.Controls automatically !adjust the energy input to the ['Not Observable !heat tracing to maintain the ;❑Not Applicable desired water temperature in the !piping. ; 403.5.2 ;Demand recirculation water ; I❑Complies [F130]2 !systems have controls that IODoes Not ;manage operation of the pump 'and limit the temperature of the ❑Not Observable water entering the cold water ❑Not Applicable piping to <= 1049F, 403.5.4 Drain water heat recovery units !❑Complies (FI31]2 tested in accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat ; ONot Observable recovery units <3 psi for Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers, 404.1 90%or more of permanent ; ;❑Complies (FI6]l fixtures have high efficacy lamps. ;❑Does Not ❑Not Observable ❑Not Applicable 404.1.1 ;Fuel gas lighting systems have ! ❑Complies (F123)3 I no continuous pilot light. P ❑Does„ii, 1 ❑Not Observable ' i❑Not Applicable 401.3 }'Compliance certificate posted. ; • !❑Complies [F17]2 ! ;❑Does Not 1 I ❑Not Observable • I❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 9 of10 Section Plans Verified Field Verified, • # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 303.3 ;Manufacturer manuals for :❑Complies [FI18]3 i mechanical and water heating ❑Does Not 1 systems have been provided. ❑Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Report date: 06/05/23 Data filename: Page 10 of10 - Icts 2018 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor o.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor E SHGC Window 0.29 Door 0.29 { Heating & Cooling Equipment f Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments