Loading...
CC-0290-2022 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development- Building & Codes (518) 761-8256 BUILDING PERMIT Permit Number: CC-0290-2022 Tax Map No: 302.7-1-18 Permission is hereby granted to: CKT Enterprises For property located at: 11 LAFAYETTE ST In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: CKT Enterprises Business Office-Addition $750,000.00 Owner Address: 2 Glendale DR Total Value $750,000.00 Queensbury,NY Contractor or Builder's Name/Address Electrical Inspection Agency Bruce Mowery 2 GLENDALE DR Queensbury,NY 12804 Plans& Specifications One 1 1/2 story additions 1008 s.f.:West end-main ofc;both will have a portion for storage Truss Sign:N;Knox Box:Y; Occ Class:A; Occ Load: 300;Bldg Code Ver:2020 $1,193.75 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday, June 6, 2024 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Queensbury; Monday, June 6, 2022 7) SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement Office Use Oniy i ADDITION/ALTERATION PERMIT Permit#: CC-— MID APPLICATION permit Fee:$ mil$•�-`J Town of Queensbury 742 Bay Road,Queensbury,NY 12804 Invoice#: �j� P:518-761-8256 www.gueensbury.net Flood Zone? Y N Reviewed By: Project Location: 11 Lafayette Street Tax Map ID#: 302.07-1-18 Subdivision Name: p EC EOVE PROJECT INFORMATION: MAY 17 2022 TYPE: Residential X Commercial, ropo�glLbfN6�� Rme _Single-Family _Two-Family _Multi-Family(#of units ) _Townhouse Business Office _Retail _Industrial/Warehouse _Garage (#of cars_) X Other(describe Funeral Home & Pole)Barn ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 6 F 1st floor: 2nd floor: 1 2nd floor: 3rd floor: 31 floor: Basement(habitable space): Basement(habitable space): Total sq ft:NSF -100S �� Total sq ft: Scope of work to be done:' Two 1-1/2 sto additions are being made to the existing Baker Funeral Home. One on th east zo?� end o the buil ' will house additional viewing room and a small office for the funeral home director an one on a west en of the building that will house the main office area for the funeral home staff. o additions will have a portion of the upper floor utilized for light storage and will not open to the general public. T Addition/Alteration Application Revised January 2021 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ $750,000 2. Source of Heat(circle one): X Gas _Oil _Propane Solar Other Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? YES XNO Explain: 4. Are there any easements on the property? YES X NO SITE INFORMATION: • Is this a corner lot? _YES XNO • Will the grade be changed as a result of the construction? YES X NO • What is the water source? X PUBLIC _PRIVATE WELL • What type of wastewater system is on the parcel? XSEWER _PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are atrue and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: Ethan P. Hall -11Architect\Agent for the Applicant SIGNATURE: rt&41,P Yr& DATE: 16 May 2022 Addition/Alteration Application Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): CKT Enterprises, LLC-Starr Mowery Mailing Address, C/S/Z: 2 Glendale Drive-Apt. B, Queensbury NY 12804 Cell Phone: 518 )232-0630 Land Line: 518 )761-9303 Email: smileckt(W-hotmail.com Primary Owner(s): Name(s): CKT Enterprises, LLC-Starr Mowery Mailing Address, C/S/Z: 2 Glendale Drive-Apt. B, Queensbury NY 12804 Cell Phone: 518 )232-0630 Land Line: ( 518 )761-9303 Email: smilecktO)-hotmail.com Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): Bruce Mowery Contractor Trade: General Construction Mailing Address, C/S/Z: 2 Glendale Drive-Apt. B, Queensbury NY 12804 Cell Phone: Land Line: � ) Email: **Workers' Comp documentation must be submitted with this application** • Arch itect(s)/Engineer(s): Business Name. Rucinski Hall Architecture Contact Name(s): Ethan P. Hall Mailing Address, C/S/Z: 134 Dix Ave, Glens Falls NY 12801 Cell Phone: 518 )260-2888 Land Line: ( 518 )741-0268 Email: ephall(aD-nycap.mcom Contact Person for Compliance in regards to this project: Ethan P. Hall Cell Phone: 518 )260-2888 Land Line: 518 )741-0268 Email: ephall(&nvcap.rr.com Addition/Alteration Application Revised January 2021 FIRE MARSHAL'S OFFICE Tozun of Queensbury kl4w 742 Bay Road, Queensbury, NY 12804 "Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW Baker Funeral Home 11 Lafayette Street CC-0290-2022 5/18/2022 Bldg Additions The following comments are based on a review of submittals: • Verify fire extinguisher location and inspection • Location of exit/Emergency lighting appear adequate. Function test will be required , including stairs to attic area • Lock/ latches shall comply with Chapter 10 of 2020 IFC. • Verify paths of egress • Knox Box key is required • NFPA 13 letter of compliance required for sprinkler system modifications • NFPA 72 letter of compliance required for fire alarm system upgrades NOTE: order (1) Knox Box and attach at main building. All keys can be put in that box Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal@queensbury.net Fire Marshal 's Office ■ Phone: 518-761-8206 - Fax: 518-745-4437 irentarshal@queensbtcnl.net - 7MMqueensbunl.net 4 G EMS HVAC Load Calculator MAY 2 7 2022 WN �www.hvacloadcalculator.com TO OF QUEENSBURYBUILDING& CODES f Date: Fri May 20 Loaded Document: baker funeral Welcome - GFOIL 202213:52pm west j Company Info Client Information Company GF HEATING OIL LLC Name Baker Funeral Home I Preparer [BRN:N:ELSON Address1 . 11 Lafeyette st Queensbury Phone (518) 792-2220 Address2 I Email brian@gfheatingoil.com Address3 I Phone (�) Email brian@gfheatingoiLcom f � E COPY .L ..Date 4 I F270-M=ay-20=22 I� 1 i This HVAC load calculation has been performed using sound engineering principles as prescribed by Manual J eighth edition and ASHRAE Handbook of Fundamentals. Duct sizing has been l performed as prescribed by Manual D. 1. Design Conditions(Temp. F) O Check If Using Celcius 1 INDOOR OUTDOOR TEMP Front of North DIFF Building is ! Facing I WINTER �- 90 I i -0 Total Sq.Ft 14Ea I SUMMER 55 95 I 30 Conditioned _ J Area j ` � 1 2. Summer Humidity Moderately H .. 40 Grains Difference J 13. How Tight is Structure Average-under 1500 Sq. Ft. .. Winter Summer Air/Changes/Hr. 4. Fireplace Evaluation Number Evaluation CFM none Tight 0 5. Number of Occupants generally equals number of bedrooms + 1 6 Overhang Characteristics f Enter all measurements decimally a. 1„=.1 7"=.5 w- I � r 3 _.3 1 __8 Al 4''" ..3 0"_.8 5 .4 11" .9 b"=.5 Example-2 ft.8 in.=2.7 ft. i EAST WEST' S/SE/SW N/NE/NW Distance of OH from top of 1.6 1.6 1.6 1.6 window (A) Length of overhang (B) 1.6 1.6 1.6 1.6 Total linear ft. across top of 0 12 6 F windows located below overhang Solar GainThrough Glass O Check this box if using manufacturer specifications and enter the latitude, U-value and SHGC Latitude 45 U- SHGC Value Facing Area(sq ft) Type Glass HTM Unshaded Shaded BTUH North or 45 Double 24.00 0 60 1,449 Shaded NE/NW 0 0.00 0 0 0 South 30 Double 40.00 15 15 586 i SE/SW 0 0.00 0 0 0 East 0 Double 75.00 0 0 0 West 60 Double 75.00 60 0 4,500 Does glass have reflective No 1 6,534 coating? Skylight 0 Clear 150 0 I Total 6,534 Solar Gain DUCTS OR PIPES Location(Heating) Conditioned are Duct 0.00 Loss Location(Cooling) Conditioned are Duct 0.00 Gain Duct/Pipe Insulation Duct Leakage Area of Attic or 0 Floor Where Duct is Located i i Attic Temperature(If ducts located in attic) Load Calculation Elements of Load Area or Lin. Insulation/R- U- Heat Heat Gain Latent Ft value Value Loss Btuh Btuh Btuh Solar Gain from 6,534 Glass Gross Wall 812 Glass 1 135 Double ... 0.56 6,804 Skylight 0 0.00 0 J Doors 2 Insulatc- .. 0.40 72 24 Net Wall 675 R-21 0.07 3,949 1,316 Ceiling 1196 R-38 0.03 2,799 1,399 Floor. Over Crawl or p IF R-19 0.05 0 0 Unheated Basement Open-Beach p 0.00 0 0 House Above Carport Slab On Grade - g4 No Insul .. 0.80 6,048 0 enter-linear ft Infiltration-Enter 9072 14,969 2,495 cubic-ft of f building People 1,380 1,200 Appliances O Enter Value Sub Total 34,640 13,152 Duct 0 0 547 Loss/Gain Total Sensible 34,640 13,152 Load Latent Load 2,056 Total Latent 3,804 Load i SUMMARY Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons 34,640 13,152 3,804 16,955 1.46 OUTDOOR AIR FLOW RATE 59.88 * CAUTION - The cooling capacity of the air conditioner'must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. Summary Including-Basement Heating Load Sensible Cooling Latent Cooling Total Cooling Load Nominal Tons 34,640. 13,152 3,804. 16,955 1.46 I i Whole House (Block Load) Completed Scroll to top For Additional Options Solar Gain Through Glass O Check if Using Manufacturer specs Latitude 40 1 U- SHGC Value Facing Area(sq ft) Type Glass HTM BTUH I North or 0 Double 24.00 0 Shaded NE/NW 0 0.00 0 i 50.00 0 South 0 � Single � , I SE/SW 0 0.00 0 East 0 � Double � 75.00 0 I l West 0 Double 75.00 0 Does Blass have reflective coating? 0 No Total Solar 0 Gain Basement Load Calculation Elements of Area or Lin. Insulation/R- U- Heat Heat Gain Latent Load Ft value Value Loss Btuh Btuh Btuh Solar Gain From 0.00 Glass I Gross Wall Above 0 Grade Glass 1 0 Double .. 0.56 0 Doors 0 0.00 0 0 Net Wall-Above 0 R-25 0.04 0 0 Grade Wall Below Grade 0 R-19 0.03 0 0 Ceiling 0 R-21 .. 0.04 0 0 Floor 0 0.02 0 0 Infiltration-Enter 0 0 0 cubic-ft of building People 0 0 0 Appliances 0 Total Sensible 0 0 Load Latent Load 0 Total Latent 0 Load i Basement Summary Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons 0 0 0 0 0.00 * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. Room by Room Load Calculation Total House Total House System CFM Cooling Heating Heat Loss Sensible Heat � 0 Gain 34,640 13,152 ♦Add-Room Room HeatLoss HeatGain CFM_Heat CFM_Cool Name :--Check-Calculations-When-Completed I f auto- 0 0 0 0 basement G• a attic 9,059 .4,388 0 0 storage Totals: 9,059-, 4,388 0 0 Percent Of Original: 26% 33% Round to Rectangle Conversion Calculator(Optional) Enter Round Side A (Inches) Side B (Inches) Diameter 0 0 i Duct Sizing I Use heating or cooling Type of duct material cfm Determine Friction Rate (see instructions) Total measured length of duct 0 Total equivalent length of 0 fittings Available static pressure for 0 duct Enter Friction Rate: O Calculate Friction Rate Supply Trunk or branch cfm duct air dia vel First section off AH 0 i 1st reduction or branch 0 2nd reduction or branch 0 3rd reduction or branch 0 4th reduction or branch 0 5th reduction or branch 0 Return Trunk or branch cfm duct air dia vel First section off AH 0 1 st reduction or branch 0 2nd reduction or branch 0 3rd reduction or branch 0 ` 4th reduction or branch 0 5th reduction or branch 0 Basement supply and return 0 trunk Room Runs cfm no of outlet duct air outlets cfm dia vel auto-basement 0 0 attic storage 0 0 Duct Sizing Completed Scroll to top For Additional Options 4 Equipment selection as per Manual S Instructions: enter load, weather and manufacture's data in white cells Auto Complete BTUH Total Heat Loss 34640 Design Outdoor Indoor Conditions Total Heat Gain 16955 -20 70 Sensible Heat 13152 95 65 Gain Latent Heat 3,804 ID Design RH 50%, 63F WB Gain Sensible/Total 0.78 Altitude 344 Ratio target clg Temp. 21 Predominantly Heating climate Drop Manufactures Equipment Specifications Equipment Manufacturer Model BTUH Total Sensible Latent No output(heating) cooling BTUH BTUH BTUH @ OD design temp Furnace RUUD R9 70000 � �Gd Zb►*10 1-1 Boiler 0 a 0 Heat Pump RUUD 24000 0 24000 or Air Conditioner Evaporator RUUD RC Coil i Air Handler Total 69036.8 23876.16 0 23876.16 Capacity with Altitude Correction Selected OVERSIZED OVERSIZED UNDERSIZED OK Equipment Size Heating CFM Cooling CFM External Static Pressure of (recommended) Blower 1200 0 0 Available static presure for Supplemental heat needed for heat duct system pump f Blower ext. 0 HP capacity @ 0 static press 47F Coil press 0 HP capacity @ 0 drop* 17F Filter press 0 HP capacity @ 0 drop* ODDT Register 0 BTUH 34,640 j press drop supplemental heat Grille 0 Pressure KW 10 Drop supplemental _. .. heat Other LO Other 0 Other 0 Available SP 0 for duct Equipment Size Limits Air conditioner- Furnace Boiler heat Pump Cool Climate Heat Climate output output Maximum Size 19,498 21,194 48,496 48,496 Selected OVERSIZED OVERSIZED OVERSIZED OVERSIZED Size Energy Cost Analysis Heat Loss 34,640.19 Heating Degree Days 7000 Heat Gain 16,955.14 Cooling Degree Days F500 I Summer Design 95 Summer Design Temp 30 Temp Diff Winter Design Temp -20 Winter Design Temp 90 Diff System #1 (Old or less efficient system) Efficiency Fuel Cost ..... .. ... Air Conditioning 0 0 Heating 0 0 0.00 Total annual operating cost of system 1 System #2 (Old or less efficient system) Efficiency Fuel Cost Air Conditioning 0 l _ Heating 0 FO 0.00 Total annual operating cost of system 1 PAYBACK AND R01 Cost of new or more efficient system 0 Cost of less efficient system 0 Rebates or credits 0 Additional Investment 0.00 Yearly Savings Payback(Years) Return on Investment (ROI ) l COMcheck Software Version 4.1.5.0 Envelope Complianc ertificate N p ECE9VI o. ; Project Information ' MAY 7 2022 0_ ro Energy Code: 2018 IECC rp (A Project Title: Baker Funeral Home Addition C rt TOWN OF QUEENSBURY CU Location: Glens Falls, New York BUILDING&CODES Climate Zone: 6a Project Type: Addition `;`�E w E n FOR Vertical Glazing/Wall Area: 11% ----�• GUMPLIANCE o Construction Site: Owner/Agent: Designer/Contractor: 11 Lafayette Street Starr Mowery Ethan P.Hall F+ Queensbury, NY 12804 CKT Enterprises,LLC Rucinski Hall Architecture I LAj 2 Glendale Drive 134 Dix Ave 01 N Quensbury,NY 12804 Glens Falls, NY 12801 to O N 518-232-0630 518-741-0274 -h N smikeckt@hotmail.com ephall@nycap.rr.com Building Area Floor Area 1-Office :Nonresidential 1008 2-Office :Nonresidential 756 Envelope Assemblies y� ; Assembly +� ' ��° Gross rea Cavity Cont. Proposed Budget U- i� or R-Value R-Value U-Factor Factor(.) Perimeter Roof 1:Attic Roof with Wood Joists,[Bldg.Use 1 -Office] 1008 49.0 0.0 0.021 0.021 Roof 2:Attic Roof with Wood Joists,[Bldg.Use 2-Office] 756 49.0 0.0 0.021 0.021 Floor 1:Slab-On-Grade:Unheated,Vertical 4 ft.,[Bldg.Use 1 - 90 -- 14.0 0.456 0.540 Office](c) Floor 2:Slab-On-Grade:Unheated,Vertical 4 ft.,[Bldg.Use 2- 78 -- 14.0 0.456 0.540 Office](c) NORTH Exterior Wall 1:Wood-Framed,16"o.c.,[Bldg.Use 1 -Office] 240 21.0 3.6 0.049 0.051 Window 1:Wood Frame:Operable,Pert.Specs.:Product ID Product 26 — — 0.290 0.430 label,SHGC 0.33,[Bldg.Use 1 -Office](b) Exterior Wall 4:Wood-Framed,16"o.c.,[Bldg.Use 2-Office] 180 21.0 3.6 0.049 0.051 Window 4:Wood Frame:Operable,Perf.Specs.:Product ID Product 12 -- -- 0.290 0.430 Label,SHGC 0.33,[Bldg.Use 2-Office](b) EAST Exterior Wall 5:Wood-Framed,16"o.c.,[Bldg.Use 2-Office] 420 21.0 3.6 0.049 0.051 Window 5:Wood Frame:Operable,Perf.Specs.:Product ID Product 56 -- — 0.290 0.430 label,SHGC 0.33,[Bldg.Use 2-Office](b) SOUTH Exterior Wall 3:Wood-Framed,16"o.c.,[Bldg.Use 1 -Office] 240 21.0 3.6 0.049 0.051 Window 3:Wood Frame:Operable,Pert.Specs.:Product ID Product 28 — -- 0.290 0.430 label,SHGC 0.33,[Bldg.Use 1 -Office](b) Door 1:Insulated Metal,Swinging,[Bldg.Use 1 -Office] 21 — — 0.320 0.370 Exterior Wall 6:Wood-Framed,16"o.c.,[Bldg.Use 2-Office] 180 21.0 3.6 0.049 0.051 Door 2:Insulated Metal,Swinging,[Bldg.Use 2-Office] 21 — -- 0.320 0.370 Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 1 of 20 Addition.cck Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor(e) Perimeter WEST Exterior Wall 2:Wood-Framed,16"o.c.,[Bldg.Use 1 -Office] 420 21.0 3.6 0.049 0.051 Window 2:Wood Frame:Operable,Perf.Specs.:Product ID Product 56 — -- 0.290 0.430 label,SHGC 0.33,[Bldg.Use 1 -Office](b) (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. EnvelopeDesign better than code Envelope Compliance Statement Compliance Statement. The proposed envelope design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. 07 _ A,� Ethan P.Hall-Architect "� ri l,rAY027 Name-Title Signatur �' ,� �'�,ti Date Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 2 of 20 Addition.cck COMcheck Software Version 4.1.5.0 Interior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Baker Funeral Home Addition Project Type: Addition Construction Site: Owner/Agent: Designer/Contractor: 11 Lafayette Street Starr Mowery Ethan P. Hall Queensbury, NY 12804 CKT Enterprises, LLC Rucinski Hall Architecture 2 Glendale Drive 134 Dix Ave Quensbury, NY 12804 Glens Falls, NY 12801 518-232-0630 518-741-0274 smikeckt@hotmail.com ephall@nycap.rr.com Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Common Space Types:Office-Open Plan 1008 0.81 816 2-Common Space Types:Office-Enclosed 756 0.93 703 Total Allowed Watts= 1520 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp 1 Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Common Space Tvoes:01 ice-Open Plan LED 1:LED Linear 22W: 1 12 32 384 2-Common Space Types:Office-Enclosed LED 2:LED Linear 22W: 1 8 32 256 Total Proposed Watts= 640 Interior Lighting PASSES: Design 58% better than code Interior Lighting Compliance Statement Compliance Statement. The proposed interior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2018 IECC requirements in COMcheck V rsion 4.1.5.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Ethan P.Hall-Architect 2 MA 7 I�ZZ Name-Title Sigdje Date Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 3 of 20 Addition.cck COMcheck Software Version 4.1.5.0 Exterior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Baker Funeral Home Addition Project Type: Addition Exterior Lighting Zone 4(High activity metropolitan commercial district) Construction Site: Owner/Agent: Designer/Contractor: 11 Lafayette Street Starr Mowery Ethan P. Hall Queensbury, NY 12804 CKT Enterprises,LLC Rucinski Hall Architecture 2 Glendale Drive 134 Dix Ave Quensbury, NY 12804 Glens Falls, NY 12801 518-232-0630 518-741-0274 smikeckt@hotmail.com ephall@nycap.rr.com Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) Entry canopy 2 ft2 0.4 Yes 1 Total Tradable Watts(a)= 1 Total Allowed Watts= 1 Total Allowed Supplemental Watts(b)= 900 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 900 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entry canopy(2 ft2):Tradable Wattage LED 1:LED A Lamp 13W: 1 2 34 68 Total Tradable Proposed Watts= 68 ,Exterior • • Design ' better than Code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2018 IECC requirements in COMcheck V ion 4.1 a to ply with any applicable mandatory requirements listed in the Inspection'Checklist. Ethan P.Hall-Architect Name-Title Sign re Date Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 4 of 20 Addition.cck COMcheck Software Version 4.1.5.0 Mechanical Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Baker Funeral Home Addition Location: Glens Falls, New York Climate Zone: 6a Project Type: Addition Construction Site: Owner/Agent: Designer/Contractor: 11 Lafayette Street Starr Mowery Ethan P. Hall Queensbury, NY 12804 CKT Enterprises, LLC Rucinski Hall Architecture 2 Glendale Drive 134 Dix Ave Quensbury, NY 12804 Glens Falls, NY 12801 518-232-0630 518-741-0274 smikeckt@hotmail.com ephall@nycap.rr.com Mechanical Systems List Quantity System Type&Description 1 HVAC System 1 (Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=60 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency: 80.00%Et or 80%AFUE Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=15.00 SEER,Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1 —Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Constant Volume,1000 CFM,0.3 motor nameplate hp,93.0 fan efficiency grade 1 HVAC System 2(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=60 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency: 80.00%Et or 80%AFUE Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=15.00 SEER,Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1—Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Constant Volume,1000 CFM,0.3 motor nameplate hp,93.0 fan efficiency grade Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck sion 4. .0 to mply with any applicable mandatory requirements listed in the Inspection Checklist. Ethan P. Hall-Architect A� 2 N/Ays22 Name-Title Si re Date Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 5 of 20 Addition.cck COMcheck Software Version 4.1..5.0 Inspection Checklist Energy Code: 2018 IECC Requirements: 92.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Re .ID C103.2 ;Plans and/or specifications provide all C]Complies ;Requirement will be met. [PR1]1 information with which compliance ;❑Does Not can be determined for the building ❑Not Observable: Location on plans/spec:A-1 envelope and document where exceptions to the standard are :.❑Not Applicable claimed. C103.2 ;Plans, specifications,and/or [ Complies ;Requirement will be met. [PR2]1 :calculations provide all information �❑Does Not ;with which compliance can be '❑Not Observable: Location on plans/spec:A-1 determined for the mechanical systems and equipment and ,❑Not Applicable ;document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and ;handbooks. C103.2 I Plans,specifications, and/or ;❑Complies ;Requirement will be met. [PR4]1 calculations provide all information ❑Does Not ;with which compliance can be ❑Not Observable; Location on plans/spec:A-1 e e determined for the interior lighting and electrical systems and equipment ❑Not Applicable ; and document where exceptions to ;the standard are claimed.Information provided should include interior ;lighting power calculations,wattage of; ; bulbs and ballasts,transformers and .:control devices. C103.2 ;Plans,specifications, and/or ;❑Complies ;Requirement will be met. [PR8]1 calculations provide all information :❑Does Not ;with which compliance can be I❑Not Observable: Location on plans/spec:A-1 determined for the exterior lighting and electrical systems and equipment :❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations,wattage of; bulbs and ballasts,transformers and control devices. C402.4.1 ;The vertical fenestration area <=30 ;❑Complies Requirement will be met. [PR10]1 :percent of the gross above-grade wall 1❑Does Not ;area. ; :Location on plans/spec:A-1 ❑Not Observable; ;❑Not Applicable C402.4.1 ;The skylight area <= 3 percent of the ;❑Complies Requirement will be met. [PR11]1 :gross roof area. ;❑Does Not ❑Not Observable Location on plans/spec:A-1 ❑Not Applicable 1 I High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 3 1 Low impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 6 of 20 Addition.cck Section # Plan Review Complies? Comments/Assumptions & Re .ID C406 ;Plans,specifications, and/or ;❑Complies ;Requirement will be met. [PR9]1 :calculations provide all information ;❑Does Not with which compliance can be ;❑Not Observable:Location on plans/spec:A-1 determined for the additional energy efficiency package options. ;❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 7 of 20 Addition.cck _ Section # Footing/Foundation Inspection Complies? Comments/Assumptions & Re .ID C303.2 'Slab edge insulation installed per !❑Complies :Requirement will be met. [FO4]2 manufacturer's instructions. ;❑Does Not ❑Not Observable:Location on plans/spec:A-1 ❑Not Applicable C303.2.1 ;.Exterior insulation protected against ;❑Complies :Requirement will be met. [FO6]1 :damage,sunlight, moisture,wind, ElDoes Not landscaping and equipment maintenance activities. UNot Observable ;❑Not Applicable ; C105 :Installed slab-on-grade insulation type ElComplies ;See the Envelope Assemblies table for values. [FO3]2 j and R-value consistent with insulation :,❑Does Not ,specifications reported in plans and ;COMcheck reports. :,[]Not Observable :❑Not Applicable ; C402.2.4 (Slab edge insulation depth/length. ;❑Complies :Exception: Requirement does not apply. [FO7]2 Slab insulation extending away from :,❑Does Not building is covered by pavement or ;See the Envelope Assemblies table for values. >= 10 inches of soil. I❑Not Observable ;❑Not Applicable ; C402.2.6 ;Radiant heating systems panels ;❑Complies ;Exception: Requirement does not apply. [FO12]3 insulated to>=R-3.5 on face opposite :❑Does Not space being heated. See the Envelope Assemblies table for values. ❑Not Observable; ❑Not Applicable C403.12.2;Snow/ice melting system and freeze ;❑Complies ;Exception: Requirement does not apply. protection systems have sensors and :❑Does Not C403.12.3;controls configured to limit service for ; [FO9]3 ;pavement temperature and outdoor ;❑Not Observable temperature.future connection to :❑Not Applicable ; controls. Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 8 of 20 Addition.cck Section # Framing/Rough-In Inspection Complies? Comments/Assumptions & Req.ID C303.1.3 ;Fenestration products rated in ;❑Complies ;Requirement will be met. [FR12]2 accordance with NFRC. ;❑Does Not ❑Not Observable:Location on plans/spec:A-1 ❑Not Applicable C303.1.3 ;.Fenestration products are certified as ;❑Complies ;Requirement will be met. [FR13]1 :to performance labels or certificates ;❑Does Not {provided. ;Location on plans/spec:A-1 ❑Not Observable ❑Not Applicable C402.4.3 ;Vertical fenestration SHGC value. ;❑Complies ;See the Envelope Assemblies table for values. [FR10]1 :❑Does Not ❑Not Observable ❑Not Applicable C402.4.3, :Vertical fenestration U-Factor. ;❑Complies ;See the Envelope Assemblies table for values. C402.4.3. ;❑Does Not 4 [FR8]1 ;❑Not Observable; ❑Not Applicable C402.4.4 ;U-factor of opaque doors associated ;❑Complies ;See the Envelope Assemblies table for values. [FR14]2 with the building thermal envelope ;[_]Does Not meets requirements. ;❑Not Observable; ❑Not Applicable C402.5.1 ;The building envelope contains a ;❑Complies ;Requirement will be met. [FR16]1 ;continuous air barrier that is sealed in :❑Does Not an approved manner and either ;❑Not Observable:Location on plans/spec:A-1 constructed or tested in an approved manner.Air barrier penetrations are ;❑Not Applicable ;sealed in an approved manner. ; C402.5.2, ;Factory-built fenestration and doors ElComplies ;Requirement will be met. C402.5.4 are labeled as meeting air leakage :❑Does Not [FR18]3 ;requirements. ❑Not Observable ❑Not Applicable C402.5.7 ;Vestibules are installed on all building ;❑Complies !Exception: Requirement does not apply. [FR17]3 entrances. Doors have self-closing UDoes Not devices. ❑Not Observable; ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 9 of 20 Addition.cck Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Re .ID C404.5, ;Heated water supply piping conforms ;❑Complies ;Exception: Requirement does not apply. C404.5.1, to pipe length and volume ElDoes Not C404.5.2 ;requirements. Refer to section details. ;❑Not Observable [PL6]3 I ;❑Not Applicable C404.5, Heated water supply piping conforms ;❑Complies ;Exception: Requirement does not apply. C404.5.1, !to pipe length and volume ;❑Does Not C404.5.2 ;requirements. Refer to section details. ;❑Not Observable [PL6]3 ❑Not Applicable C404.6.3 :Pumps that circulate water between a ;❑Complies ;Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls T❑Does Not ;that limit operation from startup to <=5 minutes after end of heating :[]Not Observable cycle. ;❑Not Applicable ; C404.6.3 Pumps that circulate water between a ;❑Complies :Exception: Requirement does not apply. [PL7]3 I heater and storage tank have controls :❑Does Not +!that limit operation from startup to <=5 minutes after end of heating :❑Not Observable cycle. ;❑Not Applicable C404.7 ;Demand recirculation water systems ;❑Complies :Exception: Requirement does not apply. [PL8]3 i have controls that start the pump ;[]Does Not ;upon receiving a signal from the ; ;action of a user of a fixture or ,❑Not Observable appliance and limits the temperature ,❑Not Applicable of the water entering the cold-water ;piping to 104°F. ; C404.7 ;Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply. [PL8]3 :have controls that start the pump ;❑Does Not upon receiving a signal from the ;action of a user of a fixture or UNot Observable j appliance and limits the temperature �❑Not Applicable ;of the water entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact((Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 10 of 20 Addition.cck Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C402.2.6 iThermally ineffective panel surfaces of;❑Complies ;Exception: Requirement does not apply. [ME41]3 ;sensible heating panels have ;❑Does Not ;insulation >=R-3.5. ;❑Not Observable; j❑Not Applicable C402.5.5, !Stair and elevator shaft vents have I❑Complies ;Exception: Requirement does not apply. C403.2.4. motorized dampers that automatically :.❑Does Not 3 ;close. Refernece section C403.7.7 for [ME3]3 !operational details. ❑Not Observable ;❑Not Applicable C403.11.3!HVAC piping insulation insulated in ;❑Complies ;Exception: Requirement does not apply. [ME61]2 accordance with Table C403.11.3. ;❑Does Not Insulation exposed to weather is protected from damage and is ❑Not Observable provided with shielding from solar :❑Not Applicable radiation. C403.11.3;HVAC piping insulation insulated in ;❑Complies ;Exception: Requirement does not apply. [ME61]2 j accordance with Table C403.11.3. ;❑Does Not Insulation exposed to weather is protected from damage and is :❑Not Observable provided with shielding from solar ;❑Not Applicable radiation. C403.8.4 Motors for fans that are not less than ;❑Complies ;Requirement will be met. [ME142]2 '1/12 hp and less than 1 hp are ;❑Does Not electronically commutated motors or , :Location on plans/spec:A-1 have a minimum motor efficiency of ;❑Not Observable 70 percent.These motors have the ;❑Not Applicable means to adjust motor speed. C403.8.4 ;Motors for fans that are not less than ;❑Complies ;Requirement will be met. [ME142]2 ;1/12 hp and less than 1 hp are ;❑Does Not electronically commutated motors or , ;Location on plans/spec:A-1 have a minimum motor efficiency of ;❑Not Observable '70 percent.These motors have the .:❑Not Applicable ; means to adjust motor speed. C403.8.5 ;Each DX cooling system>65 kBtu !❑Complies ;Requirement will be met. [ME143]2 and chiller water/evaporative cooling :❑Does Not system with fans> 1/4 hp are ❑Not Observable: Location on plans/spec:A-1 designed to vary the indoor fan airflow; as a function of load and comply with ;❑Not Applicable detailed requirements of this section. C403.8.5 :Each DX cooling system>65 kBtu ;❑Complies ;Requirement will be met. [ME143]2 and chiller water/evaporative cooling ;❑Does Not :system with fans> 1/4 hp are ❑Not Observable; Location on plans/spec:A-1 designed to vary the indoor fan airflow; as a function of load and comply with ;❑Not Applicable ;detailed requirements of this section. C403.12.1;Systems that heat outside the building;❑Complies ;Exception: Requirement does not apply. [ME71]2 !envelope are radiant heat systems ;❑Does Not controlled by an occupancy sensing device or timer switch. :❑Not Observable: ;❑Not Applicable C403.2.3 !HVAC equipment efficiency verified. ;❑Complies ;See the Mechanical systems list for values. [ME55]2 ;❑Does Not ;❑Not Observable; ❑Not Applicable C403.2.2 ;Natural or mechanical ventilation is ;❑Complies ;Exception: Requirement does not apply. [ME59]1 provided in accordance with ❑Does Not International Mechanical Code :Chapter 4. Mechanical ventilation has :❑Not Observable capability to reduce outdoor air supply:❑Not Applicable to minimum per IMC Chapter 4. 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 1 3 JLow Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 11 of 20 Addition.cck Section # Mechanical Rough-in Inspection Complies? Comments/Assumptions & Re .ID C403.7.1 ;Demand control ventilation provided !❑Complies ;Exception: Requirement does not apply. [ME59]1 :for spaces>500 ft2 and >25 ;❑Does Not people/1000 ft2 occupant density and ;served by systems with air side :❑Not Observable economizer,auto modulating outside ;❑Not Applicable air damper control,or design airflow ; >3,000 cfm. C403.7.2 ;Enclosed parking garage ventilation ;❑Complies ;Exception: Requirement does not apply. [ME115]3 !has automatic contaminant detection : Does Not and capacity to stage or modulate ;❑ `fans to 50%or less of design capacity.;❑Not Observable 1.ElNot Applicable ; C403.7.6 ;HVAC systems serving guestrooms in ;❑Complies ;Exception: Requirement does not apply. [ME141]3 :Group R-1 buildings with > 50 ;❑Does Not guestrooms: Each guestroom is ❑Not Observable provided with controls that !automatically manage temperature ;❑Not Applicable setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2). C403.7.4 ;Exhaust air energy recovery on ;❑Complies ;Exception: Requirement does not apply. [ME57]1 systems meeting Table C403.7.4(1) :❑Does Not and C403.7.4(2). ;❑Not Observable; ❑Not Applicable C403.7.5 ;Kitchen exhaust systems comply with ;❑Complies !Exception: Requirement does not apply. [ME116]3 !replacement air and conditioned ❑Does Not ;supply air limitations,and satisfy hood; ;rating requirements and maximum ;❑Not Observable !exhaust rate criteria. ;❑Not Applicable ; C403.11.1;HVAC ducts and plenums insulated in ;❑Complies ;Exception: Requirement does not apply. accordance with C403.11.1 and ;❑Does Not C403.11.2;constructed in accordance with ; [ME60]2 C403.11.2,verification may need to :❑Not Observable occur during Foundation Inspection. :❑Not Applicable C403.4.1. ;Heating for vestibules and air curtains :❑Complies ;Exception: Requirement does not apply. 4 :with integral heating include ;❑Does Not [ME63]2 ;automatic controls that shut off the heating system when outdoor air :❑Not Observable temperatures>45F.Vestibule ;❑Not Applicable ; heating and cooling systems controlled by a thermostat in the ; :vestibule with heating setpoint<_ : ,60F and cooling setpoint>=80F. C403.3.3 ;Hot gas bypass limited to: <=240 ;❑Complies ;Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% ;❑Does Not ❑Not Observable;Location on plans/spec:A-1 ❑Not Applicable C403.3.3 ;,Hot gas bypass limited to: <=240 ;❑Complies ;Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% :❑Does Not ❑Not Observable;Location on plans/spec:A-1 ;❑Not Applicable C408.2.2. ;Air outlets and zone terminal devices ;❑Complies ;Requirement will be met. 1 :have means for air balancing. :❑Does Not [ME53]3 Location on plans/spec:A-1 ;❑Not Observable; ❑Not Applicable 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 12 of 20 Addition.cck Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Re .ID C403.5, ;Refrigerated display cases,walk-in ;❑Complies ;Exception: Requirement does not apply. C403.5.1, coolers or walk-in freezers served by ;❑Does Not C403.5.2 remote compressors and remote ; [ME123]3 condensers not located in a ❑Not Observable ;condensing unit, have fan-powered :❑Not Applicable ;condensers that comply with Sections C403.5.1 and refrigeration compressor) systems that comply with C403.5.2.. Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 13 of 20 Addition.cck Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Re .ID C405.2.2. ;Spaces required to have light- ;❑Complies ;Requirement will be met. 2 :reduction controls have a manual ;❑Does Not [EL22]1 :control that allows the occupant to ❑Not Observable:Location on plans/spec:A-1 I reduce the connected lighting load in a reasonably uniform illumination ;❑Not Applicable ;pattern >=50 percent. C405.2.1, ;Occupancy sensors installed in ;❑Complies Requirement will be met. C405.2.1. classrooms/lecture/training rooms, �,❑Does Not 1 ;conference/meeting/multipurpose ; :Location on plans/spec:A-1 [EL18]1 ;rooms,copy/print rooms, UNot Observable lounges/breakrooms, enclosed offices, :❑Not Applicable ;open plan office areas, restrooms, !storage rooms, locker rooms, warehouse storage areas,and other j spaces<=300 sgft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 ;for open plan office spaces. C405.2.1. :Occupancy sensors control function in ;❑Complies :Exception: Requirement does not apply. 2 :warehouses: In warehouses,the :❑Does Not [EL19]1 ;lighting in aisleways and open areas is, controlled with occupant sensors that ,❑Not Observable automatically reduce lighting power ;❑Not Applicable ; by 50%or more when the areas are unoccupied.The occupant sensors I control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. C405.2.1. :Occupant sensor control function in ;❑Complies ;Exception: Requirement does not apply. 3 :open plan office areas:Occupant ;❑Does Not [EL20]1 ;sensor controls in open office spaces ❑Not Observable >=300 sq.ft. have controls 1) configured so that general lighting can,❑Not Applicable be controlled separately in control zones with floor areas<=600 sq.ft. within the space, 2)automatically turn 1 ;off general lighting in all control zones within 20 minutes after all occupants j have left the space, 3)are configured so that general lighting power in each control zone is reduced by>=80%of ;the full zone general lighting power ;within 20 minutes of all occupants ; leaving that control zone, and 4)are configured such that any daylight ;responsive control will activate space :general lighting or control zone ;general lighting only when occupancy ;for the same area is detected. C405.2.2, I Each area not served by occupancy ;❑Complies ;Requirement will be met. C405.2.2. !sensors(per C405.2.1) have time- :❑Does Not 1, ;switch controls and functions detailed Location on plans/spec:A-1 C405.2.2. in sections C405.2.2.1 and C405.2.2.2.;❑Not Observable 2 ;❑Not Applicable [EL21]z ; I 1 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 14 of 20 Addition.cck Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Re .ID C405.2.3, :Daylight zones provided with ;❑Complies :Exception: Requirement does not apply. C405.2.3. 1 individual controls that control the :❑Does Not 1, !lights independent of general area I❑Not Observable C405.2.3. I lighting.See code section C405.2.3 ;❑Not Applicable 2 Daylight-responsive controls for [EL23]2 applicable spaces,C405.2.3.1 Daylight; responsive control function and section C405.2.3.2 Sidelit zone. C405.2.4 ;Separate lighting control devices for ;❑Complies ;Requirement will be met. [EL26]1 (specific uses installed per approved ;❑Does Not ;lighting plans. Location on plans/spec:A-1 ❑Not Observable; ❑Not Applicable C405.2.4 ;Additional interior lighting power ;❑Complies :Requirement will be met. [EL27]1 I allowed for special functions per the ;❑Does Not approved lighting plans and is ;❑Not Observable: Location on plans/spec:A-1 ;automatically controlled and ;separated from general lighting., ;❑Not Applicable C405.2.5 ;Automatic lighting controls for exterior;❑Complies ;Exception: Requirement does not apply. [EL28]nv° �lighting installed.Controls will be ;❑Does Not ;daylight controlled, set based on business operation time-of-day,or ;❑Not Observable reduce connected lighting >30%. ;❑Not Applicable ; C405.3 ;Exit signs do not exceed 5 watts per ;❑Complies ;Requirement will be met. [EL6]1 face. ;❑Does Not ;❑Not Observable; Location on plans/spec:A-1 ❑Not Applicable C405.6 ;Low-voltage dry-type distribution ;❑Complies Exception: Requirement does not apply. [EL26]2 electric transformers meet the ;❑Does Not minimum efficiency requirements of ; 'Table C405.6. :❑Not Observable ;❑Not Applicable C405.7 ;,Electric motors meet the minimum ;❑Complies ;Exception: Requirement does not apply. [EL27]2 efficiency requirements of Tables ;❑Does Not C405.7(1)through C405.7(4). ❑Not Observable; `Efficiency verified through certification; under an approved certification ;❑Not Applicable program or the equipment efficiency I ratings shall be provided by motor manufacturer(where certification I programs do not exist). C405.8.2, ;Escalators and moving walks comply ;❑Complies ;Exception: Requirement does not apply. C405.8.2. !with ASME A17.1/CSA B44 and have :❑Does Not 1 ;automatic controls configured to [EL28]2 ;reduce speed to the minimum :[-]Not Observable permitted speed in accordance with tlNot Applicable ;ASME A17.1/CSA B44 or applicable ; local code when not conveying I passengers. C405.9 Total voltage drop across the ;❑Complies ;Exception: Requirement does not apply. [EL29]2 ;combination of feeders and branch ;❑Does Not circuits<=5%. ;❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 15 of 20 Addition.cck Section # Insulation Inspection Complies? Comments/Assumptions & Re .ID C303.1 :Roof insulation installed per 1 Complies ;Requirement will be met. [IN3]1 :manufacturer's instructions. Blown or :❑Does Not !poured loose-fill insulation is installed ❑Not Observable:Location on plans/spec:A-1 only where the roof slope is<-- in ;12. ;❑Not Applicable C402.2.1 ;Insulation installed on a suspended ;❑Complies ;Exception: Requirement does not apply. [IN20]1 (ceiling having ceiling tiles is not being :❑Does Not ;specified for roor/ceiling assemblies. Continuous insulation board installed ;❑Not Observable in 2 or more layers with edge joints :❑Not Applicable ; offset between layers. C303.1 ;Building envelope insulation is labeled ;❑Complies ;Requirement will be met. [IN10]2 iwith R-value or insulation certificate T❑Does Not ;providing R-value and other relevant data. :❑Not Observable ❑Not Applicable ; C303.2 ;Above-grade wall insulation installed ;❑Complies ;Requirement will be met. [IN7]1 !per manufacturer's instructions. ;❑Does Not ❑Not Observable;Location on plans/spec:A-1 { j❑Not Applicable C303.2.1 (Exterior insulation is protected from ;❑Complies ;Exception: Requirement does not apply. [IN14]2 'damage with a protective material. ;❑Does Not Verification for exposed foundation insulation may need to occur during ;❑Not Observable i Foundation Inspection. ;❑Not Applicable ; C105 'Installed above-grade wall insulation ;❑Complies ;See the Envelope assemblies table for values. [IN6]1 type and R-value consistent with T❑Does Not :.insulation specifications reported in plans and COMcheck reports. :❑Not Observable ;❑Not Applicable ; C402.2.3 ;Installed floor insulation type and R- ;❑Complies ;See the Envelope Assemblies table for values. [IN8]2 ivalue consistent with insulation ;❑Does Not ;specifications reported in plans and COMcheck reports. ;❑Not Observable ❑Not Applicable ; C402.2.6 Radiant panels and associated ;❑Complies :Exception: Requirement does not apply. [IN18]3 (components, designed for heat ;❑Does Not transfer from the panel surfaces to the, occupants or indoor space are f❑Not Observable !insulated with a minimum of R-3.5. ;❑Not Applicable ; C105 ;Installed roof insulation type and R- ;❑Complies ;See the Envelope Assemblies table for values. [IN2]1 value consistent with insulation T❑Does Not ;specifications reported in plans and COMcheck reports. For some ceiling ;❑Not Observable systems,verification may need to ;❑Not Applicable ; ;occur during Framing Inspection. C402.5.1. ;All sources of air leakage in the I❑Complies ;Requirement will be met. 1 building thermal envelope are sealed, ;❑Does Not [IN1]1 ;caulked, gasketed,weather stripped !❑Not Observable;Location on plans/spec:A-1 or wrapped with moisture vapor- :❑Not Applicable erva permeable wrapping material to :minimize air leakage. ; Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 16 of 20 Addition.cck Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, ;Furnished O&M instructions for ;❑Complies :Requirement will be met. C408.2.5. systems and equipment to the ;❑Does Not 2 ;building owner or designated ; [FI17]3 ;representative. :❑Not Observable ❑Not Applicable C303.3, ;Furnished O&M manuals for HVAC ;❑Complies C408.2.5. systems within 90 days of system !❑Does Not 3 acceptance. [F18]3 ❑Not Observable; ;❑Not Applicable f ' C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Exception: Requirement does not apply. [FI37]1 !dock cargo door openings and provide :❑Does Not ;direct contact along the top and sides ; ;of vehicles parked in the doorway. ;❑Not Observable ;❑Not Applicable C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Exception: Requirement does not apply. [FI37]1 :dock cargo door openings and provide UDoes Not direct contact along the top and sides I of vehicles parked in the doorway. ;❑Not Observable ;❑Not Applicable ; C402.5.6 ;Weatherseals installed on all loading ;❑Complies ;Exception: Requirement does not apply. [FI37]1 "dock cargo door openings and provide ;❑Does Not direct contact along the top and sides of vehicles parked in the doorway. ;❑Not Observable ;❑Not Applicable ; C402.5.6 ;Weatherseals installed on all loading ;❑Complies :Exception: Requirement does not apply. [F137]1 :dock cargo door openings and provide :❑Does Not ;direct contact along the top and sides ; of vehicles parked in the doorway. ;❑Not Observable ;❑Not Applicable ; C402.5.8 ;Recessed luminaires in thermal ;❑Complies ;Exception: Requirement does not apply. [F126]3 envelope to limit infiltration and be IC ;❑Does Not rated and labeled.Seal between interior finish and luminaire housing. ;❑Not Observable ❑Not Applicable C403.2.2 ;HVAC systems and equipment ;❑Complies ;Requirement will be met. [FI27]3 :capacity does not exceed calculated �❑Does Not loads. :Location on plans/spec:A-1 ❑Not Observable; ❑Not Applicable C403.2.4. ;,Heating and cooling to each zone is ;❑Complies ;Requirement will be met. 1 �controlled by a thermostat control. ;❑Does Not [F[47]3 :Minimum one humidity control device ;❑Not Observable:Location on plans/spec:A-1 per installed humidification/dehumidification �❑Not Applicable system. C403.2.4. ;Heating and cooling to each zone is ;❑Complies ;Requirement will be met. 1 controlled by a thermostat control. ;❑Does Not [FI47]3 :,Minimum one humidity control device ❑Not Observable; Location on plans/spec:A-1 1 per installed humidification/dehumidification ;❑Not Applicable ; system. C403.4.1. ;Thermostatic controls have a 5 °F ;❑Complies ;Requirement will be met. 2 �deadband. ;❑Does Not [FI38]3 ;❑Not Observable:Location on plans/spec:A-1 ❑Not Applicable , C403.2.4. ;Temperature controls have setpoint ;❑Complies ;Exception: Requirement does not apply. 1.3 overlap restrictions. ;❑Does Not [FI20]3 ; ;❑Not Observable: ❑Not Applicable 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 17 of 20 Addition.cck Section # Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. ;Each zone equipped with setback ;❑Complies Exception: Requirement does not apply. 2 ;controls using automatic time clock or :❑Does Not [FI39]3 ;programmable control system. ; ❑Not Observable; ❑Not Applicable C403.2.4. Automatic Controls: Setback to 550F ;❑Complies ;Exception: Requirement does not apply. 2.1, !(heat)and 85°F(cool); 7-day clock, 2- :❑Does Not C403.2.4. 1 hour occupant override, 10-hour 2.2 ;backup !❑Not Observable [F140]3 ;❑Not Applicable C403.2.4. Systems include optimum start ;❑Complies ;Requirement will be met. 2.3 controls. :❑Does Not [FI41]3 ;Location on plans/spec:A-1 ❑Not Observable t❑Not Applicable C403.2.4. ;Systems include optimum start ;❑Complies ;Requirement will be met. 2.3 controls. ;❑Does Not j [FI41]3 :[]Not Observable Location on plans/spec:A-1 ❑Not Applicable C405.4.1 ;Interior installed lamp and fixture ❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what UDoes Not is shown on the approved lighting plans,demonstrating proposed watts ;❑Not Observable are less than or equal to allowed ;❑Not Applicable watts. C405.5.1 ;Exterior lighting power is consistent ;❑Complies ;See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved ;❑Does Not lighting plans, demonstrating proposed watts are less than or equal ;❑Not Observable to allowed watts. ;❑Not Applicable C408.1.1 Building operations and maintenance ;❑Complies ;Requirement will be met. [F157]1 documents will be provided to the ❑Does Not owner. Documents will cover manufacturers' information, ;❑Not Observable specifications, programming :,❑Not Applicable :procedures and means of illustrating ;to owner how building,equipment and :systems are intended to be installed, maintained,and operated. C408.2.1 ;Commissioning plan developed by ;,[]Complies [F128]1 :registered design professional or ;❑Does Not approved agency. ❑Not Observable; ❑Not Applicable C408.2.3. HVAC equipment has been tested to ;❑Complies 1 ;ensure proper operation. ;❑Does Not [F131]1 ❑Not Observable ;❑Not Applicable C408.2.3. ;HVAC control systems have been ;❑Complies ;Requirement will be met. 2 :tested to ensure proper operation, :❑Does Not [FI10]1 calibration and adjustment of controls.;❑Not Observable;Location on plans/spec:A-1 ❑Not Applicable C408.2.4 :Preliminary commissioning report ;❑Complies [FI29]1 completed and certified by registered UDoes Not design professional or approved ;agency. ;❑Not Observable; ❑Not Applicable 1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: YABaker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 18 of 20 Addition.cck Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.2.5. ;Furnished HVAC as-built drawings ;❑Complies 1 !submitted within 90 days of system ;❑Does Not [FI7]3 ;acceptance. ; ❑Not Observable ❑Not Applicable C408.2.5. ;Furnished as-built drawings for ;❑Complies :Requirement will be met. 1 !electric power systems within 90 days E❑Does Not [FI16]3 ;of system acceptance. ❑Not Observable ;❑Not Applicable C408.2.5. ;,An air and/or hydronic system ;❑Complies 3 ;balancing report is provided for HVAC :❑Does Not [FI43]1 ;systems. ;❑Not Observable; ;❑Not Applicable C408.2.5. Final commissioning report due to ;❑Complies 4 :building owner within 90 days of UDoes Not [F130]1 ;receipt of certificate of occupancy. ❑Not Observable 1 ;❑Not Applicable C408.3 ;,Lighting systems have been tested to ;❑Complies :Requirement will be met. [FI33]1 :ensure proper calibration,adjustment, 1❑Does Not ;programming,and operation. ;Location on plans/spec:A-1 ,❑Not Observable, ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 19 of 20 Addition.cck Project Title: Baker Funeral Home Addition Report date: 05/02/22 Data filename: Y:\Baker Funeral Home\11 Lafayette Street\Building Expansion Plans-2022\Funeral Home Page 20 of 20 Addition.cck HAANEN ENGINEERING Job No 16o9q Sheet No. of 00 Subject: 9 h A Ass 0 cu*a1 f=S lea key �iaree, A44t 1 or, By Date a 5�z4�2z Loud C�Q 0 . exu OML SkV bu 4�v F,4 he7o ta.w�,i,@, two b Gv,e 11ui')t� U;� tic 24`-61 v- 42'-0'- 6Q 4bvz w `a be l 8 t-C; x 2I-0 ". R,'d-@-e , 20' l'l cu vi Rub(, viel� mppLOrs be 1s! lNd�� C�.l c �Jn u�► i g eh ended 47 v� {- NYs f3c .21a zo ww"ems, T,le. NY IO 3 n OL i �,'�h 51 6 i t a v `� Ron(ue. C.0'k-A.i►►1 (-W c� o'� �; �� !_ra•' t);,i'Jd1 Grin v! i� �b eF) Cfi h i VnrVll--j v LA D E C E 4�of. N7 r MAY z 7 zozz y W IFOIAIN OF TFIE C --- .ems 8; COD�.S^,��Y t�� Ne.6124, tL'� ,., AgOFJ SS{0'�'�a. Z L 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 WAANEN ENGINEERING Job No 1 b a Qq Sheet No. 2- of $ Subject: RH4 Also ciale.s AU /-C-w Fa✓►e.YuJ H-mc gy h d Date L v cc A CacLja4 oyi s �a Roo r I)ES (3 M 'Deal.d Lou� 1 �r� Loaa L,-,,.8 CNyS B -ID f1SCF, :9' -( 6) myna s � Lpu }�5 50 �s F k e 3 5 ns 5: )2. ^r CS' 2 �• �!C-AC-e 610p&-d moor, 5�u"1 �.�a� s = �s ' h� 6� x .35ns� 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 1(.092 Sheet No. 2 of 125 Subject: aF70t s�c c-ki-,-% !� ,✓ f.k nel� �mZ PA- Z;VOA By t"c,� Gr Date G5 ;2 1a (;JL LI-A-�t..('9 UML\ I -OU.J c w`<-t.��rGY1 C,N YS 66 2-a Zo PI C£ �4-- ---P ®CILUL -- b e-s y a F h e i VJ, 1 F•e e+ -� �.�,�- �I�'C��:� C���� a . ��� ko w-t�1 ter' �K i• � t-8 v.,en\tom v e J 4ence-. C tom,P rf� o N-!- 2- Low YiSe 6 v-iAd-IV'I Ita, me hl.CA rot' be. �'J�el � Lc,�c�►-�. f��� �, p�s��t rye._ 1.or.�.da�. 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 16oQ 9 Sheet No. -ey of S Subject: RHP, q-S sd r-I CJ--e-1 By �S Date 0 5 F j 22 W i yt�' GOO \ w;VNd tU�e �r 6utA.J,%k3 fie; �e Fig4rt 3o.,S .~ d w I Zable 2voF gIdl,e. --5' 4© �4s' 4. 2.F� C- 4 r' r q- l i e vey i 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING ,Job No Go Tg Sheet No. .5 of Subject:_ RH Fr &)sn c��j F_. o,ke 7 Urn !l A-A "-p By (f Date !.._C5 a d C dhJ . o -et. I) T-v�{,e"6Y Ln� Le g P�-Z > I oo P4 19. 9 -20 gncl Zohe. 3 2-o P+z l 0.3 V ?- _ 2 _£S Czo,nc - 2) 3� c."c,Y Zor,Z- 2 K-fz! 2- 1 /-' LUSH dw-t ZJ (Zoo F P4 Z ��� Z. — 4 4• �t 010nt.v�� s� )Z4(>C OVeb btA I o f*2- Cz,i,c- 3) 5ee-h6?1;s I-Z-Ohes. )� Zdy1 C - 4 5-" < 3 z 0 f-4- 106 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 16ogq Sheet No. of Subject: RJ"AF- A 14e r vt e- �ov►,2 aAO i a-)m By Date 0$P 2,C€ E 2 h C� C�P-,S '3UN'r a ell v I o Y 4"t-s GC. Clb OeS! 51\ w i hw 66LJC- S hear 2- psi' x P+) -3- 20,2PS P x C3�P+ x I°pL'`, 1 2 3psr- x 2- x (►a�-4- xsf) + piF (2. x 1 X sue) -(- 3. 2IC -� 2- Z (� + 0. 6V- _ 2T k 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 16 a al Sheet No. of SC Subject: H A AssoC 1,644 C. Cup, -euu Nd"e. By �-t�S� Date ►-1 l.0a ` CcA���+-� ►"or, c� 5J S e-i s Y,, i s Lou a �c.�►�l�rbn � f 6L N ' i5rn;c (�e�i5ti, �unerY,e 0, 2g S .5t Z a.ot5 sms = Fq- SS S 1 r- S� Z 0, IY2 3 Soy V J J CA3C£ 7 J �-461e (i •C - � U S'C 9,14 i vcA ewd -ru-� e cec!u re. . Cc c p krt I z 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 6°`�q Sheet No. `� of Subject: izH A- A-53 ce a-A2.5 ii By �� Date 6 r 2� j zz SZISm it L-ZA Cam►�-hy 't; l,,t ��Fee�,'ve St�^s r►��c. w e l� ►�•!- W _ C F-OU (- w 9 j v\- -I- Wv U w ea5 v- + t"3. 2. + 13.21-.PS + ' glSvv,rC pe4l 5- C f�wA-v �� L-COJ av urns 4-Im c IMA-en�o 254 Bay Rd - Queensbury,NY 22804- Phone:518-793-7444- Fax:518-793-7061